Page 1: MC-7 HSE Inspection 04 May 2014

YASREF Pipeline Relocation MC-7 HSE Observations

Noli T. Gula YASREF PMT

04 May 2014

Page 2: MC-7 HSE Inspection 04 May 2014

Found parcel foods hanging on the scaffold post .Foods that are not stored in food boxes can attract rodents and other animals.

Page 3: MC-7 HSE Inspection 04 May 2014

Found unstable platforms which are not properly secured in place.

Page 4: MC-7 HSE Inspection 04 May 2014

Poor housekeeping in HVAC equipment areas.

Page 5: MC-7 HSE Inspection 04 May 2014

Found some potential fire hazards, such as burlaps ,plastic, and old wooden pallets

Page 6: MC-7 HSE Inspection 04 May 2014

Presence of potential tripping and slipping hazards. Scaffolding components must be stored on boxes and not on the ground.

Page 7: MC-7 HSE Inspection 04 May 2014

Found Full body harnesses with damage hook, and with out any sign of periodic inspection

Tie knots in lanyards; it reduces the strength by 50%.

Page 8: MC-7 HSE Inspection 04 May 2014

Found tools along walkways.

Page 9: MC-7 HSE Inspection 04 May 2014

Found equipment with sub standard earthing/grounding