    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    Overview an !acility "e#cription

    Energa Mayakan is currently a gas pipeline transporting under operation betweenMacuspana and Valladolid, with a total system delivery capacity of 250 MM!" and

    delivery points in ampeche #$MM!", Merida %2MM!" and Valladolid

    &22MM!"'

    !igure &( )chematic *gure shows the e+isting system'

    Energa Mayakans planning an increase in capacity and e+tension of the pipeline in

    20&5' -his Mayakan .ipeline .ro/ect 20&5consists of three phases'

    Pha#e 1increases the total system delivery capacity to $5 MM!" with delivery

    points in ampeche #0MM!", Merida &25 MM!" and Valladolid 200MM!"'

    Pha#e 2increases the total system delivery capacity to #50MM!" with delivery

    points in ampeche #0MM!", Merida 2&0 MM!" and Valladolid200 MM!"'

    Pha#e $e+tension of the pipeline in 2#1in between Valladolid and ancn with

    delivery capacity of #2MM!"'

    MAOP% 3ll facilities shall have a ma+imum allowable operating pressure 4M36.17

    of &200 psi'

    -he 8ydraulic )imulations contained in E+hibit 9 are provided as background

    information only' -he 6wner makes no representations as to its accuracy or validity

    to support the pro/ect' -he ontractor shall be responsible for verifying the

    ade:uacy and the accuracy of all engineering completed to meet the .ro/ect;s

    goals, including modi*cation of the 6wner;s envisioned scope' -his preliminary

    8ydraulic 3nalysis indicates that the e:uipment to be installed in each phase may

    be(

    Pha#e 1 facilities may include(

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    2/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    4)7, and the other appro+imately &00 km in length located ompressor

    )tation 4)7 and Valladolid'

    !igure 2( )chematic *gure shows e:uipment that could be installed during .hase &

    Pha#e 2facilities may include(

    onstruction of a new ompressor )tation 4)7 with three compressorsets'

    km in

    length located between ompressor )tation 4)&7 and Valladolid'

    !igure ( )chematic *gure shows e:uipment that could be installed during .hase 2

    Pha#e $facilities may include(

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    3/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    -he .ro/ect ?ork shall include the detailed engineering, procurement, construction,

    supervision, testing, pre@commissioning, commissioning, interconnection to the

    e+isting Energa Mayakan .ipeline )ystem, obtaining all re:uired regulatory 4e+ceptthe -ransportation .ermit from the AE and authoriBation from )EAM3C3-,

    environmental and all construction permits'

    S&''ary Work Scope

    Work by the Contractor:

    -he .ro/ect ?ork for each .hase shall include permitting technical support, thedetailed engineering, procurement, construction and construction permitting,supervision, testing, pre@commissioning, commissioning, and the interconnectionsto the e+isting Energa Mayakan .ipeline )ystem' -he )cope of ?ork of the

    ontractor includes, but is not limited to(

    o .roviding "etailed Engineering, .rocurement, and onstruction services

    according with the best engineering practiceso .roviding D3D services necessary to e+ecute the .ro/ect in compliance with

    the ontract, all !ederal, )tate, and Municipal regulations, industry codes and

    standards'o .roviding .ro/ect Management and .ro/ect ontrols services to e+ecute the

    .ro/ect'o .roviding 8)E services necessary and enough to e+ecute the .ro/ect tin

    compliance with all !ederal, )tate, and Municipal regulations and EnergiaMayakan;s safety re:uirements'

    o .roviding supervision, testing, pre@commissioning and commissioning of the

    .ro/ect'o 3rranging and providing all re:uired utility services and facilities where

    needed for the continuous operation and maintenance of the pro/ect'o .rovide all pipeline facility technical information re:uired to support the

    6wners system

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    4/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    -ransportation )ervices 3greement with !E

    -he omisiJn Aegulatoria de Energa 4AE7 -ransportation .ermit'

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    5/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    -he contractor must have special care with the e+isting facilities during the

    e+cavation of the ditch to install a new pipeline' 3nd consider in all time the use of

    appropriate e:uipment in each task of the pro/ect'

    -he pipeline loops shall be designed and constructed with the appropriate number

    of mainline valve assemblies 4MIV;s7 together with their associated operators

    including remote monitoring and local and remote control capability, pig launching

    and receiving assemblies, blow oL and pressure relief devices plus their associated

    controls'' -he work associated with the pipeline loops and the e+tension pipeline

    shall include but is not limited to the following(

    -he ontractor will deliver a *nal hydraulic design study to the 6wner

    design including line siBing, compression re:uirements, and pipe mechanical

    re:uirements' 3ll pipeline crossings of ma/or and minor watercourses, roads, power lines,

    pipelines, communications cables and other utility easements shall meet the

    re:uirements set by the party providing the applicable crossing permit or

    agreement' 3ll necessary temporary and permanent access roads to the pipeline facilities

    including access to mainline valve sites, cathodic protection recti*er and test

    sites' 3ll necessary studies, documents and procedures for the protection of the

    environment as outlined in the M

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    6/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    Cote on alignment sheets all tie@ins, water crossings, infrastructure crossings,

    roads, railroads, housing, schools, churches, and areas of special interest' .repare class location study and note on alignment sheets as re:uired,

    according local regulation and international codes and )tandards' "esign pipeline in accordance with such class location study and the

    re:uirements of C6M@00>@)EAE@20&0 and 3)ME codes' "esign )3"3 system for the .ro/ect to integrate with and using the same

    technology as 6wners e+isting system, including leak detection and all

    communications links necessary' .rimary system is satellite based with radio

    system back up' .repare detailed drawings of pipeline pigging system' 3ll pipeline loops shall

    incorporate launching, receiving, and by@pass facilities as re:uired'

    -he pipeline must allow for the passage and use of full diameter pigsincluding an intelligent pig from launcher to receiver'

    Co casing will be used in any crossings unless speci*cally re:uired by a

    permitting agencyoperator' .repare and implement pigging plan as re:uired for inspection and

    commissioning of the .ro/ect' .repare and implement pipeline drying, purging and packing procedures'

    )ite preparation including site clearing, grading and *nal cleanup, storm

    water drainage, sewage handling and disposal, *re detection and

    e+tinguishing, gas detection and alarms, electric lighting, fencing, and the

    re:uired emergency e+its' ontractor shall design the facilities to be remotely controlled and monitored

    from 6wner;s Kas ontrol center in Merida, Nucatan and from its back@up

    ontrol enter in )&' -he *nal number and location of MIVs in the pipeline loops shall be the

    responsibility of the ontractor in strict accordance with the re:uirements of

    C6M@00>@)EAE@20&0'

    Compressor Stations

    -he pro/ect includes work at three diLerent ompressor )tation locations'ompressor )tation O& 4)&7 is located near iudad .eme+ and the village of El

    ongo in the )tate of -abasco, Me+ico' ompressor )tation O2 4)27 is located nearthe village of 3:uiles )erdan in the )tate of ampeche, Me+ico' ompressor )tationO 4)7 is to be located near Merida in the )tate of Nucatan, Me+ico'

    -he work re:uired at )& may include the installation of an additional compressorset within the e+isting )& facility as part of the .hase & work' -he compressor setis to be located within the station as shown on the plans and .

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    7/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    -he work re:uired at )2 may include the installation of two additional compressor

    sets within the e+isting )2 facility as part of the .hase & work' -he compressorsets are to be located within the station as shown on the plans and .

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    8/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    Electrical power distribution.

    -he distribution system for the installation shall be designed in accordance

    with C6M@00&@)E"E@20&2'

    -he contractor shall consider power distribution through cable trench or

    direct buried cable for outdoor installation and conduit or cable tray for

    indoor installations'

    3ll electrical panels, and /unction bo+es installed outdoor must comply with

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    9/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    designed in such a way that potential is balanced to dissipate events and

    prevent damage by electric shock in fault conditions or the presence of

    transients in the system'

    3ll electronic systems and telecommunications networks must utiliBe an

    independent system of grounding the power system, as described in the %0'

    -he lightning rod ends will be connected with copper wire according to the

    materials listed in the standard and will be a low impedance path to earth'

    Cathodic Protection system

    -he contractor shall perform detail engineering, procurement, construction,

    pre@commissioning and testing and all work re:uired for the athodic

    .rotection )ystem, including the power supply'

    !or the design of the athodic .rotection )ystem power supply, the

    contractor shall conduct a *eld survey in order to guarantee the supply of

    electricity at a voltage of 220&2> V3 for the correct operation of recti*ers,

    re:uired for complete cathodic protection of the pipeline loops, properly

    integrated with the e+isting Energa Mayakan )ystem'

    Superisory Control and Data Ac!uisition System "SCADA#

    -he ontractor shall be responsible for the design, engineering, procurement,

    construction, testing and commissioning of a )3"3 system as well as its

    integration to the e+isting )3"3 Master )ystem 4M7located at the ompany;s

    oQces in Merida, Nucatan and the )3"3 back@up system 497 located at )O&'

    -he )3"3 system design and e:uipment shall match as closely as possible the

    design and e:uipment of Energa Mayakan;s e+isting system and be incorporated

    seamlessly into same'

    $elecommunication System

    -he ontractor shall be responsible for the design, engineering, procurement,

    construction, testing and commissioning of a Aadio !re:uency -elecommunication

    )ystem monitoring Main Iine Valve )tations by the e+isting Energa Mayakan

    master )3"3 or backup )3"3 system'

    9

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    10/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    -he -elecommunications system design and e:uipment shall match as closely as

    possible the design and e:uipment of the e+isting Energa Mayakan system'

    !or satellite links E. contractor shall calculate the necessary bandwidth for V)3-

    terminals to support the minimal capacity re:uired by )3"3 plus 0R for future

    use' 3ntennas foundation dimensions and location for dish antennas shall be

    calculated from microwave *eld studies, line of sight studies, site survey and local

    wind charts' KalvaniBed steel made supports for Poorroof mounting shall be

    supplied to mount satellite dish antenna for )3"3 system to obtain the re:uired

    operation range and line of sight free of obstacles'

    E. contractor shall furnish, install and start up V)3- stations including cable runs,

    buried ducts, telecommunications ladder, *+ing hardware and all e:uipment and

    necessary materials according with the calculations of the antennas and theminimal bandwidth re:uired to route the )3"3 data from Main Iine Valve )tations

    to Mayakan master backup )3"3 )ystem in e+isting control rooms in Merida,

    NucatSn and Macuspana, -abasco'

    E. contractor shall verify e+isting e:uipment, and con*gure software or furnish

    additional hardware and cables, in e+isting Mayakan ontrols Aooms 4Macuspana

    and MTrida7 in order to integrate and receive the )3"3 signals from Main Iine

    Valves )tations' -otal integration shall be performed by E. contractor'

    3ll telecommunications e:uipment like dish antenna supports, communications

    cables, cabinets, cable trays and patch panels shall be grounded to the generalgrounding system, in order to reduce failures by surge discharging phenomena and

    electric anomalies'

    !or electronic systems and telecommunications network ontractor shall design an

    independent grounding power system, as described in the

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    11/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    personnel' -raining shall be developed under the ob/ectives( theorypractice

    e+plaining of the system e:uipment, operations, con*guration, software upgrades,

    and passwords' 3ll training shall be imparted with manuals, white papers,handbooks and presentations inside customer facilities'

    )ite 3cceptance -ests 4)3-7 and start@up tests for telecommunications systems shall

    be performed before pipeline customer acceptance' )tart@up and factory *nal test

    reports for all electronic e:uipment shall be transferred to Energa Mayakan at

    acceptance' )3- protocols shall be approved by 6wner and performed by

    ontractor' )3- conclusion does not release the ontractor responsibility to *nish

    pendant works, perform tasks and correct failures'

    Pipeline Control System

    -he ontractor shall be responsible for the design, engineering, procurement,

    construction, testing and commissioning of a pipeline control system, which shall

    include(

    Kas "ispatch ontrol )ystem'

    Ieak "etection )ystem'

    -he ontractor shall ensure all new works including compressors, pipeline loops and

    mainline valves are integrated into the pipeline simulator system 4e+isting7 for real

    time leak detection, state *nder, planning and predictor models'

    Material an E)&ip'ent Proc&re'ent

    %eneral &e!uirements

    -he ontractor shall be responsible for procurement, import and duties of all

    materials and e:uipment necessary for the implementation of the .ro/ect'

    -his shall include all administration services necessary for specifying and ordering

    of materials, :uality control and inspections, e+pediting and transportation,

    including arranging for and paying for transportation of all materials as re:uired'

    ontractor shall be responsible for all customs clearance and payments re:uired'

    3ll materials and e:uipment to be installed as part of this pro/ect shall be new andunused'

    Spare Parts

    -he ontractor shall be responsible for the provision of spare parts for pre@

    commissioning, commissioning, system start@up and performance tests' ontractor

    shall provide a list of operational spare parts'

    11

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    12/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    'nspections and Factory $esting

    3ll ma/or materials and e:uipment shall be purchased from pre@:uali*ed suppliers

    with certi*ed :uality control systems'

    -he ontractor shall be responsible for shop inspection by :uali*ed inspectors'

    -he ontractor shall be responsible for witnessing and evaluating factory testing of

    ma/or e:uipment' 3 listing of e:uipment to be shop tested and the schedule for

    testing shall be provided to 6wner' 6wner representatives may witness shop testing

    at their discretion'

    Project Mana(e'ent

    Permits( )icenses and )and Ac!uisition

    ontractor shall be responsible for all permit application technical support

    documentation and the subse:uent ac:uisition of all construction permits 4water

    crossing, road crossing and any other construction related permit7 re:uired for the

    .ro/ect and including those associated with the ontractors stockpiling, stringing,

    construction, installation and testing activities as re:uired by the .ro/ect and in

    connection with the re:uirements of local, municipal, provincial and federal

    authorities that have /urisdiction over the pro/ect'

    6btain permits, licenses, and inspections necessary to comply with )tate, Cational,

    and local building regulations

    3ll permitting activities shall be according to standard Me+ican C6AM)'

    E*ecution Plans

    -he ontractor shall prepare and submit to the 6wner a .ro/ect Management .lan, a

    onstruction E+ecution .lan and a .ro/ect E+ecution )chedule as described in

    E+hibit E' -hese plans shall address the following as minimum and shall be in

    compliance and consistent with the re:uirements of the Duality 3ssurance and

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    13/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    o .ro/ect .rogress Aeportingo .ro/ect ontrolso "esign Engineering, )urvey, "rafting, etco 6wner "rawing review and comment timingo 6wner "esign reviewo .rocurement and Iogistics plan including long lead item procurement

    plano )hop

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    14/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    o Environmental re:uirementso leaning and drying of pipelineo Hltrasonic gauging pig run testo .re@commissioningo ommissioningo 6FM training

    Pro+ect E*ecution Schedule

    Design Engineering Schedule

    -he design engineering schedule shall be in suQcient detail to cover the

    ma/or activities separately detailing its sub@activities including 6wner "esign

    Aeviews' )ub@activities to be considered shall include but not be limited to

    the following(

    9asic studies

    -opographical studies

    Keotechnical studies

    8ydrologic studies, including rainfall, runoL, Pood areas, rivers crossing

    and lakes, as well as scour .ipeline )ystem "esign

    .ermits

    rossings

    MIV;s

    Electrical .ower 3ccess roads

    athodic .rotection )ystem

    Ieak detection )ystem

    ompressor )tations

    )ite on*guration and grading

    .iping

    9uildings

    Electrical .ower, interconnections and M

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    15/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    Procurement Schedule

    -he procurement schedule shall be in suQcient detail to cover the activities

    separately detailing its sub activities' )ub activities to be considered shall

    include but not be limited to the following(

    .reparation of material and e:uipment purchase speci*cations, re:uest

    for :uotation 4A!D;s7 technical and commercial evaluations and

    re:uisitions and purchase orders Aeviews of vendor data

    E+pediting

    )hop inspections

    )hop testing

    )hipping and transportation Material tracking

    Construction Schedule

    -he construction schedule shall be in suQcient detail to cover the ma/or

    activities and sub@activities for the construction of all facilities' -he ma/or

    activities and sub@activities shall maintain logical ties to the engineering

    design and procurement activities and all sub@activities'

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    16/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    )urvey and maintain pipeline route, A6? limits, and third party crossings as

    re:uired

    Maintain communications with local authorities, landowners, and key leaders

    throughout /ob as outlined in the Environmental

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    17/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    3t fenced areas under the ontractors responsibility, ontractor shall perform

    grading in accordance with drawings and install drainage ade:uate to prevent the

    accumulation of water under the most severe anticipated weather conditions' 3boveground facilities shall be located so that such facilities or their accesses shall not to

    be in areas susceptible to Pooding'

    Cathodic Protection and Pipeline ,arkers

    ontractor shall be responsible for the supply and installation of permanent

    cathodic protection systems and induced current mitigation systemsU including

    location and A6?' 4Aight of ?ay7 for recti*ers andor ground beds associated with

    the pipeline and other related facilities, all strictly in accordance with the design

    drawings, speci*cations and procedures'

    -he ontractor shall install cathodic test stations and pipeline markers' 3ll

    re:uirements for buried reference electrodes and their connection to the test

    stations shall be adhered to'

    -ydrostatic $esting( Dewatering( Cleaning and Drying

    ontractor shall be responsible for the cleaning, gauging and hydrostatic testing of

    the completed pipeline and for the subse:uent dewatering, cleaning and drying

    activities, which includes obtaining permits for drawing and discharging of water for

    hydrostatic testing'

    ontractor is responsible test water supplydisposal agreements and for the costsassociated therewith and shall be responsible for providing, installing and removing

    all testing and recording e:uipment' "isposal of test water shall be the ontractors

    responsibility and shall conform to the M

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    18/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    )lope grading'

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    19/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    Archaeological and Paleontological Sites

    ontractor shall ensure that any historical artifact found by ontractors personnel

    or by its subcontractors shall immediately be brought to the attention of the 6wner

    Aepresentative or the 6wners designated environmental' -he ontractor to take

    immediate steps to protect the site until direction is received from 6wner and or

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    20/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    ontractor must provide the following documents that comply with C6M@00>@

    )EAE@20&0(

    6peration, maintenance and safety procedures manual'

    6perating, maintenance and safety yearly work program'

    3ccidents prevention program'

    Education and training )chedule'

    Design 2$echnical ,eetings and Design &eiews

    "esign-echnical meetings and design review meetings with 6wner shall be held as

    fre:uently as deemed re:uired by 6wner andor the ontractor, but no less than

    once every &5 days after Cotice to .roceed' -echnical meetings with ma/or

    e:uipment and material suppliers shall be arranged by ontractor as deemed

    re:uired by 6wner' -he ontractor shall be responsible for recording and issuing

    minutes of meetings of all designtechnical meetings and design reviews in which

    ontractor has participated'

    ontractor shall prepare a *nal "esign 9asis Memorandum 4"9M7, schedule of

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    21/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    .reparation and submission of 3s 9uilts1 within 0 days of Mechanical ompletion 4

    i'e' following the >2 hour .erformance -est7

    ompletion of a lose

  • 8/9/2019 Mayakan Phase III Scope of Work Oct 30 FINAL

    22/22

    Mayakan Pipeline Project 2015

    Exhibit AScope of Work

    Date: 03/09/2014

    REV: 0

    Organi4ation 5or Commissioning and Start.up

    -he ontractor shall submit to 6wner for approval an organiBation chart for the

    commissioning teams' -he responsibilities for each individual in the chart shall be

    speci*ed' -his organiBation shall be designed with the consideration that 6wner

    plans to assign its technical supervisor together with all of his technical personnel to

    take part in commissioning of the .ro/ect' -he technical supervisor will approve the

    commissioning plans' 6wner;s personnel will handle I.K movement activities F

    calibration of instruments' ontractor will coordinate the formation of the

    commissioning team, including vendors, suppliers, and the 6wner' ontractor shall

    provide labor, materials and vendor support on e:uipment and facilities supplied by

    ontractor'

    -he ontractor and the 6wner will meet to design and *naliBe the commissioningteam4s7 organiBation prior to commissioning'

    )chedule for each .hase

    )tart Engineering and procurement.hase & Mar 20&5.hase 2 Mar 20&$.hase Mar 20&>