MICRO PLAN THROUGH PARTICIPATORY RURAL
APPRAISAL Village : Tonsa Forest Range : Kathgarh Hadbast No. : 416 Tehsil : Balachaur District : Saheed Bhagat Singh Nagar Year : 2017-18.
PREPARED UNDER
“GREEN INDIA MISSION PROJECT”
Forest Division Nawanshahar
at Garhshankar
2
Micro Plan
(Prepared Under Green India Mission Project)
TONSA FPC/JFMC
Month/Year 2016-17 & 2017-18
Address of FPC/JFMC
Revenue Village/Villages : TONSA.
Hadbast Number : 416
Post Office : Ansro
Police Station : KATHGARH.
District : SHAHEED BHAGAT SINGH NAGAR.
Pin Code : 144522
3
1 Km
0.5
Km 14 Km
Location Map of FPC/JFMC
9 Km
Rail
Majra
Ropar
2 Km
Banna
Tonsa
Main Bazar
Sr Sec School
Colleges
Middle School
Dispensery Health/ Vet
Anganvadi
Bank
Range Office Tajewal
Balachaur
Bank
High School
B D O Office
4
1. Basic Information Sheet
1. Name of the FPC / JFMC
TONSA
2. Reference No./ID of FPC/ JFMC (To be provided by PMU)
REG. NO.39
3. Name of Gram Panchayat
TONSA
4. Name of the FMU/ Range
KATHGARH
5. Name of the DMU/Forest Division
Nawanshahar at Garhshankar
6. Name of the Panchayat Samity
Balachaur
7. Name of the District
Shaheed Bhagat Singh Nagar
8. Period of Micro Plan
From Month: MARCH Year: 2017-18, To Month: MARCH Year: 2022-23.
9. Date of approval of Micro Plan by FPC/ JFMC (Executive Committee)
(The copy of the resolution of Executive Committee to be attached)
10. Date of approval of Micro Plan by Head of DMU/ DFO
March, 2017.
11. Key team members engaged in Preparation of Micro Plan
SARV SH./SMT.Dharmpal.F.G,Block Officer ,Social Faciltator,Subhash chander ,Raj Kumar,Jura ram,Paramjeet Kaur,Amarjeet kaur
5
2. General Profile of FPC/ JFMC 2.1 Date & No. of registration of FPC/ JFMC :- 39(6/9/2001) 2.2 Land availability in the FPC / JFMC
Sl. Description Area (in ha.)
Forest area 768 acres.
Reserved Forest (RF): -
Protected Forest (PF): -
Unclassed Forest (UF): -
2 Agriculture land 800 acres.
3 Fallow land/ waste land 20 acres.
4 Water bodies 05 acres.
5 Habitation/ homestead area 40 acres.
6 Any Other Catagoryof Land Panchayat Forest/ Pvt. Foreat 768 acres. panchayat Forest
2.3 No. of Revenue/ Forest Villages covered 01/Tonsa. 2.4 Bank Account details
a) Name of the Bank Co-operative Bank, Tonsa
b) Date of A/c opened 29/03/2012
c) Bank A/c Number 154434003000158
2.5 No. of Households in the Village and households represented in FPC/ JFMC
Category Village (s) FPC / JFMC
Total HH 01 655
ST --- -
SC --- 430
BC --- 190
Others (General) --- 35
2.6 Details of Executive Committee Members of FPC/ JFMC
Sl. Designation Name SARV SH./SMT.
M/F
1 Karmadhakhya/ Nominee (BOBSSS) and member - -
2 Pradhan/ Nominee (Gram Panchayat) and member Dharam pal M
3 Member Secretary Gurdass Singh M
4 Member Roop Lal M
5 Member Subhash Chand M
6 Member (SC/ST) Paramjeet kaur F
7 FG/BM/BS and member - -
8 MLA/ Representative and Member Raj Kumar M
6
3. Socio-Economic Profile of FPC/ JFMC 3.1 General description of the FPC/ JFMC
Tonsa village have 468 ha. Panchayat Forest . The detail of Socio-Economic profile is
as under: -
6-7 Castes in the village ( Pandit,S.C., Gujjar, Tarkhan,Nai,Lohaar.Rajput,Khatri etc,)
Total House Hold: 655
Population: 4150
Male: 2157
Female: 1993
Works: -
Labour, Private Job, Small shops, Milk Sold, Government Job.
SC65%
BC29%
General6%
Community
7
3.1 General description of the FPC/ JFMC
3.2 Population (FPC/JFMC)
Social category
Population
Male Adults
Female Adults
Total Adults
Male Children
Female Children
Total Children
Scheduled Tribes
--- --- --- --- --- ---
Scheduled Castes
1346 1238 2584 680 610 1290
OBC (B.C.) 685 645 1330 260 210 470
Others (Gen.) 126 110 236 45 40 85
Total 2157 1993 4150 985 860 1845
3.3 Educational Status (Adults) – FPC/ JFMC
Level Nos.
Male Female Total
Literate without formal education 195 220 415
Primary education 698 620 1318
Middle education (10th) 755 622 1417
Higher Secondary (12th) 410 395 805
Graduates and above 99 96 195
Total literates (a+b+c+d+e) 2157 1993 4150
Percentage of total literates -- -- --
3.4 Enrolment of Children (5-16 years) – FPC/JFMC
Place Total children (5-16 yrs)
Enrolled Percentage of enrolment
M F M F M F
Schools/ Colleges 340 320 340 320 N.A N.A
3.5 Landholding details of FPC/ JFMC
Category No. of Households (HH)
Landless households 395
Marginal land holding households (0.1 to 2.5 Acre) 260
8
3.6 Livestock population (FPC/ JFMC)
Type No. of animals – approx.
Cows 390
Buffaloes 350
Bullocks 48
Goats 110
Sheep --
Poultry --
Others –specify ---
Others –specify --
3.7 Status of access to basic services/ amenities
Sl. Type of service/ amenities
Whether available within FPC/ JFMC area (Yes/No)
If No, where available and
distance
Functional (Yes/No)
1 Drinking water Yes --- Yes
2 Electricity YES --- YES
3 Sanitation Need Some awareness NO
4 School (Primary/High) YES --- YES
5 Health services for people
Yes --- YES
6 Health services for livestock
YES -- YES
7 Telecommunication YES -- YES
8 Transport and communication
YES --- YES
9 Postal and Banking services
NO Asron (5KM) YES
10 Market services Yes -- YES
11 Public Distribution System/ Ration
YES --- YES
12 Others - specify --- --- ---
13 Others – specify --- --- ---
14 Others – specify --- ---- ----
15 Others - specify --- --- ---
9
3.8 Dependence of households on different livelihood sources
Sl. Source of livelihood Number of Households Problems and opportunities
1 Agriculture 220 Wild animal problem
2 Forestry 55 Due to Lantana problem
3 Livestock/ Animal Husbandry 250 Lack of Vet. Facility
4 Wage labour 440 Not regular (only seasonally)
5 Small business 48 Market Problem (Need IGA Training)
6 Service/Job 42 ---
7 Milk Sold 05 Need of IGA Training
3.9 Identification of households, who need immediate attention by the Project and other
Departments
Sl. Name of head of household SARV SMT.
HH No. in social map
Main sources of livelihood
Problems Opportunities
1 Pooja Devi In S.C Basti Labour Not Regular
Need of IGA Training
2 Sonia In B.C Basti Labour Not Regular
Need of IGA Training
3 Tarsem lal In Gen.Basti Tea shop Not Regular
Financial help for shop
4 Rajinder kaur In S.C Basti Labour Not Regular
Need of IGA Training and silai machine
5 Amarjeet pal In S.C. Basti Labour Not Regular
Need of IGA Training
3.10 Wealth ranking
Sl. Category Criteria/ Indicators No. of HH
Category code*
1 Better off House hold Database
205 A
2 Manageable House hold Database
150 B
3 Poor House hold Database
197 C
4 Vulnerable (need immediate attention)
Landless Database 103 D
Total 655 Note: * Category code will be used for the Household Database.
10
3.11 Different Programmes/ Schemes implemented by different Departments/ Agencies in
FPC/ JFMC during last 5 years
Sl. Name of the Project/ Scheme/
Activity
Year Achievements Implementing Department/ Agency
Specify Unit
Physical Financial (Rs.) Approx.
1 Panchayat Grant 2013-14 03 Street 3 lakh BDO, Bal.
2 M.P Fund 2014-15 01 S.C Dharamsala
1.5 lakh M.P Fund
3 MLA Fund 2014-15 06 Street 10 lakh MLA Fund
4 Panchayat Grant 2015-16 10 Street 25 lakh BDO, Bal.
5 Water sanitation Deptt.
2015-16 01 Water tank 85 Lakh Water sanitation Deptt.
6
7
8
9
10
11
3.12 Social Map prepared by the FPC/ JFMC
12
3.13 Occupational pattern diagram
4. Participatory Resource Assessment
4.1 Describe different resources available to FPC/ JFMC
The total area of village is 1633 acres. Out of this 768 acres is Panchayat forest About
800 acres land comes under the agriculture land. There in 03 ponds in the village that comes
near the forest area.
4.2 Different events of the past and their influence on the resource management and people
Sl. Decade/ Period
Event Effect, Influence and Impact on the Resource/ People
Response of community to the situation
1 2004-09 JBIC Employment Got Positive
2 2004-05 JBIC EPA Room Aganwari school going on in this building
4.3 Describe the efforts for Biodiversity Conservation (especially in case of JFMCs)
Due to more growth of Lantana in forest area.
Nature camps or fire awareness camps organized by the Forest Department in the village for Biodiversity Conservation.
During plantation work we introduced or added new plants for plantation in forest area.
We also given so many plants (Safeda, Poplar) under RKVY scheme.
Agriculture35%
Labour55%
Shop/ Business/ Jobs10%
Occupation
13
4.4 (a) Status of different resources available to FPC/ JFMC
Sl. Type of resource Area (ha)
Current status Key problems in resource management
1 Reserve Forest --- --- ---
1.1 High forest --- --- ---
1.2 Harvestable Plantation --- --- ---
1.3 Other Plantation --- --- ---
1.4 Degraded forest --- --- ---
1.5 Open/ Blank --- --- ---
2 Protected Forest --- --- ---
2.1 High/Coppice Forest --- --- ---
2.2 Harvestable Plantation --- --- ---
2.3 Other Plantation --- --- ---
2.4 Degraded forest --- --- ---
2.5 Open/ Blank --- --- ---
2.6 Degraded Sal area fit for Coppicing
--- --- ---
3 Plantations on the community land
15 going on ---
4 Any other plantations outside the forest
--- --- ---
5 Agriculture land 800 Wheat, Maize, Chari,Rice,Sugar
cane
---
6 Water resources 03 pond
--- Need of renovation.
7 Any other resource – Specify --- --- ---
14
4.4 (b) Resource Map prepared by FPC/ JFMC
15
4.5 (a) Forest resources
Sl. Plant (local name)
Main uses
Relative abundance
Perceived value of plant (scale of 1-10, 1 being lowest)
Men Women
1 Gilo Use as
medicine
--- According to
need. 15
According to need. 11
2 Neem Use as medicine
--- According to need. 15
According to need. 15
3 Karhi Patta Use in vegetable
--- According to need. 20
According to need. 25
4.5 (b) Describe the faunal resources available in the area and issues in habitat management and conservation
There are so many wild animals in the forest area. The Tonsa forest is situated near the village.
There Two Choes in the forest area which across the village in rainy season.
4.6 (a) Collection and Management of NTFPs
Sl. Name NTFP
Collection time –
Months
No. of HHs
engaged -
approx.
Unit Quantum collected
in a season/
year
Quantum consumed
by the FPC/ JFMC
Quantum sold in a season/
year
Sale value in Rs.
From FPC Area - yes/no
Any pro- blem
1 Kharkana Aug.to Oct.
--- 01 4000 qut.(2015-
16)
By Panchayat
Yes 20000 Panchayat Forest
Lantana
* Due to Lantana problem village not sold forests NTFP.
4.6 (b) Describe if the FPC is engaged in some processing/ value addition activities of NTFPs
This village have a Panchayat forest .Last year(2015-16) panchayat sold Kharkana of Rs.20000.They
done the sanitation work(drain Work) in the village.
4.7 (a) Consumption of fuel wood and dry leaves
Sl. Type of fuel used
Approx. No. of HHs
Approx. Annual Consumption (Specify unit) by the FPC
Sources Problems
1 Fuel wood 190 2000 quintal/year Forest Agriculture
Market
Due to Lantana
2 Babbar Grass
20 200 quintal/year Forest Due to Lantana
16
4.7 (b) Describe how the FPC/ JFMC is managing the gap in demand and supply of fuel wood
They used gas and fuel wood from agricultural fields.
4.8 (a) Utilization of timber, small timber/poles, bamboo
Sl. Product Approx. Annual utilization by the FPC/ JFMC
Current source of collection/ purchase
Problems
1 Timber --- --- ---
2 Poles ---- ---- ----
3 Bamboo ----- ----- ---
4.8 (b) Describe how the FPC/ JFMC is managing the gap in demand and supply of timber,
small timber and bamboo
Collect from Forest (Dry Timber) 4.9 Agriculture resources
Sl. Crop No of farmers engaged Yield – approx. Problems Opportunities
1 Wheat, Bajra,Rice
and Maize
220 30000 quin.(wheat)or
2000 quin.Maize ,6000 Qt.Rice
Wild animal or Awara
Cows Problem.
Need of Fencing in
Forest Area.
2 Sugar cane
10 500000 quin. - Do - ---
Gass80%
Fuel Wood20%
Fuel Wood
17
4.10 Water resources
Sl. Type Nos. Availability of water (Months) Uses Problems Opportunities
1 Water Tube well
01 12 For irrigation
--- ---
2 Drinking Water
01 12 For drinking
--- ---
3 Ponds 03 In rainy season For wild animal and domestic animal
--- Need of renovation.
4.11 Utilization of fodder in FPC/ JFMC
Sl. Type of Fodder used Approx. No. of HHs using it Sources Problems
1 Grass 95 Forest Agriculture
Lantana Problems
2 Dry Grass 105 Agriculture & Mrkt
---
Forest Agriculture
60%
Market40%
Fodder
18
4.12 Activity calendar –Livelihoods
Sl. Month (local) Main activities carried out during the month
Agriculture Forestry Works Wage Work
1 JANUARY Wheat Earth Work Yes
2 FEBRUARY Wheat Earth Work Yes
3 MARCH Wheat,Sugar cane
Protection of Fire Yes
4 APRIL Sugar cane Protection of Fire Yes
5 MAY Sugar cane Protection of Fire Yes
6 JUNE - Sugar cane Protection of Fire Yes
7 JULY Makki, Bajra, Sugar cane
Plantation work Yes
8 AUGUST Makki, Bajra, Sugar cane
Plantation work Yes
9 SEPTEMBER Makki, Bajra. Sugar cane
Plantation work Yes
10 OCTOBER Wheat, Sugar cane
Watch & Ward Yes
11 NOVEMBER Wheat Watch & Ward Yes
12 DECEMBER Wheat Watch & Ward Yes
Sugar cane
5. Assessment of Local and External Institutions
5.1 Venn diagram
Tonsa
Panchayat
Middle
School
SHG
FPC
Aganwari
Bank
Main
Market
Sr. Sec.
School
Health/
Animal
Husb. Youth
Club
19
5.2 Local Institutions in FPC/ JFMC area and their functions
Type of Institution No Total Members/ HHs having membership
Functions and benefits to the community
Self Help Groups 1 11 Self saving only
Cooperatives/ Credit unions
--- --- ---
Women organizations --- --- ---
Youth clubs -- --- ---
Farmers organizations --- --- ---
Any other – specify --- ---- ---
5.3 Institutional Analysis – External Institutions operating in the FPC/ JFMC
Sl. Name of the Institution/ Organization
Since when operating in the FPC/ JFMC
Target group/ beneficiary
Activities undertaken so far
Problems faced by these Institutions/ Organization
Plans for the future
What the FPC/ JFMC shall do in collaboration with these institutions
1 Gram Panchayat
1952 Villagers Development of village
Lack of coordination with other department
Development of village
and Forest Area
Support for Development
2 Aganwari 1995 Villagers Welfare of children
Building Problem
--- ---
3 Primary School
1976 Villagers Welfare of children
--- --- ---
5.4 Profile of existing SHGs
Sl. No.
Name of the SHG
Members of SHG Income Generating Activities (IGA) undertaken
Approx. funds invested in IGA
Loan taken from Bank /other agencies
Any support needed from the Project
Male Female Total
1 Parvati SHG.
--- 11 11 No No No Need of more
training. Need of
exposure visit.
20
6. Problem analysis and problem prioritization
With the use of PRA exercises we find so many problems related to forestry,
agriculture, women, unemployed youth and landless people etc. All problems are divided in
different categories.
6.1 Problem identification and analysis
Sl. Key Stakeholder groups of FPC /
JFMC
Key problems identified by
each stakeholder
group
Most important causes of each
problem
Perceived solutions to
each problem
Activities to be carried out by FPC/ JFMC to address the
problem
1 Women IGA and Health Lack of IGA and P.H.C. Coordination with Govt.
Coordination with Govt.
2 Landless/ Unemployed youth
IGA and Health Need of IGA trainings Coordination with Govt.
Coordination with Govt.
3 Farmer Wild Animal, Lack of Animal
Husbandry
Wild Animal problem and Lack of Animal
Husbandry Doctor for live stock
Coordination with Govt.
Coordination with Govt.
4 Labourers lack of wages and Health
P.H.C. lack of regular labour
Coordination with Govt.
Coordination with Govt.
5 Forest Lantana, Lack of Timely
fund availability
Lantana, Lack of Timely fund
availability
Coordination with Govt.
Coordination with Govt.
6 Panchayat Sewerage, Cremation work
Lack of funds. Coordination with Govt.
Coordination with Govt.
6.2 Scoring and Ranking of Problems/ Activities
Sl. Activities identified from the Stakeholders analysis
Scoring of Activities by different stakeholders – Score – 1 to 10 (1 being the lowest)
Total Scores
Ranks
Name of Stakeholder Group
Name of Stakeholder Group
Name of Stakeholder Group
Name of Stakeholder Group
1 Damage to Crops by Wild Animal
10 7 4 6 27 1
2 IGA trainings for unemployed youth/women/landless (Kadi Patta, Gilo Product Training)
10 5 2 6 23 4
3 Lantana 6 5 7 4 22 5
5 Need of Pond renovation 5 5 5 6 21 6
6 Need of Plantation 7 6 8 5 26 2
7 Ground water polution due to factories
7 2 6 10 25 3
8 Need of Sr.Sec.Schools 4 4 3 5 16 7
21
6.3 SWOT Analysis of the FPC/ JFMC
Strength
- Involvement of villagers Panchayat coordination mechanism for forest management.
- Active involvement of women’s in the activities of FPC.
Opportunity
- Need of awareness meetings or camps. - Need of exposure visits. - Timely availability of funds in new project. - Need of Record making trainings.
Weakness
- Lack of linkages or coordination with other departments. - Lack of funds.
Threat
- Lantana problem in the forest area. - Severe soil erosion in damage.
7. Setting the objectives for Development of FPC/ JFMC for 5 years
7.1 Objectives for Development
1 Regular meetings with FPC, Panchayat and Local Institutions.
2 Organise the exposure visits for forest development or forest resources.
3 Organized I.G.A. trainings for women weaker section or unemployed youth with the help of forest department and others.
4 Regular monitoring of the forest plantation area.
5 Organized awareness camps or environment days celebration in school or ward wise in the villages.
22
8. Activities for Institution Development (Capacity Building) of FPC/ JFMC and
SHGs
8.1 Details of Proposed Training Programmers, awareness camps, exposure visits to be
conducted (FPC/ JFMC and SHGs)
Sl. Subject/ Theme Target group
No of Participants
Duration Tentative Month and Year
1 Powder of Kadi Patta , Gillo Product Training
SHG & Unemployed youth
25 1 month 2017-18
1 Cutting & Tailoring SHG 15 2 months
2018-19
2 Bamboo Furniture making Trg.
SHG & Unemplloyed youth
20 20 days 2019-20
3 Exposure visit for medicine products
SHG 20 2 Days 2017-18
8.2 Formation of various working groups for smooth implementation of activities mentioned
in the Micro Plan
Name of the working group
Name of the Leader SARV SH/SMT.
Members Responsibility
A Dharam Pal 10 Mapping (Social nature)
B Raj Kumar 25 Transect Walk
C Churu Ram 15 Problem Analysis
D Paramjit Kaur 11 Women issues
8.3 Records to be maintained by the FPC/ JFMC and SHGs
Sl. Name of the record/ register to be maintained
To be maintained by whom
To be verified by whom
1 Proceedings reg. FPC/SHG/ Secretary Forest Range Officer
2 Saving reg. SHG Forest Range Officer
3 Loan reg. SHG/FPC Forest Range Officer
4 Membership reg. FDC Forest Range Officer
5 Maps Both Forest Range Officer
23
8.4 Fund management by FPC/ JFMC Describe how the FPC/ JFMC is managing their funds/ financial resources received from different
sources
They utilize their funds according to the Joint forest Management Guidelines.
8.5 Social audit
Describe how the FPC/ JFMC is planning to conduct social audit as part of their efforts to
maintain transparency and accountability
The FPC/VFC conduct social audit twice in a year in general house.
8.6 Monitoring mechanism Describe the monitoring mechanism for different activities prescribed in the micro plan.
VFC/FPC, Facilitators , Forest Staff.
9. FPC/ JFMC Development and Perspective Plan for 5 years
9.1 Activities to be carried out for overall development of FPC/ JFMC for 5 years
(Consolidated)
Sl. Activities Physical Target Financial Target Rs.
Indicative list of Departments/ Agencies for support
1 Basic services
2 Community Infrastructure Development
1 (Room & Shed community centre construction)
10,00,000 Green India Mission
3 Livelihood Enhancement
22 Solar Lamp, 10 Solar Street Light
44,000 1,80,000
Green India Mission
4 Resource development
Plantation 25,00,000 Green India Mission
5 Capacity Building 10 1.5 Lac Green India Mission
24
9.2 Year-wise break up of different activities to be carried out by FPC/ JFMC for 5 years
Proposed Activity Year 1 Year 2 Year 3 Year 4 Year 5
Physical Financial Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
Basic services --- --- --- --- --- --- --- --- --- ---
Community Infrastructure Development
--- --- --- --- --- --- --- --- --- ---
Livelihood Enhancement
--- --- --- --- --- --- --- --- --- ---
Resource Development
--- --- --- --- --- --- --- --- --- ---
Capacity Building --- --- --- --- --- --- --- --- --- ---
Signature of Member Secretary of FPC/ JFMC:
Approval by Head of DMU:
25
Attachment I
Forest dwellers’ development plan
1. Total number of forest dwellers in the FPC/ JFMC: Category Total
Families Total
population Total
claimants under FRA
Total families got patta under
FRA
Total forest areas given
under FRA
Any other information on
the forest dwellers
ST --- --- --- --- --- ---
Other Forest
Dwellers
--- --- --- --- --- ---
Total --- --- --- --- --- ---
2. Potential social and environmental impact of interventions by the FPC/ JFMC on the forest dwellers and suggested mitigation measures Activities to be carried out by FPC/ JFMC
Positive environmental and social impact on the forest dwellers
Negative environmental and social impact on the forest dwellers
Suggested Measures for mitigation of negative impact
Basic services
Community infrastructure development
--- --- ---
Livelihood enhancement
--- --- ---
Resource development
--- --- ---
Capacity building
--- --- ---
3. Activities suggested for the Forest Dwellers and estimated costs
Year Activities Physical target Financial target in Rs. --- --- --- --- --- --- --- --- --- --- --- ---
Signature of Member Secretary of FPC/ JFMC:
26
Attachment II
Resolution of FPC/ JFMC for approval of Micro Plan
27
Attachment III
Photographs of Micro planning Process in FPC/ JFMC
28
Attachment IV
GPS Survey Map of FPC/ JFMC
29
Attachment V Proposed Land-use Map of FPC/ JFMC
30
Part II of Micro Plan
Attachment A
Annual Action Plans of FPC/ JFMC for _______(Year)
Sr.
No.
Submission/
Intervention
Category Type Unit Admissible
cost Norm
(Rs./ha) Chandiani Kalan
A. Cost norms for Submission and Intervention
1 Submission -I
Enhancing quality of
forest cover and
improving
ecosystem services
(4.9 m ha)
b) Eco-restpratopm
pf degraded open
forests
TARGET 35
1100 Plants/Ha (Type B)
84000
a) Advance Work 33600 1176000
b) Creation 29400 0
c) Maintenance I Year
12600 0
II Year 4200 0
III Year 4200 0
Sub Total-B 84000 1176000
TARGET 4
4 Sub Mission 4 Agro-
Forestry and Social
a) Farmer's land
including current
fallows
Farmer's land 56000
a) Advance Work 22400 89600
b) Creation 19600 0
c) Maintenance I Year
8400 0
II Year 2800 0
III Year 2800 0
Sub Total- A 56000 89600
Total (A) 1265600
31
B. Support Activities
Activities Cost
1 Research (2%A) 25312
2 Publicity/Media/outreach activities (1% of A) 12656
3 Monitoring and Evaluation (1% of A+B) 12656
4 Livelihood improvement activities (17% of A) 215152
5 Strengthening FDs (5%A) 63280
6 Strengthening FDs (5%A) 63280
7 Mission organization, operation and maintenance, contingencies and
overheads(4%A)
50624
Total (B) 442960
Total (A+B) 1708560
Signature of Member Secretary of FPC/ JFMC:
32
Attachment B
Information received from Office of Block Development Officer on various Development
Schemes proposed to be implemented in FPC/ JFMC area
Name of the FPC/ JFMC: TONSA Gram Panchayat: TONSA
Panchayat Samity: Balchor District: S.B.S. NAGAR.
Sl. Name of the Scheme
Name of the Implementation Agency/ Dept.
Activities implemented in FPC/ JFMC area during the Previous Year ____________ along with quantity of work
Funds utilized during the Previous Year ____________ (In Rs.)
Activities proposed to be implemented in FPC/ JFMC area during Current Year ____________ along with quantity of work
Financial Target for the Current Year ____________ (In Rs.)
1
2
3
Signature of BDO: Date:
33
Five Year Plan of Tonsa
Sr. No.
Submission/ Intervention Category Type Unit A
dm
issi
ble
co
st
No
rm (
Rs.
/ha)
2016-17 2017-18 2018-19 2019-20 2020-21
A. Cost norms for Submission and Intervention
1
Submission -I Enhancing quality of forest cover and improving ecosystem services (4.9 m ha)
a) Moderately dense forest cover, but showing degradation
ANR (without plantation) 42000
a) Advance Work Ha. 16800
Phy 0 4 5 3 0
Fin 0 67200 84000 50400 0
b) Creation Ha. 14700
Phy 0 0 4 5 3
Fin 0 0 58800 73500 44100
c) Mtc. I Year Ha. 6300
Phy 0 0 0 4 5
Fin 0 0 0 25200 31500
II Year Ha. 2100
Phy 0 0 0 0 4
Fin 0 0 0 0 8400
III Year Ha. 2100
Phy 0 0 0 0 0
Fin 0 0 0 0 0
Sub Total-A 58800 0 67200 142800 149100 84000
b) Eco-restpratopm pf degraded open forests
200Plants/Ha (Type A) 44800
a) Advance Work Ha. 17920
Phy 0 0 0 0 0
Fin 0 0 0 0 0
b) Creation Ha. 15680
Phy 0 0 0 0 0
Fin 0 0 0 0 0
c) Mtc. I Year Ha. 6720
Phy 0 0 0 0 0
Fin 0 0 0 0 0
II Year Ha. 2240
Phy 0 0 0 0 0
Fin 0 0 0 0 0
III Year Ha. 2240
Phy 0 0 0 0 0
Fin 0 0 0 0 0
Sub Total-A 62720 0 0 0 0 0
1100 Plants/Ha (Type B) 84000
a) Advance Work Ha. 33600
Phy 11 20 23 16 5
Fin 369600 672000 772800 537600 168000
b) Creation Ha. 29400
Phy 0 11 20 23 16
Fin 0 323400 588000 676200 470400
c) Maintenance I Year Ha. 12600
Phy 0 0 11 20 23
Fin 0 0 138600 252000 289800
II Year Ha. 4200 Phy 0 0 0 11 20
34
Fin 0 0 0 46200 84000
III Year Ha. 4200
Phy 0 0 0 0 11
Fin 0 0 0 0 46200
Sub Total-B 117600 369600 995400 1499400 1512000 1058400
2500 Plants/Ha (Type C) 140000
a) Advance Work Ha. 56000
Phy 0 10 10 7 3
Fin 0 560000 560000 392000 168000
b) Creation Ha. 49000
Phy 0 0 10 10 7
Fin 0 0 490000 490000 343000
c) Maintenance I Year Ha. 21000
Phy 0 0 0 10 10
Fin 0 0 0 210000 210000
II Year Ha. 7000
Phy 0 0 0 0 10
Fin 0 0 0 0 70000
III Year Ha. 7000
Phy 0 0 0 0 0
Fin 0 0 0 0 0
Sub Total-B 196000 0 560000 1050000 1092000 791000
C) Restoration of grass land
Grass Sps 98000
a) Advance Work Ha. 39200
Phy 0 0 0 0 0
Fin 0 0 0 0 0
b) Creation Ha. 34300
Phy 0 0 0 0 0
Fin 0 0 0 0 0
c) Maintenance I Year Ha. 14700
Phy 0 0 0 0 0
Fin 0 0 0 0 0
II Year Ha. 4900
Phy 0 0 0 0 0
Fin 0 0 0 0 0
III Year Ha. 4900
Phy 0 0 0 0 0
Fin 0 0 0 0 0
Sub Total-C 137200 0 0 0 0 0
2
Sub Mission 2 Ecosystem restoration and increase in forest cover (1.8 mha)
a) Rehabilitation of Shifting Cultivation Areas
1100 Plants/Ha 84000
a) Advance Work Ha. 33600
Phy 0 0 0 0 0
Fin 0 0 0 0 0
b) Creation Ha. 29400
Phy 0 0 0 0 0
Fin 0 0 0 0 0
c) Maintenance I Year Ha. 12600
Phy 0 0 0 0 0
Fin 0 0 0 0 0
II Year Ha. 4200
Phy 0 0 0 0 0
Fin 0 0 0 0 0
III Year Ha. 4200
Phy 0 0 0 0 0
Fin 0 0 0 0 0
Sub Total-A 117600 0 0 0 0 0
b) Restoring Scrublands
2500 Plants/Ha 140000
a) Advance Work Ha. 56000
Phy 0 0 3 0 0
Fin 0 0 168000 0 0
35
b) Creation Ha. 49000
Phy 0 0 0 3 0
Fin 0 0 0 147000 0
c) Maintenance I Year Ha. 21000
Phy 0 0 0 0 3
Fin 0 0 0 0 63000
II Year Ha. 7000
Phy 0 0 0 0 0
Fin 0 0 0 0 0
III Year Ha. 7000
Phy 0 0 0 0 0
Fin 0 0 0 0 0
Sub Total-A 196000 0 0 168000 147000 63000
c)Restoration/ Planting Sea-buckthorm 280000 0 0 0 0 0
d)Restoration of Mangroves 196000 0 0 0 0 0
e) Ravine reclamation 196000 0 0 0 0 0
f) Restoration of abandoned mining area 280000 0 0 0 0 0
3
Sub Mission 3 Enhancing tree cover in Urban & Periurban areas (including institutional lands: 0.2
a) Plantation in Urban & Peri-urban areas
2500 Plants/Ha. 280000
a) Advance Work Ha. 112000
Phy 0 0 0 0 0
Fin 0 0 0 0 0
b) Creation Ha. 98000
Phy 0 0 0 0 0
Fin 0 0 0 0 0
c) Maintenance I Year Ha. 42000
Phy 0 0 0 0 0
Fin 0 0 0 0 0
II Year Ha. 14000
Phy 0 0 0 0 0
Fin 0 0 0 0 0
III Year Ha. 14000
Phy 0 0 0 0 0
Fin 0 0 0 0 0
Sub Total- A 392000 0 0 0 0 0
4
Sub Mission 4 Agro-Forestry and Social
a) Farmer's land including current fallows
Farmer's land 56000
a) Advance Work Ha. 22400
Phy 3 9 7 5 0
Fin 67200 201600 156800 112000 0
b) Creation Ha. 19600
Phy 0 3 9 7 5
Fin 0 58800 176400 137200 98000
c) Maintenance I Year Ha. 8400
Phy 0 0 3 9 7
Fin 0 0 25200 75600 58800
II Year Ha. 2800
Phy 0 0 0 3 9
Fin 0 0 0 8400 25200
III Year Ha. 2800
Phy 0 0 0 0 3
Fin 0 0 0 0 8400
Sub Total- A 78400 67200 260400 358400 333200 190400
b) Shelterbelt plantation 224000
c) Highways / Rural roads/ Canals/ TankBunds
Road/Canals/Tank Bunds 196000
a) Advance Work Ha. 78400
Phy 0 0 0 0 0
Fin 0 0 0 0 0
36
b) Creation Ha. 68600
Phy 0 0 0 0 0
Fin 0 0 0 0 0
c) Maintenance I Year Ha. 29400
Phy 0 0 0 0 0
Fin 0 0 0 0 0
II Year Ha. 9800
Phy 0 0 0 0 0
Fin 0 0 0 0 0
III Year Ha. 9800
Phy 0 0 0 0 0
Fin 0 0 0 0 0
Sub Total- A 274400 0 0 0 0 0
5
Sub Mission 5:Restoration of Wetlands: 0.1mha 60000 0 0 0 0 0
Cross cutting interventions 0 0 0 0 0
2
5.3.2 Community livelihood enhancement (No.) (Constitution and support to SHGS) 100000 0 0 0 0 0
A Workshop in Nos. 50000 0
B
Soil & Water Moisture Conservation Works
Dry Stone Masonary Check Dams (M3) M
3 770
Phy 0 0 0 0 0
Fin 0 0 0 0 0
Cement Masonary Structure (M3) M
3 2770
Phy 0 0 0 0 0
Fin 0 0 0 0 0
Create Wire Structure (M3) M
3 1846
Phy 0 0 0 0 0
Fin 0 0 0 0 0
Live Hedges
Single line (km) km 100000
Phy 0 0 0 0 0
Fin 0 0 0 0 0
Double line (km) km 344000
Phy 0 0 0 0 0
Fin 0 0 0 0 0
6 Promoting alternative
Biogas, solar devices, LPG, Biomass-based system, improved stoves
Per House Hold (25 House Holds) No. 3300
Phy 0 0 1 0 0
Fin 0 29700 82500 0 0
Total (A) 436800 1912700 3301100 3233300 2186800
37
B. Support Activities
Activities Cost
1 Research (2%A) 8736 38254 66022 64666 43736
2 Publicity/Media/outreach activities (1% of A) 4368 19127 33011 32333 21868
3 Monitoring and Evaluation (1% of A+B) 4368 19127 33011 32333 21868
4 Livelihood improvement activities (17% of A) 74256 325159 561187 549661 371756
5 Strengthening FDs (5%A) 21840 95635 165055 161665 109340
6 Strengthening FDs (5%A) 21840 95635 165055 161665 109340
7 Mission organization, operation and maintenance, contingencies and overheads(4%A) 17472 76508 132044 129332 87472
Total (B) 152880 669445 1155385 1131655 765380
Total (A+B) 589680 2582145 4456485 4364955 2952180