mdx landscaping and aesthetics updatemdx system wide landscaping • conceptual designs began in...

83
MDX Landscaping and Aesthetics Update February 22nd, 2008 Richard Johnson Roadway Maintenance Engineer

Upload: others

Post on 06-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX Landscaping and Aesthetics Update

February 22nd, 2008

Richard JohnsonRoadway Maintenance Engineer

Page 2: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX Aesthetics Enhancements Goals

• In July of 2003, the MDX Board adopted a policy that focused on developing roadway enhancements as an integral part of all roadway infrastructure and capacity improvements projects.

• Enhancements include:• Landscape Improvements• Noise Mitigation• Architectural Approaches• Greenways and Bike Paths

Page 3: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide Landscaping

• Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874

• Landscape Design Criteria:• Think Green• Provide native trees and plants using xeriscape

principles• Removal existing invasive and exotic plant materials • Long range maintainability• Utilize landscaping to reduce the highway impacts on

neighboring communities• Final designs completed in Summer 2006• Implementation of landscaping began in Fall of 2006

and will continue through 2008

Background History

Page 4: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide Landscaping

• As a result of the impacts incurred by Hurricanes Katrina and Wilma, priorities were shifted to the SR 874 corridor.

• Clearing of the hurricane damaged trees and debris resulted in expediting the design and installation of new plantings.

• This also provided the opportunity for using mixed planting schemes to benefit adjacent homeowners and MDX patrons.

SR 874

Page 5: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 874 after Hurricane Katrina and WilmaNovember 2005

Page 6: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 874 Concept Design

Page 7: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 874 after landscaping Completed July 2006Status April 2007

Page 8: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 874 after landscaping Completed July 2006Status April 2007

Page 9: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 874 after landscaping Completed July 2006Status April 2007

Page 10: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 874 after landscaping Completed July 2006Status April 2007

Page 11: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 874 after landscaping Completed July 2006Status January 2008

Page 12: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 878 Prior to New Plantings

MDX System Wide Landscaping

Page 13: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 878 Prior to New Plantings

MDX System Wide Landscaping

Page 14: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 878 Concept Design

Page 15: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 878 After New Planting Completed November 2006

MDX System Wide Landscaping

Page 16: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 878 After New Planting Completed November 2006

Page 17: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 878 After New PlantingCompleted November 2006 Status January 2008

Page 18: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 878 After New Planting Completed November 2006

Page 19: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 878 After New Planting Completed November 2006

Page 20: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 878 After New Planting Completed November 2006

Status January, 2008

Page 21: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 112 / N.W. 27th Avenue Pre-existing Condition

Page 22: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 112 / N.W. 27th Avenue Concept Design

Page 23: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 112 / N.W. 27th Avenue After New PlantingsCompleted February, 2007

Page 24: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 112 / N.W. 27th Avenue After New PlantingsCompleted February, 2007 Status January, 2008

Page 25: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 112 / N.W. 27th Avenue After New Plantings

Completed February 2007 Status January 2008

Page 26: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 112 Median After New Plantings Completed

February 2007

Page 27: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 112 Median After New Plantings Completed February 2007 Status January 2008

Page 28: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 112 West End After New Plantings Completed December 2007

Page 29: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 112 West End After New Plantings Completed December 2007

Page 30: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 112 West End After New Plantings Completed December 2007

Page 31: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 112 / N.W. 40th Street Illegal dump site to Park

MDX System Wide Landscaping

Page 32: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 112 / N.W. 39th Street

Page 33: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 836 / N.W. 27th Avenue Pre-existing Condition

Page 34: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 836 / N.W. 27th Avenue Pre-existing Condition

Page 35: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 836 / N.W. 27th Avenue Pre-existing Condition

Page 36: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 836 / N.W. 27th Avenue Pre-existing Condition

Page 37: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 836 / N.W. 27th Avenue Pre-existing Condition

MDX System Wide Landscaping

Page 38: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 836 / N.W. 27th Avenue Concept Design

Page 39: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide Landscaping• SR 836 / N.W. 27th Avenue Concept Design

Page 40: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 836 / N.W. 27th Avenue After Installation

MDX System Wide Landscaping

Page 41: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 836 / N.W. 27th Avenue After Installation

MDX System Wide Landscaping

Page 42: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 836 / N.W. 27th Avenue After Installation

Page 43: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 836 / N.W. 27th Avenue After Installation

Page 44: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 836 / N.W. 27th Avenue After Installation

Page 45: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 836 / N.W. 27th Avenue After Installation

Page 46: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 836 / N.W. 37th Avenue after installation

MDX System Wide Landscaping

Page 47: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingSR 836 / N.W. 87th to 137th Avenue Pre-existing

Condition

Page 48: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingFuture Landscape Project MDX 83617

Page 49: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingFuture Landscape Project MDX 83617

Page 50: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingFuture Landscape Project MDX 83617

Page 51: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project MDX 83617 Budget $5,000,000 Design began Spring 2007 Divided into three segments to be installed by multiple Pushbutton

contractsSegment 1 began construction August 2007, completed January 2008Segment 2 began construction December 2007, 40% completeSegment 3 to begin construction February 2008

Page 52: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project MDX 83617 Began August 2007

Page 53: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project MDX 83617 Began August 2007

Page 54: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project MDX 83617 Segment 1

Page 55: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project MDX 83617 Segment 1

Page 56: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project MDX 83617 Segment 2

Page 57: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project MDX 83617 Segment 2

Page 58: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project MDX 83617 Segment 2

Page 59: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project MDX 83617 Segment 2

Page 60: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project SR 878 / US-1 InterchangePre-existing Condition

Page 61: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project SR 878 / US-1 InterchangePre-existing Condition

Page 62: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project SR 878 / US-1 Interchange

Page 63: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project SR 878 / US-1 InterchangeProjected

Page 64: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project SR 878 / US-1 InterchangeProjected

Page 65: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project SR 878 / US-1 Interchange

Pre-existingProjected

Page 66: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingLandscape Project SR 878 / US-1 Interchange

Pre-existing Proposed

Page 67: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 836 Extension - Bike Path between N.W. 107th Avenue and N.W. 87th Avenue

MDX System Wide Aesthetics

Page 68: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 836 Extension - Bike Path between N.W. 107th Avenue and N.W. 87th Avenue

MDX System Wide Aesthetics

Page 69: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide LandscapingMDX Projects 87404 / 87407 – Landscaping & Aesthetics

Page 70: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide AestheticsSR 836 Corridor Aesthetic Color Scheme

Page 71: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide AestheticsSR 112 & SR 924 Corridors Aesthetic Color Scheme

Page 72: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide AestheticsSR 874 & SR 878 Corridors Aesthetic Color Scheme

Page 73: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide AestheticsMDX Project 87407

Page 74: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX System Wide AestheticsMDX Project 87407

Page 75: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 836 Extension at N.W. 137th Avenue

MDX System Wide Aesthetics

Page 76: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 836 Extension at N.W. 137th Avenue

MDX System Wide Aesthetics

Page 77: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 836 Extension – Toll Plaza Completed July 2007

MDX System Wide Aesthetics

Page 78: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 836 Extension – Toll Plaza Completed July 2007Status January 2008

MDX System Wide Aesthetics

Page 79: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 112 at Le Jeune Road – Bridge Painting Project

MDX System Wide Aesthetics

Page 80: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX Sign Structures

MDX System Wide Aesthetics

Page 81: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 836 Extension Overhead and Cantilever Signs

MDX System Wide Aesthetics

Page 82: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

SR 836 Overhead ORT Gantry and Sign Structure

MDX System Wide Aesthetics

Page 83: MDX Landscaping and Aesthetics UpdateMDX System Wide Landscaping • Conceptual designs began in Spring 2005 on SR 836, SR 112 and SR 874 • Landscape Design Criteria: • Think Green

MDX Landscaping and Aesthetics Update

Thank You