MAY, 2016 AT ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENT MANAGEMENT PLAN for PROPOSED “HOTEL RESORT” PROJECT At plot bearing S. No. 47/1, 47/2, 49 & 43 of village – Borli, Tal – Murud, Dist – Raigad, State – Maharashtra. PROPOSED BY MRS. POOJA RAVINDRA BHOWAR & OTHERS

Upload: others

Post on 22-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

MAY,2016

AT

ENVIRONMENTALIMPACTASSESSMENTAND

ENVIRONMENTMANAGEMENTPLANfor

PROPOSED“HOTELRESORT”PROJECT

AtplotbearingS.No.47/1,47/2,49&43ofvillage–Borli,Tal–Murud,Dist–Raigad,State

– Maharashtra.

PROPOSEDBY

MRS.POOJARAVINDRABHOWAR&OTHERS

Page 2: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 1

TABLEOFCONTENTSList of Tables ......................................................................... 4 

List of Figures ....................................................................... 5 

CHAPTER1 ............................................................................... 6 

INTRODUCTION ......................................................................... 6 

1.1  Preamble ....................................................................................................... 6 1.2  ProjectLocation ........................................................................................... 6 1.3  STRUCTUREOFEIAREPORT ...................................................................... 9 1.4OBJECTIVESOFTHESTUDY ........................................................................ 10 1.5METHODOLOGYOFTHESTUDY ................................................................. 10 

CHAPTER2 ............................................................................. 12 

2.1  INTRODUCTION ......................................................................................... 12 2.2  PROJECTDESCRIPTION ............................................................................ 12 2.2.1  Project Cost .............................................................................................. 15 2.2.2  Land Use .................................................................................................. 15 2.2.3  Built up Area ............................................................................................ 15 2.2.4  Accessibility ............................................................................................. 16 2.2.5  Site Setting ............................................................................................... 16 2.3  PROJECTCOMPONENTS............................................................................ 18 2.3.1  Project layout and development concept ................................................. 18 2.3.2   Building and Tenement Statement ....................................................... 18 2.3.3  Car parking Arrangements ....................................................................... 21 2.4  PROJECTINFRASTRUCTUREANDUTILITIESPLANNED ....................... 21 2.4.1  WaterSupply .......................................................................................... 21 2.4.2  Sewerage System ..................................................................................... 23 2.4.3  Solid waste ............................................................................................... 26 2.4.4  Power supply ............................................................................................ 26 2.4.5  Fire Fighting............................................................................................. 26 2.5  RAINWATERHARVESTING ...................................................................... 26 2.6  STORMWATER‐COLLECTIONANDDISPOSAL ...................................... 27 2.7  ENVIRONMENTALASSESSMENTOFBUILDINGPLANNINGANDUSE . 29 

CHAPTER3 ............................................................................. 30 

BASELINEENVIRONMENTALQUALITY ........................................... 30 

3.1  INTRODUCTION ........................................................................................ 30 3.2  SCOPEOFBASELINESTUDIES ................................................................ 30 3.3  AIRENVIRONMENT .................................................................................. 33 3.3.1 Meteorology ............................................................................................. 33 3.3.2 AMBIENTAIRQUALITY ......................................................................... 35 3.4  NOISEENVIRONMENT ............................................................................. 39 3.4.1 MethodologyforNoiseMonitoring ..................................................... 40 3.5  WATERENVIRONMENT ........................................................................... 41 3.6  SEISMOLOGY .............................................................................................. 42 3.7  SOIL ............................................................................................................. 43 3.8  BIOLOGICALENVIRONMENT ................................................................... 44 3.8.1ECOLOGY ................................................................................................... 44 3.8.2FLORA ........................................................................................................ 45 3.8.3FAUNA ....................................................................................................... 46 AVIFAUNA ........................................................................................................... 46 

CHAPTER4 ............................................................................. 50 

Page 3: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 2

ENVIRONMENTALIMPACTIDENTIFICATION,PREDICTIONANDANALYSIS ........................................................................................... 50 

4.1  INTRODUCTION .......................................................................................... 50 4.2  POLLUTIONSOURCES ................................................................................ 50 4.3  IMPACTIDENTIFICATION ......................................................................... 51 4.3.1 EnvironmentalAspectsofConstructionOperations .............................. 51 4.3.2 EnvironmentalAspectsofBuildingPlanningandUse ........................... 52 4.4  LANDENVRIONMENT ............................................................................... 52 4.5  WATERENVIRONMENT ............................................................................ 54 4.6  ECOLOGICALENVIRONMENT ................................................................... 57 4.7  AIRENVIRONMENT ................................................................................... 58 4.8  NOISEENVIRONMENT .............................................................................. 58 4.9  AESTHETICS ............................................................................................... 60 4.10 Socio‐EconomicEnvironment ................................................................... 61 4.11 BUILDINGMATERIAL ................................................................................ 61 4.12 ENERGYCONSERVATION .......................................................................... 62 4.13 TRAFFICIMPACT........................................................................................ 62 4.14 IMPACTMATRIX......................................................................................... 63 

CHAPTER5 ............................................................................. 66 

SPECIFICSTUDIES .................................................................... 66 

5.1  TRAFFICPATTERNANDDENSITY ........................................................ 66 5.2  IMPACTONTRAFFIC .............................................................................. 67 5.2.1 ConstructionPhase................................................................................. 67 5.2.2 FunctionalPhase ..................................................................................... 67 5.3  MITIGATIONMEASURES ........................................................................ 68 5.3.1 TrafficManagementPlan ...................................................................... 68 

CHAPTER6 ............................................................................. 69 

ENVIRONMENTALMONITORINGPROGRAMME ................................. 69 

6.1  ENVIRONMENTALMONITORINGPROGRAMME .................................... 69 6.2  MONITORINGPLANDURINGCONSTRUCTIONPHASE .......................... 69 6.3  AREASOFCONCERN ................................................................................. 70 6.4  GROUNDANDSURFACEWATERQUALITY .......................................... 70 6.5  STPSEWAGEQUALITY ............................................................................ 71 6.6  AMBIENTAIRQUALITY ........................................................................... 71 6.7  NOISE .......................................................................................................... 72 6.8  GREENBELTDEVELOPMENT .................................................................. 72 6.9  MONITORINGPLANDURINGCONSTRUCTION/OPERATIONPHASE 72 

CHAPTER7 ............................................................................. 74 

RISKASSESSMENT&DMP ........................................................... 74 

7.1FIRERISK ...................................................................................................... 74 7.2PUBLICSAFETY ............................................................................................ 74 7.3EMERGENCYRESPONSE .............................................................................. 75 7.3.1EmergencySituations ................................................................................ 75 7.3.2EmergencyResponseinCaseofEmergency ........................................... 75 7.3.3ActionsintheEventofFire: ...................................................................... 75 7.3.4LeakagefromaLPGcylinder(canteenarea)withoutfire: .................... 76 7.3.5Responsesequencefordangeroussituations: ........................................ 76 7.36  PostEmergencyFollowUp ................................................................ 76 

Page 4: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 3

7.4  MEDICALAID .............................................................................................. 76 7.5  RESPONSEEVALUATION,TESTING&UPDATINGOFTHEPLAN .......... 76 7.6EMERGENCYPROCEDURES ......................................................................... 78 

CHAPTER8 ............................................................................. 80 

PROJECTBENEFITS ................................................................... 80 

8.1  PHYSICALINFRASTRUCTURE ................................................................... 80 8.2  EMPLOYMENT ............................................................................................ 80 

CHAPTER9 ............................................................................. 81 

ENVIRONMENTALMANAGEMENTPLAN .......................................... 81 

9.1  INTRODUCTION ......................................................................................... 81 9.2  AIRENVIRONMENT ................................................................................... 81 9.2.1 ConstructionPhase .................................................................................... 81 9.2.2 FunctionalPhase ........................................................................................ 82 9.3  NOISEENVIRONMENT .............................................................................. 82 9.3.1 ConstructionPhase .................................................................................... 82 9.3.2 FunctionalPhase ........................................................................................ 83 9.4  IMPACTONWATERRESOURCES ............................................................. 83 9.4.1 ConstructionPhase .................................................................................... 83 9.4.2 FunctionalPhase ........................................................................................ 83 9.5  LANDENVIRONMENT ............................................................................... 85 9.5.1 ConstructionPhase .................................................................................... 85 9.5.2 FunctionalPhase ........................................................................................ 86 9.6  ECOLOGICALENVIRONMENT .................................................................. 87 9.6.1 ConstructionPhase .................................................................................... 87 9.6.2 FunctionalPhase ........................................................................................ 87 9.7  AESTHETICS ............................................................................................... 89 9.8  ENERGYCONSERVATION ......................................................................... 89 9.9  ENVIRONMENTALLYSIGNIFICANTFEATURES ..................................... 89 9.10 RAINWATERHARVESTINGANDREDUCESURFACERUNOFF ............. 90 9.12  SOILDWASTEMANAGEMENTPLANT .................................................... 90 9.14 EMPRESOURCESREQUIREMENTANDEMPBUDGET ...................... 91 9.16  ENVIRONMENTALBUDGET ..................................................................... 94 

CHAPTER10 ........................................................................... 95 

EXECUTIVESUMMARY ............................................................... 95 

INTRODUCTION .................................................................................................. 95 PROJECTLOCATION ........................................................................................... 95 SALIENTFEATURESOFPROJECT ..................................................................... 95 

CHAPTER11 ......................................................................... 100 

CREDENTIALSOFCONSULTANTS ................................................ 100 

Page 5: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 4

ListofTables Table1.1:DetailsofResortbuildings .................................................. 6 Table1.1:SurveyofEnvironmentalAttributes ..................................... 11 Table2.1:Projectdetails .............................................................. 14 Table2.2:AreaStatement ............................................................. 16 Table2.6:WaterBalanceChart ....................................................... 22 Table2.7:TreatedWaterReuse ...................................................... 23 Table2.8:ExpectedCharacteristicsofRawandtreatedWater ................... 24 Table2.9:SolidWasteGeneration .................................................... 26 Table2.10:RoofTopRainWaterHarvestingPotential ............................ 27 Table3.1:BaselineDataGeneration ................................................. 30 Table3.2:MicrometeorologicalConditions ......................................... 34 Table3.3:AmbientAirQualityMonitoringStationsLocation ..................... 36 Table3.4:TechniquesUsedforAnalysisofAirQuality ............................ 37 Table3.5:AmbientAirQualityStatus ................................................ 38 Table3.6:NationalAmbientAirQualityStandards(NAAQS) ..................... 38 Table3.7:NoiseMonitoringResults ................................................. 40 Table3.8:AmbientNoiseQualityStandards ........................................ 40 Table3.9:GroundWaterQualitywithintheStudyArea ........................... 41 Table3.10A:ParticleSizeDistributionasperIS:1498 ............................ 44 Table3.10B:ParticleSizeDistributionandTextureofSoilwithintheStudyArea............................................................................................ 44 Table3.11:SoilQualityParametersintheStudyArea ............................. 44 Table3.12:ListsofPlantSpeciesObservedinStudyArea ........................ 45 Table3.13:ListofAvifaunaRecordedintheStudyArea .......................... 46 Table3.14:ListofFaunaObservedintheStudyArea .............................. 48 Table4.1:PollutantSourcesandCharacteristics ................................... 50 Table4.2:NoiseLimitsforAppliances&Equipment’satConstructionStage ... 58 Table4.3:NoiseLevelsGeneratedfromConstructionEquipment ............... 59 Table4.4:ConstructionPhaseImpactMatrix ....................................... 63 Table4.5:OperationPhaseImpactMatrix .......................................... 64 Table5.1:ExistingTrafficVolumes‐Year2016 .................................... 66 Table 5.2: Recommended PCU Factors for Various Types of Vehicles onUrbanRoads .................................................................................... 67 Table5.3:RecommendedDesignServiceVolumes(PCU’sPerHour) ............ 68 Table5.4:ComparisonofCongestionIndices(V/Cratios) ........................ 68 Table6.1:EnvironmentalMonitoringProgramme ................................. 72 Table7.1:BuildingEmergencyPlan.................................................. 77 Table9.1:FugitiveDustControlMeasures .......................................... 82 Table9.2:EMPCosting ................................................................ 94 

Page 6: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 5

ListofFigures Figure1.1:LayoutsuperimposedonIRSMap ........................................ 7 Figure1.2:LocationMapIndicatingProposedProjectanditsSurroundingroads.............................................................................................. 8 Figure2.1:LayoutPlan ................................................................ 13 Figure2.2:GoogleImage(ProjectSite&ItsSurrounding) ........................ 17 Figure2.3:ProjectLayoutplan ....................................................... 19 Figure2.4:Parkingplan ............................................................... 20 Figure2.5:WaterBalanceDiagram(DrySeason) .................................. 23 Figure.2.6:LocationofSTP&vermi‐compostingunitonLayoutMap ........... 25 Figure2.7:StormWaterDrainagePlan .............................................. 28 Figure3.1:SamplingLocationMap ................................................... 32 Figure3.2:WindRoseatstudyarea ................................................. 35 Figure3.3:SeismicZoneMapofIndia ............................................... 42 Figure4.2:StormWaterDrainagePlan .............................................. 56 Figure4.2:PredictedNoiseLevels ................................................... 60 Figure5.1:Projectlocation ............................................................ 66 

Page 7: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 6

CHAPTER1INTRODUCTION

1.1 Preamble Mrs. Pooja Ravindra Bhowar & Others is proposing construction of“HotelResort”atplotbearingS.No.47/1,47/2,49&43ofvillage–Borli,Tal–Murud,Dist–Raigad,State–Maharashtra.Theprojectcomprisingof3Cottages(Groundfloor),AdministrativeBuildingwithrestaurant(G+1floor),Standardrooms(G+1floor)andSwimmingpool.TheprojectcomesunderthepurviewofCRZNotification2011.Theplotisin CRZ‐III area, as the same is situated within 200‐500 m from HTL(ArabianSea).ThelayoutsuperimposedonapprovedCZMPisdepictedinFigure1.1.

The purpose of this study is to evaluate andprovide information on thenatureandextentofenvironmentalimpactsarisingfromtheconstructionanduseofproposedresortandrelatedactivitieswithaviewtodefineanEnvironmental Management Plan (EMP) to minimize adverseenvironmentalimpactsonthesurroundingenvironment.

1.2 ProjectLocation

Theproposed“HotelResort”isplannedatPlotbearingS.No.47/1,47/2,49&43ofvillage–Borli,Tal–Murud,Dist–Raigad,State–Maharashtra.ItsGooglelocationis18˚30’47.57”Nlatitudeand72˚54’50.48”Elongitude.The site is accessible by existing 13.0 m wide Alibaug‐ Murud Statehighway&9.0mwideaccessRoad.

DetailsoftheproposedResortisdepictedinTable1.1

Table1.1:DetailsofResortbuildingsSr.No.

BuildingDetails Buildingconfiguration

No.ofRooms

Population

1. Cottages G+1floor 7 28

2. StandardRooms G+1floor 12 24

3. AdministrativeBuilding(Restaurant)

G+1floor ‐ 20

4. Hotelstaff

‐ 20

TOTAL 92

Page 8: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

ThelocationmapindicatingproposedprojectanditssurroundingsaredepictedinFigure1.2.

Figure1.1:LayoutsuperimposedonIRSMap

Page 9: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 8

Figure1.2:LocationMapIndicatingProposedProjectanditsSurroundingroads

Page 10: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 9

1.3 STRUCTUREOFEIAREPORT

EIA report contains baseline data, project description, assessment ofimpacts, preparation of environmental management plan & disastermanagementplan.Thereportisorganizedinfollowingtenchapters:

Chapter1:Introduction

ThischapterdescribesobjectivesandmethodologyforEIA.

Chapter2:ProjectDescription

Thischaptergivesabriefdescriptionofthe location,approachability,amenities,layoutandutilitiesoftheproposedproject.

Chapter3:BaselineEnvironmentalStatusofProjectArea

Thischapterpresentsdetailsofthebaselineenvironmentalstatusformicroclimate,airquality,noise,traffic,waterquality,soilquality,flora,faunaandsocio‐economicstatusetc.

Chapter4:PredictionandEvaluationofImpacts

This chapter discusses the possible sources of pollution andenvironmental impacts of the project during construction and usephases.

Chapter5:SpecificStudies

This chapter discusses the Specific studies like Traffic Impact andEnergyConservationmeasures

Chapter6 EnvironmentalMonitoringProgramme

This chapter discusses the details about the post projectenvironmentalmonitoringprogramme.

Chapter7 RiskAssessment&DisasterManagementPlan

This chapter presents the risks associated with the proposedconstructionprojects,approachtoriskmanagementandDMP

Chapter8ProjectBenefits

Thischapterpresentsthebenefitsfromtheproposedproject.

Chapter9 EnvironmentalManagementPlan

This chapter deals with the Environmental Management Plan (EMP)for the proposed construction Project and indicates measuresproposedtominimizethelikelyimpactsontheenvironment.

Chapter10ExecutiveSummary

Chapter11Credentialsofconsultants

This chapter deals with the details of environmental consultants,NABETaccreditationdetails

Page 11: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 10

1.4OBJECTIVESOFTHESTUDY TheobjectivesoftheEIAstudyare:

Todescribethescopeoftheproposedprojectandassociatedworks;

To identify and quantify pollution sources and determine thesignificanceofimpactsonsensitivereceptors;

Toidentify,predictandevaluateenvironmentalandsocial impactsexpectedduring theconstructionand functionalphases in relationtotheexistingcivicinfrastructureandsensitivereceptorspresentifany;

To develop mitigation measures so as to minimize pollution,environmental disturbance and nuisance during construction andfunctionalphases;and

1.5METHODOLOGYOFTHESTUDY

Reconnaissance survey was carried out to understand nature of theproposed project, conduct visual site inspection, decide the samplinglocationsandprogramme.Samplinglocationswereidentifiedonthebasisoffollowingcriteria:

Predominantwinddirectioninthestudyarea;

Existingtopography;

Locationofsensitiveareas;

Accessibility,availabilityofpower;and

Areathatrepresentsbaselineconditions.

Samples were collected at various locations identified in thereconnaissance survey to establish thebaselineenvironmentalqualityatthe project site. The impacts of proposed development are predictedduring different phases of project viz. construction, operations andemergencies. The predicted impacts are analyzed and appropriateEnvironment Management Plans (EMPs) are defined to mitigate theadverseenvironmentalimpacts.

Sampleswerecollected foraperiodof threemonths i.e. fromDectoFeb2016.ParticularsrelatedtoSurveyareoutlinedinTable1.1.

Page 12: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 11

Table1.1:SurveyofEnvironmentalAttributes

Sr.No

Attribute Parameters FrequencyofMonitoring

1 Ambient airquality

PM10,PM2.5,SO2,NOxandCO

Ambient Air Qualitysamples weremonitored for 24hrs,twice a week for total13weeks

2 Meteorology Surface:Windspeedanddirection, temperaturerelative humidity andrainfall.

Primary data at Site,and Secondary datacollection from IMD,Santacruz.

3 Waterquality Physical, Chemical andBacteriologicalparameters.

Primary data –Groundwater samplewas collected from Oneborewell, One Surfacewatersample

4 Ecology Existing terrestrial andaquaticfloraandfauna.

Based on the datacollected fromsecondarysources.

6 Noiselevels NoiselevelsindB(A) Continuous 24‐hourlymonitoring at 5locations during thestudyperiod

7 Soilcharacteristics

Parameters related toagricultural &afforestationpotential.

Sampling at project sitewasstudied.

8 Trafficstudy Trafficdensity/pattern Survey at 1 locationonceinstudyperiod.

9 Geology Geologyofthearea Based on data collectedfromsecondarysources.

10 Hydrology Drainagepattern, natureof streams, aquifercharacteristics rechargeanddischargeareas.

Based on data collectedfromsecondarysources.

Page 13: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 12

CHAPTER2PROJECTDESCRIPTION

2.1 INTRODUCTION

Thischapterpresentsthesalient featuresoftheproject& infrastructurerequiredfortheconstruction,functioningoftheproposedprojectatBorli,Tal‐Murud,Dist‐Raigad,Maharashtra.

2.2 PROJECTDESCRIPTION

Theproposedsiteislocatedat PlotbearingS.No.47/1,47/2,49&43ofvillage–Borli,Tal–Murud,Dist–Raigad,State–Maharashtra.Theprojectcomprising of 3 Cottages (Ground floor), Administrative Building withrestaurant(G+1floor),Standardrooms(G+1floor)andSwimmingpool.The proposed development will involve site formation works andconstruction of building/structures, access roads, drains and sewerconnections.Theresortisproposedtolocateonaflatland.

ThePlotareaofproposedsiteis4030.00m2andTotalConstructionAreais1302.22m2,12Standardrooms,7cottages,Restaurant,Administrativebuildingisproposedinthisproject.

Thedesignof the layouthas taken intoconsideration thestateof theartdesignfeaturesforlivingatmosphereandarrangementsofopenspacesoastocreateapleasantlivingenvironmentfortourists.

The proposed development will involve site formation works andconstructionofbuildingstructures,approachroadsanddrains.ThelayoutplanofproposedprojectisshowninFigure2.1

Page 14: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 13

Figure2.1:LayoutPlan

Page 15: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 14

ThesalientfeatureoftheproposedprojectisgiveninTable2.1.

Table2.1:Projectdetails

SR.No. Details Information Unit

1 NameoftheprojectProposedconstructionof

HotelResortatBorli,Raigad,Maharashtra

2 TotalPlotArea 4030.00 m2

3 FSIArea 1,002.22 m2

4 NonFSIArea 300.00 m2

5 TotalConstructionArea 1,302.22 m2

6 No.oftenements12standardrooms,7cottages,Restaurant,

AdministrativebuildingNos.

7 Totalwaterrequirement 15 KLD

8 SewageandSTPdetailsSewagegeneration:9

STPCapacity:10STPTechnology:Phytorid

KLDKLD‐

9 TotalSolidWasteGeneration 18 kg/d

10 Biodegradablecomponent(VermiComposting)

11 kg/d

11 TotalPowerRequirement ConnectedLoad:0.12DemandLoad:0.08

MWMW

12 DGSet 20 kVA

13 EnergyEfficiencyTotalEnergySavings

:23.25 %

14 ParkingProvision4‐Wprovided:202‐Wprovided:12

Nos.Nos

15 RWHCapacity 10 KLD

16 SWDGeneration(300mmwidechannel) 458.7 m3/hr

17 EMPCostCapitalcost:11.15Rs.

Operation&MaintenanceCost:3.1Rs.

LakhsLakhs/yr

Page 16: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 15

2.2.1 Project Cost Thecostof theproject isapproximatelyRs.1.92Crorefortheprojectofresortbuildings,Recreational,andother infrastructure likeRoads, culverts,STP, solidwastemanagementStormwaterdrainage,Landscapeetc.

2.2.2 Land Use Theproposedprojectplotisofstripshape.Thedevelopmentofsaidprojectshallbeaccordingtothelanduseplan.TheFSIavailableforthedevelopmentis0.25of the plot area. The proposed construction is as per the prevailing townplanningnorms.Thedevelopmentof the resortwill be include constructionofsmall cottages, tourist huts, play area etc. New pipelines for water supply,drainage&Rainwatershallbelaid.

2.2.3 Built up Area The projectwill be developed on the land comprising about 4030.00m2 area.The total built up area (FSI Proposed) of the Project is 1002.22m2. The areastatementofproposeddevelopmentisgiveninTable2.2

Page 17: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 16

Table2.2:AreaStatement

Sr.No. Description Areainm2

1 AREAOFPLOT 4,030.002 NETAREAOFPLOT(1‐ 2) 4,030.003 REQUIREDOPENSPACE10%(ONABOVE3) 403.004 PROVIDEDOPENSPACE 415.155 PERMISSIBLEFSI(ONABOVE2) 0.256 PERMISSIBLEBUILT‐UPAREA 1,007.507 PROPOSEDBUILTUPAREA 1,002.22

2.2.4 Accessibility The proposed construction site is located at 18030’47.57” N latitude and72054’50.48”Elongitude.Theproposedsiteislocatedatabout35kmfromtheRoharailwaystation;AlibagugSTDepot:23km;Thesiteisaccessiblebyexisting13.0mwideAlibaug‐MurudStatehighway&9.0mwideaccessRoad.

2.2.5 Site Setting

The land is flat and sloping towards the West side. Ground water table isobservedatthedepthofaround0.5to1mbelowthegroundlevel.

TheGoogleimageoftheprojectsiteanditssurroundingsaregiveninFigure2.2.ThecontourmapofthesiteisgiveninFigure2.3

Page 18: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 17

Figure2.2:GoogleImage(ProjectSite&ItsSurrounding)

Page 19: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 18

2.3 PROJECTCOMPONENTS

2.3.1 Project layout and development concept

TheproposedProjectlocatedatPlotbearingS.No.47/1,47/2,49&43ofvillage– Borli, Tal – Murud, Dist – Raigad, State – Maharashtra will provide betteraminities&bettercomfortablestay in it.MurudTalukaisoneofthe importanttouristspotsinRaigaddistrict.KorlaibeachandKorlaiFortareimportantsitesvisitedbyhugenumberoftouristseveryyear.

The said development will serve as a tourist spot & provide facilities forspending vacations or weekends to the tourists as well as the people withinRaigad.

The proposed project shall be benefited & shall have a positive & favorableimpactduetofollowingpoints:

Theprojectenvisagesemploymentpotentialforlocalpeople.

The landwillbeconvertedtoevergreenpieceofenvironmental friendlysettlement

Theprojectcomprisingof3Cottages(Groundfloor),AdministrativeBuildingwith restaurant (G + 1 floor), Standard rooms (G+ 1 floor) and Swimmingpool.

2.3.2 Building and Tenement Statement

The total population during operation phase when it is fully occupied will bearound92Nos.

TheproposedlayoutofprojectisgiveninFigure2.3

Page 20: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 19

Figure2.3:ProjectLayoutplan

Page 21: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 20

Figure2.4:Parkingplan

Page 22: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 21

2.3.3 Car parking Arrangements

Adequatecarparkingfacilitiesareprovidedintheproposedresortproject.Fortheproposedproject, thecarparkingprovisionof20Noshasbeenmade.Alsoprovisionoftwowheelerparkingfor12Nos&cycleparking.hasbeenmadeandshowninfigureNo.2.4.

2.4 PROJECTINFRASTRUCTUREANDUTILITIESPLANNED

The utilities and recreational facilities planned in proposed project includeSewage Treatment Plant for recycling of treated sewage, Roof top rain waterharvesting,RGarea,StormwaterDrainageplanetc.Theother infrastructure facilitiesplanned forproposedprojectarehighlightedbelow:

2.4.1WaterSupplyThetotalwaterrequirementofprojectwillbearound15KLD.Thewaterstoragefacilitieswillbeatgroundlevel(undergroundwatertank).Duetotherecyclingof 4 KLD of treated sewage for flushing, the fresh water requirement will bereduced to8KLD.Thewater requirement for theproposedproject is given inTable2.6. Flowchartofwaterbudgetduring functionalphase (Dry season) isgiveninFigure2.5

Page 23: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 22

Table2.6:WaterBalanceChart

ThewaterbalancediagramisgiveninFigure2.5

Page 24: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 23

Figure2.5:WaterBalanceDiagram(DrySeason)

2.4.2 Sewerage System ThewastewatergeneratedfromproposedResortwillbearound9m3/day.Thesewagewill be treated in STP of 10 KLD capacity. The treated sewagewill beusedforflushing,gardening.

Table2.7:TreatedWaterReuse

Sr.No. ReuseQuantity(KLD)

1. Flushing 42. Gardening 54. Total 9

TheLocationofSTP’sonLayoutPlanisgiveninFigure2.6.

DOMESTIC USE FLUSHING USE

FRESH WATER

8 KLD

TO S

TP

5 KLD

TO S

TP

4 KLD

9 KLDTO STP

STPCAPACITY:10 KLD

TREATED WATER

LOSSES3 KLD

4 KLD

EXCESS TREATED WATER TOGARDENING

TOTAL WATER REQUIREMENT:12 + 3 = 15 KLD

SLUDGE USE AS MANURE

SLUDGEDRYING BEDS

9 KLD

0.09 KLD

5 KLD

TOTAL FRESH WATER REQUIREMENT:8 KLDSWIMMING POOL MAKE-UP

Page 25: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

TreatmentProcess:Phytorid

Table2.8:ExpectedCharacteristicsofRawandtreatedWater

Sr.No. Parameters RawSewage TreatedSewage

1 pH 6to9 6.5‐8.5

2 SuspendedSolids 150‐250 Upto50mg/l

3 BOD(3days27˚C) 250‐300 <30mg/l

4 COD 500‐600 Upto1mg/l

5 Oil&Grease <10 Nil

Page 26: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 25

Figure.2.6:LocationofSTP&vermi‐compostingunitonLayoutMap

Page 27: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 26

2.4.3 Solid waste

Solidwastegeneratedfromentireprojectduringfullyoperationphasewillbe18kg/day.Outofwhich11kg/daywillbebiodegradableComponentand7kg/daywillbeInert,RecyclableWaste.

Thesolidwastegenerationfrombuildingsisgivenbelow:

Table2.9:SolidWasteGeneration

Segregation of dry and wet garbage will be done at source. Dry garbage asinert/recyclablewastesuchasplastics,glass,metals,rubberwillbesegregatedand disposed off to recyclers. Wet garbage/biodegradable matter as leftoverfood,vegetableswillbetreatedusingvermicopostingunits.

ThelocationofVermi‐compostingunitisdepictedinFigure2.6.

2.4.4 Power supply

Thepowerrequirementduringconstructionperiodwillbeabout25kVA.DuringOperationphase, thepowersupply(DemandLoad)necessary fortheproposedproject is estimated as 0.08 MW. The power will be made available from theMaharashtraStateElectricityBoard (MSEB).TheDGsetswith total capacityof20kVAwillbeprovidedforemergency.

ENERGYCONSERVATIONMEASURES

Energyconservationmeasuresproposedintheprojectisasfollows:

Efficientwallsystemslikesolidblockswithflyashcontent,

Energy efficient lighting using LEDs in Rooms and LEDs in Lift Lobby,

Toiletsetc.

Useofhighenergyefficientpumpsforfirefighting,UGtanksandSTP

2.4.5 Fire Fighting

Thefirefightingschemeinproposedprojectwillbeplannedtoprovideadequatesafetymeasuresagainst firehazard.TheProjectproponentswill adhere to thesuggestions and schemes made by the concerned regulatory authority in thisregard. Apart from fire‐fightingwater jets, there will be proper fire detectionsystem.Firehydrantswillbeprovidedatstrategiclocations.

2.5 RAINWATERHARVESTING

TherooftoprainwaterwillbedivertedfromterracetothestoragetankthroughHDPE/PVCpipesafterpassing througha filtermedia.Thevalvesystemwillbe

Sr.No. DescriptionSolidwastegenerationkg/day

1. BiodegradableComponent 112. Inert,RecyclableWaste 73. Total 18

Page 28: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 27

provided to enable the first rain washings from terrace/ roof to bypass thestoragetankasitwouldcontainundesirabledirt.Theexcessrainwaterfromthetanks will be diverted to storm water drain. The mouths of all pipes and itsopeningswillbecoveredwithmosquito(insect)proofwirenet.Fortheefficientdischargeof rainwater, therewill be at least two rainwaterpipes of 100mm.diameterforaroofareaof100sq.m.

Therooftoprainwaterharvestingpotentialoftheprojectareaisaround5KLD.TheRWHtankwillbeprovidedtoeachbuilding.TheexcessharvestedwaterwillbedischargedinStormwaterdrains.

The annual rainfall over Raigad district is around 2400mm/year. Consideringthe95rainydays, theaveragerainfall isaround25mm/day.Theroof toprainwaterharvesting structure (Tanks)hasbeendesigned considering the averagerainfall of25mm/day.However the stormwaterdrains aredesigned forpeakrainfallof150mm/hr.

Table2.10:RoofTopRainWaterHarvestingPotential

Sr.No. AreaDetails Areainm2AverageRainfall25mm/day

RunoffCoefficient

RWHPOTENTIALKLD

1 Rooftoparea 253 25 0.8 5Harvestingrainwaterwillbeutilisedforfloorwashing,carwashing,gardeningduringnon‐rainydaysandflushingetc.2.6 STORMWATER‐COLLECTIONANDDISPOSAL

Stormwaterdrainsinsideeachplotwillbeconstructedstrictlyinaccordancetothetownplanningregulations. Stormwaterfromtheentireplotwillbecollectedthroughnetworkofstormdrains.Thestormwaterdrainshasbeendesignedfor150mm/hrofpeakrainfall.TheoverflowofRWHtankswillbedischargedintheexistingstormwaterdrains.

Thedetailsofstormwatergenerationfromplotandsurroundingareaisgiveninfollowingdrawing.

Page 29: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 28

Figure2.7:StormWaterDrainagePlan

Page 30: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 29

2.7 ENVIRONMENTAL ASSESSMENT OF BUILDING PLANNING AND

USE

EnvironmentalissueshavebeenaddressedinplanningofProjectthrough:

TotalNo.ofWorkersduringconstructionphase:40perday

TotalNo.ofproposedRooms:12Nos.ofStandardRooms,7cottages

Totalpopulationaftercompletionofbuildings:92Nos.

AllpublicareaswillhaveLEDforlighting.

TotalWaterrequirementforresidentialpropose@135lpcd:15KLD

Sewagegeneration:9KLD.

RainwaterisproposedtobeharvestedinTank.

Sewage would be treated in STP. And treated sewage will be used forgardening,flushing,etc.

Approximate Solid Waste Generation: 18 kg/day of which 11 kg/day isBiodegradable.

Fly‐ashisusedinconcretework.

TypicalresidentialframetohavemaximumnumberofR.C.C.wallsandveryfewbrickmasonrywalls.

Separate internal road for pedestrians, ramps will be provided at theentrancelobby.

Page 31: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 30

CHAPTER3BASELINEENVIRONMENTALQUALITY

3.1 INTRODUCTION

Baseline environmental status forms the basis for evaluation of the proposeddevelopment on the existing conditions. This can be broadly grouped intophysical, social, aesthetic and economic environment. Physical environmentincludes air, water, land, aquatic and terrestrial flora & fauna, civicinfrastructure, public services, etc. Social environment includes demography,community facilities and services, community characteristics, employmentcentres, commercial facilities servicing the area, etc. Economic environmentcovers employment levels, sources and levels of income, economic base of thearea,landvalues,landownershipetc.

3.2 SCOPEOFBASELINESTUDIES

ForthepresentEIAstudy,theattributesofenvironmentconsideredare:

Air environment (Meteorology, ambient air quality, noise levels, trafficpatternandtrafficdensity);

Waterenvironment;

Land environment (Geology, Geo‐hydrology, land use, solid wastedisposaletc.);

Biologicalenvironment(Flora,fauna,vegetation,ecosystem);and

Socio‐economic environment (Demography, occupational structure,educational,medicalfacilities,literacyetc.)

ItisimportanttodefinethestudyareaforconductingtheEnvironmentalImpactAssessment Study which could reflect the changes due to the proposeddevelopmentalactivity

Followingsectionofthereportwillgivethebaselineenvironmentalscenariointhestudyareawithrespect to theabovestatedenvironmentalattributesalongwithitsmonitoringdetails,resultsobtained,dataanalysisandconclusions.

Table3.1:BaselineDataGeneration

Sr.No.

EnvironmentalAttribute

SamplingLocation

1. Meteorology IndianMeteorologicalDepartment,Raigad2. AmbientAirQuality SamplingatThree locations A1 Projectsite A2 AtWandeli village A3 AtBorli village3. Noiselevels SamplingatFour locations N1 ProjectSite N2 AtBorli village N3 AtWandeli village

Page 32: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 31

Sr.No.

EnvironmentalAttribute

SamplingLocation

N4 AtKorlaivillage4. GroundWater ProjectSite5. SurfaceWater Arebiansea6. Geologyand

GeohydrologyGeneralin10kmStudyArea

7. Landusepattern Generalin10kmstudyarea8. SoilQuality Samplingatprojectsite9. Ecology Generalin10kmStudyArea

Page 33: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 32

Figure3.1:SamplingLocationMap

Page 34: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 33

3.3 AIRENVIRONMENT

3.3.1Meteorology

Meteorology (weatherandclimate) is thekey tounderstanding theairquality.The essential relationship between meteorology and atmospheric dispersioninvolves thewind in the broadest sense of the term.Wind fluctuations over avery wide range of time accomplish dispersion and strongly influence otherprocessesassociatedwiththem.

Secondary data also plays an important role in identifying the generalmeteorological status of the region. Site specific data can be compared withsecondarydatainordertoidentifychangeswhichmayhavetakenplaceduetovariousdevelopments in the area.Bothprimary and secondarymeteorologicaldatawerecollected.

Classificationofmonthsaccordingtoseasonsisshowninfollowingtable:

Season PeriodSummer MarchtoMayMonsoon JunetoSeptemberPostmonsoon OctobertoNovemberWinter DecembertoFebruary

PresentationofSecondaryData:

ThemainsourceofsecondarymeteorologicaldataforthestudyareawastheGazetteerofIndia.

The climate ofRaigaddistrict ismostly humid all‐round the year and receiveswith average annual rainfall in the district is 2874.9 mm. About 94% of theannualrainfallisreceivedduringsouthwestmonsoonseason.

Sr. No

Month Temperature (oC)

Rainfall (mm)

No. of Rainy Days

Relative Humidity (%)

Mean Wind Speed kmph

Max. Min. 1 January 30.9 19.1 0.6 0.0 62 7.6 2 February 30.8 19.6 0.0 0.0 63 7.6 3 March 31.4 22.4 0.2 0.0 69 8.0 4 April 32.2 25.3 2.2 0.2 71 9.0 5 May 32.7 26.5 40.2 2.3 72 10.1 6 June 30.5 24.9 828.6 19.8 84 12.9 7 July 28.8 24.2 937.6 26.0 89 17.9 8 August 28.5 24.0 612.2 24.3 88 14.8 9 September 29.3 23.6 280.1 14.9 85 8.1 10 October 31.5 23.5 121.8 5.4 77 6.6 11 November 32.9 21.6 41.8 1.8 64 7.4

Page 35: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 34

12 December 32.2 20.2 9.6 0.3 59 7.8 Total 2874.9 95.0 Average 31.0 22.9 73 9.8

(Source: IMD Climatological Table (Year 1951 to 1980) Theprojectareahasatypicalcoastalclimate.Theyearcanbedividedintofourdistinctseasons.TheperiodfromMarchtoMaycomprisesthesummerseasonsand in subsequentmonths from June to September, the area comes under theinfluence of south‐west monsoons. The months of October and Novemberexperience the post‐monsoon seasons, while winter seasons lasts fromDecembertoFebruary.

PresentationofPrimaryData:

A weather station was installed onsite to collect hourly data. This stationmeasuredwindspeedanddirection,temperature,relativehumidity,andrainfall.

Thedetaileddata on themicroclimateof the sitewas collected for a periodofthree month (Dec 2016 ‐ Feb 2017), representing the winter season. Amicrometeorologicalstationwassetupinthestudyareaneartheprojectsiteforcollection of data at hourly intervals during the study period. Temperature,humidity, wind speed and direction, pressure, rainfall and cloud cover weremonitoredathourlyintervals.ThedatasummariesaregiveninTable3.2.

Table3.2:MicrometeorologicalConditions

Month Averagewindspeed(km/hr)

Temperature(0C)

RelativeHumidity(%)Min Max

December2016 3 230C 320C 76%January2017 3 220C 340C 61%February2017 4 200C 330C 54%

ItwasobservedthatthepredominantwinddirectionduringwinterseasonwasNorthWest.Theaveragewind speedwas2.46m/s.Wind rose ispresented inFigure3.2.

Page 36: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 35

Figure3.2:WindRoseatstudyarea

3.3.2 AMBIENTAIRQUALITY

Air pollution can cause significant effects on humans, animals, vegetation andmaterials.Theprojectconstructionisnotamajorcontributortotheairpollutionexcept for particulatematter emission during both construction phase due toplant and machinery and vehicular pollution during use phase. However, airenvironmentmonitoringcoveredtheparameterforwhichNationalAmbientAirQualitystandardshavebeendefinedbytheMinistryofEnvironmentandForests.Accordingly,parametersmonitoredwerePM10,PM2.5,OxidesofNitrogen(NOx),Sulphurdioxide(SO2)andCarbonmonoxide(CO).

Anassessmentofbaselineairqualitywasundertaken:

(a)Toestablishthestatusofexposureofthemajorsensitivereceptors

(b)Toidentifythemajorairpollutionsourcesandtheirimpactsontheareasurroundingthesite.

Thefollowingsourcesofairemissionswereidentifiedwithintheimpactzone:

VehicularEmissionsonRevdanda‐MurudRoad

Vehicularandconstructionactivitiesinthesurroundingareasofthesite;and

NORTH

SOUTH

WEST EAST

7%

14%

21%

28%

35%

WIND SPEED (m/s)

>= 11.1

8.8 - 11.1

5.7 - 8.8

3.6 - 5.7

2.1 - 3.6

0.5 - 2.1

Calms: 20.88%

Page 37: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 36

Other sourcesofairpollutionwithin the impact zone includedomestic fuelcombustion.

Awelldevisedairqualitymonitoringprogramwasundertakentoascertainthemajorairpollutants(PM10,PM2.5,SO2,NOX,andCO).

During the time of ambient air quality sampling (winter) the monitoringlocations were selected by taking into consideration the long‐termmeteorological trends to obtain the predominant wind direction. Monitoringstationswereplacedatsensitivereceptorswithin5kmradiusfromtheprojectsite.Monitoringstationswereplacedattheheightof3metersat&aredescribedinTable3.3.ThelocationsselectedfortheairmonitoringareshowninFigure3.1.

Table3.3:AmbientAirQualityMonitoringStationsLocation

Sr.No. MonitoringLocation

DistancetoSite(km)

DirectionfromSite

1 ProjectSite ‐ ‐

2 Wandelivillage 0.4 S

3 Borlivillage 0.1 SE

Airqualitywasmonitoredatfivelocationsfor24hours,twiceaweek,foratotalof 12weeks as per the guidelines specified by theMoEF. The volumetric flowrateofeachsamplerwasmaintainedat1.1‐1.2l/min.CollectedairsamplesareanalysedbyusingstandardproceduresprescribedbyCentralPollutionControlBoard(CPCB),IndianStandards:IS5182andAmericanPublicHealthAssociation(APHA).DetailsoftechniquesusedforanalysisofairsamplesaregiveninTable3.4.

Page 38: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 37

Table3.4:TechniquesUsedforAnalysisofAirQuality

Sr.No.

ParameterCodeofPractice

SamplerEquipment/InstrumentsforAnalysis

MethodologyAdopted

1. PM10IS:5182(PartIV)

RespirableDustSamplerwithCycloneSeparator

BalanceGravimetricMethod

2. PM2.5 PM2.5

Sampler Balance

GravimetricMethod

3. SO2IS:5182(PartV)

HVS Colorimeter Colorimetric

4. NOxIS:5182(PartV)

HVS Colorimeter Colorimeter

5.Carbonmonoxide(CO)

IS:5182(PartX)

BladderandAspirator

GasChromatographwithMethaniser

FlameIonizationDetector

PresentationofAirQualityAnalysisResults

Ambient air quality analysis results for the three monitoring locations, whichwereselectedtorepresentbaselineconditionsoftheregion,aregivenbelow.

The summary of the monitoring results including minimum, maximum andaveragelevelsalongwiththe98thpercentilevaluesarepresentedinTable3.5.Theresultsobtainedwerecomparedfor24hrsaveragestandardsforresidentialareas prescribed by theNationalAmbientAirQuality Standards (NAAQS). Theanalysis results of all the locations carried out during the study period arepresented in Annexure IV. The National Ambient Air Quality Standards arepresentedinTable3.6.

Page 39: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 38

Table3.5:AmbientAirQualityStatus

Sr.No.

Location

Concentrations

RSPM(μg/m3)

PM2.5(μg/m3)

SO2(μg/m3)

NOx(μg/m3)

CO(mg/m3)

1. ProjectSite

Maximum 61.6 31.9 22.4 23.7 0.8

Minimum 50.3 22.4 13.6 14.5 0.5

Average 57.2 27.9 19.3 19.1 0.7

StandardDeviation

3.4 2.8 2.6 3.1 0.1

98thPercentile 60.8 31.6 22.4 23.6 0.8

2. WandeliVillage

Maximum 62.5 35 24 25 0.7

Minimum 53.9 25 15 17 0.5

Average 60.6 31 20 22 0.6

StandardDeviation

2.8 3 3 3 0.1

98thPercentile 62.4 34 24 25 0.7

3. BorliVillage

Maximum 61 38 22 24 0.72

Minimum 51 28 12 14 0.44

Average 58 34 18 20 0.60

StandardDeviation

3 3 3 3 0.09

98thPercentile 61 38 22 23 0.70

Table3.6:NationalAmbientAirQualityStandards(NAAQS)

Sr.No. Pollutants

TimeWeightedAverage

ConcentrationinAmbientAir(inµg/m3exceptindicated)IndustrialResidential,

RuralandOtherAreas

SensitiveArea

1 Sulphurdioxide(SO2)AnnualAverage* 50 20

24Hours** 80 80

2 NitrogenDioxide(NO2)

AnnualAverage* 40 30

24Hours** 80 80

3ParticularMatter(Sizelessthan10µg)orPM10

AnnualAverage* 60 60

24Hours** 100 100

Page 40: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 39

Sr.No.

PollutantsTimeWeighted

Average

ConcentrationinAmbientAir(inµg/m3exceptindicated)IndustrialResidential,

RuralandOtherAreas

SensitiveArea

4ParticularMatter(Sizelessthan2.5µg)orPM2.5

AnnualAverage* 40 40

24Hours** 60 60

5 Lead(Pb)AnnualAverage* 0.50 0.50

24Hours** 1.0 1.0

6 Carbonmonoxide(CO)8HourAverage 02mg/m3 02mg/m3

1HourAverage 04mg/m3 04mg/m3

7 Ammonia(NH3)AnnualAverage* 100 100

24Hours** 400 400

8 Benzene(C6H6) AnnualAverage* 05 05

9Benzo(a)Pyrene(BaP)‐particulatephaseonly

AnnualAverage* 01 01

10 Arsenic(As) AnnualAverage* 06 06

11 Nickel(Ni) AnnualAverage* 20 20

12 Ozone(O3)8HourAverage 100 100

1HourAverage 180 180

* Annualarithmeticmeanofminimum104measurementsinayeartakentwiceaweek24hourlyatuniforminterval

** 24hourly/8hourlyvaluesshouldbemet98%ofthetimeinayear.However,2%ofthetimeitmayexceedbutnotontwoconsecutivedays

3.4 NOISEENVIRONMENT

Noise in general is a sound composed of frequency components of variousloudnessdistributedovertheaudiblefrequencyrange.Thefactorsonwhichthesound is described as noise depends upon its degree of loudness, period ofexposureandtimeofdayandlocationatwhichitoccurs.

The noise levels measurements were carried out by measured (A‐weighted)usingprecisionnoiselevelmeter.Thenoiselevelsurveywascarriedatalltheairmonitoringstationslocatedwithinthe5kmradiusoftheproposedprojectsite.Themajor source identified in the study area is of vehicular trafficmovementandtheconstructionactivities.

Backgroundnoiselevelswerealsomonitoredinstudyarea.

Page 41: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 40

3.4.1 MethodologyforNoiseMonitoring

Soundpressurelevel(SPL)measurementswereautomaticallyrecordedwiththehelp of an Integrated Sound LevelMeter to give the equivalent noise level foreveryhourcontinuouslyfor24hoursinaday.Inthismanner,1fullday(i.e.24hourlyvalues)ofdatawascollectedateachofthefourlocations.

SelectionofNoiseMonitoringLocations:Thelocationsselectedfornoisemonitoringwere

ProjectSite(R) WandeliVillage BorliVillage KorlaiVillage

Allthefourlocationsarelocatedintheresidentialzone.ResultsThe equivalent noise levels viz., Lday and Lnight at all the noise monitoringlocations are presented inTable 3.7. The equivalent noise levels obtained atthese locations were compared with day time and night time Ambient NoiseQualityStandardswhicharegiveninTable3.8.

Table3.7:NoiseMonitoringResults

Sr.No. Location

DayTime NightTime

LeqdB(A)

LimitdB(A)

LeqdB(A)

LimitdB(A)

1 ProjectSite 53.3 55 44.2 45

2 Wandelivillage 54.2 55 41.6 45

3 Borlivillage 54.6 55 43.2 45

4 Korlaivillage 53.8 55 44.1 45

Daytimeshallmeanfrom6.00a.m.to10.00p.m.Nighttimeshallmeanfrom10.00p.m.to6.00a.m.

Table3.8:AmbientNoiseQualityStandards

AreaCode CategoryofArea/ZoneLimitsindB(A)Leq*

DayTime NightTime(A) Industrialarea 75 70(B) Commercialarea 65 55(C) Residentialarea 55 45(D) SilenceZone 50 40

Daytimeshallmeanfrom6.00a.m.to10.00p.m. Nighttimeshallmeanfrom10.00p.m.to6.00a.m. Silencezone isdefinedasanareacomprisingnot less than100metersaroundhospitals,

educationalinstitutionsandcourts.Thesilencezonesarezones,whicharedeclaredassuchbythecompetentauthority.

Page 42: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 41

Mixedcategoriesofareasmaybedeclaredasoneofthefourabove‐mentionedcategoriesbythecompetentauthority.

3.5 WATERENVIRONMENT

Ground water sample of exiting well were identified within the study area.However the upcoming project will not affect these water bodies directly orindirectly.

ThedrinkingwaterisprovidedbyPhansadDamthroughGrampanchayat.

Water analysis of physico‐chemical and parameters related to health werecarriedout asper theStandard IS10500 to assessbaselinewaterquality.TheresultsofthewaterqualityalongwiththeparameterswhichweremonitoredaregiveninTable3.9

Aftertheanalysisofthecollectedwatersample, itwasobservedthatpHofthewatersamplewasobservedtobe7.1.

Allresultswerefoundwithinthedesirablelimits.

HeavymetalssuchasCopper,Chromium,Lead,Cadmium,Arsenicetc.werenotfoundinthewatersample.

Table3.9:GroundWaterQualitywithintheStudyArea

Sr.No.

Parameters UnitProjectSite

IS10500standardsDesirable Permissible

1 pH ‐ 7.1 6.5‐8.5 6.5‐8.52 Temperature 0C 28 NS NS3 Turbidity N.T.U. 0.6 5 104 Colour Hazen 3 5 25

5 Odour ‐Unobjectionable

Unobjectionable

Unobjectionable

6 Alkalinity mg/l 163 200 6007 SuspendedSolids mg/l 6.3 NS NS

8 TotalDissolvedSolids

mg/l 182 500 2000

11 Chloride mg/l 47 250 100012 Sulphate mg/l 19.3 200 40013 Nitrate mg/l 0.60 45 10014 Fluoride mg/l N.D 1.0 1.515 TotalHardness mg/l 176 300 600

16TotalAmmonicalNitrogen

mg/l 0.8 NS NS

17 FreeAmmonia mg/l 0.03 NS NS18 TotalPhosphorus mg/l N.D. NS NS19 Boron mg/l N.D. 1 5

20ElectricalConductivity

mmhos/cm

326 NS NS

Page 43: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 42

Sr.No.

Parameters Unit ProjectSite

IS10500standardsDesirable Permissible

21 Iron mg/l N.D. 0.3 1.022 Copper mg/l N.D. 0.05 1.523 Zinc mg/l N.D. 5 1524 Lead mg/l N.D. 0.05 0.0525 Cadmium mg/l N.D. 0.01 0.0126 Chromium mg/l N.D. 0.05 0.05

27 HexavalentChromium

mg/l N.D. NS NS

28 Phenol mg/l N.D. 0.001 0.00229 TotalColiform No./100ml <2 10/100ml 10/100ml30 FecalColiform No./100ml <2 10/100ml 10/100ml

Note:N.D:‐NotDetected,N.S:‐NOTSpecifiedTheproposedprojectarealiesinRaigaddistrictinMaharashtrawhereinPanvelcreek,Talojacreek(TalojeRiverandKasardiRiver)majorsurfacewaterbodiesin the area. The Kasardi River water is polluted due to disposal oftreated/untreatedeffluent fromthe talojaMIDCarea.TheKasardiRiver finallymeets to Taloja Creek. Taloja creek is also polluted due to disposal of sewagefromKharghararea.PanvelcreekmovesfromNortheasttowardsSouthwestinthe study area. Groundwater sources are alsoused inmost of the villages fordrinkingandagriculturalpurposes.Due to high rainfall and loamy soil, the drainage intensity is high. The rockformationinthisregionismainlyderivedfromDeccanbasalt.Theareaisgentlysloping towards the coast onwest and is coveredwithmoderately shallow todeepsoils,mostlylateriticinnature,sometimesoxidizedtoyellowmurrum.ThePatalganga,Kundalika,AmbaandSavitririversconstitutethewesterlydrainagesystem of the coastal region. The drainage pattern is sub parallel which iscontrolled by joints and fractures. The land is highly undulating with denseforest hills to flat land with occasional low raised but weathered outcrops ofsedimentary&metamorphic.Soilsaremostlyloamyincharacter.

3.6 SEISMOLOGY

StudyareaisclassifiedundertheZoneIIIoftheBureauofIndianStandards(BIS)2000 seismic zonemap for India as seen inFigure3.3. Zone III is defined ashavingamaximumintensityexpectedofaroundVIIonMMscale.

Figure3.3:SeismicZoneMapofIndia

Page 44: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Zone Max.MSKIntensity2 VI3 VII4 VIII5 IXorhigher

Structurally, proposed project at has been designed to meet seismicrequirementsofZoneIII.

3.7 SOIL Soilsamplewerecollectedatprojectsitetoestablishthebaselinecharacteristics.Soil sample have been collected using auger from a depth of 60 cm from onelocation. Soil sample collected were analysed for physical and chemicalcharacteristics.TheresultsoftheanalysisaregiveninTable3.13.Texture isan importantparameterof thesoilwhichdeterminestheusefulnessforagriculturepurposes.Soilismainlycomposedofthreemineralsi.e.sand,silt,and clay. According to their size, these mineral particles are grouped intoseparates.Soilseparateinagroupofmineralparticlesthatfitwithindefinitesizelimits expressed as diameter in millimetres. A quantitative assessment of theparticle size distribution in the soil was made by wet sieve analysis andsedimentation analysis using hydrometer, as per procedures laid down in IS:

Page 45: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 44

2720PartIV.AccordingtoBISclassificationsystem,soilsareprimarilyclassifiedbasedondominantparticlesizesand itsplasticitycharacteristics.Soilparticlesmainlyconsistoffoursizefractions.TheparticlesizesaredesignatedaccordingtothescalementionedinIS:1498,areshownbelow:

Table3.10A:ParticleSizeDistributionasperIS:1498

Sr.No. SoilTypes RangeofParticleSize1. Gravel 80– 4.75mm2. Sand 4.75mm– 0.075mm(75microns)3. Silt 75– 2micron4. Clay lessthan2micron

Table3.10B:ParticleSizeDistributionandTextureofSoilwithintheStudyArea

Sr. LocationsParticleSizeDistribution

(%) TextureSand Clay Silt

1 ProjectSite 50.3 49.1 0.6 SandyClay

Table3.11:SoilQualityParametersintheStudyArea

Sr.No. Parameters LocationAtProjectSite

1 pH 6.72 EC+(mS/cm) 1.453 CEC*(mEq/100gm) 12.44

Organicmatter(mg/kg) 17.5

5 Sodium(mg/kg) 2186 Nitrogen(mg/kg) 2817 Phosphorus (mg/kg) 7.268 Potassium(mg/ha) 3849 Copper(mg/kg) 45.110 Zinc(mg/kg) 48.211 Texture#(%) SC12 WaterholdingCapacity(%) 38.413 Porosity(%) 32.0

ND–NotDetectable

3.8 BIOLOGICALENVIRONMENT

3.8.1ECOLOGY

The ecological survey was carried out to establish the baseline ecologicalconditionsoftheregion.Theprojectbeingresidentialinnaturewillnotaffecttheflora and fauna in the vicinity. On the contrary it will help in improving thegeneralambienceofthelocality.

Page 46: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 45

Description of ecological environment accompanied with possible importantdelinationisessentialtoimpactassessmentprocess.Biologicalenvironmenthasbeendefinedasallplantsandanimalsinagivenplaceandtimeandadescriptionof them. Also, it is defined as a "Science that concerns itself with theinterrelationships of living organisms, plants and animals and theirenvironment" (A. Macfadyen, 1957). However, only description of plants andanimals isnot justsufficient for theEIA,but it is importanttoknowhowthesecomponents will be affected adversively or positively due to the proposedactivities.

3.8.2FLORA

List of flora observed in study area is given inTable3.12. None of the plantspeciesisidentifiedasbelongingtorare,endangeredorthreatenedcategoryascomparedwith recordsofBotanical Survey of India (RedBook ofData,Nayar,1987,1988&1990)andother available reports suchasdata from thedistrictforest office and the related reference books from the BNHS on the subject(Billore,1972;Almeida,1996).

Table3.12:ListsofPlantSpeciesObservedinStudyArea

BotanicalName Habit Family EnglishandLocalNames

Acaciaauriculiformis T Fabaceae AustralianWattle,BangaliBaboolAzadirachtaindica T Meliaceae MargosaTree,NimBorassusflabellifer T Arecaceae PalmyraPalm,TadButeamonosperma T Fabaceae ButeaGumTree,PalasCalotropisgigantea S Asclepiadaceae GiganticSwallowWort,RuhiCarissacarandas S Apocynaceae CarandasPlum,KaraundaCocosnucifera T Arecaceae Coconut,NarielDelonixregia T Fabaceae MayFlower,GulmohurEucalyptusglobulus T Myrtaceae BlueGum,NilgiriFicusbengalensis T Moraceae Eve'sApron,Wad,BargadFicusglomerata T Moraceae DumriTree,UmberFicushispida T Moraceae RoughLeavedFig,KatgulariaGliricidiasepium T Fabaceae Gliricidia/MadreTreeIpomoeacarnea S Convolvulaceae BushMorningGlory,BesharamLantanacamara H Verbenaceae CommonLantana,RaimuniyaLeucaenaleucocephala

T Fabaceae LeadTree,Subabul

Madhucaindica T Sapotaceae HoneyTree,MahuaMangiferaindica T Arecaceae MangoTree,AamMorindapubescens T Rubiaceae IndianMulberry,AalMoringaoleifera T Moringaceae DrumstickTree,SahjanPeltophorumpterocarpum

T Fabaceae CopperpodTree,Peltophorom

Page 47: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 46

BotanicalName Habit Family EnglishandLocalNamesPongamiapinnata T Fabaceae IndianBeechTree,KaranjSalmaliamalabarica T Malvaceae WhiteSilkCotton,SafedSimulSyzygiumcumini T Myrtaceae IndianJamun,JamunTamarindusindica T Fabaceae Tamarind,AmbliTectonagrandis T Verbenaceae Teak,SagwanTerminaliaarjuna T Combretaceae ArjunTerminaliacatapa T Combretaceae IndianAlmound,DeshiBadamThespesiapopulnea T Malvaceae PortiaTree,GajadandaZiziphusmauritiana T Rhamnaceae IndianPlumTree,Ber

3.8.3FAUNA

Thefaunaofanarea isdependentuponthevegetationandtherearecountlessrelationshipsbetweenthespeciescomposingananimalcommunity.Assessmenttechniques generally provide information on the dominant species, rare orendangered species, species sensitive to impacts and important ecologicalinterrelationships.Thereareseveralmethodsinwhichanimalsmaybeassessed.Thechoiceofmethodthatisusedvarieswiththeextentandpurposeofstudy.A published list from Forest Departments (Thane and Raigad District) andinformationgatheredfromthepeopleresidinginandaroundthestudyareawasusedasreferencematerials.

AVIFAUNA A total number of 71 species of birds including aquatic birds were identifiedduringtheecologicalsurvey.Table3.13givesthelistofavifaunarecordedinthestudyarea.Themoststrikingwastheavifaunaandduetotheactivelocomotionoftheirbodycataloguingspecieslistmethodwasappliedintheassessment.Themark‐recapturemethodwasnotpracticallyfeasibleforthepresentstudy.

Table3.13:ListofAvifaunaRecordedintheStudyArea

Family ScientificName CommonName StatusAccipitridae Accipiterbadius Shikra RSturnidae Acridotherestristis Indianmyna RAlcedinidae Alcedoatthis Commonkingfisher RPasseridae Anthusrufulus Paddyfieldpipit RRallidae Amaurornis

phoenicurusWhitebreastedwaterhen

R

Apodidae Apusaffinis HouseSwift RArdeidae Ardeolagrayii Pondheron RStrigidae Athenebrama SpottedOwlet RArdeidae Bubulcusibis Cattleegret RCuculidae Centropussinensis GreaterCoucal R

Page 48: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 47

Family ScientificName CommonName StatusMuscicapidae Cercomelafusca Brownrock‐chat RCharadriidae Charadriusdubius Littleringedplover RColumbidae Columbalivia Bluerockpigeon RMuscicapidae Copsychussaularis OrientalMagpieRobin RCoraciidae Coraciasbenghalensis Indianroller/bluejay RCorvidae Corvussplendens Housecrow RPicidae Dendrocopos

mahrattensisYellowcrownedwoodpecker

R

Dicaeidae Dicaeumagile Thick‐billedFlowerpecker

R

Corvidae Dicrurus macrocercus Blackdrongo RArdeidae Egrettagarzetta Littleegret RAccipitridae Elanuscaeruleus Black‐shoulderedkite RFringillidae Emberizabruniceps Redheadedbunting WVCuculidae Eudynamysscolopacea AsianKoel RFalconidae Falcoperegrinus Peregrinefalcon RFalconidae Falcotinnunculus CommonKestrel RScolopacidae Gallinagogallinago Commonsnipe WVScolopacidae Gallinagostenura Pintailsnipe WVAccipitridae Haliasturindus Brahminikite RDacelonidae Halcyonsmyrnensis Whitethroated

kingfisherR

Cuculidae Hierococcyxvarius CommonHawkCuckoo RRecurvirostridae Himantopus

himantopusBlackwingedstilt R

Hirundinidae Hirundodaurica Red‐rumpedSwallow RMHirundinidae Hirundosmithii Wiretailedswallow RDaniidae Laniusschach Rufousbackedshrike RDaniidae Laniusvittatus BaybackedShrike REstrildinae Lonchurapuntulata Scaly‐breastedMunia RCapitonidae Megalaima

haemacephalaCoppersmithBarbet R

Meropidae Meropsorientalis Smallgreenbee‐eater RAccipitridae Milvusmigrans CommonpariahKite RPasseridae Motacilla

maderaspatensisWhite‐browedwagtail R

Passeridae Motacillacinerea Greywagtail RMPasseridae Motacillaflava Yellowwagtail RMCisticolidae Orthotomussutorius CommonTailorbird RParidae Parusmajor Greattit RAccipitridae Pernisptilorhyncus Honeybuzzard RPhalacrocoracidae Phalacrocoraxniger LittleCormorant RMuscicapidae Phoenicurusochruros Blackredstart WVPloceidae Ploceusphilippinus Bayaweaver RPsittacidae Psittaculakrameri Roseringedparakeet RPycnonotidae Pycnonotuscafer RedventedBulbul RPycnonotidae Pycnonotusjocosus RedwhiskeredBulbul R

Page 49: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 48

Family ScientificName CommonName StatusMuscicapidae Rhipiduraaureola Whitebrowedfantail

flycatcherR

Muscicapidae Saxicoloidesfulicata Indianrobin RAccipitridae Spilornischeela Crestedserpenteagle RLaridae Sternaaurantia Rivertern RLaridae Sternaacuticauda Blackbilledtern RColumbidae Streptopeliachinensis Spotteddove RColumbidae Streptopelia

senegalensisLaughingdove R

Sturnidae Sturnuspagodarum Brahminystarling RThreskiornithidae Threskiornis

melanocephalusBlack‐headedibis R

Scolopacidae Tringahypoleucos Commonsandpiper WVScolopacidae Tringanebularia CommonGreenshank WVScolopacidae Tringaochropus GreenSandpiper WVScolopacidae Tringatotanus CommonRedshank WVSylviidae Turdoidescaudatus Commonbabbler RStrigidae Tytoalba BarnOwl RCharadriidae Vanellusindicus Redwattledlapwing RR–Resident,WV–WinterVisitor,RM–ResidentMigrant

ThefaunaofthestudyareashowsaverywidediversityThe common domestic animals observed during the survey are Bos indicus(Cow), Babalus babalis (Buffalo), Capra domesticus (Goat), Felis domesticus(Cat),Canisfamiliaris(Dog),Susdomesticus(Pig),Equuscabalus(Horses)werealsonoticedduringthesurvey.ThelistoffaunasitedinthestudyareaispresentedinTable3.14.Theidentifiedfauna in thestudyareahasbeenclassifiedwith respect to theirPhylum,Class,RedDataBookcategory,etc.

Table3.14:ListofFaunaObservedintheStudyArea

Class ScheduleWPA1972 Scientificname Commonname

InsectaButterflies Catopsiliapomona CommonEmigrant

Cynthiacardui PaintedLady Danausgenutia StripedTiger Euremahecabe CommonGrassYellow Limenitisprocris Commander Neptishylas CommonSailor Pachlioptaaristolochiae CommonRose Papiliopolymnestor CommonMormon Paranticaaglea GlassyTiger Symphaedranais Baronet

Grasshoppers

Chorthippusbicolor CommonGrasshopper Poecilocerapicta PaintedGrasshopper

Ants Oecophyllasmaragdina WeaverAnt Crematogastersp PagodaAnt

Page 50: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 49

Insecta Bees Apismellifica HoneyBeeSpiders Attidaesp JumpingSpider

Argiopesp SignatureSpiderAmphibia IV Ranacyanophlyctis SkipperFrog

IV Ranatigrina IndianBullfrogReptilia Calotesversicolor CommonGardenLizard

Mabuyacarinata CommonSkinkII Xenochropispiscator CheckeredKeelback

Mammalia V Bandicotaindica BandicootRatIV Funambuluspalmarum ThreestripedpalmsquirrelII Herpestesedwardsi CommonMongooseV Pteropusgiganteus IndianFlyingFox

Page 51: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 50

CHAPTER4ENVIRONMENTALIMPACTIDENTIFICATION,PREDICTION

ANDANALYSIS

4.1 INTRODUCTIONEnvironmental impact assessment involves identification, prediction andevaluationofpotentialimpactsoftheproposedactivitieswithinthestudyarea.These activities include all the actions that are required for successfulconstruction of project and its use. The baseline setting for the environmentalcomponents are documented in the previous chapter whereas the presentchapterdiscussespotentialimpactsduringtheconstruction/Operationphases.Theimpactidentificationandpredictionprocessaimsto:

Identifypotentialsourceorcauseofimpactthroughoutthelifeofproject

Assess the potential of changing likely‐hood of impact throughEnvironmentalManagementPlan(EMP).

4.2 POLLUTIONSOURCESPollutantsgeneratedinthedevelopmentofproposedHotelResortprojectduringboth the construction and functional phases are solid, liquid and gaseous innature. Also the generation of pollution could be continuous, periodic oraccidental.SourcesofpollutantsandtheircharacteristicsduringtheconstructionandfunctionalphasearegivenbelowinTable4.1.

Table4.1:PollutantSourcesandCharacteristics

Sr.No.

Activity/Area Pollutant Pollutant

Characteristics Frequency

CONSTRUCTIONPHASE1. Site

PreparationAir emissions– SPM, PM10,CO,NOx,SO2

Dustfrom,constructionactivitiesandexcavation.Particulates,NOxandCOfromvehicleexhaust

Temporaryduringconstructionphaseandduringgroundworkingandlevellingactivities.

Earth / solidwaste

Solidwastefromconstructionactivityandexcavation(foundationpurpose).

Periodic.

Noise Noisegeneratedfromconstructionequipmentandmachinery

Temporaryduringinitialconstructionphase.

Page 52: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 51

Sr.No.

Activity/Area Pollutant

PollutantCharacteristics Frequency

SolidWaste SolidWastegeneratedfromtemporarylabourcampsonsite

Temporary–duringtheinitialconstructionphase

FUNCTIONALPHASE1. Vehicular

movementAir emissionsandNoise

Vehicleexhaustemissions

Continuous/Periodic

2. SewagetreatmentPlant

Solidwaste Settledandstabilizedsludge

Continuous

Treatedwater Treatedsewageusedforhorticulture

Continuous

3. Maintenance/Hotelstaff

Wastewater Floorwashing ContinuousSolidwaste Usedequipment

partsandgardenwastes

Continuous

4. VehicleParkingArea

OilSpills Minoroilleaksinparkinglot

Continuous–smallquantities

5. Storm waterdrains

Wastewater Contaminationdischargefromsite–Mainlysuspendedsolids

Duringrainyseason

4.3 IMPACTIDENTIFICATIONThe critical areas of environmental concerns for which the impacts and theirpredictionsaretakenintoconsiderationaremainly:

LandEnvironment

WaterEnvironnent

AirEnvironnent

NoiseEnvironnent

Aesthetics

SocioeconomicEnvironment

EnergyConservation

TrafficImpact

Theimpactscanbefurthercategorizedaspositiveimpactsandnegativeimpactsdependingupontheirnature,potentialandmagnitude.

4.3.1 EnvironmentalAspectsofConstructionOperationsMajorenvironmentalconcernsrelatedtoconstructionactivitiesare:

Generation,storage,anddisposalofwastes;

Page 53: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 52

Noise pollution due to plant, machinery, equipments and vehiclemovement;

Airpollutionduetomachinery,equipmentsandvehiclemovement;

Generationanddisposalofwastewater;

Consumptionofresourcessuchaswater,electricity

Soil erosion caused due to loss of vegetation and other constructionactivities.

4.3.2 EnvironmentalAspectsofBuildingPlanningandUseImpactsidentifiedduringoperationoftheResortsuchas:

Disposalofdomesticsewage.

Disposalofsolidwastesgeneratedintheproposedproject.

Increaseinemissionsduetovehiculartraffic.

Increaseinnoiselevelsduetotransport.

Environmental aspects of complex are not just limited to impact of sources ofpollutionbutalsorelateto:Sr.No. Area Aspect

I. Energyconservation

SolarHeatingNaturalVentilationInteriour/ExteriorLighting

II. WaterConservation

ReuseofrecycledWaterGardeningWaterSourceBathroomFittingsRainwaterHarvesting

III. MaterialUseConstructionMaterialsSelectionPaintSelectionUseofRecycledMaterials

IV. AestheticsDuringFunctionalUse

ParkingStandbyPowerSupplyProvisionforGarden

4.4 LANDENVRIONMENT

ThelandisflatandslopingtowardsWestdirection.Theexistinglandusewillbealteredduetoproposedproject

Page 54: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 53

Figure4.2:Googleimageofprojectsiteandsurrounding

Page 55: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 54

Landarea,builtuparea:Theprojectwillbedevelopedonthe landcomprisingabout4030m2area.Thetotalbuiltuparea(FSIProposed)oftheProjectis1002.22m2.

Water Supply: The total water requirement of project will during operationphase will be 15 KLD. Sewage generation is 9 KLD. Total Fresh waterrequirement is 8 KLD. Water will be source from Phansad Dam throughGrampanchayat. 4 KLD of treated water will be used for flushing, 5 KLD forgardeningpurpose.

Power:ThemaxdemandloadforProject is0.08MW.ThepowerwillbemadeavailablefromtheMSEB.Connectivity:TheprojectsiteisaccessiblebyRevdandaMurudRoad. Parking:Thefourwheelerparkingrequiredasperruleis20Nosandprovidedis20Nos.Thetwowheelerparkingrequiredasperruleis12Nos.andprovidedis12Nos.Construction debris: The construction debris generated during constructionphaseis40m3.Theregularhealthcheckofconstructionworkerswillbecarriedoutatprojectsite.ThePersonalprotectiveequipment’swillbeprovidedtoeachworker.Theregulartrainingonhealthandsafetywillbegiventotheworkers.During construction phase activities such as clearance, cutting, filling andLevellingwill take place. Construction activities involving levelling, excavation(Foundation purposes) and removal of existing vegetation would invariablydisturbthesoilofthearea.Theimpactsonsoilduringconstructionphaseshallbemainlyduetolossoftopsoil intheconstructionareasandcontaminationofthesoilsofsurroundingareaduetoconstructionmaterialssuchascement,sandetc.

4.5 WATERENVIRONMENT

Thewater requirementduringconstructionphase is5KLD.Groundwaterwillnot be used during construction phase. Therefore, impact on ground wateravailabilityisinsignificant.Thecurrentgroundwaterlevelisintherangeof0.5‐1.0m.

Domestic water supply for the proposed project of the project will be fromPhansadDamthroughGrampanchayat.The totalwaterrequirementofprojectwillbe15KLD.Sewagegeneration is9KLD.TotalFreshwaterrequirementis8KLD.WaterwillbesourcefromPhansadDam throughGrampanchayat.4KLDof treatedwaterwillbeused for flushingand5KLDforgardeningpurpose.

TreatedwaterfromSTPwillbeusedforflushingintoiletsandlandscapearea.

Theprojectactivityshallhaverainwaterharvestingonlyofrainfallonterraces.RWHtankof10m3willbeprovided.Thestoredwaterwillbeusedfordomesticpurpose.

Page 56: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 55

Stormwater: Stormwatergeneration from theentireplot area is0.22m3/sec.SWDarealreadydevelopedinandaroundtheprojectsite.StormwaterGenerationCalculation

1)Unpavedarea(a) 415.15m2

Maximumrainfall(b) 150mm/hr

Totalvolumeofrainfall(axbx0.4) 25m3/hr

2)Pavedarea(a) 3,614.85m2

Maximumrainfall(b) 150mm/hr

Totalvolumeofrainfall(axbx0.8) 433.7m3/hr

Totalstormwater 458.7m3/hr

Stormwaterdrainsof300mmwillbeprovidedalongtheplotboundary.

TheplanshowingSWDlineatprojectsiteisgiveninfigure4.2:

Page 57: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 56

Figure4.2:StormWaterDrainagePlan

Page 58: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 57

To prevent degradation and maintain the quality of water source, adequatecontrolmeasures have been proposed to check the surface run‐off, as well asuncontrolledflowofwaterintoanywaterbody. Avoidexcavationduringmonsoonseason.

Rainwaterharvestingcanserveasasolutiontowaterprobleminworstcasescenario.

Following methods can increase efficiency of rainwater harvesting andrecharginggroundwater.

Catchdrainageallalongtheperipheryofplottopreventsurfacerunoff.

Reduceandfiltersurfacerunoff.

Usevegetatedswalesanddepressionstoreducerunoff.

Impactsoftheproposalonthegroundwater:Intheproposeddevelopmenttherewillbenotappingofgroundwater.WaterdemandfortheoperationalphasewillbemetfromsourcessuchasTMC.

Unsanitary conditions during construction phase: No, the deployment ofconstruction labourers will not lead to any unsanitary condition. Theconstruction labourerswill be providedwith temporary shelter shadeswithinthe project premises. The unsanitary condition will be removed by means ofprovidingreadymadeseptictanks.Solidwastewillbedisposedoffinmunicipalwastedisposalsystem.

SewageTreatment:TheSewageTreatmentplant (STP) isdesigned to treat therawwastewatergenerated.Probableimpactonwaterresourcesintheoperationphasewillbemainlyduetodischargeofdomesticsewagegeneratedduringtheusephaseofthebuilding.

Thesewagegeneratedfromproposedprojectwillbearound9KLD.ThesewagewillbetreatedinSTPoftotal10KLDcapacity.Thetreatedsewagewillbeusedforflushingandgardeningpurpose.

Dualplumbingsystem:Theproposeddevelopmentwillhavethedualplumbingsystemasthetreatedsewagewillbeusedforrecycling.

4.6 ECOLOGICALENVIRONMENT

VEGETATION:

Impactonecologymaybeoftwotypes:(1)physicaldisturbances,(2)Exposuretopollutants.

There is no sensitive ecosystem present at site that will be disturbed by theproject,asexistinglanduseinsurroundingareaisresidentialandcommercial

Disturbances of physical environment either directly by occupation of land orindirectlybychangesinwaterlevelsandflow,soilstructure,landformetc.canhave effect of removing habitats, plants and animals or, disturbing feeding,

Page 59: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 58

roosting, nesting, reproduction and migration requirements. Damages to thehabitatscanbecausedbyvariousconstructionactivities.

FAUNA

Therewillbenodirectorindirectimpactontheavifaunaofthearea.

Thesightingsofbirdspecieswerevery lessduring thestudyperiod.Themostcommonly spotted bird species of this area were; Parrot, sparrow, Owl, BatIntermediate Egret, Red‐wattled Lapwing, Spotted Dove, House Crow, PurpleSunbird,BankMynaandcommonMyna,MagpieRobin,CattleEgret,RockPigeon,,Puff‐throatedBabbler,White‐breastedKingfisher,Wire‐tailedSwallow.

4.7 AIRENVIRONMENTTheprojectwillresultinnegligibleincreaseintheatmosphericconcentrationsofgases due to increased traffic. The proposed activity will not result in theformationofanyheatislands,asitdoesnotinvolveanysignificantchangeinthelandusepattern.ThebaselineconcentrationofpollutantsatprojectsiteisgivenbelowSourcesofairpollutionduringconstructionphaseare:

Movementofvehiclestocarryconstructionmaterial;

Siteclearance/excavation(Foundationpurpose);

Emissionfromconstructionmachinery;and

Emissionsduetovehicularmovement

Vehiclescarryingconstructionmaterialareexpectedtoresult inincreasedSPMlevels. This can be of potential importance if the vehicles pass through theresidentialareas.At the constructionyard, thedust levels arealsoexpected toincreaseduetounloadingofconstructionmaterials.

4.8 NOISEENVIRONMENT

Construction Phase: Increase in ambient noise levels is expected duringconstruction phase. The operation of construction / material handlingmachinery. Construction vehicles employed for transporting variousconstruction materials will also lead to increase in ambient noise levels.However thiswill be short term impacts andwill be restricted to constructionphaseonly.

Themagnitudeof impact fromnoisewilldependupontypeofequipmenttobeused, constructionmethod and also onwork scheduling.Thequantityof thewastebeingverysmall,thehoursofoperationsisnotexpectedtobemorethan one shift. Further, it has been decided not to operate the landfill aftersunset.Thus,itisnotexpectedtoaffectambientnoiselevels.

Noise limit/specifications forconstructionequipment’sarenotyetprescribedby MoEF. However, the limited information on some of the equipment’s isavailableandistabulatedbelow:

Table4.2:NoiseLimitsforAppliances&Equipment’satConstructionStage

Page 60: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 59

Equipment Noise LimitdB(A)

WindowAirConditioner 68AirCooler 60DieselGenerators 85‐90Compactors (rollers), front loaders, concrete mixers,cranes,vibrators&saws 75

General noise levels generated from the operation of construction equipmentandmachineryareprovidedinTable4.3.

Table4.3:NoiseLevelsGeneratedfromConstructionEquipment

Equipment NoiseLevelat1mfromsource,dB(A)*BackHoe/Loader 105ConcreteMixer 109ConcretePump 94ConcreteVibrators 101DumpTruck 107Hammering 110Jackhammer 112

*calculatednoiselevelsreferringtothesourceColumbiaWorkshop1‐ConstructionNoise.pdfTheresultantaveragenoiseemissionlevelat1mfromsource,ascalculatedfrominformationprovidedinTable4.3areconsideringthatallpertinentequipment’sareinoperationatatime,whichisaremotepossibility.The baseline noise level at project site and surrounding area is 54 dB(A).PredictionshavebeencarriedouttocomputethenoiselevelatvariousdistancesaroundtheprojectsiteandoutputisshowninFigure4.2Anticipated noise levels at project site and surrounding area resulting fromconstructionactivityhavebeencomputedusingpointsourcemodel.

Basicphenomenonofthemodelisthegeometricattenuationofsound.Noiseatapoint generates spherical waves, which are propagated outwards from thesourcethroughtheairataspeedof1,100ft/sec,withthefirstwavemakinganever‐increasing sphere with time. As the wave spreads the intensity of noisediminishes as the fixed amount of energy is spread over an increasing surfaceareaofthesphere.

Theassumptionofthemodelisbasedonpointsourcerelationshipi.e.,foreverydoublingofthedistancethenoiselevelsaredecreasedby6dB(A).Pointsourcepropagationisdefinedbythefollowingequation:

Noise(Receptor)=Noise(Source)–20log[Distance(Receptor)/Distance(Source)]

Page 61: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 60

Figure4.2:PredictedNoiseLevels

Useofproperpersonalprotectiveequipmentwillmitigateanysignificantimpactof thenoisegeneratedbysuchequipment.Similarly,as themajorworkwillbecarriedoutduringthedaytime,theimpactonthesurroundingareaduetotheactivitywillbenegligible.Functional Phase: The impact on noise during the operation phase of theprojectwillbeduetovehiculartraffic.Theincrementalnoiselevelatprojectsitewill be around 4 dB(A). The noise impact due to traffic on habitable floor isnegligible. Proper management of the entry & exit movement of the vehiclewouldreducethecongestionofroadsleadinginandoutoftheproposedproject.Implementationof trafficmanagementsystemswillhelp in lessening thenoiseimpacts.TheDGSetsshallbeaspertheguidelineslaiddownbyEPRforspecificnoise emission standards. Measures shall be taken for reduction of noise byusingacousticenclosures.

4.9 AESTHETICSTheprojectwouldhavesignificantimpactonaestheticsifitwouldcauseanyofthefollowingconditionstooccur

Haveasubstantialadverseeffectonascenicvista;

Substantiallydamagescenicresources,including,butnotlimitedto,trees,rockoutcroppings,andhistoricbuildingswithinastatescenichighway

Substantially degrade the existing visual character or quality of the siteanditssurroundings

Thedegreetowhichtheprojectwouldcontributetothearea'saestheticvalue;

Thedegreeof contrastbetweenproposed featuresandexisting featuresthatrepresentthearea'svaluedaestheticimage;

Thechangeinambientilluminationlevelsasaresultofprojectsources

Predicted Noise Levels

0102030405060708090

100

1 25 50 75 100

125

150

175

200

225

250

275

300

325

350

375

400

Distance from source (m)

Noi

se L

evel

[d

B(A

)]

Noise Levels

Page 62: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 61

ConstructionPhase:Theaestheticsoftheprojectareaislikelytogetdisturbedduring the construction phase. However, barricading the construction sitewillhelp in improving itsvisual aesthetic to thebypassers.Also, thiswillnotbe apermanentimpactandwillbeconfinedtotheconstructionphaseonly.

Functional Phase: The proposed land use of the site would be mainlyResidential&restaurant&LodgingBuildingsandwillnotresultinobstructionofview, scenic amenity or landscape. However, the buildings will be planned insuchawaythattheorganisedopenareasandlandscapedareasareatthecentreso that all can enjoy the green areas. Internal roads, footpaths/ pedestrianpathwayshavebeenplannedwithintheproposedproject.Theprojecthasbeendesigned as per the development control of Town planning Authority. Noanthropologicalorarchaeologicalsitesorartefactsarefoundnearthesitearea.

Therewillbearound415.15m2openspace/RGinprojectproject.Theprovisionof landscaped garden and green belt development in proposed project willimprovetheaestheticsvalue.

4.10 Socio‐EconomicEnvironmentConstructionPhase: Majority of the labourwill be recruited locally and onlyminimalskilledworkerswouldbefromoutside,whichisanticipatedtobeverysmallandwillnotaltertheexistingdemographicprofileofthearea.Mostoftheconstruction work is labour intensive. As most of the job will be done bycontractors, itwillbeensured that the contractor'sworkersareprovidedwithproperfacilitiesincludingsanitationanddrinkingwatersupply.Asignificantnumberofworkers(Approx30Nos.,) comprisingof skilled, semi‐skilledandunskilledlabourers,shallbeemployedbyvariouscontractorsatsiteduringthepeakperiodofconstructionphase.Significantnumberofsemiskilledandunskilled labourerswouldbe recruited from thenearbyareas.Thiswouldcreatetemporaryemploymentopportunitiesinthearea.Short term employmentwill be created during construction activities and thiswillbeapositiveimpactoftheproposedproject.Functional Phases: The use phase of the project will have overall positiveimpactsonsocioeconomicenvironment.Theprojectwillgenerateemployment(employmentofHotelstaffactivity)duringoperationalphasewhichwillbenefitthe local population in getting work opportunities. It will create long termemployment in activities such as maintenance of the buildings and ancillaryservices.Thiswillimprovethequalityoflifewithinthecorezoneandwillhavealong‐termbeneficialimpact.

4.11 BUILDINGMATERIALBuildingmaterialswithhighembodiedenergywillbeused.Materialswithhigh‐embodied energy Building materials such as fly ash, light weight concrete,compositeorengineeredmarble,aluminium,recycledglassorcompositewoodwillbeused.

Page 63: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 62

Transportandhandlingofmaterialsduringconstructionmayresultinpollution,noise & public nuisance. Adequate mitigative measures will be adopted.Construction equipmentwith idling control technologieswill be used. Regularmaintenance of the equipmentswill be carried out. The construction activitieswillbecarriedoutduringthedaytimeonly.Theworkersexposedtohighnoisegeneratingwould be providedwith earplugs earmuffs. ThedetailedmitigationmeasuresaregiveninChapter9

Solidwaste:Theoperationphaseof theprojectwill generategarbageas solidwaste. Land contamination mainly occurs because lack of proper storage anddisposal of solidwaste.The solidwastewill bemainlydomestic innature andwillnotcontainanyhazardouswaste.Solidwastegeneratedfromentireprojectwillbe18kg/day.Outofwhich11kg/daywillbebiodegradableComponentand7 kg/daywill be Inert, RecyclableWaste. Segregationof dry andwet garbagewill be done at source. Dry garbage as inert/recyclablewaste such as plastics,glass, metals, rubber will be segregated and disposed off to recyclers. Wetgarbage/biodegradable matter as leftover food, vegetables will be compostedusingvermicomposting.

4.12 ENERGYCONSERVATIONThe power supply (Maximum Demand Load) necessary for the proposedbuildings isestimatedas0.08MW.Thepowerwillbemadeavailable fromtheMSEBandPermissionforthesamewillbeobtained.Energyconservationmeasuresproposedintheprojectisasfollows

EnergyefficientlightingusingLED’s

SolarlightingonstreetandRGarea

Solarhotwatersystem

Useofhighenergyefficientpumpsforfirefighting,UGtanksandSTP

Solar street lights are proposed in building and common areas such as openspaces,pathways,RGetc.Alsosolarhotwatersystemisproposedproject.

4.13 TRAFFICIMPACT ConstructionPhase:Thetrafficimpactduringconstructionphasewillbeduetoincreasedmovementof truckscarryingdebris.Theparkingof theconstructionvehicles at the site premises on the road will cause congestion of traffic.Adequate parking space should be made inside the construction premises tolessentheimpacts.FunctionalPhase:Intheoperationphasetherewillbeincreaseinthevehicularmovementbecauseofthetouristandvisitors.Thesiteisaccessiblebyexisting13.0mwideAlibaug‐MurudStatehighway&9.0mwideaccessRoad.

Page 64: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 63

4.14 IMPACTMATRIX

Variousactivitiesfromtheproposedprojectarelikelytohavesomeimpactsonthe environmental constituents during its construction as well as operationalphase. The impact assessment matrix given inTable 4.4 reveals the impactsassociatedwitheachactivityoftheprojectonvariousenvironmentalparametersbeforeanymitigationmeasuresareimplemented.Table4.5revealstheimpactmatrix after possible mitigation measures are implemented. To assess theseverityoftheimpacts,theyarecategorizedasfollows.

Category SeverityofImpact Definition

A HighlyPositiveImpact.Something much better than status quo(donothing)

B LowPositiveImpact. SomethingslightlybetterthanstatusquoC HighlyNegativeImpact. Something much damaging than status

quoD LowNegativeImpact Something slightly damaging than status

quo

‐‐Indicates noconceivable impact ontheenvironment.

Statusquo(Donothing)

* ShortTermImpact ImpactslimitedtocertainPhase** LongTermImpact Longlastingimpacts

Table4.4:ConstructionPhaseImpactMatrix

Sr.No.

EnvironmentalParameter

ProposedActions

ExcavationCivilWorks

Transportation Machineryoperation

1.

AirEnvironmentSPM/RSPM C* C* C* D*Sulphurdioxide ‐ ‐ D* D*Nitrogenoxides ‐ ‐ D* D*CarbonMonoxides ‐ ‐ D* D*

2.

WaterEnvironmentGround waterquality ‐ ‐ ‐ ‐

Surface waterQuality ‐ ‐ ‐ ‐

Drainagesystem

C ‐ ‐ ‐

3.LandEnvironmentWasteDisposal C ‐ ‐ ‐SoilErosion C ‐ ‐ ‐

Page 65: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 64

Sr.No.

EnvironmentalParameter

ProposedActions

ExcavationCivilWorks

Transportation Machineryoperation

4.NoiseAmbient noiselevels

C* D* D* C*

5.

EcologicalParametersFlora ‐ ‐ ‐ ‐Fauna ‐ ‐ ‐ ‐Aquaticecology ‐ ‐ ‐ ‐

6.

SocioEconomicParametersEmployment B* A* A* B*OccupationalHealth ‐ ‐ ‐ D

Infrastructure D ‐ D ‐

Table4.5:OperationPhaseImpactMatrix

Sr.No.

EnvironmentalParameter

ProposedActionsTransportation /commutation

SolidWastegeneration

SewageGeneration

WaterConsumption

EnergyConsumption

Recreation/Gardening /Greenbelt

1. AirEnvironmentSPM/RSPM D** ‐ ‐ ‐ D* A**Sulphurdioxide D** ‐ ‐ ‐ D* B**OxidesofNitrogen D** ‐ ‐ ‐ D* B**Carbonmonoxides D ‐ ‐ ‐ ‐ ‐

2. WaterEnvironmentGround waterquality

‐ ‐ ‐ D ‐ ‐

Surface waterQuality

‐ ‐ ‐ ‐ ‐ ‐

Receiving WaterbodyQuality

‐ ‐ C** ‐ ‐ ‐

3. LandEnvironmentWasteDisposalonLand

‐ C** ‐ ‐ ‐ ‐

SoilStability ‐ ‐ ‐ ‐ ‐ A**4. Noise

Ambient noiselevels

D** ‐ ‐ D D* B**

5. EcologicalParametersFlora ‐ ‐ ‐ ‐ ‐ A**Fauna ‐ ‐ ‐ ‐ ‐ A**

Page 66: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 65

Sr.No.

EnvironmentalParameter

ProposedActionsTransportation /commutation

SolidWastegeneration

SewageGeneration

WaterConsumption

EnergyConsumption

Recreation/Gardening /Greenbelt

Aquaticecology ‐ ‐ D** ‐ ‐ ‐6. SocioEconomicParameters

EmploymentGeneration

B** ‐ ‐ ‐ ‐ A**

OccupationalHealth

‐ ‐ ‐ ‐ ‐ B**

Infrastructure D** ‐ ‐ ‐ ‐ A**7. Resources

Energy/Fuel C** ‐ ‐ D ‐8. Aesthetics

Topography/skyline

‐ ‐ ‐ ‐ ‐ A**

VisualAirQuality ‐ ‐ ‐ ‐ ‐ A**

Page 67: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

CHAPTER5

SPECIFICSTUDIES

5.1 TRAFFICPATTERNANDDENSITY

TrafficSurveysarenecessarytocapturetheexistingpatternandvolumeoftrafficasabaselinedata.Network Inventory Survey and Traffic Volume Surveys were conducted on theGrampanchayat Road. The Grampanchayat Road is the main road in the studyareaforcommutingtoprojectsite.Thetrafficsurveywasconductednearprojectsite to ascertain the present traffic scenario to evaluate traffic impact that willresultfromproposeddevelopment.

Figure5.1:Projectlocation

Intheoperationphasetherewillbeincreaseinthevehicularmovementbecauseofthetouristsandvisitors.Thepeakhourtrafficcountforroadisasfollows:

Table5.1:ExistingTrafficVolumes‐Year2016

Sr.No. Road

2Wheeler Taxi Car LCV Bus Truck Total

1 Alibaug–MurudStateHighway 52 0 12 6 0 3 73

Sr.No. Road

TotalPCU(V)

CapacityofRoads(C)

V/Cratio LOS

GeneralOperatingConditions

1Alibaug–MurudStateHighway 73 900 0.08 A Reasonably

flow

Page 68: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 67

5.2 IMPACTONTRAFFIC

5.2.1 ConstructionPhase

Thetraffic impactduringconstructionphasewillbeduetoincreasedmovementof haul trucks carrying excavated soil, debris and constructionmaterials. Thesemovements of truckswill be very less in numbers as compared to the presenttraffic.Theparkingoftheconstructionvehiclesoutsidethesitepremisesontheroad will cause congestion of traffic. Adequate parking space has been madeinsidetheconstructionpremisestolessentheimpacts.5.2.2 FunctionalPhase

Intheoperationphasetherewillbeincreaseinthevehicularmovementbecauseofthetouristandvisitors.

AtrafficsurveywascarriedoutduringtheEIAstudyperiod.ThedetailsoftrafficmovementontheGrampanchayatRoadmonitoredforaperiodof12hrsisgivenintheTable5.2.

The observed traffic data was analysed using the guidelines of Indian RoadCongress(IRC).TheIRChasstipulatedthestandardsofnumberofpassengercarunits(PCU)per laneperhour fordifferentroadsi.e.,dividedandundividedandcityroadsandHighways.TheIRCnormsforofPCU’sofdifferenttypeofvehiclesandtypeofroadareasunder:

Table5.2:RecommendedPCUFactorsforVariousTypesofVehicleson

UrbanRoads

Sr.No.

VehiclesTypeEquivalentPCUFactors

PercentagecompositionofVehicletypeintrafficstream

5% 10%andabove FastVehicles 1. TwoWheelersMotorcycleorscooter

etc.0.5 0.75

2. Passengercar,pick‐upvan 1.0 1.03. Auto‐rickshaw 1.2 2.04. Lightcommercialvehicle 1.4 2.05. TruckorBus 2.2 3.76. AgriculturalTractorTrailer 4.0 5.0 SlowVehicles 7. Cycle 0.4 0.58. Cyclerickshaw 1.5 2.09. Tonga(Horsedrawnvehicle) 1.5 2.010 Handcart 2.0 3.0

Source:IRC:106–1990

Page 69: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 68

Table5.3:RecommendedDesignServiceVolumes(PCU’sPerHour)

S.No. TypeofCarriagewayTotalDesignServiceVolumesfor

DifferentCategoriesofUrbanRoads

ArterialSub‐

arterialCollector

1. 2‐Lane(One‐Way) 2400 1900 14002. 2‐Lane(Two‐Way) 1500 1200 9003. 3‐Lane(One‐Way) 3600 2900 22004. 4‐LaneUndivided(Two‐way) 3000 2400 18005. 4‐LaneDivided(Two‐Way) 3600 2900 ‐6. 6‐LaneUndivided(Two‐Way) 4800 3800 ‐7. 6‐LaneDivided(Two‐Way) 5400 4300 ‐8. 8‐LaneDivided(Two‐Way) 7200 ‐ ‐

Source:IRC:106–1990

Table5.4:ComparisonofCongestionIndices(V/Cratios)

Sr.No. Road Present LOS

After5

YearsLOS

After10

YearsLOS

1 GrampanchayatRoad 73 A 158 A 358 B

5.3 MITIGATIONMEASURES

5.3.1 TrafficManagementPlan

• Provideadequatetrafficsignagestonotifyvisitors• PreventparkingneartheEntryandExitGate• Providespeedhumpstoregulatespeedofvehicles

Page 70: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 69

CHAPTER6

ENVIRONMENTALMONITORINGPROGRAMME

6.1 ENVIRONMENTALMONITORINGPROGRAMME

An environmental monitoring programme is required to provide scientificallydefensibleinformationfordeterminingthestatusoftheenvironmentalqualityofthesurroundingareaoftheprojectsiteandtocheckwhetherthelevelsofcriticalpollutants are within the environmentally acceptable limits. This will help toobtainanearlywarningofunacceptableenvironmentalconditionssothatcontrolmeasurescanbetakenimmediately.

6.2 MONITORINGPLANDURINGCONSTRUCTIONPHASE

Environmentalmonitoringduringconstructionphaseshallcomprisechecking:

Appropriatepermits,certificates,authorizationsand

Thiscanbeensuredthroughuseofchecklistsfor:

Siteestablishment Siteclosure Environmental Management Plan implementation monitoring during

constructionphase

Monitoringchecklistsarepresentedbelow.

ProjectStart–upChecklist

EnvironmentalAspect Yes/No Comments

Personnelonsiteareenvironmentalawareofthevariousissuesofinterest

Telephonenumbersofemergencyservicesareavailableonsite.Solidwastemanagementsystemhasbeenestablishedatbothconstructionsite

Wastewatermanagementsystemhasbeenestablishedatbothconstructionsite

Necessaryfire‐fightingequipmentisavailableandingoodworkingorder.

Page 71: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 70

WeeklyChecklist

EnvironmentalAspect Yes/No Comments

Constructioncampisneatandtidyandthelabourersfacilitiesareofanacceptablestandard.

Wastecollectionandremovalsystemisbeingmaintained.

Sufficientfire‐fightingequipmentisavailableatconstructionsiteandisingoodworkingorder.AllconstructionvehiclesareingoodworkingorderandhavevalidPUCcertificates.Dustcontrolmeasures(wherevernecessary)areinplaceandareeffectivelycontrollingdust.Noise‐controlmeasures(wherevernecessary)areinplaceandareworkingeffectively.Erosioncontrolmeasures(wherevernecessary)areinplaceandareeffectiveincontrollingerosion.

6.3 AREASOFCONCERN

From the monitoring point of view, the important parameters are ground andsurfacewaterquality, aquatic floraand fauna,noise, etc.Anattempt ismade toestablishearlywarningsystemwhichindicatethestressontheenvironment.Suggestedmonitoringparametersandprogramsaredescribedinthesubsequentsections.

6.4 GROUNDANDSURFACEWATERQUALITY

Thegroundwaterqualityneedstobemonitoredat1location.Thesurfacewaterqualityneeds tobemonitoredat1 location in the studyarea.The frequencyofmonitoringshouldbeonceinthreemonths.Theparameterstobemonitoredarelistedasbelow:

Page 72: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 71

Sr.No. Parameters Sr.No. Parameters1 pH 13 Phosphates

2 Electricalconductivity 14 Fluorides3 Turbidity 15 Chlorides

4 TDS 16 Sulphates

5 TSS 17 Sodium

6 TotalHardness 18 Potassium

7 Alkalinity 19 Calcium

8 Carbonate 20 Magnesium

9 BOD 21 Oil&Grease

10 COD 22 Iron(asFe)

11 DO 23 Manganese

12 Nitrates 24 Copper

25 TotalColiform

Any other frequency prescribed by the MPCB/ MOEF for monitoring shall befollowed.

6.5 STPSEWAGEQUALITY

Thephysico‐chemicalmonitoringofselectedparametersofinfluentandoutgoingsewage from STP will be maintained on monthly basis. The samples shall beanalyzedforgeneralparametersandspecificparameters.All the samples collected from STP shall be tested for General Parametersmentionedbelow:

i) pHii) SuspendedSolidsiii) DissolvedSolidsiv) DissolvedOxygenv) CODvi) BODvii) Oil&Greaseviii) Chloridesix) MixedLiquorSuspendedSolidsx) Phosphatexi) TotalNitrogen

6.6 AMBIENTAIRQUALITY

Ambientairqualitymonitoringwillhavetobeconductedat3locationswithinthestudyarea.TheparameterstobemonitoredarePM10,PM2.5,SO2,Nox&CO.Thepost‐projectambientairqualitymonitoringworkwillbecarriedoutfromMoEF

Page 73: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 72

recognized Laboratory. The frequency prescribed by the MPCB/ MOEF formonitoringshallbefollowed.

6.7 NOISE

Personnelinvolvedinworkonnoiseproducingequipment/machineriesarelikelytobeexposedtohighlevelofnoise.

Thepost‐projectnoiselevelmonitoringwillbecarriedoutbytheprojectstaffandanoisemetershallbepurchased.

6.8 GREENBELTDEVELOPMENT

Greenbeltdevelopmentwillbemonitoredonceinmonthstostudythegrowthofvarious species and to identify the needs if any, such as for irrigation, fertilizerdosing,pesticides,etc.

6.9 MONITORINGPLANDURINGCONSTRUCTION/OPERATIONPHASE

The summary of environmental program during construction and operationphaseofproposedprojectisgiveninTableNo.6.1

Table6.1:EnvironmentalMonitoringProgramme

Sr.No.

Environmentalattribute

Locations ParametersPeriodandFrequency

1.AmbientAirQuality

Locationsat•Oneatcentre•OneUpwind&•OnedownwindLocation

CriteriaPollutants:SO2,NOx,PM10,PM2.5andCO

24‐hraveragesamplingexceptforCO,whichwillbe8‐hrsampling.(Twiceaweek)

2. AmbientNoiseProjectSiteandNearbyvillages,Sensitiveplaces

dB(A)levels SPL(dB(A)) Leq(Night+Day)

Leq(day)andLeq(Night)shouldbemonitoredonceinaseason.

3. Soilquality Greenbeltarea

Organicmatter,C,H,N,Alkalinity,Acidity

Once

4.Groundwater&surfacequality At2locations

DrinkingwaterparametersasperIS10500SurfacewaterasPerIS2296

once

5. Waterquality STP

STPoutletwaterqualityforpH,BOD,COD,SS,FC,Nitrate,PhosphateandO&G,residualchlorine,

Monthly

Page 74: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 73

Sr.No.

Environmentalattribute

Locations ParametersPeriodandFrequency

coliforms)

6.Greenbeltdevelopment

ProjectSiteandSurroundings

RateofSurvivalandGrowthofVariousspecies

Onceinamonth

Page 75: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 74

CHAPTER7

RISKASSESSMENT&DMPRisk assessment study deals with identifying and evaluating the magnitude ofimpendingriskstothepopulationisexposedduetooccurrenceofaccidentsfromproject construction anddevelopment. This assists in illustrating the guidelinesforpreparationofdisastermanagementplanwhichwillbeexecutedtohandlethesituationifanyemergency.Followingaretherisksthatareidentifiedinbuildings.

7.1FIRERISKFireismainlycausedinresidential&restaurantduetonegligence,shortcircuitsandmalfunctioningofgasregulator(Kitchen),tubeandsuchrelatedproducts.

Attheproposedproject,hazardoccurrencemayresultinon‐siteimplicationslike:

Fireand/orexplosion;

Leakageofflammablematerialandleadingtofire;

Naturalcalamitieslikeearthquake,tsunamietc.

Therearetwoworst‐casescenariosforfiresinbuildings:

If fire takes place with high intensity such that even after it is beingextinguished,itcoulddamagethebuildingstructureontermpointofview.

Afireoriginatingonthebuilding’sfloorsisabletospreadthroughoutallthelevelsofthestructure.

The overall objective of a disaster management plan is to make use of thecombinedresourcesatthesiteandoutsideservicestoachievethefollowing:

1.Tolocalizetheemergencyandifpossibleeliminateit;

2.Tominimizetheeffectsoftheaccidentorhazardonpeopleandproperty;

3.Effecttherescueandmedicaltreatmentofcasualties;

4.Safeguardotherpeople;

5.Evacuatepeopletosafeareas;

6.Initiallycontainandultimatelybringtheincidentundercontrol;

TheDMPhasthereforetoberelatedtothe identificationofsources fromwhichhazardscanariseintheconcernedarea.Theplantakesintoaccountactionsthatcansuccessfullymitigatetheeffectsoflosses/Emergencyneedtobewellplannedso as they would require less effort and resources to control and terminateemergencies.

7.2PUBLICSAFETY Theincidenceoffireorotherdisastersoccurringinbuildingsoftenendangersthesafetyofthepersonsworkinginthestructure,intheeventofanemergency.

Page 76: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 75

Theonlywayofreducingthedamagetopubliclifeandpropertyisbyconductingfire safety drills and installing well equipped fire safety equipment’s such assmokedetectors,heatsensors, sprinklers, fireextinguisher,water jet,hooters&firedetectionsystem.

7.3EMERGENCYRESPONSE

7.3.1EmergencySituations Thesearedefinedasthefollowing: Anyfireorexplosioninthepremises

Anysmokeoutside/insidepremises

7.3.2EmergencyResponseinCaseofEmergencyBasicActions:

Immediateandpromptactionisthemostimportantfactorintheemergencycontrol

Immediatestepstostopfire

Electrical system except the lighting and fire fighting system would beisolatedandbekeptseparated.

If the feed to the fire cannot be cut off, the fire must be controlled and notextinguished.Someofthemeasuresthatcouldbefollowedare:

Startwaterspraysystemsintheareasinvolvedinorexposedtofirerisks. Block all roads in the adjacent area and enlist support for the purpose, if

warranted.

7.3.3ActionsintheEventofFire:Basicactionswillbesameasdetailedabove.

Extinguishingfires:AsmallfireatapointofleakageshouldbeextinguishedbyenvelopingwithawatersprayorasuitablesmotheringagentsuchasCO2.However, fire should not, unless under exceptional circumstances, beextinguished until the escape or leakage of product (e.g. LPG) has beenstopped.

Fire fighting personnel working in or close to fire, must be protectedcontinuously bywater sprays. Fire fighters should advance towards the firedownwindifpossible.

Incase theonlyvalve thatcanbeused tostop the leakage issurroundedbyfire,itmaybepossibletocloseitmanually.Thepersonattemptingtheclosureshould be continuously protected bywater sprays, fire entry suit, water jetblanket etc. The personmust be equippedwith a safety belt and amannedlifeline.

Page 77: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 76

7.3.4LeakagefromaLPGcylinder(canteenarea)withoutfire:

Cordonoff theareaaround30meters radiusso thatnovehicleor sourceofignition approached the area. Attempt must be made to close the control/manualvalve.

Openallwindowstoincreaseventilationandhencepreventbuildupofvaporcloud.

Avoidgettingentrappedinthecloudvapor.

Warnthesurroundingareastoputoffallnakedflames.

7.3.5Responsesequencefordangeroussituations:Personnoticingthefireshouldattempttoisolateandextinguishthefirewiththeavailableequipmentand informorarrangeto informthesecurity regarding thefollowing:

Locationofthefire

Theextentoffire

Securityondutycoordinatorswill:

Mustrespondaccordinglyandcoordinatealltheactivities

Arrange to send the necessary fire fighting equipment to the place of theincident

Extinguishthefirewiththeavailableequipment.

7.36PostEmergencyFollowUp All cases of fire occurrence, no matter how small or big, must be reported

promptlytotheCoordinatorforfollowup.

Under no circumstances should fire extinguishing equipment once used bereturned to its fixed location before it is recharged/ certified fit by the Firechief/SafetyManager.

Used fire extinguishersmust be laid horizontally to indicate that they havebeenexpended.

7.4 MEDICALAIDFirstaidkitboxmustbemaintainedateachfloor.Itshouldatleasthavemedicinalaid for burns and some asphyxiation. If needed, help from the nearby cityhospitals/doctorsshouldbeobtained.

7.5 RESPONSEEVALUATION,TESTING&UPDATINGOFTHEPLANFormulationofaDisasterManagementPlancannotpossiblybeanendbyitself.Itneeds to be amended by holding of periodicalmock emergency simulation anddrill. Any shortcomings revealed during such exercise should thereafter becorrectedbyamendingtheplan.

Page 78: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 77

The plan should be reviewed at periodic intervals. The plan should be alsoreviewedandupdatedwhen:

Majoralterationorextensionofexistingstructureiscarriedout.

Majorchangeinhabitationorlanduseoftheneighbourhoodstakesplace.

Importanttelephonenumbersusedarealteredorchanged.

Mockdrillsactivitiesshouldbeconductedperiodicallyforensuringitsefficiencyduringemergencyaswellasforrefinementandupgradation.Thesedrillsbasedontheplanwillhelpachieveitsobjectivesofthedisastermanagementplan.

Table7.1:BuildingEmergencyPlan

BuildingInformation

EmergencyAssemblyAreaLocation

EmergencyManagementAreaNumber

EmergencyStaff

PotentialFireHazards

FirePreventionProcedures

MedicalandRescueDutiesforEmployees

IMPORTANTPHONENUMBERS

Telephone Numbers for Life‐ThreateningEmergencies

Where to Get Information During a Large‐ScaleEmergencyWhat to Do When You Hear BuildingWarningSirens/SignsTelephone Numbers for Non‐LifeThreateningEmergencies

EMERGENCYPROCEDURES

EmergencyNotificationProcedures

EvacuationProcedures

FireProcedures

EarthquakeProcedures

ExplosionorBombThreatProcedures

UtilityFailure

ElevatorFailure

Flooding,PlumbingorSteamLineFailure

NaturalGasReleaseorLeak

VentilationProblem

Page 79: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 78

EMERGENCYPREPAREDNESS

Supplies

SecuringBuildingContents

7.6EMERGENCYPROCEDURES7.6.1EvacuationProcedures:A building may required by law to evacuate the building when the fire alarmstarts.Theremaybeinstanceswherethebuildingwouldbeevacuatedwithoutafirealarmsounding.Whenevacuatingyourbuildingorworkarea:

Thefloordiagramwillbeprovidedtoeveryfloorwhichcanshowtheentryandexistduringevacuation.

Proper sign showing the exit route towards the staircases would beprovided.

Primaryevacuationroutesleadingtothedesignatedassemblypoint(solidlines)wouldbeprovided.

Staycalm;donotrushorpanic. Ifsafe,gatheryourpersonalbelongings. Ifsafe,closedoorandwindow,butdonotlockthem. If in parking lot, immediately park your car so that the access to other

vehicles aswell as people are not hampered andproceed to the nearestexitbystaircaseorasguided.

Use the nearest stairs and proceed to the nearest exit. Do not use theelevator.

7.6.2FirefightingProcedures:

Abuildingoccupantmayberequiredbylawtoevacuatethebuildingwhenthefirealarmbegins.

If trained, able and safe (with a sure and safe exit), use a portable fireextinguisher to extinguish the fire. Evacuate if oneextinguisherdoesnotputoutthefire.

EvacuatethebuildingassoonasthealarmsoundsandproceedtotheEAA. Onyourwayout,warnothers. Usestairsonly;donotuseelevators. Moveawayfromfireandsmoke.Closedoorsandwindowsiftimepermits. Touchcloseddoors.Donotopenthemiftheyarehot. Enter the building only when instructed to do so by emergency

responders.

Page 80: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 79

7.6.3EarthquakeProcedures:Duringanearthquake:InsidetheBuilding:

Duck under the nearest sturdy object and hold onto it until the shakingstops. If you are not near a sturdy object, make yourself as small aspossibleandcoveryourheadandneck.

Ifyoustandinadoorway,braceyourselfagainsttheframeandwatchoutforaswingingdoororotherobstruction.

Avoid windows, filing cabinets, bookcases, and other heavy objects thatcouldfallorshatter.

If safe, before evacuating, neutralize / turn off any flammable source(cookinggas,electricityetc.)thatcouldleadtofurtherdanger.

OutsidetheBuilding:

Move away from trees, signs, buildings, electrical poles and wires, fires,andsmoke.

Protectyourheadwithyourarmsfromfallingdebris.

7.6.4 Flooding,PlumbingorrelatedFailure:Ifyourbuildinghasaplumbingfailure,aflood,orrelatedfailure:Ceaseusingelectricalequipment.CallXXXPlumbingservice.ForwaterremovalcallXXXXService.

7.6.5 GasReleaseorLeak(PNG,LPGetc):Ifyousmellnaturalgas:Ceasealloperationsimmediately.Donotoperatelightswitches.Evacuateassoonaspossible.CalltheserviceprovidersemergencynumbersCallFacilitiesServicesorsocietyManagerforleasedspace.

Page 81: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 80

CHAPTER8PROJECTBENEFITS

8.1 PHYSICALINFRASTRUCTURE

The proposed project is the part of Rural infrastructure development (Town

planning) and its associated activities will help to build physical infrastructure

likeaccomodation,roads, telephones line,electricsubstations,andwatersupplylinesinstudyarea.Thebenefitsoftheproposedprojectareasfollows:

1‐ The project will create an additional stock for tourist people for theiraccommodation

2‐ Adequateparkingfacilitiestothetourist3‐ Goodsanitationfacilities4‐ Theexpectedoutcomeoftheproposedprojectwillbethegoodqualityof

livelihoodtopeople5‐ Waterrecyclingandrainwaterharvesting6‐ Solarhotwatertotourist,solarlightingwithincompoundwall7‐ The establishment of a vegetation covering land in and around the

proposedprojectwillresultinmanydirectandindirectbenefits

8.2 EMPLOYMENT

Proposed project would employ personnel during construction phase that willhelpinimprovingtheexistingsocio‐economicstatus

The significant positive impact on employment and occupation is envisaged onaccountof

Bettereconomicstatusofthecommunityduetobetterearnings

Employment of local people in activities like housekeeping, security,office/hotelstaffetc.–10‐15peopleemployed.

Page 82: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 81

CHAPTER9ENVIRONMENTALMANAGEMENTPLAN

9.1 INTRODUCTION

Identification and prediction of impacts further needs to suggest themitigationmeasureswhichplayavitalroleinpreventionofenvironmentalpollutionduringconstruction and implementation phase of proposed project. This leads topreparation of environmental management plan. Environmental managementplanthereforeformsanimperativepartofRapidEIAprocess.

TheEnvironmentalManagementPlan (EMP) is a site specificplandeveloped toensurethat theproject is implemented inanenvironmentalsustainablemannerwhere all contractors and subcontractors to understand the potentialenvironmental risks arising from the proposed project and take appropriateactions. EMP also ensures that the project implementation is carried out inaccordancewiththedesignandbytakingappropriatemitigativeactionstoreduceadverseenvironmentalimpactsduringitslifecycle.

The potential environmental impacts, which need to regulate are mentionedbelow:

AirpollutionduetotheemissionofParticulateMatterandgaseouspollutants;

Noisepollutionduetovariousnoisegeneratingequipmentaswellasvehicularmovement;

Wastewater generation from sanitary/domestic activities; and Solid wastedisposal.

9.2 AIRENVIRONMENT

9.2.1 ConstructionPhase

Themajorsourcesofairpollutionduringtheconstructionperiodwillbefromthemovement of vehicles for construction activity, the emissions are from thestationary sources like generator sets during emergency service only, andexcavation for foundation. Dust suppression by spraying of water will reducetheseimpactsconsiderably.

To mitigate the impact of SPM/dust during the construction phase of theproposedproject,thefollowingmeasuresarerecommended:

AFugitivedustcontrol.

Proceduralchangestoconstructionactivities.

‐FugitiveDustControl

SourcewiseFugitivedustcontrolmeasuresaretabulatedbelow:

Page 83: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 82

Table9.1:FugitiveDustControlMeasures

Source ControlMeasures

Earthmoving‐ Foranyearthmovingwhicharemorethan30mfrom site boundary, conduct watering asnecessarytopreventvisibledustemissions.

Disturbedsurfaceareas

‐ Applydustsuppressionmeasuresfrequentlytomaintain a stabilized surface; ‐ Areas, whichcannotbestabilized,asevidencedbywinddrivendust,must have an application ofwater at leasttwiceperday.

Unpavedroads

‐ Waterallroadsusedforanyvehiculartrafficatleast twice per day of active operations; OR ‐Water all roads used for any vehicular trafficoncedailyandrestrictvehiclespeedto20kmph,whichwillreducedustemission.

Track‐outcontrol‐ Downwashof construction vehicles (especiallytyres)priortodeparturefromsite.

The most cost‐effective dust suppressant is water, because a source of watertends tobe readily available on a construction site.Water canbe appliedusinghandheldsprays.

9.2.2 FunctionalPhase

Tomitigatetheimpactofpollutantsfromvehiculartrafficduringtheoperationalphaseofthesite,thefollowingmeasuresarerecommendedforimplementation:

Vehicleemissioncontrols;and

Landscapedevelopment.

VehicleEmissionControls

Regularmaintenanceofthevehicleshouldbemandatory.Restrictionofspeedisalsohelpfulinthereducingtheemissionrate.Insteadofpetrol,CNG/LPGasfuelshouldbeencouraged.

LandscapeDevelopment

IncreasingvegetationintheformofLandscapeisoneofthepreferredmethodstomitigate air pollution. Plants generate oxygen, serve as a sink for pollutants,reducetheflowofdustandreducenoisepollution.

9.3 NOISEENVIRONMENT

9.3.1 ConstructionPhaseTo mitigate the impact of noise from construction equipment, the followingmeasuresaresuggested:

Noiseproneactivitieswillberestrictedtotheextentpossibleduringnight.

Page 84: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 83

Workersemployedinhighnoiseareaswillberotated.Earplugs/muffs,orotherhearingprotectivewearwillbeprovidedtothoseworkingveryclosetothenoisegeneratingmachinery.

9.3.2 FunctionalPhase

To mitigate the impact of noise from diesel generator sets as discussed inpreviouschapterduringthisphasethefollowingmeasuresarerecommendedforimplementation:

NoiseEmissionsControlTechnologies:

DG would be housed in a suitable acoustic treated room, which should bedesignedformeeting theambientnoisestandards. Itwouldbeensuredthat themanufacturer provides acoustic treated rooms as an integral part with dieselgeneratorsets.

LandscapeDevelopment:

Noise attenuating / breaking species can be used in a Landscape especiallysurroundingnoisegeneratingsources.Appropriate treeswhichwillactasnoisebarriersshouldbeplantedinthepremisesandalongtheroadside.

9.4 IMPACTONWATERRESOURCES

9.4.1 ConstructionPhase

Topreventdegradationandmaintain thequalityof thewater, adequatecontrolmeasures have been proposed to check the surface run‐off, as well asuncontrolled flow of water into any nearby water body like sea etc. Followingmanagement measures are suggested to protect the water quality during thisphase.

Avoidexcavation(foundationpurpose)duringmonsoonseason.

Careshouldbetakentoavoidsoilerosion.

Septictanksshallbeconstructedonthesiteduringconstructionphasetopreventwastewaterfromenteringthewaterbodies.

Construction activities generate disturbed soil, concrete fines, oils andotherwastes.On‐sitecollectionandsettlingofstormwater,prohibitionofequipmentwashdowns,andpreventionofsoillossandtoxicreleasesfromtheconstructionsitearenecessarytominimizewaterpollution.

9.4.2 FunctionalPhase

Waterconservationneedtobetakenincludingallpossiblepotentialforreuseandrecyclingofwater.Thesecouldbeintheformofthefollowing:

Rainwaterharvesting

Recyclingoftreatedwater

Minimizingwaterconsumption

Promoting reuse of water after treatment and development of closed loopsystemsfordifferentwaterstreams.

Page 85: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 84

Rain water harvesting: Roof top rain water harvesting shall bepracticed.Asapartofmeasure,ProjectProponenthasplannedforrooftopRainwaterharvestingasdetailedinChapter‐2.

Minimizing Water Consumption: Water consumption will beminimizedbyacombinationofwatersavingdevicesandotherdomesticwater conservation measures. Furthermore, to ensure ongoing waterconservation, an awareness programme will be introduced. This isdiscussedinfollowingsection,whichshallbeimplemented:

Usage:

Useofwaterefficientplumbingfixtures.Waterefficientplumbingfixturesuselesswaterwithnomarkedreductioninqualityandservice.

Leakdetectionandrepairtechniques.

Horticulture:

Drip irrigation system shall be used for the lawns and other green area.Dripirrigationcansavebetween15‐40%ofthewateruse,comparedwithotherwateringtechniques.

Plantswithsimilarwaterrequirementsshallbegroupedoncommonzonestomatchprecipitationheadsandemitters.

Useoflow‐volume,low‐anglesprinklersforlawnareas.

Select controllers with adjustable watering schedules and moisturesensors to account for seasonal variations, and calibrate them duringcommissioning.

Selectingadroughtresistantgrass,andusinglawnchemicalsandfertilizersparinglyalsoreduceswateringneeds.

Place3to5in.ofmulchonplantingbedstominimizeevaporation.

Promoting reuse ofwater after treatment & development of closed loopsystems:

Topromotereuseanddevelopmentofclosedloopsystemforwater,segregationof two schemes namely (i) Sewage treatment scheme (ii) Roof top rainWaterharvestinghasbeenproposed.Harvested roof top water will be utilised for floor washing, car washing,gardening,andotherdomesticpurposesandtreatedSewageshallberecycledforflushingandgardeningIt is estimated that reusing wastewater will save approximately 35 to 40% ofpotablewaterperday.

Page 86: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 85

StormWaterManagement:

Asdiscussedearlier,mostofthestormwaterproducedonsitewillbeharvestedforgroundwaterrecharge, thuspropermanagementof thisresource ismust toensure that it is freeof contamination.Thedetails of Stormwatermanagementproposedisgiveninchapter2.

Contaminationofstormwaterispossiblefromthefollowingsources:

DieselandoilspillsintheDieselPowerGenerator&fuelstoragearea.

Wastespillsinthesolidwastestoragearea.

Oilspillsandleaksinvehicleparkinglots.

Siltfromsoilerosioningardens.

StormWaterManagementPlanwillbedevelopedwhichwillconsidertheabovesourcesandwillincorporatefollowingbestmanagementpractices:

Regularinspectionandcleaningofstormdrains.

Coverwastestorageareas.

Avoidapplicationofpesticidesandherbicidesbeforewetseason. Secondarycontainmentanddykesinfuel/oilstoragefacilities.

Conductingroutineinspectionstoensurecleanliness.

Preparation of spill response plans, particularly for fuel and oil storageareas.

Goodhousekeepingintheaboveareas.

9.5 LANDENVIRONMENT

9.5.1 ConstructionPhase Waste generated from construction activity includes construction

debris, biomass from land clearing activities, waste from the labourcamp, etc. Following section discusses management for each type ofwaste.Besidesmanagementof topsoil is an importantarea forwhichmanagementmeasuresarerequired.

ConstructionDebris:

Constructiondebrisisbulkyandheavyandre‐utilizationandrecyclingis an important strategy formanagement of suchwaste. As concreteandmasonry constitute themajority ofwaste generated, recycling ofthis waste by conversion to aggregate can offer benefits of reducedlandfill space and reduced extraction of raw material for newconstruction activity. This is applicable to proposed site since theconstructionistobecompletedinaphasedmanner.

Recycledaggregatewillbeusedforfillerapplication,andasasub‐baseforroadconstruction.Mixeddebriswithhighgypsum,plaster,shallnot

Page 87: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 86

beusedasfill,astheyarehighlysusceptibletocontamination,andwillbegiventorecyclers.

Construction contractors shall remove metal scrap from structuralsteel, piping, concrete reinforcement and sheet metal work from thesite. A significant portion of wood scrap can be reused on site.Recyclable wastes such as plastics, glass fiber insulation, roofing etc.shallbesoldtorecyclers.

TopsoilManagement

To minimize disruption of soil and for conservation of topsoil, thecontractorshalltakethetopsoiloutseparatelyandstockpileit.Aftertheconstruction activity is over, topsoil shall be utilized for landscapingactivity.Othermeasures,whichwouldbefollowedtopreventsoilerosionandcontaminationinclude:

Maximize use of organic fertilizer for landscaping and green beltdevelopment.

Topreventsoilcontaminationbyoil/grease,leakproofcontainersshouldbe used for storage and transportation of oil/grease andwash off fromtheoil/greasehandlingareashallbedrainedthroughimperviousdrainsandtreatedappropriatelybeforedisposal.

Removalof as little vegetationaspossibleduring thedevelopment, andre‐vegetationofbareareasaftertheproject.

Workinginasmallareaatapointoftime(phasewiseconstruction).

9.5.2 FunctionalPhase Thephilosophyof solidwastemanagementwill be toencourage the fourR’sofwaste i.e. waste reduction, reuse, recycling, and recovery (materials & energy).Thiswillresultinlesserrelianceonlandfilling.

TheEnvironmentalManagementPlanforthesolidwastefocusesonthreemajorcomponents of the waste management system i.e. collection & transportation,treatment or disposal and closure & post closure care of treatment/disposalfacility.

Page 88: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 87

Collection&Transportation:

During thecollectionstage, thebiodegradableandnon‐recyclable/non‐biodegradable waste will be stored and collected separately. Only thenon‐recyclable & non‐biodegradable waste will be sold to authorizedagency.Biodegradablewastewillbecomposted.

Tominimize littering and odors, waste will be stored in well‐designedcontainers/binsthatwillbelocatedatstrategiclocations.

The collection vehicles will be well maintained to minimize noise andemissions, andwhile transportingwaste, thesewill be covered toavoidlittering.

Treatment&Disposal:

The segregated biodegradable waste will be composted usingmechanicalcompostingmethod.Thefinishedproduct,i.e.thecompostcan be utilized in green area. The details of solidwastemanagementproposedforprojectisgivenchapter2.

9.6 ECOLOGICALENVIRONMENT

9.6.1 ConstructionPhaseAftercompletionofmajorconstructionwork,thegreenbeltwillbedevelopedastherewillbenoorlessdisturbanceintheseareas.

9.6.2 FunctionalPhase

Inthefunctionalphasetheproposedprojectwillnothaveanymajorimpactsonthebiologicalenvironment.Extensiveplantationand landscaping isproposedtomitigateanyimpactsduringthisphase.

LandscapeDevelopmentPlan

Various types of trees are proposed for plantation. Plantationwill be taken uprandomly and the landscaping aspects would be taken into consideration. Thetreeswillbeplantedalongthecompoundwallwithadequatespacebetweenthemsothattheirgrowthisnothampered.Landscapeplanisshowninfigure9.1.

Page 89: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 88

Figure9.1:LandscapePlan

Page 90: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 89

9.7 AESTHETICS

Alsotheimpactsonaestheticenvironmentareshorttermandrestrictedonlyintheinitialstagesofprojectconstruction.Furtherintheoperationphaseitwillbecompensatedbytreeplantationandgardens.

9.8 ENERGYCONSERVATION

Energyconservationprogramwillbeimplementedthroughmeasurestakenbothon energydemand and supply. Energy conservationwill be one of the focusesduring the building planning. The conservation efforts would consist of thefollowing:

ArchitecturalDesign:

Maximizetheuseofnaturallightingthroughdesign.

Energy conservation aspects such as selection of appropriate buildingmaterialhavingadequatethermalresistancevalue(Rvalue)andsolarwaterheating systems. A solar hot water will be provided to population. Solarlightswillbeprovidedforstreetlightingandgardenlighting.

EnergySavingPractices:

Purchaseofenergyefficientappliances.

Adjusting the settings and illumination levels to ensure minimum energyusedfordesiredcomfortlevels.

UseofLED’sincommonareas

Behaviouralchangeonconsumption:

Trainingstaffonmethodsofenergyconservationandtobevigilanttosuchopportunities.

Overandabove theenergy conservationmeasuresproposedand%savingofenergyisgiveninchapter5

9.9 ENVIRONMENTALLYSIGNIFICANTFEATURES

Followingaresomefeaturesoftheprojectthatwillhelpinimprovingtheoverallenvironmentrelatedaspectsintheresidentialcomplex.

All roomsaredesignedwithadequateopening tohavepropernatural lightand ventilation.Not only thiswill create comfortable, healthy and pleasantindoorenvironmentbutalsoitwillhelpinimprovingtheheatlossandgainbalanceofthebuildings.

All external openingswill have an apron to reduce the heat gain from theatmosphere which in turn will result in reduced electrical energyconsumptionandtherebyenhancingcostsavings.

External aluminum windows with appropriate glass will be provided tocontrol the unwanted glare of day lighting which will also result inminimizingtheheatgain,thuscreatingcoolingeffect.

Page 91: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 90

Treated domestic sewage and grey water after treatment will be used forgardening and flushing purpose thus, serving the purpose of waterconservation.

A well planned rain water harvesting unit is proposed which will help inrechargingtheundergroundwatertable.

9.10 RAINWATERHARVESTINGANDREDUCESURFACERUNOFF

Rainwaterharvestingcanserveasasolutiontothewaterprobleminthewatercrises areaby capturing the runoff.Rainwaterharvestinghelps inutilizing theprimarysourceofwaterandpreventtherunofffromgoingintosewerorstormdrains,therebyservingdualpurpose:

Makingwateravailableforfutureuseandreducingtheloadontreatmentplants.Recharging the water aquifers help in improving the quality of existinggroundwater through dilution. Rainwater harvesting comprises of twocomponents:

StoringRainwateringroundwaterreservoirsforbeneficialuseinfuture Rainwaterharvestingforartificialrechargeofgroundwater.

Amount of water that can be effectively harvested is called the harvestingpotential of the site. Based on the run off coefficient, rainfall and type ofcatchmentsarea,waterharvestingpotentialofsitecanbecalculated.

Thegroundwaterrechargeintheprojectareaisnotfeasibleasthegroundwatertableintheprojectareaisat0.5to1m.TherooftoprainwaterwillbedivertedfromterracetothestoragetankthroughHDPE/PVCpipesafterpassingthroughafiltermedia.

Therooftoprainwaterharvestingpotentialoftheprojectareaisaround5KLD.1 RWH tank will be provided with capacity of 10 KLD. The excess harvestedwaterwillbedischargedinStormwaterdrains.

The roof top rain water harvesting structure (Tanks) has been designedconsideringtheaveragerainfallof25mm/day.Howeverthestormwaterdrainsaredesignedforpeakrainfallof150mm/hr.

9.12 SOILDWASTEMANAGEMENTPLANTThe garbage and waste generated would be mostly domestic in nature. Thedomesticwastegenerallyconsistsofwastefromkitchen,paperwaste,wrappingsusedforhouseholdcommodities,bottles,crockery,plasticcans,etc.

This solid waste will be segregated at source as dry and wet garbage. Theresidents will be asked to keep two buckets having different colours asidentification marks for dry and wet waste. The wet garbage such as kitchenwastewillbecollected ingreencolourbucketanddrygarbage suchasplastic,crockery,etc.willbecollectedintheblackcolourbucket.

AftercollectionthewetgarbagewhichismostlybiodegradablewillbetreatedinBiogas Biofertilizer Plant, while dry garbagewill be disposed off for recyclingpurpose.

Page 92: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 91

ThedetailsofSolidwastegenerationanditsmanagementisgiveninChapter2.

9.14 EMPRESOURCESREQUIREMENTANDEMPBUDGET

TheresourcesrequiredforimplementingtheEMPanditscorrespondingbudgetisgivenbelowDuringOperationPhaseOperational Activities

Potential Impacts Mitigation Measures Implementing

Responsibility

Impact due to Water Consumption & Wastewater Generation

Fresh water consumption

• The use only low flow and low flush – water saving plumbing fixtures, automatic level controllers at water tanks to reduce/optimize the demand side of water resource.

• Treated waste water from STP will be used for green belt & flushing. This will reduce the demand for fresh water.

• Project Proponent • Society Chair Person &

Appointed AMC

Sewage generation & disposal problems

• Onsite Sewage Treatment Plant • Environmental monitoring will be

done monthly to avoid or to check the contamination of sewage in ground water or surface water

• Project Proponent • Society Chair Person &

Appointed AMC

Impact due to rainwater discharges

Water Pollution

• Rain water & storm water management plan will be incorporated.

• Annual Cleaning of RWH filters and SWD

• Project Proponent • Society Chair Person &

Appointed AMC

Flooding conditions

• Adequate Storm water drains to collect, carry, recharge/discharge storm- water runoff .

• Regular Cleaning of SWD

• Project Proponent & Society

Biological Environment

• RG Provided: 415.15 m2

• Project Proponent • Society Chair Person &

Appointed AMC

Page 93: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 92

Operational Activities

Potential Impacts Mitigation Measures Implementing

Responsibility

Impacts due to Solid Waste generation

Land pollution

• The Solid waste management process includes primary source segregation at apartment level, building-wise collection, secondary collection in community bins and transport to the processing plant

• Separate dustbins for collection of wet & dry waste will be provided.

• Wet garbage (11 kg/day) will be treated in vermiculture

• The recyclable material like plastic, metals, paper etc. will be separated and transported by auto-trippers/ trucks for sale to recycle vendors.

• Hazardous waste (used oil) will be disposed off through authorized recycler.

• Dry garbage (7 kg/day) as will be segregated and disposed off to recyclers

• Soil Contamination due to fuel leakage: Residents will be advised to check and repair their vehicle from time to time

• Project Proponent • Society Chair Person &

Appointed AMC

Impact due to Energy Consumption

Energy Consumption for building utilities and functions

• Solar street lighting and Solar hot water system.

• The site planning will be done such that none of the building blocks will hinder light access to other buildings

• The project will use pumps, motors and transformers with minimum losses and as per the ECBC 2007 requirements.

• Project Proponent • Society Chair Person &

Appointed AMC

Parking Traffic congestion

• Proper entry and exit points and driveways for easy movement of vehicles

• Vehicular movement, no parking areas signage's shall be installed

• Adequate parking space is provided within the complex

• Project Proponent • Society Chair Person

DG set and Traffic

Noise Pollution

• Silent DG Sets • Traffic management measures to

reduce noise. • Plantation along plot boundary,

Creepers on Plot boundary

• Project Proponent • Society Chair Person

Page 94: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 93

Potential Impacts Mitigation Measures Accountability

Energy Consumption for Thermal Comfort of Residents

• Tree plantation is proposed along the periphery of the site ensuring adequate buffer and reducing heat gain by the building so that the buildings will remain naturally

• The project design will use high energy performing building materials which would have low U value (Thermal Conductance) as compared to the conventional materials. The external wall of building would use fly ash blocks, which will have mandatory SHGC as required by ECBC.

• The units in the project are extensively naturally ventilated

Project Proponent Society Chair Person & Appointed AMC

Energy Consumption for Lighting

• Internal and external lighting design will be provided as required by ECBC which will have Lighting Power Density as per space requirements.

• The project would provide 20% lower LPD than as specified in ECBC, to achieve energy saving, while providing the require illumination levels, by using high efficacy lighting.

• Solar street lights will be provided

Society Chair Person & Appointed AMC

Safety hazards

• The Transformer or the Sub Station for the project shall be adequately protected from entry, allowing only authorized personnel to enter the facility

• All required energy protection measures such as high voltage cut-off, shock protector etc. shall be installed.

Society Chair Person & Appointed AMC

Impacts due to Cleaning & repairing activities

• Future residents and Cleaning AMC shall be encouraged to: do the following. A Manual will be created by the PP to make residents aware of these measures to be undertaken:

• Choose non-toxic, biodegradable substitutes for household cleaning agents. • Avoid products with potentially harmful ingredients such as sponges with antibacterial ingredients. • Conserve water, sweep instead of wet mop when possible. • Use biodegradable drain clog removers made with natural enzymes. • Don't pour hazardous chemicals through the sink or the drain; Don't use chlorine based bleach for

cleaning The regular monitoring & repairing of the equipment's such as STP, SWM, DG sets etc to avoid the sudden failure.

• Cleaning of building premises, parking areas, common areas shall be done on a regular basis., taking care to see that no solid waste is carried to the storm water drains.

• Green Guideline Brochure will be circulated to future residents & AMC workers.

Society Chair Person & Appointed AMC

Page 95: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 94

9.16 ENVIRONMENTALBUDGET

It isnecessaryto includetheenvironmentalcostasapartof thebudgetarycostcomponent.Itisproposedtotakeupprotectivemeasureslikewatersprinklingonroad during construction, STP, rainwater harvesting, Solar hotwater provision,Solidwastecompostingplantandgreenbeltdevelopment.

Adequate budgetary provision will be made for execution of EnvironmentalManagementPlan.Thedetailsofbudgetisgivenbelow:

Table9.2:EMPCosting

Component

CapitalCost(Rs.InLakhs)

O&MCost(Rs.In

Lakhs/year)Frequency

STP(Tertiary) 2.00 0.2

ContinuousO&MEnvironmentMonitoring:Monthly,STPoutletwaterqualityforpH,BOD,COD,SSandO&G

SolarHotWater 5.00 0.5 Quarterly

Rainwaterharvesting

1.00 0.1Duringrainyseason(cleaningofUGtanksandfiltrationunitsbeforerainyseason)

SolidWasteManagement

0.15 0.1

ContinuousO&MEnvironmentMonitoring:Monthlytoassessthecompostquality

Landscapeandtreeplantation

3.00 0.2TwiceaWeek

EnvironmentalMonitoring

‐ 2 AspertheCPCBguidelinesthroughMoEFapprovedlaboratories

TotalCost 11.15 3.1

Page 96: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 95

CHAPTER10EXECUTIVESUMMARY

INTRODUCTION Mrs. Pooja Ravindra Bhowar & Others are proposing construction ofHotelResortAtplotbearingS.No.47/1,47/2,49&43ofvillage–Borli,Tal–Murud,Dist –Raigad, State –Maharashtra.Theproject comprisingof 3Cottages (Ground floor), Administrative Building with restaurant (G + 1floor),Standardrooms(G+1floor)andSwimmingpool.

Sr.No. BuildingDetails Building

configuration No.ofRooms Population

1. Cottages G+1floor 7 28

2. StandardRooms G+1floor 12 24

3. AdministrativeBuilding(Restaurant)

G+1floor ‐ 20

4. Hotelstaff ‐ 20

TOTAL 92

The project comes under the purview of CRZ notification 2011. The landfalling between 500 m from HTL on the landward side. The proposedprojectfallsundertheCRZIIIareaaspertheCRZnotification2011.

PROJECTLOCATION

TheproposedHotelResortisplannedatplotbearingS.No.47/1,47/2,49&43ofvillage–Borli,Tal–Murud,Dist–Raigad,State–Maharashtra.ItsGooglelocationis18030’47.57Nlatitudeand72054’50.48Elongitude.Thesiteisaccessiblebyexisting13.0mwideAlibaug‐MurudStatehighway&9.0mwideaccessRoad.

SALIENTFEATURESOFPROJECT

SR.No. Details Information Unit

1 NameoftheprojectProposedconstructionof

HotelResortatBorli,Raigad,Maharashtra

2 TotalPlotArea 4030.00 m2 3 FSIArea 1,002.22 m2

Page 97: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 96

4 NonFSIArea 300.00 m2

5 TotalConstructionArea 1,302.22 m2

6 No.oftenements 12standardrooms,7cottages,Restaurant,

Administrativebuilding Nos.

7 Totalwaterrequirement 15 KLD

8 SewageandSTPdetails

Sewagegeneration:9 STPCapacity:10

STPTechnology:Phytorid

KLD KLD ‐

9 TotalSolidWasteGeneration 18 kg/d

10 Biodegradablecomponent(VermiComposting)

11 kg/d

11 TotalPowerRequirement

ConnectedLoad:0.12 DemandLoad:0.08

MW MW

12 DGSet 20 kVA 13 EnergyEfficiency TotalEnergySavings:23.25 %

14 ParkingProvision 4‐Wprovided:20 2‐Wprovided:12

Nos. Nos.

15 RWHCapacity 10 KLD

16 SWDGeneration(300mmwidechannel)

458.7 m3/hr

17 EMPCost Capitalcost:11.15Rs. O&MCost:3.1Rs.

Lakhs Lakhs/yr

WaterSupply

The totalwater requirement of projectwill be 15KLD. Sewage generation is 9KLD.WaterwillbesourcefromPhansadDamthroughGrampanchayat.

SolidWasteManagement

The proposed solid waste management process includes primary sourcesegregationatsourcelevel,secondarycollectionincommunitybinsandtransporttothesolidwastetreatmentplant.Drygarbageasinert/recyclablewastesuchasplastics,glass,metals,rubberwillbesegregatedanddisposedofftorecyclers.Wetgarbage/biodegradable matter as leftover food, vegetables will be treated inVermicompostingunit.

Page 98: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 97

PowerSupply

Thepowersupply(MaxDemandLoad)necessaryfortheproposedbuildingsareestimatedas0.08MW(Functionalphase).ThepowerwillbemadeavailablefromtheMSEB.Thenetworkofpowersupplyinthisregioniswellestablished.DGsetwillbeprovidedinthecaseofemergencyofcapacity20kVA.

Socio‐economicEnvironmentInconstructionphaseitwillcreateworkopportunityforthelocalpopulation.Nonegative impact isenvisaged.Overallpositive impact in the functionalphase,astheprojectwillcreatelongtermemploymentinactivitiessuchasmaintenanceofbuildingsandancillaryservices.EnvironmentManagementPlanMeasures which will be adopted to reduce the magnitude of negative impactsfromtheproposedprojectduringconstructionandfunctionalphasearediscussedbelowintheEnvironmentManagementPlan.EnvironmentalManagementPlanduringConstructionPhaseSr.No.

EnvironmentalComponents MitigationMeasures

1. AmbientAirQuality

Toavoiddust,regularsprinklingofwateronroad.CoveringjutesheetoverthehaultruckssprinklingthroughwaterTanker.

BarricadingtoPlot Periodicmaintenance of construction equipment.

Barricadingalongtheplotboundary. UseofPersonalProtectiveEquipment Ensure that all vehicles andmachinery are fitted

with appropriate emission control equipment,maintainedfrequently

DG:asperCPCBnorms,propermaintenance,LSDfueluse,safestorageoffuel.

2. Noise Equipment’s will be regularly serviced. Heavyconstructions activity limited to day‐time hoursonly

PPE to workers Silencers will be fitted onconstructionequipmentandDGsets

3 Water Avoid excavation during monsoon season, Careshallbetakentoavoidsoilerosion

Sedimentation pits along the plot boundary toavoidtheexcessivesoilrunoff

SupplyofAdequatedrinkingwater TyreCleaning Ground water‐hydraulic containment and

Treatment

Page 99: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 98

Sr.No.

EnvironmentalComponents

MitigationMeasures

4. Land To minimize disruption of soil and forconservationof topsoil, topsoilwill bekept asideandafter the constructionactivity is over, topsoilshallbeutilizedforlandscapingactivity

Reutilizationofconstructiondebrisatsiteonly

5 Traffic Provision of Parking space for ConstructionMaterialcarryingVehicles

Sign Boards, Persons at entry ‐ exit and Parkingarea

6 BiologicalEnvironment

Treesplantation Regulation of vehicular trips and proper

maintenanceofmachinery.

7 Aesthetics Barricadingalongtheplotboundary

8 SafetyMeasures Adequatedrinkingwater Personalprotectiveandsafetyequipment'swillbe

provided. Firstaidfacilityforconstructionworkers. Regularhealthcheckup Regularpestcontrolwillbedoneonsite.

Page 100: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 99

EnvironmentalManagementPlanduringfunctionalPhase

Sr.No. EnvironmentalComponents

MitigationMeasures

1. AmbientAirQuality

PeriodicmaintenanceofDGSets. Use of CNG/LPG as alternate fuel in cars will be

encouraged, Cars of Euro IV specifications will reduceemissions

ProperLandscapedevelopmentalongplotboundary 2. Noise Constructionofcompoundwall

GrowingofcreepersonCompoundwall Conservation of exiting trees near roadside and

PlantationalongRoadside. AcousticenclosuretoDGSet

3. Water STPwillbeprovidedofcapacity:10m3.Treatedwaterwillbeusedforgardening,flushing.

Environmental monitoring will be done monthly toavoid or to check the contamination of sewage ingroundwaterorsurfacewater

Useofwaterefficientplumbingfixtures RainwaterharvestingthroughTanks Drip irrigationandsprinklers systemshallbeused for

thegreenarea Storm water management through provision of

adequateSizesSWD Regular leak detection and repairing for water supply

networkandseweragenetwork Goodhousekeepingandstormwatermanagementwill

befollowed.4 Land Total waste generated from the project will be 18

kg/day. Therecyclablemateriallikeplastic,metals,paperetc.

will be separated and transported by auto‐trippers/trucksforsaletorecyclevendors

Wetgarbagewillbetreatedinvermicultureunit DenseTreePlantationaroundSolidWasteProcessing

Unit

5 BiologicalEnvironment

415.15m2oflandscapeareawillbedeveloped

6 TrafficPattern Adequate parking space is provided within the theproposedproject

Properentryandexitswillbeprovided Effectivetrafficmanagementwillbepracticed

Page 101: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

Mrs.PoojaRavindraBhowar&Others 100

CHAPTER11CREDENTIALSOFCONSULTANTS

NAMEOFTHECONSULTANTS

MahabalEnviroEngineerPvt.Ltd.PlotNoF‐7,RoadNo‐21,

WagleEstate,ThaneWest‐400604,Maharashtra.

TelephoneNo:90‐22‐25823154/3139/0658

Fax:91‐22‐25823543Email:[email protected],[email protected]

Website:www.mahabalenviro.com

MahabalEnviroEngineersPvt.Ltd.(MEEPL)incorporatedon19thOct.,1984isacompany engaged in providing environmental consultancy services. It has alaboratoryestablishedundertheEnvironment(Protection)ActandislocatedatitsHeadOfficeatF‐7,RoadNo.21,WagleEstate,Thane‐400604.AlthoughthejurisdictionoftheHeadOfficeextendsalloverthecountry, it isassistedbythebrancheslocatedatNashik,Pune,Delhi,Aurangabad,JalgaonandNagpur(allinMaharashtra), Chhindwara in Madhya Pradesh, and Bharuch in Gujarat. TheBranches do also have laboratories established either in the office or at theclient’s site for analysis of general parameters in Air,Water andWasteWatersamples.

MahabalEnviroEngineersPvt.Ltd.isanISO9001‐2000CertifiedCompanyandlaboratoryisaccreditedby:

MinistryofEnvironmentandForest(MoEF),Govt.ofIndia,NewDelhi. NABL IMS18001

The firmhasbeenengaged in the jobsofpreparationofEnvironmental ImpactAssessment (EIA)&EnvironmentalManagementPlan (EMP) formore than15years for the purpose of obtaining clearance fromMinistry of Environment &Forest.

The firm hasmajor experience in operation andmaintenance of STP in Pune,Nagur,NashikandShimla.

SomeoftheotherServicesOfferedbyfirmaregivenbelow. EnvironmentalClearanceFromMoEFandSEIAA CRZClearancesfromMoEF EnvironmentalQualityMonitoring NoiseMappingandDesignofNoiseBarriers Stack&WorkplaceMonitoring EnvironmentalDueDiligencestudy PlantVentilationStudy ConsenttoOperate/Establish/Renewal

Page 102: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

DesignofSTPandETP SupplyofNoiseMeter,WeatherStations,RDSmachinesetc. Legalguidancetoindustry

QCINABETACCRIDATIONAccredited by NABET. (Minutes of Accreditation Committee meeting forSurveillanceAssessmentheldon01.10.2014)

EIATEAMMEMBERS

QCINABETACCRIDATIONAccreditedbyNABETbyit’svideletterNo.QCI/NABET/ENV/ACO/16/06/0172

dated16.06.2016

EIATEAMMEMBERS

EIACORDINATOR

1 Dr.D.A.Patil

FUNCTIONALAREAEXPERT1 Dr.D.A.Patil AP (A), WP (B), MSW

(B),N(B)

2 Mr.RaghunathMahabal AP (A), Noise (A), WP(A),RH(A)

3 Mr.PravinLatwade AQ (A), WP (B), MSW(B),RH(B)

4 Ms.JayaPande LU(B)

5 PradeepSingh SE(B)

6 SachinGore WP(B) FUNCTIONALAREAEXPERT 7 PriyankaShinde WP,MSW

Page 103: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is

RapidEIA,ConstructionofHotelResortatBorli,Tal‐Murud,Dist‐Raigad

8 RohitBhagwat SHW,EB

9 MrudulaLaghate TeamMember

10 PradnyaBagul MSW

11 NitaSalunkhe TeamMember

Associated FunctionalAreaExpert

12 SwatiSawant WP,SHW(B)

13 RanjitDeulkar WP,SHW(B)

14 KunalGajare AP,WP(B)

15 PrachiSathe LU(B) EMPANELLEDFUNCTIONALAREAEXPERT16 JotiramBalwantPishte HG(A),GEO(A)17 BhaubaliPatil SE(B)18 GopalChiplunkar LU(B)19 AnkurKulkarni LU(B)

Page 104: MAY, 2016 - environmentclearance.nic.in · The site is accessible by existing 13.0 m wide Alibaug‐ Murud State highway & 9.0 m wide access Road. Details of the proposed Resort is