PRM -February 26th & 27th
ME & COLLECTIVES
COIR PROJECT
• Current Status of All identified spaces:
(Possible Locations only- Approved & Joint
Inspection Pending)
• Possible strategies to identify more spaces to start
Defibering units (Private property on lease-10
years minimum can also be considered)
• Need 500 Units – District wise allocation
• COIR AGRO SERVICE TEAM Training (Calicut,
Ernakulam, Kannur, Thrissur, Alappey)No: of Space
Identified
Joint InspectionCompleted
No: of Space Approved after Joint Inspection
No: of space available
for immediate action
No: of DefiberingUnits
Started Operation
55 34 17 10 0
No District Identified SpaceJoint Inspection
Status(Completed/
Pending/Not
Joint Inspection
Result(Approved/Rej
ected)
Location/Ward Status Final Possibility
Possible/Impossible
1 Trivandrum Cherunniyoor Completed ApprovedMudiyacode,puthenkadavu|Ward
No: 10Construction needed, road access
2 Thirupuram Ward No:7,kanchampazhinjiConstruction needed, National coir cluster situated near the
proposed location, Panchayat decision pending
3 Karode Completed Approved kunniyode,Ward No 13 Construction needed
4 Kollam Panayam Pending
5 Perinad Completed ward no:18 waiting for approval,conditions satisfied.
6 Thazhava Completed Rejected ward no:8
7 Pathanamthitta Niranam
8 Alappuzha Thrikkunnappuzha1 Completed ApprovedP T Junction,Near K V Jetty,Thrikkunnapuzha Ward- 3
9 Thrikkunnappuzha 2 Completed Rejected
10 Thanneermukkom Completed Approved Njattayil, Thanneermukkam P O, Ward-14
11 Vayalar Completed Approved Near Panchayath Office, Ward-4
12 Pattanakkad Completed Approved Mankury Nikarth, Pattanakkad P O Ward-10
13 Kottayam Kumarakom Pending Ward No:9 land, water, electricity and road
14 Idukki Kanjikkuzhi Pending Chelachuvadu Construction required
15 Ernakulam Vadakkekkara Completed APPROVED ALL ARE AVLABLE
16 Chittattukara CompletedINSPECTION DONE BUT
STATUS PENDINGALL ARE AVILABLE
17 Puthen Velikkara(7) Pending BUILDING IS NOT THERE
18 Puthen Velikkara(16) Pending BUILDING IS NOT THERE
19 Kunnathunadu Pending ALL ARE AVILABLE
20 Mazhuvannoor CompletedINSPECTION DONE BUT STATUS PENDING BUILDING IS NOT THERE
21 Pallipuram Completed APPROVED Ward No: 7 BUILDING NEED SOME RENOVATION
22 Thrissur Alagappa Nagar Completed APPROVED Vendoor North/ W- 3 Ready to install
23 Kodungallur Pending Vayalar / W-6
24 Meloor Pending Koovakattukunnu/ W-9
25 Engandiyur Pending Polakkal/ W - 11
26 Chowannur Pending Manchery/ W - 1
27 Valapad Pending Kazhimbram/ W- 17
28 Varavoor Pending Vettukad/ W-10
29 Palakkad Vaniyamkulam Completed Approved Ward No: 15 Building exist
30 Cherplesseri Completed Approved Ward No: 16 Modification in building required
31 Peringotukurussi Completed Approved Ward No: 4 Building exist, Road Access Excellent
32 Vellinezhi Rejected, Road access not good
33 Kannambra Private land, To be considered in next phase
Haritha Karma Sena:
• Number of LSG’s completed Training:
• Number of people trained:
• Number of active Haritha karma sena units:
• % of training completion before March 30, 2018:
• Expected Training completion date:
• Campaigning
Working model of waste management
units
Collection items, fees and collection methods, Employee status,
Supervision, Complaint handling mechanism, Economic
management, Waste collection methods, waste management and
selling methods for each items/options available, Income , other
related income generation methods, Uniform, ID…
No: of LSGs
(GP,M,C)
No: of LSGs kept
fund for HKS
No: of HKS Identified
No: of LSGs completedtraining of
HKS
No: of HKS
Trained
No: of LSG’sinstalled Plastic
ShreddingMachine
No: of HKS units
started Operation
1034 534 18527 350 9951 32 15
Coastal ME
• Guideline Revised
• DMCs can sanction projects in your district.
• Capital Subsidy : Group ME - 75% of Project cost or 5 lakh rupees which ever is less.
Individual Subsidy- 75% of Project cost or 1 lakh rupees which ever is less.
• Start 1 ME in concerned districts before March 31st .
Green Protocol
• Capital Subsidy from Suchithwa Mission
• Idukki district submitted the project report. Other districts are pending
• Last date of Submission-March 7th
ME Turnover
• Update monthly turnover details in the spread sheet
• 15 types of ME units listed
• Update the details before 15th of succeeding month
Affiliation Certificate for ME units
• Certificates for all MEs
• Renew the certificate
every year
• Maintain a separate register for distributing certificates at CDS office
• Certificates already sent to all districts except Pathanamthitta
ME Register• UID No:- CDS No:-• Name & Address of ME:-• Individual/Group ME:-• Sector(Production/Service/Trade):-• Regular/Seasonal:-• Year of starting:-• No. of members:-• Bank Account:• Audit Status: Yes/No• Annual Turnover :- Last Year
Current year(Month wise)• Bank Repayment:• Any Financial Assistance from Kudumbashree:-• Name of the MEC
YUVA WEAVE
• Start one batch training before March 31st
2018.
District No. of ParticipantsIdentified
District No. of ParticipantsIdentified
Trivandrum 40 Palakkad 60
Kollam 20 Malappuram 20
Kottayam 20 Kozhikode 20
Alappuzha 60 Wayanad 20
Ernakulam 20 Kannur 50
Thrissur 20 Kasargod 40
Railway
• Install Boom Barriers and CCTV
• Billing machine – with vehicle number tracing facility
• Avoid leakage of Revenue
• Scale up to Palakkad division
District Beneficiaries
for Auto
driving
Beneficiaries for 4
wheeler driving
Beneficiaries for
Bus driving
Total no of
beneficiaries
Agency selected
for providing
training
Per Batch
size
Training
commenced/
will be
commenced
on Thiruvananthapuram 0 54 0 54 IETD Kannur 15 01.03.2018
Kollam 10 2 0 12 Amal Driving School 15 20.03.2018
Pathanamthitta 30 30 0 60 Nil
Alappuzha 0 13 0 13 Kavitha ITI 13 March
Kottayam 22 76 0 98 Nil March- April
Idukki 212 92 0 304 Mithra Driving School 15 01.03.2018
Ernakulam 0 270 0 270 Rajagiri ,IETD 15 March
Thrissur 30 25 3 58 IETD Kannur 15 05.03.2018
Palakkad 10 30 0 40
Malappuram 0 17 0 17 National Driving School 20 06.03.2018
Kozhikode 0
Wayanad 0 605 5 610 IETD Kannur 15 06.03.2018
Kannur 0
Kasaragod 0 300 0 300 IETD 15
State Total 314 1514 8 1836 138
KASE Driving Training
KASE & Skill Training
E seva
• E seva units are currently working in 31 RTO/Sub RTO offices
• Starting of Eseva units in all possible and feasible RTOs/ Sub RTO offices. Eg :- Kuttanad
• Tracking the Monthly income Details of Eseva.
E seva Photos
Status OF E sevas in RTOs/Sub RTOs
Sl No Name of RTO /SUB RTO Office Space received or notSet up E seva Kendra (
Yes/No)
1Alappuzha YES YES
2Attingal YES YES
3Ernakulam YES YES
4Idukki YES YES
5Kannur YES YES
6Kasargod YES YES
7Kollam YES YES
8Kottayam YES YES
9Kozhikode YES YES
10Malappuram YES YES
11Muvattupuzha YES YES
12Palakkad YES YES
Status OF E sevas in RTOs/Sub RTOs
Sl No Name of RTO /SUB RTO Office Space received or notSet up E seva Kendra (
Yes/No)
13Pathanamthitta YES YES
14Trivandrum YES YES
15Thrissur YES YES
16Vadakara YES YES
17Wayanad NO NO
18Kunnathur YES YES
19Mallappally NO NO
20Kuttanad YES NO
21Manathavady NO NO
22Mannarkkad YES YES
23Mattencherry NO NO
24Mavelikara YES YES
25Nedumangad NO NO
26Nilambur NO NO
27Neyyathinkara NO NO
28North Paravur NO NO
Status OF E sevas in RTOs/Sub RTOs
Sl No Name of RTO /SUB RTO Office Space received or notSet up E seva Kendra (
Yes/No)
29Ottapalam NO NO
30Pala NO NO
31Parasala YES YES
32Pattambi NO NO
33Perinthalmanna NO NO
34Perumbavoor NO NO
35Ponani NO NO
36Punalur YES NO
37Ranni NO NO
38Sulthan Bathery NO NO
39Thalassery YES YES
40Thaliparamba YES YES
41Thiruvala NO NO
42Thodupuzha NO NO
43Tirur YES NO
44Tirurangadi YES NO
45Thripunithura YES YES
46Udumbanchola NOT FEASIBLE NOT FEASIBLE
47Uzhavoor NOT FEASIBLE NOT FEASIBLE
Status OF E sevas in RTOs/Sub RTOsSl No Name of RTO /SUB RTO Office Space received or not
Set up E seva Kendra ( Yes/No)
48Vadakancherry NO NO
49Vaikom NO NO
50Vandiperiyar NO NO
51Kudapanakunnu NOT FEASIBLE NOT FEASIBLE
52Adoor YES yes
53Alathur NO NO
54Aluva NO NO
55Angamaly YES NO
56Chalakudy YES NO
57Changanacherry NO NO
58Chengannur NO no
59Cherthala NO YES
60Chittur NO NO
61Devikulam NO NO
62Guruvayur NO NO
63Irinjalakuda YES YES
64Kannhangad YES YES
65Kanjirapally NO NO
Status OF E sevas in RTOs/Sub RTOs
Sl No Name of RTO /SUB RTO Office Space received or notSet up E seva Kendra (
Yes/No)
66Karunagappaly NO YES
67Kayamkulam YES YES
68Kazhakootam YES YES
69Kodungaloor NO NO
70Koduvally NO NO
71Kothamangalam NO NO
72Kottarakara NO NO
73Koilandi NO NO
Nutrimix Grading Details
Sl.No District Total number of
Nutrimix units
No: of units secured ‘A’
grade
No: of units secured ‘B’ grade
No: of units
secured ‘C’ grade
1 Trivandrum 18 16 1 1
2 Kollam 10 10 0 0
3 Pathanamthitta 8 5 3 0
4 Alappuzha 14 14 0 0
5 Kottayam 10 8 2 0
6 Idukki 13 13 0 0
7 Ernakulam 10 10 0 0
8 Thrissur 20 16 4 0
9 Palakkad 19 19 0 0
10 Malappuram 43 328 *3 Closed for
Renovation
11 Kozhikode 26 24 1 1
12 Wayanad 10 10 0 0
13 Kannur 28 27 1 0
14 Kasaragod 12 12 0 0
TOTAL 241 216 20 2
Areas to be focused• Take necessary steps to upgrade all nutrimix units
to ‘A’ grade.SL.No
Activity MAR APR MAY JUN
1Meeting should be organized to prepare an action plan for those units which secured ‘B’ and ‘C’ grade
2DPM or B.C should visit the unit to monitor the progress and the report should submit to the district mission.
3DPM should report the progress to the state mission on or before 4th of every month
4Grading team should visit and grade the units.
5All nutrimix units should acquire ‘A’ grade by June.
• Give special focus on Value additionSl.No
Activity MAR APR MAY JUN
1 Meeting has to be organized for units which are not doing value addition and Prepare an action plan with the help of DPM/B.C
2 M.E.C needs to study the demand gap and marketing opportunities of the value addition products.
3 M.E.C needs to submit a report on value addition products based on market study.
4 Provide Value addition training for the units if needed
5 All nutrimix units should start value addition by the month of May
6 Find markets of the product through M.E.C. (A circular should be issued by the state mission with regard to M.E.C remuneration.)
Key Points to discuss
• MEC Policy
• Fund utilization Report
• SC fund UC
PHOTOS-Activities in February
Skill training-Trivandrum
Rubber Tapping Training-Malappuram
Handicraft Unit-Alappuzha
Detergents-Kasargode
HKS Training-Alappuzha