memorandum to: stuart basham ncdot division 10 planning ... forecasts/u-4714 mecklenburg...
TRANSCRIPT
-
Memorandum
To: Stuart Basham – NCDOT Division 10 Planning Engineer
From: RS&H Project Team
Subject: U-4714/U-4713A Traffic Forecast Report
Date: February 26, 2018
Please find attached the traffic forecast for State Transportation Improvement Program (STIP)
Projects U-4714 and U-4713A. These projects fall within the Charlotte Regional Transportation
Planning Organization (CRTPO) planning area. The North Carolina Department of Transportation
(NCDOT) proposes the following improvements as part of these two projects:
» STIP Project U-4713A proposes to construct a two-lane roadway (McKee Road Extension) on new location beginning at the intersection of McKee Road (SR 3440) and Pleasant Plains
Road (SR 3448) to tie into E John Street / Old Monroe Road (SR 1009) just north of
Morningwood Drive. This project is located in Mecklenburg County, NCDOT Division 10.
» STIP Project U-4714 proposes to widen E John Street / Old Monroe Road to a multi-lane facility from Trade Street (SR 3448/3474) in the Town of Matthews to Wesley Chapel-
Stouts Road (SR 1377) in the Town of Indian Trail, a total of 6.5 miles. This project is
located in Mecklenburg and Union Counties, NCDOT Division 10.
This forecast was requested by Stuart Basham, NCDOT Division 10 Planning Engineer, and includes
the following scenarios:
» 2017 Base Year No Build (BYNB)
» 2017 Base Year Build (BYB)
» 2040 Future Year No Build (FYNB) (3 Scenarios)
» 2040 Future Year Build (FYB)
Proposed Improvement
2040 Future Year No Build
Forecast Scenarios
No Build
Conditions
No Build
Forecast
Scenario A
No Build
Forecast
Scenario B
McKee Rd Extension (U-4713A) X X
Widen E John St / Old Monroe Rd (U-4714) X X
-
This forecast was approved by NCDOT Transportation Planning Division on February 21, 2018.
This is the second traffic forecast for U-4714 and the first forecast for U-4713A. A project level
traffic forecast was prepared for Project U-4714 on July 22, 2013.
The following persons were consulted during the development of this forecast:
NCDOT Transportation Planning Division
Keith Dixon
John (Andy) Bailey
NCDOT PDEA
Elmo Vance, Jr
NCDOT Division 10
Stuart Basham
NCDOT District 2 – Mecklenburg Co
Wendy A. Taylor, PE
NCDOT District 3 – Union Co
Lee Ainsworth, III, PE
NCDOT Super Resident Engineer’s Office
Brian Davis, PE
CRTPO
Neil Burke, AICP, PTP
Union County
Richard Black
Crystal Panico
Brian Matthews
Town of Matthews
Kathi Ingrish
Town of Indian Trail
Rox H. Burhans
Town of Stallings
Lynne Hair
City of Monroe
Lisa Stiwinter
Charlotte DOT
Tim Gibbs
Andy Grzymski
Certain Assumptions were made during the development of this forecast.
Fiscal Constraint:
The Metrolina Regional Travel Demand Model 16v1.0 (MRM), adopted in October 2017, was used
to produce this forecast and included all fiscally constrained projects documented in the CRTPO
2040 Metropolitan Transportation Plan (MTP) and the NCDOT Current STIP – August 2017 projects
funded for construction.
Methodology:
The traffic forecasts and traffic factor estimates for the 2017 Base Year No Build Conditions were
developed based on project specific traffic counts and historic Annual Average Daily Traffic (AADT)
trends projected to 2017.
The 2040 Future Year No Build Conditions traffic forecasts were estimated by linearly extrapolating
the 2017 Base Year Conditions traffic forecasts using the growth rates calculated based on the
-
MRM model output, historic traffic and population growth rates, and population and employment
forecasts regarding projected growth in the study area. Additional development and travel
pattern changes were taken into consideration for the 2040 FYNB traffic forecasts.
The 2040 FYNB Scenario A and Scenario B Conditions traffic forecasts were primarily developed
using the changes in travel patterns obtained by comparing the MRM model output of the 2040
No Build Conditions to Scenario A and the 2040 Build Conditions to Scenario B.
The 2017 BYB and 2040 FYB Conditions traffic forecasts were primarily developed using the
changes in travel patterns obtained by comparing the MRM model output of the respective years’
No Build and Build Conditions.
If we can be of any further assistance on this project, please do not hesitate to contact Tom Kelly
[email protected] 704.940.4710.
CC (with Attachments):
Mike Reese, PE, Congestion Management
Brenda Moore, PE, CPM, Roadway Design
Clark Morrison, Pavement Management
Sean Epperson, PE, Division 10
Bob Cook, AICP, CRTPO
Brian Wert, PE, TPD Planning Supervisor
Elmo Vance, NCDOT PDEA
Keith Dixon, State Traffic Forecast Engineer
Traffic Forecasting GIS Support
mailto:[email protected]
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
SHEET 1 of 3
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
NO BUILD CONDITIONSBASE YEAR
FIGURE 1
MA
TC
HLIN
E A (See S
heet 2)
PM7
(3, 1)55
PM
7(3, 1)
55
35
PM
8(5, 1)
55
45
2017
21 50
22 32PM
55(3, 1)
7
551 27
868PM
55
(2, 1)
9
237
62 84
31532 3
228
70
17
8
111
PM
55
(4, 1)
8
9 36
29
MATCHLINE B (See Sheet 3)
64
651
PM
55
(5, 4)
8
621
642
PM8
(4, 3)55
PM8
(4, 3)55
172 211 154 181
130
147 28
848 143
119
247183
111
PM
55
(5, 4)
8P
M55
(5, 4)
8
PM55
(4, 2)7
PM
7(3, 1)
55
286
PM7
(4, 2)55
7474
N Tra
de St
Buckle
y W
ay
Charles
S Tra
de St
Stallin
gs R
dPotter
Rd
Ple
asant Plains R
d
Old Monroe Rd
Old Monroe RdE John St
W John St E John St
485
485
PM
60
(3, 1)
8
PM
7(2, 1)
65
Mc
Kee R
d
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
PM
8(2, 1)
55
51 PM
8(2, 1)
65
60 48
3
SHEET 2 of 3
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
NO BUILD CONDITIONSBASE YEAR
FIGURE 1
2017
PM
55
(5, 2)
8
4 47
1 1
55 4
PM
8(2, 1)
60
16 27
PM
55
(2, 1)
9
PM
55
(5, 2)
8
53 18
30 55
PM
8(3, 1)
55
PM
8(3, 1)
60
32
1723
48
4 PM
8(2, 1)
55
35 PM
8(2, 1)
55
29
21
5
36 PM
60
(3, 1)
8
1620
1513
33 PM
55
(2, 1)
9
181 224 202 227 176 189 175
182
196
142
179
102
PM55
(4, 2)7
PM55
(4, 2)7
PM55
(4, 2)8
PM55
(6, 2)8
PM55
(4, 2)8
PM55
(6, 2)8
Shoppin
g C
enter
Sun V
alley C
om
mons
Mid
way Dr
South F
ork R
d
Old Monroe Rd
Chestn
ut
Ln
Garm
on R
d
Oaks P
kw
y
Bra
ndon
Musta
ng Dr
Chapel
Rd
Wesle
y
Old Monroe Rd Old Charlotte Hwy
Hig
h S
chool
Dw
y
Sun V
alley
Sto
uts R
d
Wesle
y C
hapel-
India
n Trail R
d S
Trail R
d
Waxha
w-India
n
MA
TC
HLIN
E A (See S
heet 1)
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
SHEET 3 of 3
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
NO BUILD CONDITIONSBASE YEAR
FIGURE 1
2017
431
48 2
48 73PM
8(3, 1)
60PM
8(3, 1)
60
118
MATCHLINE B (See Sheet 1)
12
PM
55
(2, 1)
9
34
22
170 17016
3448
24
148
PM9
(2, 1)55
PM
60
(3, 1)
8
PM
55
(4, 1)
8
PM9
(2, 1)55
848
180
PM9
(2, 1)55
PM8
(3, 1)55
444 535
PM9
(3, 1)55
93 93
143
45
128
121
163
848
837
PM
55
(5, 4)
8P
M55
(5, 4)
8
PM
55
(2, 1)
9P
M55
(2, 1)
9
PM9
(2, 1)55
1616
Weddington Rd
Ple
asant Plains R
d
Potter
Rd
Pleasant Plains Rd
Weddington Rd
Pla
ntation R
d
Mc
Kee R
d
485
485
87 169
127118
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
SHEET 1 of 3
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 2
MA
TC
HLIN
E A (See S
heet 2)
PM7
(3, 1)55
PM
7(3, 1)
55
63
PM
8(5, 1)
55
PM
8(3, 1)
60
45
2017
21
22 70PM
55(3, 1)
7
12 26
890PM
55
(2, 1)
9
416 50330 4
327
62
20
7
PM
55
(4, 1)
8
1 44
51
MATCHLINE B (See Sheet 3)
34
590
PM
55
(5, 4)
8
645
563
PM8
(4, 3)55
PM8
(4, 3)55
260 402 241 284
110
154 38
853
183
PM
55
(5, 4)
8P
M55
(5, 4)
8
PM55
(4, 2)7
PM
7(3, 1)
55
385
PM7
(4, 2)55
7474
N Tra
de St
Buckle
y W
ay
Charles
S Tra
de St
Stallin
gs R
dPotter
Rd
Ple
asant Plains R
d
Old Monroe Rd
Old Monroe RdE John St
W John St E John St
485
485
143
84
115 118
121
97
99
23115
167
BUILD CONDITIONSBASE YEAR
143 220
PM
7(2, 1)
65
Mc
Kee R
d
PM
55
(2, 1)
8
Mc
Kee R
d E
xt
assumed to be constructed.
Only STIP Projects U-4714 and U-4713A are
:2017 Base Year Build Conditions
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
PM
8(2, 1)
55
67 PM
8(2, 1)
65
66 64
3
SHEET 2 of 3
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 2
2017
PM
55
(5, 2)
8
1 66
1 1
59 6
PM
8(2, 1)
60
37 21
PM
55
(2, 1)
9
PM
55
(5, 2)
8
46 1
59 40
PM
8(3, 1)
55
PM
8(3, 1)
60
6
2323
56
4 PM
8(2, 1)
55
36 PM
8(2, 1)
55
29
21
6
36 PM
60
(3, 1)
8
1620
1719
42 PM
55
(2, 1)
9
284 349 299 323 270 252 184
161
213
127
188
111
PM55
(4, 2)7
PM55
(4, 2)7
PM55
(4, 2)8
PM55
(6, 2)8
PM55
(4, 2)8
PM55
(6, 2)8
Shoppin
g C
enter
Sun V
alley C
om
mons
Mid
way Dr
South F
ork R
d
Old Monroe Rd
Chestn
ut
Ln
Garm
on R
d
Oaks P
kw
y
Bra
ndon
Musta
ng Dr
Chapel
Rd
Wesle
y
Old Monroe Rd Old Charlotte Hwy
Hig
h S
chool
Dw
y
Sun V
alley
BUILD CONDITIONSBASE YEAR
India
n Trail R
d S
Sto
uts R
d
Wesle
y C
hapel-
Trail R
d
Waxha
w-India
n
MA
TC
HLIN
E A (See S
heet 1)
assumed to be constructed.
Only STIP Projects U-4714 and U-4713A are
:2017 Base Year Build Conditions
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
SHEET 3 of 3
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 2
2017
530
17 6
34PM
8(3, 1)
60PM
8(3, 1)
60
MATCHLINE B (See Sheet 1)
14
PM
55
(2, 1)
9
34
20
153 15328
2927
34
149
PM9
(2, 1)55
PM
60
(3, 1)
8
PM
55
(4, 1)
8
PM9
(2, 1)55
853
159
PM9
(2, 1)55
PM8
(3, 1)55
423 525
PM9
(3, 1)55
45
109
153
853
843
PM
55
(5, 4)
8P
M55
(5, 4)
8
111 126
167
PM9
(2, 1)55
1616
Weddington Rd
Ple
asant Plains R
d
Potter
Rd
Pleasant Plains Rd
Weddington Rd
Pla
ntation R
d
Mc
Kee R
d
485
485
853
91 91 81
97
16
159
80
3325
BUILD CONDITIONSBASE YEAR
Mc
Kee R
d E
xt
167
PM
55
(2, 1)
8P
M55
(2, 1)
8
assumed to be constructed.
Only STIP Projects U-4714 and U-4713A are
:2017 Base Year Build Conditions
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
SHEET 1 of 3
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 3
MA
TC
HLIN
E A (See S
heet 2)
PM
7(3, 1)
55
41
PM
8(5, 1)
55
PM
8(3, 1)
60
56
2040
34 46
34 26PM
55(3, 1)
7
701 30
1167PM
55
(2, 1)
9
264 32135 6
236
84
21
11
124PM
65
(2, 1)
7
PM
55
(4, 1)
8
8 48
22
MATCHLINE B (See Sheet 3)
950
PM
55
(5, 4)
8
835
864
PM8
(4, 3)55
PM8
(4, 3)55
231 235 162 202
144
164 31
1142 176
117
PM
55
(5, 4)
8P
M55
(5, 4)
8
PM55
(3, 1)7
PM55
(4, 2)7
PM
7(3, 1)
55
292
PM7
(4, 2)55
7474
N Tra
de St
Buckle
y W
ay
Charles
S Tra
de St
Stallin
gs R
dPotter
Rd
Ple
asant Plains R
d
Old Monroe Rd
Old Monroe RdE John St
W John St E John St
485
485
NO BUILD CONDITIONSFUTURE YEAR
76
218 356
147 95
Mc
Kee R
d
86
constructed.
and the Chestnut Connector are assumed to be
but all other fiscally constrained projects in the area
STIP Projects U-4714 and U-4713A are not built,
:2040 Future Year No Build Conditions
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
69 PM
8(2, 1)
65
73 59
4
SHEET 2 of 3
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 3
2040
PM
55
(5, 2)
8
8 27
1 1
67 4
PM
8(2, 1)
60
19 33
PM
55
(2, 1)
9
PM
55
(5, 2)
8
69 18
42 61
PM
8(3, 1)
55
PM
8(3, 1)
60
30
2928
33
5 PM
8(2, 1)
55
44 PM
8(2, 1)
55
37
32
7
45 PM
60
(3, 1)
8
2025
1816
41 PM
55
(2, 1)
9
202 250 248 279 216 232 195
225
241
142
200
136
PM55
(4, 2)7
PM55
(4, 2)7
PM55
(4, 2)8
PM55
(6, 2)8
PM55
(4, 2)8
PM55
(6, 2)8
Shoppin
g C
enter
Sun V
alley C
om
mons
Mid
way Dr
South F
ork R
d
Old Monroe Rd
Chestn
ut
Ln
Garm
on R
d
Oaks P
kw
y
Bra
ndon
Musta
ng Dr
Chapel
Rd
Wesle
y
Sto
uts R
d
Wesle
y C
hapel-
Old Monroe Rd Old Charlotte Hwy
Hig
h S
chool
Dw
y
Sun V
alley
NO BUILD CONDITIONSFUTURE YEAR
72
PM
8(3, 1)
55
207
Chestn
ut
Connector
Pro
posed
India
n Trail R
d S
PM
8(3, 1)
55
Trail R
d
Waxha
w-India
n
101
MA
TC
HLIN
E A (See S
heet 1)
constructed.
and the Chestnut Connector are assumed to be
but all other fiscally constrained projects in the area
STIP Projects U-4714 and U-4713A are not built,
:2040 Future Year No Build Conditions
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
SHEET 3 of 3
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 3
2040
537
59 2
59PM
8(3, 1)
60PM
8(3, 1)
60
145
MATCHLINE B (See Sheet 1)
16
PM
55
(2, 1)
9
45
29
22813
31
71
216
PM9
(2, 1)55
PM
60
(3, 1)
8
PM
55
(4, 1)
8
PM9
(2, 1)55
1142
241
PM9
(2, 1)55
PM8
(3, 1)55
495 720
PM9
(3, 1)55
176
56
157
148
219
1141
1126
PM
55
(5, 4)
8P
M55
(5, 4)
8
127 195
247
PM
55
(2, 1)
9P
M55
(2, 1)
9
PM9
(2, 1)55
1616
Weddington Rd
Ple
asant Plains R
d
Potter
Rd
Pleasant Plains Rd
Weddington Rd
Pla
ntation R
d
Mc
Kee R
d
485
485
NO BUILD CONDITIONSFUTURE YEAR
115 115
39
1142
109
89
90
367
228
159
124
constructed.
and the Chestnut Connector are assumed to be
but all other fiscally constrained projects in the area
STIP Projects U-4714 and U-4713A are not built,
:2040 Future Year No Build Conditions
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
SHEET 1 of 3
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 4
MA
TC
HLIN
E A (See S
heet 2)
2040
34742 4
217
37
10
13
45
MATCHLINE B (See Sheet 3)
116
273
7474
N Tra
de St
Buckle
y W
ay
Charles
S Tra
de St
Stallin
gs R
dPotter
Rd
Ple
asant Plains R
d
Old Monroe Rd
Old Monroe RdE John St
W John St E John St
485
485
PM
55
(2, 1)
8
125
2763
SCENARIO ANO BUILD CONDITIONS
FUTURE YEAR
Mc
Kee R
d
62
64
93
81
119
198158
Mc
Kee R
d E
xt
Conditions. All other locations remain the same as FYNB.
changes between FYNB and FYNB Scenario A
Note: Locations shown are those impacted by the
Connector are assumed to be constructed.
projects in the area (including U-4713A) and the propsed Chestnut
STIP Project U-4714 is not built, but all other fiscally constrained
: 2040 Future Year No Build Forecast for U-4714 (Scenario A)
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
63
SHEET 2 of 3
2040
5 21
Shoppin
g C
enter
Sun V
alley C
om
mons
Mid
way Dr
South F
ork R
d
Old Monroe Rd
Chestn
ut
Ln
Garm
on R
d
Oaks P
kw
y
Bra
ndon
Musta
ng Dr
Chapel
Rd
Wesle
y
Old Monroe Rd Old Charlotte Hwy
Hig
h S
chool
Dw
y
Sun V
alley
SCENARIO ANO BUILD CONDITIONS
FUTURE YEAR
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 4
India
n Trail R
d S
Sto
uts R
d
Wesle
y C
hapel-
9862
197
Chestn
ut
Connector
Pro
posed
Trail R
d
Waxha
w-India
n
MA
TC
HLIN
E A (See S
heet 1)
198
Conditions. All other locations remain the same as FYNB.
changes between FYNB and FYNB Scenario A
Note: Locations shown are those impacted by the
Connector are assumed to be constructed.
projects in the area (including U-4713A) and the propsed Chestnut
STIP Project U-4714 is not built, but all other fiscally constrained
: 2040 Future Year No Build Forecast for U-4714 (Scenario A)
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
SHEET 3 of 3
2040
748
31 7
44
MATCHLINE B (See Sheet 1)
35521
39
136
166 PM
55
(2, 1)
8
1616
Weddington Rd
Ple
asant Plains R
d
Potter
Rd
Pleasant Plains Rd
Weddington Rd
Pla
ntation R
d
Mc
Kee R
d
485
485
37
2326
PM
55
(2, 1)
8
46
SCENARIO ANO BUILD CONDITIONS
FUTURE YEAR
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 4
Mc
Kee R
d E
xt
125
122 122 121
119
101160 82
PM
55
(2, 1)
8
223 117
Conditions. All other locations remain the same as FYNB.
changes between FYNB and FYNB Scenario A
Note: Locations shown are those impacted by the
Connector are assumed to be constructed.
projects in the area (including U-4713A) and the propsed Chestnut
STIP Project U-4714 is not built, but all other fiscally constrained
: 2040 Future Year No Build Forecast for U-4714 (Scenario A)
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
SHEET 1 of 2
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 5
42
2040
49729 13
4256
11 11 45
34
294
192
107
481
7474
N Tra
de St
Buckle
y W
ay
Charles
S Tra
de St
Stallin
gs R
dPotter
Rd
Ple
asant Plains R
d
Old Monroe Rd
Old Monroe RdE John St
W John St E John St
485
485
SCENARIO BNO BUILD CONDITIONS
FUTURE YEAR
114
MATCHLINE A (See Sheet 2)
94
80 82
Mc
Kee R
d
Conditions. All other locations remain the same as FYB.
changes between FYB and FYNB Scenario B
Note: Locations shown are those impacted by the
Connector are assumed to be constructed.
projects in the area (including U-4714) and the proposed Chestnut
STIP Project U-4713A is not built, but all other fiscally constrained
2040 Future Year No Build Forecast for U-4713A (Scenario B):
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
SHEET 2 of 2
2040
345
69 7
49
149
35714
32
68
192
163
150 PM
55
(2, 1)
9
1616
Weddington Rd
Ple
asant Plains R
d
Potter
Rd
Pleasant Plains Rd
Weddington Rd
Pla
ntation R
d
Mc
Kee R
d
485
485
33
SCENARIO BNO BUILD CONDITIONS
FUTURE YEAR
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 5
MATCHLINE A (See Sheet 1)
101
105
PM
55
(2, 1)
9
153
224 119
Conditions. All other locations remain the same as FYB.
changes between FYB and FYNB Scenario B
Note: Locations shown are those impacted by the
are constructed.
projects in the area (including U-4714) and the Chestnut Connector
STIP Project U-4713A is not built, but all other fiscally constrained
2040 Future Year No Build Forecast for U-4713A (Scenario B):
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
SHEET 1 of 3
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 6
MA
TC
HLIN
E A (See S
heet 2)
PM
7(3, 1)
55
75
PM
8(5, 1)
55
PM
8(3, 1)
60
56
2040
29
16 72PM
55(3, 1)
7
9013 27
1181PM
55
(2, 1)
9
482 51136 4
380
65
8
15
107PM
65
(2, 1)
7
PM
55
(4, 1)
8
6 50
54
MATCHLINE B (See Sheet 3)
879
PM
55
(5, 4)
8
835
791
PM8
(4, 3)55
PM8
(4, 3)55
321 468 284 328
117
178 40
1142 125
112
PM
55
(5, 4)
8P
M55
(5, 4)
8
PM55
(3, 1)7
PM55
(4, 2)7
PM
7(3, 1)
55
436
PM7
(4, 2)55
7474
N Tra
de St
Buckle
y W
ay
Charles
S Tra
de St
Stallin
gs R
dPotter
Rd
Ple
asant Plains R
d
Old Monroe Rd
Old Monroe RdE John St
W John St E John St
485
485
78
198 339
122 69
Mc
Kee R
d
85
BUILD CONDITIONSFUTURE YEAR
120
3073
138 PM
55
(2, 1)
8
Mc
Kee R
d E
xt
be constructed.
Chestnut Connector are assumed to
All fiscally constrained projects and the
:2040 Future Year Build Conditions
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
68 PM
8(2, 1)
65
77 88
4
SHEET 2 of 3
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 6
2040PM55
(5, 2)
8
5
1 1
70 5
PM
8(2, 1)
60
42 38
PM
55
(2, 1)
9
PM
55
(5, 2)
8
73 3
53
PM
8(3, 1)
55
PM
8(3, 1)
60
15
2544
31
5 PM
8(2, 1)
55
44 PM
8(2, 1)
55
37
32
7
45 PM
60
(3, 1)
8
2025
2322
53 PM
55
(2, 1)
9
328 406 371 402 337 334 210
190
269
121
215
144
PM55
(4, 2)7
PM55
(4, 2)7
PM55
(4, 2)8
PM55
(6, 2)8
PM55
(4, 2)8
PM55
(6, 2)8
Shoppin
g C
enter
Sun V
alley C
om
mons
Mid
way Dr
South F
ork R
d
Old Monroe Rd
Chestn
ut
Ln
Garm
on R
d
Oaks P
kw
y
Bra
ndon
Musta
ng Dr
Chapel
Rd
Wesle
y
Sto
uts R
d
Wesle
y C
hapel-
Old Monroe Rd Old Charlotte Hwy
Hig
h S
chool
Dw
y
Sun V
alley
48
PM
8(3, 1)
55
180
Chestn
ut
Connector
Pro
posed
India
n Trail R
d S
PM
8(3, 1)
55
BUILD CONDITIONSFUTURE YEAR
Trail R
d
Waxha
w-India
n
100
31 102
MA
TC
HLIN
E A (See S
heet 1)
be constructed.
Chestnut Connector are assumed to
All fiscally constrained projects and the
:2040 Future Year Build Conditions
-
DHV DPM
(d,t)
Duals, TT-ST's (%)(d,t)
Direction of D
PM Peak PeriodPM
Peak Hour Directional Split (%) D
Design Hourly Volume (%)DHV
LEGEND
No. of Vehicles Per Day in 100's000
COUNTY:
PREPARED BY:
DATE:
DIVISION:
WBS: TIP:
N
E
S
W
Not To Scale
RS&H
10
39077.1.2
39078.1.1 / U-4714 / U-4713A
Union
Mecklenburg /
Mecklenburg County, Div 10
Union County, Div 10
PROJECTS:
LOCATIONS:
Road Widening and McKee Road Extension
E. John Street / Old Monroe
Plains Rd at McKee Rd
Old Monroe Rd at McKee Rd to Pleasant
- from U-4713A Wesley Chapel-Stouts Rd;
- from Trade St to U-4714
February 2018
SHEET 3 of 3
DAILY TRAFFIC FORECASTS
ANNUAL AVERAGE
FIGURE 6
2040
743
31 8
34PM
8(3, 1)
60PM
8(3, 1)
60
115
MATCHLINE B (See Sheet 1)
16
PM
55
(2, 1)
9
45
29
21422
38
78
216
PM9
(2, 1)55
PM
60
(3, 1)
8
PM
55
(4, 1)
8
PM9
(2, 1)55
1142
227
PM9
(2, 1)55
PM8
(3, 1)55
485 710
PM9
(3, 1)55
125
56
136
170
219
1141
1126
PM
55
(5, 4)
8P
M55
(5, 4)
8
124 192
244
PM
55
(2, 1)
8
PM9
(2, 1)55
1616
Weddington Rd
Ple
asant Plains R
d
Potter
Rd
Pleasant Plains Rd
Weddington Rd
Pla
ntation R
d
Mc
Kee R
d
485
485
33
1142
48
87
345 BUILD CONDITIONSFUTURE YEAR
97 97
138
PM
55
(2, 1)
8
23 27
Mc
Kee R
d E
xt
153
218
99
111
be constructed.
Chestnut Connector are assumed to
All fiscally constrained projects and the
:2040 Future Year Build Conditions