mhps hitachi - ibc · centrifugal compressor since. 1917. gas turbine. since. 1963. mhps. in. 2014....
TRANSCRIPT
© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
Innovative technology of H-100LNG
NOBUYUKI HORII30/01/2018
as compressor driver forproduction Proprietary and Confidential Information. This document or information
cannot be reproduced, transmitted, or disclosed without prior written consent of Mitsubishi Hitachi Power Systems,Ltd.
MHI Oil & Gas Business StructureMHI offers the LNG main ref. driver package as one stop solution.
MCO in 2010
Centrifugal compressor since 1917
Gas Turbine since 1963.
MHPS in 2014
Gas Turbine since 1966.
H-100
1© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
Power Domain in 2017
MHI for O&G in JAPAN
Tokyo
H-100 Gas turbineString Test
M501/701Large Frame GT
2© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
MHPS Takasago
MHPS HitachiMCO Hiroshima
MHI GT Line-up0 50 100 150 200 250 300 350 400Model Cycle
H-100
M701J
3© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
FT-8 50/60 Hz
FT-4000 50/60 Hz
H-25 50/60 Hz
H-100 50/60 Hz
M501D 60Hz
M701D 50Hz
M501F 60Hz
M501G 60Hz
M501J 60Hz
M701F 50Hz
M701G 50Hz
M701J 50Hz
H Series Gas Turbine Pedigree H-100 based on proven H-25 technologies
H-100(110)110
100
90
50
40 H-25(42)
H-25(35)35
30 H-25(32)
25
20
1985 1990 1995 2000Year
2005 2010 2015
4© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
Gas
Turb
ine
Out
put(
MW
)
H-25
H-10Scale Up
H-100(100)
H-100 Two Shaft
Turbine
Compressor
H-25(28) Axial ExhaustOriginal
Experience of H-Series Gas Turbine 250
200
H-100 Gas Turbines
150
100
50 H-25 Gas Turbines
01987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Years5© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
Uni
ts
H series gas turbines have been delivered to mainly industrial application, petrochemical and oil&gas.
Experience of LNG plant power block
: 21 units
: 174 units
H-15 Gas Turbines : 6 units
H-100 Sales Record H-100 (100) & (110) Gas Turbine Projects in Japan
THE CHUGOKU ELECTRIC POWER CO.,INC.Yanai Power Station
50Hz
Total : 21 units60Hz
TOKYO ELECTRIC POWER COMPANYKYUSHU ELECTRIC POWER CO.,INC. Futtsu Power StationOSAKAGASShin Oita Power Station Torishima Gas & PowerOSAKI COOLGEN
CORPORATIONOsaki Power Station
6© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
No.2System IGCCGT Type H-100 (100)
Fuel SyngasNo. of Units 1
No.2System GTCCGT Type H-100 (100)
Fuel LNGNo. of Units 1
No.1System GTCCGT Type H-100 (100)
Fuel LNGNo. of Units 6
No.2System GTCC
GT Type H-100 (110)Fuel LNG
No. of Units 7
No.1System GTCCGT Type H-100 (100)
Fuel LNGNo. of Units 6
H-100 Design FeaturesApplication
Design Concept
High Efficiency 100-120MW ClassHeavy Duty Design, Two Shafts
- On-Site Maintenance- No-Reduction Gear
Package Installation
Gas Turbine
Configuration
Rotating SpeedHP Turbine &Compressor
4,580 min-1:LP:
Turbine & Output ShaftCompressor17 stagesAxial Type
Combustor10 cansReverse Flow
Turbine2 shafts4 stagesImpulse Type
3,000 min-1(50Hz)3,600 min-1(60Hz)
Type
7© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
Power Generation Replacement of Old GT Mechanical Drive
H-100 Gas Turbine Base Structure
8© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
H-100 LNG Introduction/Incentive
High Efficiency, Simplified System, Low Initial Installation Cost, High Reliability > 99%
Conventional H-100 drivenPower Block Power BlockMain Ref. Strings Main Ref. Strings
Compact and Simple !Higher Reliability & Availability !Inverter Switch GearHelpers
No Helper VSD System !
9© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
H-100 LNG Value Proposition
100MW class HD gas turbine with 2-shafts and DLE
Direct alternative to single shaft HD GT-MR compressor train
10© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
Brownfield LNG - H-100(100)
• More revenue from increased LNG
• Fuel saving and Flexible operation
• Bring competition for after market
Greenfield LNG - H-100(110)
• Low CAPEX and OPEX
• Flexible operation
• Game change competition in 5-6MTPA LNG market
H100(100) H100(110)
Max Power 108 MW 120 MWEfficiency 38.9% 39.0%
Turbine 3600rpm 3000rpmSpeed (70-105%) (70%-105%)
H-100 Main Ref. Concept
Less CAPEXRugged Simple HeavyDuty Design
Less OPEX
High EfficiencyRugged SimpleDuty Design
SimplicityReliabilityAvailability
MHI One Stop Solution
Heavy Less Equipment
Less Utility
Simple Operation
Fuel Flexibility2-Shaft Variable SpeedSettle Out Press. Startup
11© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
Major Bases - Overseas
Tokyo
H-100 Gas turbineString Test
M501/701Large Frame GT
12© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
MHPS Takasago
MHPS HitachiMCO Hiroshima
Major Bases - Overseas
RussiaUK Germany Canada
RumaniaBelgium ChinaKorea
U.S.AItaly
Egypt Saudi ArabiaAlgeria Mexico Puerto RicolndiaU.A.E Thailand Philippines
VenezuelaSingapore
IndonesiaBrazil
AustraliaSouth Africa
【Overseas Gr. CompaniesTotal 57】
13© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
MHPS-LATMHPS-ZAF
MHPS-India
CBCMHPS-AUS/MHPS-ANZ
MHPS-AP
MHPS CHN
MHPS AMERMHPS KOR
MHPS EU
Summary
H-100 (3000 / 3600 rpm) ready for LNG businesses
H-100 for brown field and green field opportunities in large scale LNG projects
MHI single responsibility and commitment to LNG business
14© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
Thank You
15© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.
16© 2018 Mitsubishi Hitachi Power Systems, Ltd. All Rights Reserved.