“measuring” team work in captsone projects

12
Measuring” Team Work in Captsone Projects Using Rubrics Developed by Minha Ha

Upload: anakin

Post on 14-Feb-2016

27 views

Category:

Documents


0 download

DESCRIPTION

“Measuring” Team Work in Captsone Projects. Using Rubrics Developed by Minha Ha. Context. Chem Eng 4W04: Three projects, different areas, groups of 4-5 students. Report writing, group presentation and peer evaluation. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: “Measuring” Team Work in  Captsone  Projects

“Measuring” Team Work in Captsone Projects

Using Rubrics Developed by Minha Ha

Page 2: “Measuring” Team Work in  Captsone  Projects

Context

• Chem Eng 4W04: Three projects, different areas, groups of 4-5 students.

• Report writing, group presentation and peer evaluation.

• How to “measure” team work for accreditation purposes. Need rubrics for indicators/attributes

Page 3: “Measuring” Team Work in  Captsone  Projects

Attributes/Indicators

Use Minha Ha's Teamwork Assessment Strategy as Rubrics

Page 4: “Measuring” Team Work in  Captsone  Projects

Rubric Developed by Minha (old version)

Page 5: “Measuring” Team Work in  Captsone  Projects

Rubric Developed by Minha (contd.)

Page 6: “Measuring” Team Work in  Captsone  Projects

How Measurement Was Done

• The quality of team work is reflected in three fronts:– Quality of the Final Report (but what %)– Observations by the professor– The opinions of the students in the groups.

• Created a googledocs survey where the rubric was given to students. They had to pick which level to be closest to their experience

Page 7: “Measuring” Team Work in  Captsone  Projects

Example of Survey

• Screen Capture from Google Docs

Page 8: “Measuring” Team Work in  Captsone  Projects

Results

0

2

4

6

8

10

12

14

16

18

20

Fails to Meet Expectations

Marginally Meets Expectations

Meets Expectations

Exceeds Expectations

Page 9: “Measuring” Team Work in  Captsone  Projects

Main Results

• Lots of Room for Improvement• Time management is most common problem• Accountability is widely achieved • A high number of people are in the

“marginally achieve” expectation category

Page 10: “Measuring” Team Work in  Captsone  Projects

Most Recent Rubrics for Team Work (V3)

Page 11: “Measuring” Team Work in  Captsone  Projects

Most Recent Rubrics for Team Work (V3-contd.)

Page 12: “Measuring” Team Work in  Captsone  Projects

Most Recent Rubrics for Team Work (V3-contd.)