michael said cv

7
Michael Said Flat 6, 51 Iverna Gardens, Kensington, London W8 6TP (Mobile) +44 7551 484 551 [email protected] Prince II Accredited Project Manager with a proven track record of success within B2B, Oil and Gas, Rail, engineering, Construction, Petro-chem, Commissiong/completions & commercial market sectors. Experience of strategic planning, EPC, FEED, Detailed design, Commissioning of multiple Instrument and Telecoms systems for pipelines, Offshore Platforms, LNG Plants, Loading facilities and receiving terminals. Strong leadership, full project lifecycle & pan-European development experience. Results-orientated & quality-focused, with excellent relationship management skills. KEY CAREER HIGHLIGHTS INCLUDE: Extensive experience working with large scale EPC contractors such as Chiyoda, Snamprogetti, Technip, Fluor, Petrofac, Foster Wheeler, KBR, Kentz, Mustang, WGI, ENI, Yokagawa and bombardier Transportation, CCC & Genesis Offshore UK. Extensive experience with large oil and gas customers including but not limited to Shell, BP, Exxon, Chevron, Ras Gas, Qatar Gas, OXY, NPCC, KNPC, Saudi Aramco, JGC, Enpi among others Successfully completion of multiple concurrent projects supporting Instrument telecoms & IT on time Proven successful application of key commercial, analytical & technical skill sets Middle East Experience: Contributed to the satisfactory completion of many project including: Egypt to Jordan Gas pipeline, NPCC PS1 D,Q platforms for OXY petroleum Qatar,. Mesaieed Process Facility, LNG Trains 5, 6,7 & Common Offplots projects for RG PMT and Common Sulfur and LNG train 5 Projects on behalf of QG PMT, Saudi Aramco Mustang Package, KNPCC clean fuel Project, Simian Sapphire offshore Egypt, Algeria Aziri Project, Shell Unconventional Gas Project for BP/Saudi Aramco and Shell’s Majnoon Project in Iraq. CAREER HISTORY: Feb 2014- Present Lead Telecoms Engineer (TELECOMMUNICATIONS & INSTRUMENTATIONS), Project Management Consultancy (PMC): Foster Wheeler, UK Provide Instrument Electrical and telecoms Management Consultancy for several Projects

Upload: michael-said

Post on 17-Jul-2015

49 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Michael said CV

Michael SaidFlat 6, 51 Iverna Gardens, Kensington, London W8 6TP

(Mobile) +44 7551 484 [email protected]

Prince II Accredited Project Manager with a proven track record of success within B2B, Oil and Gas, Rail, engineering, Construction, Petro-chem, Commissiong/completions & commercial market sectors.

Experience of strategic planning, EPC, FEED, Detailed design, Commissioning of multiple Instrument and Telecoms systems for pipelines, Offshore Platforms, LNG Plants, Loading facilities and receiving terminals.

Strong leadership, full project lifecycle & pan-European development experience.

Results-orientated & quality-focused, with excellent relationship management skills.

KEY CAREER HIGHLIGHTS INCLUDE:

Extensive experience working with large scale EPC contractors such as Chiyoda, Snamprogetti, Technip, Fluor, Petrofac, Foster Wheeler, KBR, Kentz, Mustang, WGI, ENI, Yokagawa and bombardier Transportation, CCC & Genesis Offshore UK.

Extensive experience with large oil and gas customers including but not limited to Shell, BP, Exxon, Chevron, Ras Gas, Qatar Gas, OXY, NPCC, KNPC, Saudi Aramco, JGC, Enpi among others

Successfully completion of multiple concurrent projects supporting Instrument telecoms & IT on time

Proven successful application of key commercial, analytical & technical skill sets Middle East Experience: Contributed to the satisfactory completion of many

project including: Egypt to Jordan Gas pipeline, NPCC PS1 D,Q platforms for OXY petroleum Qatar,. Mesaieed Process Facility, LNG Trains 5, 6,7 & Common Offplots projects for RG PMT and Common Sulfur and LNG train 5 Projects on behalf of QG PMT, Saudi Aramco Mustang Package, KNPCC clean fuel Project, Simian Sapphire offshore Egypt, Algeria Aziri Project, Shell Unconventional Gas Project for BP/Saudi Aramco and Shell’s Majnoon Project in Iraq.

CAREER HISTORY:

Feb 2014- Present Lead Telecoms Engineer (TELECOMMUNICATIONS & INSTRUMENTATIONS), Project Management Consultancy (PMC):Foster Wheeler, UK

Provide Instrument Electrical and telecoms Management Consultancy for several Projects

Page 2: Michael said CV

Provided direction on engineering matters for Telecoms for the Clean Fuels Project for KNPC, the Maj noon project for Shell and BP’s Unconventional Gas project for Saudi Aramco

Extensive relationship management with Foster Wheeler's Main contractors for the Clean Fuels Project Petrofac and Fluor in UAE and Holland

Coordinated with the Interface Management team on tie-ins and common facilities optimisation.

Provided the engineering data required for weekly and Monthly progress reports Coordinated the split of responsibilities for unconventional gas between the WAS

complex and for system A and follow on feasibility work for system B including centralised control/operation buildings as required

Lead the charge on the Fosterwheeler Feed for the development of the Unconventional Gas around the Kingdom of Saudi Arabia around the Emty Quarter, south Ghwar and Jalamid regions.

Support the sales function in producing successful Telecommunication and Instrument Control Proposals on add hoc basis

Managed Contractor claims and Issue of change orders, site instructions to stringent budget allocation as required

Jan 2013- Dec 2013 Project Manager (TELECOMMUNICATIONS & INSTRUMENTATIONS), Optilan International, UK RLIC

Successfully completed RLTO project supporting telecoms & IT This included the following systems used in the industry: Satellite

Communications System, Pipeline Communications, Radio Telemetry, Transmission Systems – SDH / PDH / OTN, Meteorological Systems, Marine Berthing & Load Line Monitoring System, Security Access Control, Security Intrusion Detection Systems, Marine and Aviation Communications, Submarine Cable Systems

Provided project management for the design implementation, Installation of twelve Telecoms systems on Time

Managed Contractor claims and Issue of change orders and site instructions Extensive relationship management skills, with business, 3rd parties & customer

Aug 2010 to Nov 2012Project Manager (TELECOMMUNICATIONS & ELECTRONICS), Project Management Team (PMT): KJVG Ltd, Australia

Manage day to day delivery of the telecommunications and Electronics Package for chevron’s Gorgon Project (over 28 telecoms systems).

Provided direction to a team of 12 Engineers to coordinate engineering reviews for over 5000 deliverable for Telecoms and Electronic Systems including tie ins

Coordinate with Planning and project controls as required to ensure successful execution to project objectives

Provided and Present the engineering and Progress data (narrative, charts, graphs, etc.) as required

Page 3: Michael said CV

Provided Management weekly and monthly progress reports and dashboard reviews for project directorate

Coordinate with contract administration and legal to ensure contract is executed correctly and in accordance to local laws

Managed Legal claims and Issue of change orders and site instructions as required

Ensured all HSE procedures were adhered to, documentation & reporting for change

June 2009 to May 2010LEAD TELECOMS ENGINEER, Project Management Team (PMT): Qatar Gas Ltd, Qatar

Provide project management for the design implementation, installation and financial/economic management of Fibre Network, LAN, Radio, CCTV, PAGA, Access Control, Fire Alarm telecommunication and computing infrastructure.

Conducted design reviews with client and managed change in accordance to MOC process.

Provided all Tie in information for the common sulphur project and JSA’s associated with tie in work fronts with third parties.

Steward the EPC contractor's activities with respect to engineering execution, installation and testing to meet target Mechanical Acceptance dates.

Responsible for field design changes; Site Acceptance, Integration, Inspection and Performance testing; Liaison with Qatar Gas operations departments

Capture and communicate engineering and design lessons learned for the project Act as a liaison for all Handover related matters with Operation

May 2005 to May 2009LEAD TELECOMS ENGINEER, Project Management Team (PMT): Ras Gas Ltd, Qatar

Participate in kick-off meetings with the EPC contractor and PMT to ensure common understanding of engineering FEED requirements, including deliverables for 12 telecoms systems

Conducted project team member briefing sessions with respect to engineering requirements and processes

Cooperated with IPR teams and post audit activities with respect to contract administration and subcontracting

Coordinate owner and PMT design reviews to minimize disruption of the contractor's work

Provide all of the engineering data (narrative, charts, graphs, etc.) required for the monthly progress report

Authorize design alternative studies, as required, to optimize project cost and schedule

Maintain close liaison with appropriate members of PMT (Safety, Project Services, Quality Functional Support)

Supervise and administer PMT's engineering staff as required Participate actively in the project's change management program

Page 4: Michael said CV

Provided mentoring and promote knowledge, judgment, and project management skills for less senior staff participating on projects.

Support contractors and operation during SIMOPS and other critical activity pertaining to commission

Capture and communicate engineering and design lessons learned for the project

Jun 2004 to Feb 2005PROJECT MANAGER (TELECOMMUNICATIONS: OXY & NPCC, Abu Dhabi

Responsible for all aspects of complex project & programme management activities Provided Commissiong Plans for OXY's offshore facilities & wellheads in PSID

Area Managed the production on engineering design and system integration for entire

Telecommunication and Electronics system. Coordinate with sub-contractors and vendors on site activities ensuring contractual

schedules is in line with Mechanical Acceptance date targets Managed site installation and field design changes; Site Acceptance, Integration,

Inspection and Performance testing Liaised with NPCC and OXY project management and operations departments as

required Liased with third parties, resources & subcontractors to ensure smooth running of

project

Apr 2001 to Apr 2004 PROJECT MANAGER (TELECOMMUNICATIONS): Optilan International, UK

Incorporate technical & financial pre-sales consultancy to fulfil best value solution Provided Project Plans and system designs of solutions for Oil & Gas industries

(multiple projects). Ensured delivery to time and within budget against offered SLAs and ITU-T

recommendations Successfully managed and installed Al-Arish to Taba Pipeline RTU & Comms system

in Egypt and to Aqaba Jordan valued $18.1M Completed pre-feed telecom studies for many projects including Petrofac's BP

(Hasdrubal project) in Tunisia on and Completed Project design for the In Amenas Gas project Camp and Pipeline

Algeria on behalf of BP. Managed design and delivery of the Simian Sapphire Gas development telecoms

system offshore Egypt on behalf of Technip France Managed the Usinsk Project Design and delivery on behalf of LukOIL consortium

Russia including English and Russian design specifications Managed the Early Stages of design for the Isle of Grain receiving terminal in Kent on

behalf of the UK National Grid Responsible for budgetary control of resource allocation & equipment dispatch to

north west Russia Supported regional project managers on project preparation & deployment schedules Liased with all parties, resources & subcontractors to ensure smooth running of project

Page 5: Michael said CV

Managed Design and implementation of Network Solutions utilising various protocol sets & technologies (SDH/Access Control/IP/Radio/PA/CCTV/NDB/fibre/networks/security) to stringent budget allocation

Managed the design and Implementation of the Bad Scwartau Light Rail Way Telecoms infrastructure in Germany

Managed the design and Implementation for the Porto Light Rail network on behalf of bombardier Transportation.

Handled resource and leadership for all internal engineers and subcontractor staff Ensured all HSE procedures were adhered to, documentation & reporting for

change Ongoing management of design solutions alignment to stringent budget allocation

Jul 2000 to Mar 2001SENIOR DESIGN ENGINEER: MCI Worldcom International Ltd, UK

Incorporated technical & financial pre-sales consultancy to fulfil best value solution Responsible for all aspects of transmissions delivery & financial analysis activities Supported regional project managers on project preparation & deployment schedules Appointed to lead specialist team to plan & deliver strategic deployment solutions Included planning, costing and installation of pan-European network infrastructure This was driven by growing capacity demand, requiring quality & timely deliverable Drove production of accompanying detailed technical & procedural documentation Complied numerous ‘expert’ white papers, including key financial & service impact Contained effect of offering optical Ethernet on existing transmission infrastructure Drove cost analysis & system development of key client network design strategies Also ongoing business communication with incumbent and prospective 3rd parties Handled multi-disciplined team of Engineers, including appraisal, reviews & career

development

Jul 1999 to Jun 2000LEAD TECHNOLOGY IMPLEMENTATION ENGINEER: MCI International Limited, UK

Responsible for end-to-end management of multiple concurrent project activities Appointed to control key expert team to schedule & implement SDH & Ethernet

infrastructure Comprised complete range of manufactured SDH wide-band digital cross connects Handled projects startup, planning, development, test, implementation & resources Drove & facilitated definition & design of all cross connect configurations & layouts Incorporated key implementation cost calculations, including quotation production Set up & co-ordinated numerous site surveys to order to determine specific issues Managed identification & subsequent costing of available practicable workarounds Reviewed all adaptive needs, with cable routing, distance, positioning & allocation Introduced and established procedural & technical documentation to support

above Ongoing management of multi-skilled team, including all training and assessment

Page 6: Michael said CV

PROFESSIONAL TRAINING COURSES:

Various in-house & external training programmes Effective communication & presentation skills Team leadership & motivation techniques Finance & Accounting (IEE) All major Telecommunication hardware platforms including Cisco; smart networks

& TCP/IP/MPLS Fully conversant with the following International Industry Standards: EIA / TIA

568B or IEC 11801, ITU G 651/652/655, BICSI, Cisco Networking Ericsson technologies including SDH & WDM Network Traffic Planning;

Nortel/Alcatel WDM technology Ultra Longhaul WDM; Ciena WDM; Cisco ONS 15454 multi-service platform, HP,

Juniper Networks Avaya, Redback, Fujitsu, Corvis, Lucent & older Marconi technologies Various Light Speed Europe Presentations Operating systems include DOS, Windows, NT, MAC, MVS, JCL & Unix MS Project; MS Access; primavera P6 MS Visio (standard & technical) Powerpoint (standard & technical) MS Windows, Word, Excel, Outlook & Explorer skills

SAFTEY TRAINING COURSES:

Sea Survival & Fire Fighting skills Permit to Work and Manual Handling Helicopter Underwater Escape Training H2S / BA

EQUIPMENT KNOWLEDGE & EXPERIANCE:

LAN / WAN & Fiber Networks including spectrum applications Knowledge of the following systems: Data Communications and Networking,

IPTV / CCTV System Design, Public Address and General Alarm System, Digital Trunked Mobile Radio Systems, Structured Cable System Design, Voice Communication Design and External (Outside) Plant Cable Network Design

PDH/SDH/DWDM/OTN/ Microwave and fibre Transmission Protocols Security Access Control System/Intrusion detection Radio Communication Systems (UHF/UHF Tetra/VHF/HF) VSAT / INMARSAT Mobile Satellite Systems Entertainment and CATV Telephony & Digital PABX Switches Lightning Protection, Structured Cable and Grounding Systems. Fire and Life Safety Systems

Page 7: Michael said CV

Tidal Wave and Met ocean systems Hotline systems

MANAGEMENT EXPERIANCE:

Project Engineering & Project Management. Established ISO 9002 Procedures. HSE Planning and Implementation. Operations Management & Financial Decision Making. Installation & Commissioning Supervision. Planning for Factory Acceptance Testing (FAT). Planning for Site Acceptance Testing (SAT). Handover & Maintenance Strategy Planning.

TRAINING & QUALIFICATIONS:

MBA –Engineering Management (under study) - Robert Gordon University BEng Hons - Telecommunications Engineering- University of London- Part of the

Russell Group. Foundation in Engineering - Liverpool University ‘A’ levels – Bellerby’s college, Brighton, UK

PERSONAL DETAILS:

Born 16thJune, 1976 References available on request Fadi Michael Said