Tuesday, May 16, 2017 Agenda Los Angeles County Metropolitan Transportation Authority BUS OPERATIONS SUBCOMMITTEE William Mulholland Conference Room – 15 th Floor 9:30 am 1. Call to Order (1 minute) Action Jane Leonard 2. Approval of April 18, 2017 Minutes (1 minute) Action BOS 3. Chair’s Report (5 minutes) Information Jane Leonard 4. Metro Report (5 minutes) Information Annelle Albarran 5. FTA Update (10 minutes) Information Arianna Valle/Adam Stephenson/Stacy Alameida 6. FAP Approval (10 minutes) Action Manijeh Ahmadi 7. Update on New Low Income Program (10 minutes) Information Armineh Saint 8. FY18 Budget Update (15 minutes) Information Quintin Sumabat 9. Access Update (10 minutes) Information Matthew Avancena 10. Transit Industry Debriefing/Updates (5 minutes) Information All

Upload: others

Post on 28-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Tuesday, May 16, 2017

    Agenda

    Los Angeles County Metropolitan Transportation Authority

    BUS OPERATIONS SUBCOMMITTEE William Mulholland Conference Room – 15th Floor 9:30 am

    1. Call to Order (1 minute)

    Action Jane Leonard

    2. Approval of April 18, 2017 Minutes (1 minute)

    Action BOS

    3. Chair’s Report (5 minutes)

    Information Jane Leonard

    4. Metro Report (5 minutes)

    Information Annelle Albarran

    5. FTA Update (10 minutes)

    Information Arianna Valle/Adam Stephenson/Stacy Alameida

    6. FAP Approval (10 minutes)

    Action Manijeh Ahmadi

    7. Update on New Low Income Program (10 minutes)

    Information Armineh Saint

    8. FY18 Budget Update (15 minutes)

    Information Quintin Sumabat

    9. Access Update (10 minutes)

    Information Matthew Avancena

    10. Transit Industry Debriefing/Updates (5 minutes)

    Information All

  • Information Items:

    90-day Rolling Agenda Summary of Invoices FY 2017 Summary of EZ Pass Invoices FY 2017 Subsidy Matrix FY 2017 TDA-STA Capital Claims FY 2017 TDA-STA Claims FY 2017 FY18 Budget Update

    BOS Agenda Packages can be accessed online at: https://www.metro.net/about/bos/ Please call SCOTT HARTWELL at 213-922-2836 or ANNELLE ALBARRAN at 213-922-4025 if you have questions regarding the agenda or meeting. The next BOS meeting will be held on Tuesday, June 20, 2017, at 9:30 am in the Mulholland Conference Room, 15th Floor of the Metro Headquarters Building.

    11. New Business Information All

    12. Adjournment

  • Bus Operations Subcommittee Minutes/Action Items

    April 18, 2017

    1 of 10

    1. Call to Order The meeting was called to order at 9:40 am. A quorum was

    present.

    Action Jane Leonard

    2. Approval of March 21, 2017 Minutes

    A motion to approve the minutes was made by David Feinberg

    (Santa Monica Big Blue Bus) and seconded by Dana Pynn

    (GTrans). The minutes were approved as submitted.

    Action BOS

    3. Chair’s Report Dana Pynn reported on the following items from the April 5, 2017

    TAC meeting:

    Kalieh Honish (Metro) provided an update on the Measure M

    Guidelines. The Guidelines reinforce Metro’s fiduciary

    responsibility, address any concerns that Measure R did not

    address, and will allow Metro to deliver projects and

    programs, not to escrow funds. The Draft Guidelines

    encompass three core principles: timely use of funds; cash

    flow; and multi-year funds partnering and related toolbox.

    Comments on the Draft Guidelines must be made in writing.

    TAC intends to provide formal comments on the Guidelines.

    Time will be budgeted at the next TAC meeting to draft and

    develop comments. Jane Leonard (Culver CityBus) added

    that the Los Angeles County Municipal Operators Association

    (LACMOA) is going to have a meeting next week to bring

    together ideas specific to bus operations funds for the

    Measure M Guidelines.

    Zoe Unruh (Metro) provided a CTC update. A draft State

    Transportation Improvement Program (STIP) fund estimate

    assumption was brought forward at the CTC meeting. The

    draft assumptions include a forecast of four funding scenarios

    Information Dana Pynn/ Jane Leonard

  • Bus Operations Subcommittee Minutes/Action Items

    April 18, 2017

    2 of 10

    for the five year 2018 STIP. The recommended alternative

    assumes a modest increase in the base excise tax, which

    would grow to 18 cents per gallon in 2021-2022.

    Desiree Portillo Rabinow (Metro) reported that pending Board

    approval, Round 5 of the Transit Oriented Development (TOD)

    Planning Grant Program will be released. There will be a total

    of $3.1 million available. Eligible applicants include local

    municipalities, LA County, and entities that have land use

    control to establish regulatory documents.

    Michelle Boehm (California High-Speed Rail Authority)

    provided an update of all of the work being done to improve

    regional rail services in Southern California.

    The General Managers’ (GM) meeting for the month of April was

    cancelled.

    4. Metro Report Annelle Albarran (Metro) noted that the Draft Measure M

    Guidelines went to the Board this past month and were released

    for public comment.

    Information Annelle Albarran

    5. STA Efficiency Test Approval of Final Draft

    Susan Richan (Metro) distributed and discussed the final draft of

    the FY17 STA Fund Efficiency Standards. Based on the efficiency

    test, Culver CityBus, Long Beach Transit, MTA, and Big Blue Bus

    have passed after turning in some additional exclusions. They can

    therefore draw down the full amount. However, Claremont Dial-A-

    Ride, Beach Cities Transit, Torrance Transit, and Santa Clarita

    Transit will receive a scaled back deduction depending on what

    category they didn’t pass.

    Action Susan Richan

  • Bus Operations Subcommittee Minutes/Action Items

    April 18, 2017

    3 of 10

    A motion to approve the STA Fund Efficiency Standards was

    made by Joseph Loh (GTrans) and seconded by David Feinberg.

    The motion was approved.

    6. FTA Update Arianna Valle (FTA) provided the following updates:

    The upcoming grants application workshop is scheduled for

    Monday, April 24 from 8:30am-12:30pm. Information

    packages will be sent out later this week. Be advised that

    Region 9 will be hosting a Financial Management Oversight

    Review (FMO) and a Procurement System Review (PSR)

    Workshop on the same day.

    The FY17 budget is funded and appropriated through

    April 28, 2017. Congress is working on a bill to fund the

    government through the full fiscal year (September 30, 2017).

    A link to a new performance based planning website will be

    sent to BOS members. The website includes roundtable

    presentations that were made this past year, webinar

    recordings, info on the final planning rule with transit operators

    and the Metropolitan Planning Organization, and links to

    Transit Asset Management (TAM) and safety plans.

    Effective March 21, 2017, the Buy America handbook

    solidifies the requirement that by FY20, Buy America content

    is required to be 70%. Also, effective March 21, 2017 is

    Circular 5010 (awards management).

    FTA is collecting information for the Continuity of Operations

    Plan (COOP). In a state of emergency, the FTA administrator

    needs to be able to reach out to transit agency directors/GMs.

    Information Arianna Valle

  • Bus Operations Subcommittee Minutes/Action Items

    April 18, 2017

    4 of 10

    FTA needs cell phone numbers/emergency content

    information within the next month. Program Managers will be

    reaching out to agencies; the information can be emailed.

    A temporary change has occurred in the San Francisco

    regional office—the planning and program development group

    has been cut in half due to retirements and promotions. As a

    result of a decision made on Monday, the LA office will be

    processing grant applications for agencies in other regions

    within SCAG’s area, until the end of the fiscal year

    (September 2017). Program Managers will continue working

    on their grants in addition to others.

    An advance notice of proposed rulemaking which was

    published on October 3, 2013 and included MAP-21 programs

    such as the National Safety Program and the transit asset

    management requirements (TAM System) was revoked on

    Monday, April 17, 2017. However, since the TAM rulemaking

    was done separately it will stand. FTA will provide a point of

    contact if you have any additional questions.

    The following National Transit Institute courses are coming up

    as webinars:

    o May 11, 2017- Current Trends in Multiagency Transit

    Electronic Fare Systems

    o July, 2017- Transit Cooperative Research Program

    (TCRP) Synthesis: Successful Practice and Training

    Initiatives to Reduce Accidents and Incidents at Transit

    Agencies

  • Bus Operations Subcommittee Minutes/Action Items

    April 18, 2017

    5 of 10

    Susan Lipman (Santa Clarita Transit) commented that the Transit

    Award Management System (TrAMS) is set to Greenwich time,

    and this is not clearly articulated to users, therefore, making their

    submissions late. Arianna responded that because the program

    was written by a company based in Europe the time setting can’t

    be changed but a better job can be done to clarify the deadline.

    7. FAP Updates Manijeh Ahmadi (Metro) presented the second draft of the FY18

    Transit Fund Allocations and asked the Subcommittee to review

    the forms for accuracy and email her any comments/changes by

    close of business, Thursday, May 4, 2017. The final draft will be

    released to the Subcommittee for comments on Tuesday,

    May 9, 2017. The final allocations will be presented to the BOS

    for approval on Tuesday, May 16, 2017 and to the full Metro

    Board on Thursday, June 29, 2017.

    Information Manijeh Ahmadi

    8. Measure M Draft Guidelines

    Michelle Navarro (Metro) provided an update on the Measure M

    Draft Guidelines. The Guidelines were released for public

    comment last month and are being reviewed by the Policy

    Advisory Committee. The Draft Guidelines encompass three core

    principles: Timely Use of Funds; Cash Flow; and Multi-Year

    Subregional Programs.

    The Timely Use of Funds principle consists of two elements:

    project readiness requirements and the lapsing policy. Project

    readiness involves demonstrating that projects are “ready to go”

    before securing funds while the lapsing policy will ensure that

    money not being used is reprogrammed to maximize delivery.

    Information Michelle Navarro

  • Bus Operations Subcommittee Minutes/Action Items

    April 18, 2017

    6 of 10

    The cashflow management principle will mainly focus on moving

    projects based on funding availability. It will ensure that projects

    are “shovel ready”, that they stay within the scope of the costs set

    forth in the Expenditure Plan, and that there is discipline in

    understanding comprehensive assessments and amendments of

    projects when changes are needed.

    The Multi-Year Subregional Programs (MSP) were developed

    from the Mobility Matrices. These projects are consistent with

    Guideline definitions, and it will be up to the subregions to deliver

    these projects. MSPs will still have to meet the Timely Use of

    Funds and Project Readiness requirements. If a MSP exceeds its

    scope and needs additional financial assistance from Metro it will

    have to comply with other Metro policies.

    Eligibility, technical criteria and a competitive process will be

    developed for the following capital areas: 2% Active

    Transportation Program (ATP), 2% Highway, and 2% Transit;

    Countywide Bus Rapid Transit and Visionary Seed Fund. Almost

    half (44%) of Measure M funds will go to LA County transit

    operators, cities, Access, and Metro to improve mobility.

    Staff is currently analyzing potential methods for allocating the

    local return funds and is waiting for the Board to adopt guidelines

    that will determine the formula split for ADA Paratransit and Metro

    discounts for seniors and students. Currently, Metro is working

  • Bus Operations Subcommittee Minutes/Action Items

    April 18, 2017

    7 of 10

    with Metrolink to develop performance metrics which are required

    to increase percent allocation in FY39 from 1% to 2%.

    Joseph Loh (GTrans) asked for clarification regarding the 3%

    local contribution toward transit station construction. Michelle

    Navarro responded that the contribution amount will be based on

    the total project cost established at 30% design.

    A question was asked regarding whether agencies can use transit

    as a contribution, and Michelle responded that as the Draft

    Guidelines are currently structured, only capital contributions

    would be allowable to satisfy the 3% match.

    David Feinberg commented that there have been discussions at

    TAC about taking a position on the Guidelines and asked if BOS

    should consider doing so as well.

    Comments on the Draft Guidelines must be made in writing

    through the Metro website at http://theplan.metro.net or by email

    at [email protected] by May 26, 2017.

    9. Access Update Matthew Avancena (Access) provided the following updates:

    Metro’s Triennial Review was done last month and there was

    no ADA oversight finding

    An announcement will be sent out next week regarding the

    upcoming Access Board elections. Names for nominees are

    being requested for two seats that will open this year.

    Information Mathew Avancena

  • Bus Operations Subcommittee Minutes/Action Items

    April 18, 2017

    8 of 10

    Currently, Joyce Rooney (Beach Cities Transit) is the

    chairperson for the Municipal Operators Committee and

    Kathryn Engel (Glendale Beeline) is the chairperson for Local

    Operators Committe.

    Access’s Free Fare Paratransit Working Group meeting was

    held two weeks ago. Two proposals were made: 1) use funds

    from Measure M to address the reimbursement cap, and

    2) surplus funds from systems that fall under their cap could

    be used for systems that go over their cap. The next Working

    Group meeting will be in late May.

    Jane Leonard suggested that operators list the Free Fare

    Paratransit Working Group as part of their communication with

    Access in Triennial Reviews. Jane also suggested that the

    Transit Mutual Assistance Systems Compact (TransMAC) group

    can be part of agencies’ oversight and collaboration.

    10. Transit Industry Debriefing/Updates

    Michelle Caldwell (Foothill Transit) announced that Foothill Transit

    is having a public hearing on Saturday, April 22, 2017 to accept

    comments on a fare change proposal. Cash fares would increase

    by 25 cents, the cost of the monthly pass would decrease, and a

    day pass would be added to the fare media. Fares for customers

    paying with a TAP card would remain the same. One of the

    primary goals of the fare change is to encourage use of TAP

    cards over cash payments. About 50% of Foothill Transit’s

    passengers pay cash, which slows down service. The Board will

    vote at the end of May, with implementation in the Fall of 2017.

    Information All

  • Bus Operations Subcommittee Minutes/Action Items

    April 18, 2017

    9 of 10

    Enny Chung announced that as of last week Big Blue Bus is

    piloting with Token Transit. Customers can now buy passes by

    showing their phone to the driver.

    Jane Leonard thanked Long Beach Transit for sponsoring the

    Disadvantaged Business Enterprise (DBE) workshop.

    11. FTA Section 5307 15% Discretionary Capital and 1% ATI Funds Allocation

    A total of $37,806,964 was available for the FY 2018 FTA Section

    5307 15% Capital Discretionary and 1% Associated Transit

    Improvement (ATI) Fund Allocations ($35,421,667 and

    $2,385,297 respectively).

    The Southern California Regional Transit Training Consortium

    (SCRTTC) received their first year allocation in the amount of

    $300,000 off the top from the FY18 Section 5307 15% Capital

    Discretionary Funds. Metro was awarded 50% of the remaining

    $35,121,667. The remaining 50% of the funds ($17,560,833)

    was awarded to the following agencies:

    Norwalk Transit; Culver CityBus; Santa Monica’s Big Blue

    Bus; Gardena’s GTrans; LADOT; and Foothill Transit.

    A motion to approve the BOS funding award recommendations for

    the Section 5307 15% Capital Discretionary Fund Allocation and

    to award the Southern California Regional Transit Training

    Consortium (SCRTTC) $300,000 off the top for the first of three

    years (FY18, FY19 and FY20) was made by Joseph Loh (GTrans)

    and seconded by Judy Fry (AVTA). The motion was approved

    Action Jane Leonard

  • Bus Operations Subcommittee Minutes/Action Items

    April 18, 2017

    10 of 10

    unanimously.

    Of the $2,385,297 available for 1% ATI projects, Metro was

    awarded 50% of the funds. To the remaining 50% ($1,192,648),

    the balance of the FY17 5307 1% ATI ($398,527) was added, for

    a combined total of $1,591,176 to be awarded to qualifying

    municipal agency projects. These funds were awarded as follows:

    Norwalk Transit; LADOT; Torrance Transit; Culver CityBus.

    There was a balance of $462,832 which the Subcommittee

    agreed to split evenly between projects from Culver CityBus

    and Norwalk Transit. Each of the two respective projects were

    submitted under the 15% Capital Discretionary funds but had

    enhancements that qualified under the 1% ATI funds.

    A motion was made by Michelle Caldwell (Foothill Transit) and

    seconded by Robert Portillo (Montebello Bus Lines) to approve

    the 1% ATI funding recommendations and to allocate/split the

    remaining balance of $462,832 equally between Norwalk Transit

    and Culver CityBus. The motion was approved unanimously.

    Final funding awards for the 5307 15% Discretionary and 1% ATI

    funds are shown on the attached spreadsheet.

    12. New Business No new business report/information was provided. Information All

    13. Adjournment The meeting was adjourned at 3:00 pm.

  • Rev: 5/10/2017

    BOS Attendance Chart - January-December 2017

    Agency 2BRepresentative

    Janu

    ary

    Febr

    uary

    Mar

    ch

    Apr

    il

    May

    June

    July

    Aug

    ust

    Sept

    embe

    r

    Oct

    ober

    Nov

    embe

    r

    Dec

    embe

    r

    Antelope Valley SEC: Judy Fry Alt: Colby Konisek

    Arcadia Transit Rep: Linda Hui Beach Cities Transit Rep: Joyce Rooney

    Alt: Diane Amaya Alt: Amy Ahdi Claremont Dial-A-Ride

    Rep.: George Sparks Alt: Nicole Campos

    Commerce Municipal Bus Lines

    Rep: Martin Gombert Alt: Claude McFerguson

    Culver CityBus Chair: Jane Leonard Alt: Samantha Blackshire

    Foothill Transit VC: Michelle Caldwell Alt.: David Reyno

    G Trans Rep: Joseph Loh Alt: Dana Pynn

    LADOT Rep: Brian Lee Alt: Nora Chin La Mirada Transit Rep: Judith Quiñonez

    Alt: Lisa Montoya

    Long Beach Transit 0BRep: Jennifer Abro Alt: Paul Gonzales

    Montebello Bus Lines

    Rep: Robert Portillo Alt: Eric Yan

    MTA 1BRep: Nancy Saravia Alt: Israel Marin

    Norwalk Transit Rep: Theresa Clark Alt: Susan Chow

    Santa Clarita Transit Rep: Susan Lipman Santa Monica’s Big Blue Bus

    Rep: David Feinberg Alt: Enny Chung

    Torrance Transit Rep: James Lee Alt: Ifeanyi Ihenacho

    Quorum? (9 Members or more)

  • Upcoming Agenda Items

    MetroLos Angeles County

    Metropolitan Transportation

    Authority

    One Gateway Plaza

    3rd Floor Board Room

    Los Angeles, CA

    Ad Hoc Congestion, Highway and Roads Committee

    Wednesday, April 19, 2017

    Authorize Contract Modification No. 114 by Caltrans for construction

    contract of the Segment 3 of the I-5 North Capacity Enhancements

    Project between SR-134 and SR-118 (Project) under the Funding

    Agreement No. MOU. P0008355/8501A/A6, in the amount of

    $552,110.89, using non local fund sources.

    2017-0067

    Status: CEO Draft Meeting Ready

    Authorize Contract Modifications No. 56-1 & No. 112 (CCO 56-1 & CCO

    112) by Caltrans for the construction contract of I-5 South Carmenita

    Road Interchange Improvements Project (the Project) under the Funding

    Agreement No. MOU.P0006376A-03, in the total amount of $4,300,000

    within the LOP budget.

    2017-0095

    Status: CEO Draft Meeting Ready

    Receive and File I-710 South Corridor Project EIR/EIS update report.2017-0094

    Status: CEO Draft Meeting Ready

    Receive and file status report on the HDC project2017-0135

    Status: CEO Draft Meeting Ready

    CONSIDER:

    A. APPROVE $11.8 million of additional programming within the

    capacity of the Measure R Highway Subregional Programs and funding

    changes via the updated project list,

    · Highway Operational Improvements in Arroyo Verdugo

    · Highway Operational Improvements in Las Virgenes Malibu

    · I-405, I-110, I-105 and SR-91 Ramp and Interchange Imp. (South

    Bay)

    · I-605 Corridor “Hot Spots” Interchange Imp. in Gateway Cities

    · I-710 South and/or Early Action Projects in Gateway Cities

    as shown in Attachment A;

    B. AUTHORIZING the CEO or his designee to negotiate and execute all

    necessary agreements for approved projects;

    C. Receive and File the SR-138 Capacity Enhancements (North

    County) project list as shown in Attachment B;

    2017-0098

    Page 1 Printed on 4/3/2017

  • Monday, April 03, 2017

    Status: CEO Draft Meeting Ready

    Wednesday, May 17, 2017

    Authorize Contract Modifications No. 42 (CCO 42) by State of California

    Department of Transportation (Caltrans) for the construction contract of

    the Segment 5 of I-5 South Capacity Improvements Project from Orange

    County Line to I-605 under the Funding Agreement No.

    MOU.P0004292A-3, in the total amount of $1,700,000 within the LOP

    budget.

    2017-0151

    Status: Approval Cancelled

    Authorize Contract Modifications No. 115 (CCO 115) by State of

    California Department of Transportation (Caltrans) for the construction

    contract of the Segment 4 of I-5 South Capacity Improvements Project

    from Orange County Line to I-605 under the Funding Agreement No.

    MOU.P0004292A-3, in the total amount of $577,500 within the LOP

    budget.

    2017-0229

    Status: Draft

    Receive and File the status of the State Route 710 North Project2017-0097

    Status: Draft

    Page 2 Printed on 4/3/2017

  • Monday, April 03, 2017

    Board of Directors - Regular Board Meeting

    Thursday, April 27, 2017

    APPROVE Minutes of the Regular Board Meeting held March 23, 2017.2017-0234

    Status: Agenda Ready

    Oral Presentation by JPA on High Speed Rail Component of the HDC2017-0184

    Status: Draft

    A. Hold a Public hearing on the proposed Resolution of Necessity

    B. Adopt the Resolution of Necessity authorizing the commencement of

    an eminent domain action to acquire Parcel RM-27, consisting of a full

    take of the real property for construction of the Project.

    2017-0088

    Status: Draft

    Page 3 Printed on 4/3/2017

  • Monday, April 03, 2017

    Budget Public Hearing

    Thursday, May 25, 2017

    Draft Measure M Guidelines Item 8 (March 23, 2017) Motion Response2017-0226

    Status: Draft

    Page 4 Printed on 4/3/2017

  • Monday, April 03, 2017

    Construction Committee

    Thursday, April 20, 2017

    A. Authorize the Chief Executive Officer (CEO) to execute a final

    Modification to Contract C1013R, with Skanska USA Civil West

    California District Inc., for the design and construction of the west

    entrance at the North Hollywood Station on the Metro Red Line, in the

    amount $1,261,770, adjustingincreasing the total current contract price

    from $15,743,901.61 to $17,005,671.61 within the life of project budget.

    2017-0137

    Status: CEO Draft Meeting Ready

    A. Authorize the Chief Executive Officer (CEO) to execute a Contract

    Modification to Contract No. C1043 with Griffith Company, for the design

    and construction of the Universal City Pedestrian Bridge, in the amount

    of $450,000, increasing the total current contract value from

    $24,264,752 to24,264,752 to $24,714,752 within the Life of Project

    budget.; and

    B. Approve an increase in Contract Modification Authority (CMA) for

    Contract No. C1043 in the amount of $170,252, increasing the total

    CMA from $3,119,500 to $3,289,752 also within the Life of Project

    budget.

    2017-0138

    Status: Approval Review

    RECEIVE Oral report by the Program Management Chief Officer.2017-0202

    Status: Approval Review

    Thursday, May 18, 2017

    A. Increase the Life-of-Project Budget (LOP) for the Low Impact

    Development Project by $1,000,000, increasing the Life-of-Project

    Budget from $940,000 to $1,940,000 due to potential closure of Division

    4.

    B. Approve change of project name from Permeable Pavement and

    Bioretention Pilot Project, Division 4 Maintenance Facility to Permeable

    Pavement and Cistern Pilot Project, Central Maintenance Facility due to

    potential closure of Division 4.

    2016-0933

    Status: Draft

    Authorize the Chief Executive Officer to execute the a Memorandum of

    Understanding (MOU) for Operation and Maintenance Agreement

    (OMA) with The City of Santa Monica for operation and maintenance of

    Expo II and as approved to form. and as approved to form.

    2017-0027

    Status: Draft

    A. FINDING that use of the design-build contracting delivery approach

    pursuant to Public Utilities Code 130242(a) will achieve certain private

    2017-0173

    Page 5 Printed on 4/3/2017

  • Monday, April 03, 2017

    sector efficiencies in the integration of the design and construction of the

    Emergency Security Operations Center by providing for the award of a

    design-build contract to the lowest responsive responsible bidder;

    and

    (REQUIRES 2/3 VOTE)

    B. APPROVING the use of the design-build contracting delivery

    approach pursuant to Public Contract Code 22160-22169 to reduce

    project costs, expedite project completion and allow for negotiation and

    award of a design-build contract to a responsible proposer whose

    proposal is determined to be the best-value to Metro.

    Status: Draft

    RECEIVE AND FILE status update on the Project Labor Agreement and

    Construction Careers Policy programs through the quarter ending March

    2017.

    2017-0244

    Status: Draft

    Page 6 Printed on 4/3/2017

  • Monday, April 03, 2017

    Executive Management Committee

    Thursday, April 20, 2017

    ADOPT staff recommended positions:

    A. AB 287 (Holden) - State Highway Route 710: Advisory Committee

    OPPOSE UNLESS AMENDED

    B. AB 91 (Cervantez) - High -Occupancy vehicle lanes OPPOSE

    C. AB 344 (Melendez) -- Toll Evasion Violations OPPOSE

    D. AB 673 (Chu) - Public transit operators: vehicle safety requirements

    OPPOSE UNLESS AMENDED

    E. AB 695 (Bocanegra) - Avoidance of on-track equipment SUPPORT

    F. AB 1454 (Bloom) - Transportation projects: lease agreements

    SUPPORT

    G. SB 422 (Wilk) - Transportation projects: comprehensive development

    lease agreements SUPPORT (Sponsor)

    2017-0201

    Status: CEO Draft Meeting Ready

    APPROVE amendment of Title 6, Chapter 6-05 of the Los Angeles

    County Metropolitan Transportation Authority (“Metro”) Administrative

    Code (the “Code”), otherwise known as the Metro Customer Code of

    Conduct, as set forth in Attachment A. The amended Code will become

    effective May 1, 2017.

    2017-0206

    Status: Approval Review

    RECEIVE AND FILE State and Federal Legislative Report.2017-0218

    Status: CEO Draft Meeting Ready

    Oral Report on MicroTransit Pilot2017-0178

    Status: CEO Draft Meeting Ready

    Page 7 Printed on 4/3/2017

  • Monday, April 03, 2017

    Finance, Budget and Audit Committee

    Wednesday, April 19, 2017

    RECEIVE AND FILE report on FY 2018 Budget Development Status.2017-0194

    Status: Draft

    RECEIVE AND FILE the Los Angeles County Metropolitan

    Transportation Authority’s (LACMTA) basic financial statements and

    component financial statement audits completed by Crowe Horwath LLP

    (Crowe) for the fiscal year ended June 30, 2016.

    2017-0220

    Status: Approval Review

    AUTHORIZE the Chief Executive Officer to negotiate and award All Risk

    Property and Boiler and Machinery insurance policies for all property at

    the current policy limits at a not to exceed price of $2.4 million for the

    12-month period May 10, 2017 through May 10, 2018.

    2017-0062

    Status: Approval Review

    A. APPROVE the SCRRA’s request for additional funding for urgent

    structure and rail tie rehabilitation work up to $18,381,025.

    B. PROGRAM up to $18,381,025 in Measure R 3% funds.

    C. AUTHORIZE the Chief Executive Officer, or his designee, to

    negotiate and execute all necessary agreements between LACMTA and

    the SCRRA for the approved funding.

    2017-0180

    Status: Approval Paused

    Wednesday, May 17, 2017

    AUTHORIZE the Chief Executive Officer (CEO) to execute a seven (7)

    year lease agreement (“Lease Agreement”) with The Crossroads School

    for Arts & Sciences, (“Crossroads”) to continue leasing Metro-owned

    property located adjacent to the Expo Light Rail Line, near 17th Street

    and Colorado Avenue, in Santa Monica (“Premises”).

    2017-0147

    Status: Draft

    Authorize the Chief Executive Officer to execute Modification No. 6 to

    Contract No. PS30203139 with Axiom xCell, Inc. (Axiom) to provide

    additional functionality for the Mobile Phone Validators (MPV) issued by

    Metro Transit Court to Law Enforcement and Transit Security for

    electronically reading information stored on TAP cards. These

    improvements include the ability for Fare Inspectors to activate fare on

    TAP cards and enhancements to the Mobile Device Management

    (MDM) system for an additional cost of $1,000,000 (estimated), and

    extend the monthly support services for an additional two years to

    2017-0119

    Page 8 Printed on 4/3/2017

  • Monday, April 03, 2017

    November 29, 2019, in an amount of $360,000 (estimated). This

    modification would increase the total contract value by $1,360,000, from

    $1,061,975 to $2,421,975.

    Status: Draft

    New Fare Subsidy Program2017-0183

    Status: Draft

    Page 9 Printed on 4/3/2017

  • Monday, April 03, 2017

    Planning and Programming Committee

    Wednesday, April 19, 2017

    Authorize the Chief Executive Officer to execute an Exclusive

    Negotiations and Planning Agreement (ENA) with Trammell Crow

    Company and Greenland USA (Developer) for the properties at North

    Hollywood Station (Site), for 24 months with the option to extend up to

    30 months.

    2017-0144

    Status: CEO Draft Meeting Ready

    Receive and file this quarterly status report on the Airport Metro

    Connector (AMC) 96th Street Transit Station including an update on the

    environmental clearance process and project design.

    2017-0139

    Status: CEO Draft Meeting Ready

    Receive and file the Regional Rail Update through March 20172017-0159

    Status: Approval Review

    A. APPROVE release of Round 5 of the Transit Oriented Development

    (TOD) Planning Grant Program, offering an amount not to exceed

    $3,100,000; and

    B. APPROVE the Round 5 TOD Planning Grant Program Guidelines

    (Attachment A), which include the Transit Supportive Planning Toolkit

    and the creation of the Transit Oriented Communities Tax Increment

    Financing Pilot Program.

    C. ADOPT AND CERTIFY the Strategic Growth Council Final Grant

    Report as accurate.

    2017-0049

    Status: CEO Draft Meeting Ready

    1. Adopt the Phase II Metro Bike Share Expansion (Phase II

    Expansion) Environmental Analysis findings that the expansion qualifies

    for a Categorical Exemption under Section 15303 (Class 3) New

    Construction or Conversion of Small Structures (Attachment A);

    2. Authorize staff to file the Notice of Exemption for the Phase II

    Expansion;

    3. Adopt the Phase II Expansion Title VI and Environmental Justice

    Analysis findings that there is no Disparate Impact and no

    Disproportionate Burden associated with the expansion (Attachment B);

    and

    4. Augment the Life of Project budget for Phase II Expansion by

    $1,713,000 to $4,499,000 to include previously Board approved

    pre-launch related costs.

    2017-0086

    Status: CEO Draft Meeting Ready

    Page 10 Printed on 4/3/2017

  • Monday, April 03, 2017

    CONSIDER:

    A. ADOPTING the Rail to Rail Active Transportation Corridor (ATC) -

    Segment A Preliminary Design (Attachment A); the findings of the

    environmental analysis that the project qualifies for CEQA Categorical

    Exemption under Section 15307 (Class 4) Minor Alterations to Land; and

    file the Notice of Exemption (NOE) (Attachment B);

    B. AUTHORIZING the use of Design-Build project delivery method for

    Segment A, pursuant to Public Utilities Code Section 130242 (a), will

    achieve certain private sector efficiencies in the integration of design,

    project work and components related to real property renovation,

    improvements and construction work for this project; (REQUIRES 2/3

    VOTE)

    C. ADOPTING the Rail to River ATC - Segment B Locally Preferred

    Alternative, Randolph Street Alternative, as described in the Alternative

    Analysis (AA) (Attachment C) and advance into the Environmental

    Review/Clearance and Preliminary Design phase after more refined cost

    estimates for Segment A are developed from 30% design documents.

    2017-0089

    Status: Approval Review

    CONSIDER AUTHORIZING:

    A. The Chief Executive Officer authority to execute amendments to the

    I-110 and I-105 Operations & Maintenance (O&M) Agreements to allow

    Metro to provide enhanced maintenance services for 17 Caltrans park &

    ride locations, provided that the necessary resources are allocated in the

    FY18 budget process;

    B. Amending the proposed FY 18 budget to include 28 additional FTEs

    for Facilities Maintenance and Parking Management; and

    C. Amending the proposed FY18 budget to include $6,247,000 for initial

    upgrades, full maintenance services, non-revenue vehicle purchase,

    enforcement and security for the selected park & ride lots

    2016-0758

    Status: Approval Review

    APPROVE the formal commitment of $905 million of accelerated

    Measure R funds to Westside Purple Line Extension Section 3

    (WSPLE3) to fulfill the Federal Transit Administration’s financial rating

    requirements for Metro’s New Starts project request of $1.175 billion.

    2017-0191

    Status: CEO Draft Meeting Ready

    Authorize the Chief Executive Officer to amend Metro’s Second Revised

    Amended and Restated Joint Development Agreement (“JDA”) with

    MacArthur Park Metro, LLC, (“MPM”) to: (a) extend the term of the JDA

    to December 31, 2017, and (b) allow Metro to terminate the JDA if Metro

    reasonably determines that the Ground Lease will not be executed prior

    to December 31, 2017 or that the mixed-use joint development project

    contemplated in the JDA (the “Phase B Project”) is not feasible.

    2017-0140

    Page 11 Printed on 4/3/2017

  • Monday, April 03, 2017

    Status: CEO Draft Meeting Ready

    AUTHORIZE the Chief Executive Officer to:

    A. APPROVE Project Definition for Environmental Scoping including

    four Northern Alignment Options; and

    B. RECEIVE AND FILE the West Santa Ana Branch (WSAB) Transit

    Corridor Northern Alignment Options Screening Report.

    2017-0152

    Status: CEO Draft Meeting Ready

    A. APPROVE an updated Project Definition for Environmental

    Clearance, including three alternatives:

    a. SR 60 North Side Design Variation Alternative

    b. Washington Boulevard Alternative with Atlantic Below-Grade Option

    c. Combined Alternative with both SR 60 and Washington Boulevard

    via Atlantic Segments

    B. RECEIVE AND FILE the Eastside Phase 2 Technical Study Report.

    Attachment D contains the Executive Summary. The full report is

    available upon request.

    2017-0154

    Status: CEO Draft Meeting Ready

    Thursday, April 20, 2017

    RECEIVE AND FILE this report on Metro’s long-term needs at Division

    20 in the Downtown Los Angeles Arts District and the accommodations

    necessary for a potential future Arts District passenger rail station.

    2017-0130

    Status: CEO Draft Meeting Ready

    Wednesday, May 17, 2017

    A. APPROVE programing of additional funds in the amount of

    $11,000,000 using Measure R 3% funds;

    B. APPROVE an amendment to increase the Fiscal Year (FY) 2017

    budget in the amount of $3,000,000 out of Measure R 3% funds for the

    project cost requested above;

    2017-0177

    Status: Draft

    Thursday, May 18, 2017

    CONSIDER:

    A. ESTABLISHING the Life of Project (LOP) budget in the amount of

    $155.3 million for the Rosecrans/Marquardt Grade Separation Project

    (Project);

    B. APPROVING third party costs of $1,500,000 million using measure R

    funds and amend the FY 17 budget in the amount of $500,000 for third

    2016-0959

    Page 12 Printed on 4/3/2017

  • Monday, April 03, 2017

    party costs using Measure R funds; and

    C. AUTHORIZING the Chief Executive Officer (CEO), or his designee,

    to negotiate and execute all third party agreements necessary for this

    action.

    Status: CEO Draft Meeting Ready

    Thursday, May 25, 2017

    APPROVE amendment of the existing repayment schedule agreement

    between the County of Los Angeles (County) and the Los Angeles

    County Metropolitan Transportation Authority (LACMTA) for State Route

    126/Commerce Center Drive Interchange Improvement Project STP-L

    fund exchange, as shown in Attachment A.

    2017-0245

    Status: Draft

    Page 13 Printed on 4/3/2017

  • Monday, April 03, 2017

    System Safety, Security and Operations Committee

    Thursday, April 20, 2017

    RECEIVE AND FILE monthly update on Transit Policing performance.2017-0222

    Status: Approval Review

    Receive and file status report on efforts underway to use technology and

    innovation to transform the customer experience of Metro’s Bus and Rail

    system, and mobility in the region in general.

    2017-0225

    Status: CEO Draft Meeting Ready

    Operations Employee of the Month2016-0984

    Status: Agenda Ready

    RECEIVE oral report on System Safety, Security and Operations.2016-0986

    Status: CEO Draft Meeting Ready

    Thursday, May 18, 2017

    RECEIVE AND FILE this second annual condition report on the state of

    Metro’s public artworks in response to the Board Motion, Item 44, from

    the October 2015 System Safety, Security and Operations Committee.

    2017-0013

    Status: Agenda Ready

    Operations Employee of the Month2016-0985

    Status: Draft

    RECEIVE oral report on System Safety, Security and Operations.2017-0230

    Status: Draft

    Establish a life-of-project budget for the P2550 Light Rail Vehicle

    Component Overhaul, CP# 214001 in the amount of $20,007,900.

    2016-0741

    Status: Draft

    Thursday, June 15, 2017

    APPROVE nominees for membership on Metro’s Service Councils.2017-0036

    Status: Draft

    Operations Employee of the Month2017-0231

    Status: Draft

    Page 14 Printed on 4/3/2017

  • Monday, April 03, 2017

    RECEIVE oral report on System Safety, Security and Operations.2017-0232

    Status: Draft

    Page 15 Printed on 4/3/2017

  • CITY OF ARCADIA INVOICE NUMBER SUBJECT INVOICED AMOUNT Prop A 40% Disc Prop C 5% Transit Sec Prop C 40% BSIP

    Prop C 40% FTMProp C 40% MOSIPMeasure R 20% Bus OpsTotal $0

    ANTELOPE VALLEY TRANSIT AUTHORITY INVOICE NUMBER SUBJECT AMOUNT

    PROPADISCGROWTH Prop A 40% Disc $4,193,858PROPCTRANSIT-17 Prop C 5% Transit Sec $192,500PROPC5%TS-BAL Prop C 5% Transit Sec - Capital FY16 $17,653

    PROPCBSIP Prop C 40% BSIP $47,026PROPCTRANSITSVC Prop C 40% TSE $370,518

    PROPCFOOTHILL Prop C 40% FTM $11,729Prop 1B PTMISEA Prop 1B Transit Sec

    MEASURE R20% Measure R 20% Bus Ops $2,356,535PROPCMOSIP Prop C 40% MOSIP $1,128,454

    Total $8,318,273

    CITY OF CLAREMONT INVOICE NUMBER SUBJECT AMOUNT Prop A 40% DiscretionaryProp C 5% Trans SecProp C 40% FTMProp C 40% MOSIPMeasure R 20% Bus OpsTotal $0

    CITY OF COMMERCE INVOICE NUMBER SUBJECT AMOUNT MIS000085 Prop A 40% Discretionary $239,200MIS000083 Prop C 5% Trans Sec $39,038MIS000088 Prop C 40% FTM $10,833MIS000084 Prop C 40% Disc Base Restruct $245,273MIS000086 Prop C 40% Zero-Fare Comp $640,479MIS000082 Prop C 40% MOSIP $72,387MIS000087 Measure R 20% Bus Ops $151,164

    Total $1,398,374

    CITY OF CULVER CITY INVOICE NUMBER SUBJECT AMOUNT 17-01PADISC Prop A 40% Disc $3,326,445

    17-03PCSECURITY Prop C 5% Trans Sec $313,16717-07BSIPOVER Prop C 40% BSIP $165,20917-06PCTREXP Prop C 40% TSE $236,41717-05FOOTMIT Prop C 40% FTM $150,655

    17-04PCMOSIPOP Prop C 40% MOSIP $306,64916-PC.MOSIP.CAP Prop C 40% MOSIP $446,34817-02MEASROP Measure R 20% Bus Ops $2,102,170

    Prop 1B Transit Security Bridge Funds17-01- prop1B-BR Prop 1B PTMISEA Bridge Funds $402,419

    Total $7,449,479

    SUMMARY OF INVOICES FOR FY 2017As of May 8, 2017

  • FOOTHILL TRANSIT INVOICE NUMBER SUBJECT AMOUNT OP69-2017-1 Prop A 40% Discretionary $16,081,241OP67-2017-2 Prop A 40% Discretionary-BSCP $4,558,875OP62-2017-6 Prop C 5% Transit Security $918,025

    OP74-2017-5 Prop C 40% BSIP $914,207 OP76-2017-4 Prop C 40% TSE $327,222

    OP72-2017-3 Prop C 40% Base Restruct $1,963,620OP105-2017-8 Measure R 20% Bus Ops BSCP $1,075,973OP65-2017-7 Measure R 20% Bus Ops $9,335,751

    SI004485 Prop C 40% MOSIP $364,908SI004504 Prop C 40% MOSIP $174,785SI003165 Prop 1B Transit Security Bridge Funds $499,516SI003166 Prop 1B PTMISEA Bridge Funds $6,642,369SI004419 Prop 1B PTMISEA Bridge Funds $2,214,123SI004564 Prop C 40% MOSIP $89,919SI004598 Prop C 40% MOSIP $218,255SI004672 Prop C 40% MOSIP $83,651SI004653 Prop C 40% MOSIP $597,474SI004762 Prop C 40% MOSIP $625,513SI004668 Prop C 40% MOSIP $507,935SI004834 Prop C 40% MOSIP $1,356,182SI004919 Prop C 40% MOSIP $117,809

    Total $48,667,353

    GARDENA MUNICIPAL BUS LINES INVOICE NUMBER SUBJECT AMOUNT

    GMBL16-17PA40 Prop A 40% Discretionary $3,290,679GMBL16-17PC3 Prop C 40% BSIP $172,465GMBL16-17PC2 Prop C 40% TSE $679,548GMBL16-17PC1 Prop C 40% FTM $149,035

    GMBL16-17MR20 Measure R 20% Bus Ops $2,079,567GMBL16-17TS Prop C 5% Transit Security $231,890

    GMBLMOSIP16-05 Prop C 40% MOSIP $309,278GMBLMOSIP16-06 Prop C 40% MOSIP $265,664GMBLMOSIP17-01 Prop C 40% MOSIP $35,177

    Total $7,213,304

    CITY OF LA MIRADA INVOICE NUMBER SUBJECT AMOUNT Prop A 40% Disc Prop C 5% Trans Sec

    Prop C 40% FTMProp C 40% MOSIPMeasure R 20% Bus OpsTotal $0

    LADOT INVOICE NUMBER SUBJECT AMOUNT PAG17000043 Prop A 40% Discretionary $19,645,484PAG17000046 Prop C 40% BSIP $147,446PAG17000048 Prop C 40% TSE $2,661,900PAG17000045 Prop C 40% FTM $310,527

    94PAG17000057 Measure R 20% Bus Ops $4,636,67394PAG17000052 Prop C 5% Transit Security $1,366,075

    PAG17000044 Prop C 40% MOSIP $2,220,32594PAG17000059 Prop 1B PTMISEA Bridge Funds $1,904,961

    Total $30,988,430

  • LONG BEACH TRANSIT INVOICE NUMBER SUBJECT AMOUNT 2017-PA40 Prop A 40% Disc $14,546,1272017-SEC Prop C 5% Trans Sec $1,768,3942017-BSIP Prop C 40% BSIP $809,8112017-TSE Prop C 40% TSE $2,243,5182017-FMIT Prop C 40% FTM $658,794

    1BFY14SECBridge Prop 1B Transit Security Bridge Funds $243,9352017-1BBridge Prop 1B PTMISEA Bridge Funds $1,383,233

    2017MeasureROperating Measure R 20% Bus Ops $9,192,525May16MOS15 Prop C 40% MOSIP $155,940Jul16MOS15 Prop C 40% MOSIP $184,596Jul16MOS16 Prop C 40% MOSIP $8,903Aug16MOS15 Prop C 40% MOSIP $222,132Aug16MOS16 Prop C 40% MOSIP $68,201Sep16MOS15 Prop C 40% MOSIP $213,218Sep16MOS16 Prop C 40% MOSIP $3,568Oct16MOS15 Prop C 40% MOSIP $182,149Oct16MOS16 Prop C 40% MOSIP $40,957Nov16MOS15 Prop C 40% MOSIP $68,709Nov16MOS16 Prop C 40% MOSIP $15,497

    Dec16-Feb17MOS15 Prop C 40% MOSIP $151,425Dec16-Feb17MOS16 Prop C 40% MOSIP $41,496

    Mar17MOS15 Prop C 40% MOSIP $12,993Mar17MOS16 Prop C 40% MOSIP $10,704

    Total $32,226,824

    LYNWOOD TROLLEY INVOICE NUMBER SUBJECT AMOUNTProp C 40% TSE

    Total

    CITY OF MONTEBELLO INVOICE NUMBER SUBJECT AMOUNT PAD4010.40 Prop A 40% Disc $5,236,699PCD4010.55 Prop C 5% Trans Sec $480,191PCD4010.45 Prop C 40% FTM $237,170PCD4010.30 Prop C 40% Base Restruct $1,120,117PCD4010.50 Prop C 40% BSIP $213,765PCD4010.60 Prop C 40% MOSIP $1,584,730MRD4010.65 Measure R 20% Bus Ops $3,309,368

    Total $12,182,040

    CITY OF NORWALK INVOICE NUMBER SUBJECT AMOUNT NTS17-4082 Prop A 40% Disc $2,155,535

    NTS17-4081 Prop C 5% Trans Sec $96,160NTS17-4088 Prop C 40% BSIP $55,308NTS17-4086 Prop C 40% FTM $84,966

    NTS17-4087 Prop C 40% MOSIP $567,728 NTS17-4451 Measure R 20% Bus Ops $1,185,578

    Total $4,145,275

    REDONDO BEACH WAVE INVOICE NUMBER SUBJECT AMOUNT 560809 Prop A 40% Disc $452,879560807 Prop C 40% Disc FTM $20,51156088 Prop C 40% Disc BSIP $3,926560811 Measure R 20% Bus Ops $286,200560980 Prop C 5% Trans Sec $25,361560959 Prop C 40% MOSIP $137,050

    Total $925,927

  • CITY OF SANTA CLARITA INVOICE NUMBER SUBJECT AMOUNT PA40SAC16 Prop A 40% Disc $4,427,993

    SAC2017FTM Prop C 40% Disc FTM $12,384 SAC2017TSE Prop C 40% Disc TSE $193,792

    SAC2017BSIP Prop C 40% Disc BSIP $50,302SAC2017MR20 Measure R 20% Bus Ops $2,488,096SAC2017PC5 Prop C 5% Trans Sec $208,461MOSIP-FY16 Prop C 40% MOSIP $739,488

    Total $8,120,516

    SANTA MONICA BIG BLUE BUS INVOICE NUMBER SUBJECT AMOUNT

    690-C Prop A 40% Disc $12,407,511694-C Prop C 5% Trans Sec $1,179,188692-C Prop C 40% BSIP $783,496691-C Prop C 40% FTM $561,936693-C Measure R 20% Bus Ops $7,841,012

    Prop 1B PTMISEA Bridge FundsProp 1B Transit Security Bridge FundsTotal $22,773,143

    CITY OF TORRANCE INVOICE NUMBER SUBJECT AMOUNT 2017-00151268 Prop A 40% Disc $4,008,1812017-00151262 Prop C 40% Disc FTM $181,5302017-00151266 Prop C 40% Disc TSE $795,6772017-00151265 Prop C 40% Disc Base Restruct $712,7312017-00151263 Prop C 40% Disc BSIP $236,5622017-00151264 Prop C 5% Trans Sec $255,2842017-00151267 Prop C MOSIP $784,7272017-00151261 Measure R 20% Bus Ops $2,532,998

    Prop 1B Transit Security Bridge FundsProp 1B PTMISEA Bridge FundsTotal $9,507,690

  • INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    201608232212 Jul-16 6,494 $7,341.88 $10,646.50 $17,988.38201609292240 Aug-16 8,513 $12,595.01 $10,986.00 $23,581.01201610132248 Sep-16 9,042 $15,402.34 $9,644.00 $25,046.34201611212276 Oct-16 9,035 $15,198.15 $10,009.50 $25,207.6520161214EZ Nov-16 8,685 $14,562.15 $9,669.00 $24,231.15

    201612282297 Jul-Sep, 2016 $480.98 $0.00 $480.9820170120EZ Dec-16 7,849 $13,219.71 $8,679.00 $21,898.71

    Jan-17 $0.0020170103EZ Feb-17 7,028 $11,726.12 $7,882.00 $19,608.12

    Mar-17 $0.00Total 56,646 $90,526.34 $67,516.00 $158,042.34

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    Jul-16 $0.00 $0.00Aug-16 $0.00 $0.00Sep-16 $0.00 $0.00Total 0 $0.00 $0.00 $0.00

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    Jul-16 $0.00Aug-16 $0.00Sep-16 $0.00Total 0 $0.00 $0.00 $0.00

    Summary of EZ Transit Pass Invoices FY 2017As of May 8, 2017

    ANTELOPE VALLEY

    CITY OF CARSON

    Burbank

  • INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    EZ-CCB071416 Jul-16 24,399 $18,409.69 $1,353.50 $19,763.19EZ-CCB081416 Aug-16 24,808 $17,620.82 $1,977.50 $19,598.32EZ-CCB091416 Sep-16 25,426 $18,299.04 $1,787.50 $20,086.54EZ-CCB101416 Oct-16 26,278 $19,256.12 $1,503.50 $20,759.62EZ-CCB111416 Nov-16 25,390 $18,884.60 $1,173.50 $20,058.10EZ-CCB121416 Dec-16 24,234 $18,165.36 $979.50 $19,144.86EZ-CCB011417 Jan-17 24,940 $18,329.10 $1,373.50 $19,702.60EZ-CCB021417 Feb-17 24,195 $17,698.55 $1,415.50 $19,114.05EZ-CCB031417 Mar-17 21,854 $16,217.16 $1,047.50 $17,264.66

    Total 221,524 $162,880.44 $12,611.50 $175,491.94

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    SI004521 Jul-16 38,360 $15,896.00 $43,562.00 $59,458.00SI004587 Aug-16 39,365 $15,680.25 $45,335.50 $61,015.75SI004643 Sep-16 38,790 $16,040.00 $44,084.50 $60,124.50SI004674 Oct-16 36,877 $9,411.35 $47,748.00 $57,159.35SI004732 Nov-16 36,877 $11,971.35 $45,188.00 $57,159.35SI004784 Dec-16 34,154 $8,822.20 $44,116.50 $52,938.70SI004837 Jan-17 33,996 $11,189.80 $41,504.00 $52,693.80SI004885 Feb-17 34,616 $10,529.30 $43,125.50 $53,654.80

    Mar-17 $0.00Total 293,035 $99,540.25 $354,664.00 $454,204.25

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    EZ0716G Jul-16 9,061 $6,053.63 $1,467.00 $7,520.63EZ0816G Aug-16 10,299 $5,764.67 $2,783.50 $8,548.17EZ0916G Sep-16 9,454 $7,177.48 $1,047.50 $8,224.98EZ1016G Oct-16 10,587 $8,179.19 $1,031.50 $9,210.69EZ1116G Nov-16 9,706 $7,234.72 $1,209.50 $8,444.22EZ1216G Dec-16 9,058 $6,716.96 $1,163.50 $7,880.46EZ0117G Jan-17 8,985 $7,345.95 $471.00 $7,816.95EZ0217G Feb-17 8,943 $6,952.91 $827.50 $7,780.41

    Mar-17 $0.00Total 76,093 $55,425.51 $10,001.00 $65,426.51

    CULVER CITY

    FOOTHILL TRANSIT

    GARDENA MUNICIPAL BUS LINES

  • INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    Jul-16 $0.00Aug-16 $0.00Sep-16 $0.00Total 0 $0.00 $0.00 $0.00

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    94PAG17000028 Jul-Sep, 2016 111,362 $69,797.80 $73,771.50 $143,569.3094PAG17000033 Oct-Dec, 2016 98,538 $78,863.40 $46,240.50 $125,103.9094PAG17000066 Jan-Mar, 2017 93,853 $59,972.75 $64,863.00 $124,835.75

    $0.00pTotal 303,753 $208,633.95 $184,875.00 $393,508.95

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    2117258748 Jul-Dec, 2015 4,631 $35,484.81 $0.00 $35,484.812117258748 Jan-Jun, 2016 2,331 $15,306.25 $0.00 $15,306.252117265197 Jan-Jun, 2016 underbill $5,878.85 $0.00 $5,878.852117265267 Jul-Dec, 2016 2,542 $21,300.74 $0.00 $21,300.74

    Total 6,962 $77,970.65 $0.00 $77,970.65

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    I0006241 Jul-16 64,397 $11,304.15 $49,873.00 $61,177.15I0006266 Aug-16 68,156 $14,661.70 $50,086.50 $64,748.20I0006292 Sep-16 68,793 $12,919.85 $52,433.50 $65,353.35I0006327 Oct-16 68,770 $12,820.50 $52,511.00 $65,331.50I0006346 Nov-16 63,205 $6,051.75 $53,993.00 $60,044.75I0006367 Dec-16 60,477 $8,524.65 $48,928.50 $57,453.15I0006388 Jan-17 55,864 $5,369.30 $47,701.50 $53,070.80I0006411 Feb-17 54,087 $3,773.15 $47,609.50 $51,382.65i0006438 Mar-17 66,044 $16,022.30 $46,719.50 $62,741.80

    Total 569,793 $91,447.35 $449,856.00 $541,303.35

    GLENDALE

    LADOT

    LOS ANGELES WORLD AIRPORT

    LONG BEACH TRANSIT

  • INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    2017-00000016 Jul-16 20,879 $13,015.35 $556.00 $13,571.35 2017-00000027 Aug-16 22,576 $15,195.20 $608.00 $15,803.20 2017-00000035 Sep-16 22,312 $14,480.16 $692.00 $15,172.16 2017-00000043 Oct-16 21,509 $13,814.62 $811.50 $14,626.12 2017-00000052 Nov-16 21,588 $13,682.58 $565.50 $14,248.08 2017-00000063 Dec-16 19,781 $12,859.58 $591.50 $13,451.08 2017-00000068 Jan-17 18,378 $13,491.56 $659.50 $14,151.06 2017-00000075 Feb-17 18,027 $12,361.94 $617.50 $12,979.44

    Mar-17 $0.00 Total 165,050 $108,900.99 $5,101.50 $114,002.49

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    *REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    EZ07-16-4582 Jul-16 5,166 $1,187.40 $3,462 $4,649.40EZ08-164582 Aug-16 6,323 $2,601.47 $3,026 $5,627.47EZ09-164582 Sep-16 5,364 $1,034.84 $3,310 $4,344.84EZ10-16-4582 Oct-16 5,595 $1,685.85 $2,958 $4,643.85EZ11-16-4582 Nov-16 5,196 $1,144.64 $3,220 $4,364.64

    EZ1212-16-4582 Dec-16 4,661 $907.68 $3,194 $4,101.68EZ01-17-4582 Jan-17 4,629 $899.81 $3,220 $4,119.81EZ02-17-4582 Feb-17 4,504 $628.40 $3,200 $3,828.40EZ03-17-4582 Mar-17 4,410 $596.50 $3,152 $3,748.50

    Total 45,848 $10,686.59 $28,742.00 $39,428.59

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    FY17EZ01 Jul-16 329 $602.07 $0 $602.07FY17EZ02 Aug-16 376 $688.08 $0 $688.08

    Sep-16 $0 $0.00Oct-16 $0 $0.00Nov-16 $0 $0.00

    FY17EZ06 Dec-16 355 $607.05 $0 $607.05FY17EZ07 Jan-17 519 $887.49 $0 $887.49 FY'17EZ8 Feb-17 400 $684.00 $0 $684.00

    FY'176EZ13 FY 2016 Audit $2,496.00 $0 $2,496.00 Mar-17 $0 $0.00Total 1,979 $5,964.69 $0.00 $5,964.69

    CITY OF MONTEBELLO

    NORWALK TRANSIT

    PALOS VERDES PENINSULA TRANSIT AUTHORITY

  • INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    Jul-16 $0 $0.00Aug-16 $0 $0.00Sep-16 $0 $0.00Total 0 $0.00 $0.00 $0.00

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    0716BCT Jul-16 2,002 1,561.56 $0 $1,561.560816BCT Aug-16 2,229 1,805.49 $0 $1,805.490916BCT Sep-16 2,189 $1,773.09 $0 $1,773.091016BCT Oct-16 1,820 $1,474.20 $0 $1,474.201116BCT Nov-16 1,764 $1,428.84 $0 $1,428.841216BCT Dec-16 1,986 $1,622.07 $0 $1,622.070117BCT Jan-17 1,893 $1,533.33 $0 $1,533.330217BCT Feb-17 1,710 $1,385.10 $0 $1,385.10

    Mar-17 $0 $0.00Total 15,593 $12,583.68 $0.00 $12,583.68

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    SC-EZ-2017-July16 Jul-16 2,918 $4,079.10 $2,077.50 $6,156.60SC-EZ-2017-Aug16 Aug-16 3,949 $6,100.40 $1,831.00 $7,931.40SC-EZ-2017-Sept16 Sep-16 4,027 $5,965.80 $1,989.00 $7,954.80SC-EZ-2017-Oct16 Oct-16 3,547 $5,505.25 $1,850.00 $7,355.25SC-EZ-2017-Nov16 Nov-16 2,967 $4,498.35 $2,010.00 $6,508.35

    SCEZFY16Final July2015-Jun2016 $6,870.98Dec-16 $0.00Total 17,408 $26,148.90 $9,757.50 $42,777.38

    PASADENA

    REDONDO BEACH - BEACH CITIES TRANSIT

    SANTA CLARITA TRANSIT

  • INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    688-C Jul-16 63,228 $29,411.64 $19,166.00 $48,577.64696-C Aug-16 66,140 $45,632.10 $16,295.00 $61,927.10697-C Sep-16 64,258 $39,724.66 $20,296.50 $60,021.16698-C Jan-Jul, 2016 $75,894.90 $0.00 $75,894.90699-C Oct-16 63,122 $40,497.04 $18,416.00 $58,913.04

    Nov-16 $0.00701-C Dec-16 58,706 $35,460.16 $18,985.50 $54,445.66702-C Jan-17 57,427 $39,072.19 $14,372.00 $53,444.19

    Feb-17 $0.00Mar-17 $0.00Total 372,881 $305,692.69 $107,531.00 $413,223.69

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    2017-00150531 Jul-16 11,648 $7,474.46 $1,494.50 $8,968.962017-00150935 Aug-16 12,730 $8,087.60 $1,714.50 $9,802.102017-00151346 Sep-16 11,496 $7,360.42 $1,491.50 $8,851.922017-00151717 Oct-16 11,881 $7,944.87 $1,203.50 $9,148.372017-00152616 Nov-16 11,174 $7,367.98 $1,236.00 $8,603.982017-00152618 Dec-16 10,561 $6,879.47 $1,252.50 $8,131.972017-00152620 Jan-17 10,045 $6,353.15 $1,381.50 $7,734.65 2017-00153141 Feb-17 9,555 $5,949.85 $1,407.50 $7,357.352017-00153199 Mar-17 11,165 $6,553.55 $2,043.50 $8,597.05

    Total 100,255.00 $63,971.35 $13,225.00 $77,196.35

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    Total - $0.00 $0.00 $0.00

    INVOICE NUMBER MONTH BOARDINGS

    TOTAL NET AMOUNT PAID TO

    AGENCY

    REVENUE COLLECTED BY AGENCY

    TOTAL AMOUNT

    OWED BY MTA TO AGENCY

    Jul-16 $0.00Total - $0.00 $0.00 $0.00

    Grand Totals 2,246,820 $1,320,373.38 $1,243,880.50 $2,571,124.86

    COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

    CITY OF TORRANCE

    CITY OF WHITTIER

    SANTA MONICA BIG BLUE BUS

  • NAMEProp A

    40%Prop A

    40%MOSIP MOU

    MOSIP SIP

    MOSIP Invoice Prop C Prop C Prop C TDA Claim

    MOU Invoice Serv

    ice

    Impv

    . Pl

    an

    Foothill Transit

    Mitigation

    Transit Service

    ExpansionDisc. Base Restruct. BSIP 40% MOU 5 % MOU 5% Invoice

    Antelope Valley Transit X X X X X X X N/A X X X X N/AArcadia Transit X X N/A N/A X XClaremont Dial - A - Ride X X N/A N/A N/A X XCommerce Municipal Bus Lines X X X X X X N/A X N/A X X XCulver City Municipal Bus Lines X X X X X X X N/A X X X X XFoothill Transit X X X N/A X X X X X X XGardena Municipal Bus Lines X X X X X N/A X X X X XLa Mirada Transit X X N/A N/A N/A XL.A.D.O.T X X X X X X X N/A X X X X N/ACity of Lynwood N/A N/A N/A N/A N/A N/A N/A N/A X N/A N/A N/ALong Beach Public Transportation Co. X X X X X N/A X X X X XMetro N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A P N/A XMontebello Bus Lines X X X X X X N/A X X X X X XNorwalk Transit System X X X X X X N/A N/A X X X X XRedondo Beach - Beach Cities Transit X X X X X X N/A N/A X X X X XSanta Clarita Transit X X X X X N/A X X X X N/ASanta Monica Big Blue Line X X X X N/A N/A X X X X XTorrance Transit System X X X X X X X X X X X X XX = DOCUMENT RECEIVED P = Partnership with relevant law enforcement agency(ies).

    LOS ANGELES COUNTY MUNICIPAL OPERATORSSubsidy Tracking Matrix Fiscal Year 2017

    As of May 8, 2017

    Prop C 40% Discretionary - Invoices

  • NAME

    20% Ops. MOU

    20% Ops. Invoice

    20% Ops. Service Plan

    Clean Fuel Bus MOU

    Clean Fuel Bus Invoice

    Clean Fuel Bus

    Plan

    Prop 1B PTMISEA

    MOU

    Prop 1B PTMISEA Invoice

    Caltrans Approval

    Letter

    Prop 1B Security

    MOU

    Prop 1B Security Invoice

    OHS Approval

    LetterAntelope Valley Transit X X X X X XCity of Arcadia X X N/A N/A N/A N/A N/A N/ACity of Claremont X X X XCity of Commerce X X X X N/A N/A N/A N/A N/A N/ACity of Culver City X X X X X XFoothill Transit X X X X X X X XCity of Gardena X X X X X XCity of La Mirada X X N/A N/A N/A N/A N/A N/AL.A.D.O.T X X X X X N/A X N/ALong Beach Transit X X X X X X X X X XCity of Montebello X X X X X XCity of Norwalk X X X X X XCity of Redondo Beach X X X X X XCity of Santa Clarita X X X X X N/A X N/ACity of Santa Monica X X X X X XCity of Torrance X X X X X XX = DOCUMENT RECEIVED

    LOS ANGELES COUNTY MUNICIPAL OPERATORSSubsidy Tracking Matrix Fiscal Year 2017

    As of May 8, 2017

    Measure R Funds- FY 17 Prop C 40% Discretionary Funds - Prop 1B Bridge FY 12

  • CITY OF ARCADIA INVOICE NUMBER SUBJECT INVOICED AMOUNT

    Total $0

    CITY OF COMMERCE INVOICE NUMBER SUBJECT AMOUNT

    Total $0

    CITY OF CULVER CITY INVOICE NUMBER SUBJECT AMOUNT STA Capital

    Total $0

    FOOTHILL TRANSIT INVOICE NUMBER SUBJECT AMOUNT TDA CapitalTDA Capital

    Total $0

    GARDENA MUNICIPAL BUS LINES INVOICE NUMBER SUBJECT AMOUNT

    TDAGAR16-02 TDA Capital $10,333TDAGAR17-01 TDA Capital $14,208

    Total $24,541

    CITY OF LA MIRADA INVOICE NUMBER SUBJECT AMOUNT

    Total $0

    LACMTA INVOICE NUMBER SUBJECT AMOUNT TDA Capital $10,774,981TDA Capital $118,551TDA Capital $4,487,031TDA Capital $1,117,910TDA Capital $39,056,335TDA Capital $5,362,670

    Total $60,917,478

    CITY OF MONTEBELLO INVOICE NUMBER SUBJECT AMOUNT TDA REIMB.July1,2015-JUNE30,2016 TDA Capital $383,979

    Total $383,979

    CITY OF NORWALK INVOICE NUMBER SUBJECT AMOUNT

    Total $383,979

    REDONDO BEACH WAVE INVOICE NUMBER SUBJECT AMOUNT

    Total $0

    SANTA MONICA BIG BLUE BUS INVOICE NUMBER SUBJECT AMOUNT

    TDA CapitalTDA Capital

    Total $0

    CITY OF TORRANCE INVOICE NUMBER SUBJECT AMOUNT

    Total $0

    SUMMARY OF TDA & STA Capital Claims for FY 2017

    As of May 8, 2017

  • ANTELOPE VALLEY TRANSIT AUTHORITY N/A

    CITY OF ARCADIA SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $0STA $13,965 $13,965

    Subtotal $0 $0 $13,965 $13,965

    CITY OF CLAREMONT SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $232,336 $232,336STA $29,160 $29,160

    Subtotal $0 $0 $261,496 $261,496

    CITY OF COMMERCE SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $0 $0STA $0 $0

    Subtotal $0 $0 $0 $0

    CITY OF CULVER CITY SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $5,165,678 $5,165,678STA $474,727 $37,424 $512,151

    Subtotal $5,640,405 $0 $37,424 $5,677,829

    FOOTHILL TRANSIT SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $22,940,811 $14,033 $22,954,844STA $1,841,803 $1,841,803

    Subtotal $24,782,614 $0 $14,033 $24,796,647

    GARDENA MUNICIPAL BUS LINES SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $5,110,136 $25,603 $5,135,739STA $410,267 $355,633 $765,900

    Subtotal $5,520,403 $0 $381,235 $5,901,638

    CITY OF LA MIRADA SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $0 $0STA $118,097 $118,097

    Subtotal $0 $0 $118,097 $118,097

    LONG BEACH TRANSIT SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $22,588,861 $22,588,861STA $1,813,547 $1,813,547

    SCRTTC TDA $250,000 $250,000Subtotal $24,652,408 $0 $0 $24,652,408

    LADOT N/A

    METRO SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $152,767,173 $111,670,686 $272,133,190 $536,571,049STA $21,732,177 $4,773,874 $26,506,051

    STA Pop. share $29,665,148 $29,665,148Subtotal $204,164,498 $111,670,686 $276,907,064 $592,742,248

    CITY OF MONTEBELLO SUBJECT OPERATING CAPITAL RESERVE* TOTAL

    TDA $7,758,946 $373,189 $2,873,422 $11,005,557STA $652,889 $707,534 $1,360,423

    Subtotal $8,411,835 $373,189 $3,580,956 $12,365,980

    CITY OF NORWALK SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $2,913,330 $2,913,330

    TDA/STA CLAIM SUMMARY FOR FY 2017As of May 8, 2017 - all claims received for FY17 funds.

  • TDA/STA CLAIM SUMMARY FOR FY 2017As of May 8, 2017 - all claims received for FY17 funds.

    STA $233,897 $233,897Subtotal $3,147,227 $0 $0 $3,147,227

    REDONDO BEACH - CITIES TRANSIT SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $703,281 $703,281STA $56,463 $0 $56,463

    Subtotal $759,744 $0 $0 $759,744

    CITY OF SANTA CLARITA N/A

    SANTA MONICA BIG BLUE BUS SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $19,267,778 $21,922,376 $41,190,154STA $1,546,914 $0 $257,140 $1,804,054

    Subtotal $20,814,692 $0 $22,179,516 $42,994,208

    CITY OF TORRANCE SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $6,224,354 $193,862 $6,418,216STA $499,722 $499,722

    Subtotal $6,724,076 $0 $193,862 $6,917,938

    *Includes prior year reserves. Actual balance may be different due to capital claims that were recently processed.* Amounts include total monthly deposits from funds reserved for future capital expenditures.

  • FY18 Budget - DiscussionMay 2017 Bus Operators Subcommittee

  • FY18 Proposed Budget: $6.1 Billion

    22

    Subsidy Funding Programs > Transit Operators> Access and Metrolink> 88 cities and

    unincorporated areas

    Congestion Mgmt> ExpressLanes, Freeway

    Service Patrol, Call BoxMetro Operations> Bus and Rail Services as

    adjusted by Service Councils and Board

    Metro Construction and State of Good Repair> New Transit Projects> Metro State of Good Repair> Highway Projects> Regional Rail Projects

    Debt Service> Obligations from current and past projects

    General Planning & Programming> Identify regional mobility needs

    and solutions

    6.3%

    27.9%

    3.3%

    1.6%

    24.7%

    36.3%

  • High level summary of Budget

    3

    Program Type ($ in millions) FY17 Budget FY18 Proposed Variance $ Variance %% of Total 

    FY18 Budget1 Metro Operations 1,607.8$ 1,706.0$ 98.2$          6.1% 27.9%2 Metro Construction and SGR 2,511.9 2,215.7$ (296.2)         ‐11.8% 36.3%3 Subsidy Funding Programs 1,305.1 1,509.9$ 204.9          15.7% 24.7%4 Congestion Management 112.9 97.7$ (15.2)           ‐13.5% 1.6%5 General Planning and Programs 170.0 199.1$ 29.1             17.1% 3.3%6 Debt Service 320.1 383.2$ 63.1             19.7% 6.3%7 Grand Total 6,027.8$                 6,111.6$                   83.8$          1.4% 100.0%

    • Targeting a balanced budget for FY18• Net $83.1M increase, at 1.4%, is lower than CPI while absorbing cost increases, new

    Measure M initiatives, increased security and state of good repair improvements• Subsidy funding and Planning costs increase due to Measure M• Debt service increase to fund Measure R/Measure M construction projects• Performance Measures to ensure accountability

  • Revenue Assumptions

    4

    • FY18 sales tax growth increase of 2.8%, total sales tax revenue is estimated at $3.6 billion‒ Includes new funding from Measure M‒ Only 38% or $1.4 billion is eligible for Metro Operations and State

    of Good Repair

    • Federal CMAQ and State Cap-and-Trade funds continue for Gold Line Foothill Extension 2A and Expo Phase II operations

    • Federal Grants and TIFIA loans for Crenshaw/LAX, Regional Connector and Purple Line Extension construction

    • CPI of +1.75% based on Beacon Economics forecast

  • FY18 Capital Program

    Deliver Transit Expansion Projects and Support State of Good Repair

    5

    1) Transit Expansion: • Design and construction: Continued progress for Crenshaw/LAX, Regional

    Connector & the Westside Subway Purple Line Ext (PLE) Sections 1 and 2; Advancement of PLE Sec 3 for Full Funding Grant Agreement; Airport Metro Connector; Gold Line Foothill Extension 2B.

    2) State of Good Repair:• Facility, System and Maintenance of Way: Bus, Blue, Gold, Green, Red & Purple

    projects that focus on reliability improvements. Includes rail communications, systems, stations and trackwork.

    • Vehicle Maintenance / Acquisitions: New articulated bus and zero emission bus acquisition, bus midlife, engine replacements, continue light rail delivery & heavy rail acquisitions / component / midlife overhauls.

    • Technology Improvements: TAP/Bike Share integration, connected buses web infrastructure, tablet POS system, software/hardware refresh, mobile phone validator app.

  • Planning and Engineering

    Projects Under Planning/Engineering in FY18

    6

    TRANSIT> East San Fernando Valley Transit Corridor> South Bay Metro Green Line Extension> West Santa Ana Branch> Eastside Extension Phase II> Crenshaw Northern Extension> Orange Line grade separation operational improvements> Sepulveda Pass Transit Corridor

    ACTIVE TRANSPORTATION/JOINT DEVELOPMENT PROJECTS> Bikeshare and Bike program > Parking program> Willowbrook/Rosa Parks Station improvements> Rail to River Active Transportation Corridor

  • Metro Bus and Rail Services

    What’s Happening in FY18?

    7

    BUS No change in overall Revenue Service Hours from the FY17 Budget 7,005,960 Bus Revenue Service Hours scheduled Although there is no increase in Revenue Service hours, service has been

    right-sized to increase peak frequencies on priority bus lines, improve efficiency of our Owl Network, maximize the amount of Revenue Service Miles run, and incorporate service support for rail line maintenance and special events

    Initiate manufacture and delivery of ten Electric Zero Emission Buses for demonstration on the Orange and Silver lines, as well as initiation of a procurement for additional electric and ultra low emission CNG Buses

  • Subsidy Funding Passed to Cities

    About 25% goes to cities to improve transit and mobility (Local Return Money)

    8

    Public TransitDial-A-RideParatransitShuttle Service

    Fare Subsidy ProgramsYouth and Senior Recreational TransitTaxi subsidies

    Bus Stop Improvements/MaintenanceBus SheltersSafety ImprovementsTransit Center Parking

    Bikeways, Bike trails, lanes, boulevardsBicycle parking and lockersCitywide Bikeshare programs

  • Subsidy Funding Passed to Cities

    Many projects are underway by each of the cities to improve transit and mobility

    Pedestrian ImprovementsCrosswalk programsTraffic signals near schoolsSafe Routes to school

    Street Repair and MaintenanceStreet Lighting ProjectsComplete Streets ProjectsPavement RehabStreetscape Improvements

    Traffic Signal Enhancements & InstallationsTraffic Signal SynchronizationBicycle Infrastructure

    9

  • Congestion Management

    Freeway Operations

    10

    > ExpressLanes - Toll operations> Caltrans Operations and Maintenance> California Highway Patrol (CHP)> Freeway Service Patrol> Call Box Program> Regional Integration of Intelligent Transportation System

    OTHER CORRIDOR FUNDED PROGRAMS> Bus service enhancement (Metro, Foothill Transit, Gardena Transit, Torrance Transit)> ExpressLanes Revenue Reinvestment Grant Program> Marketing and Outreach> Professional services contracts to support existing and evaluate new ExpressLanes

  • • Public comments can also be submitted by mail or email.

    • Deadline for written comments is Friday, May 12 at 5pm

    • Submit to• [email protected] or • Attn: FY18 Budget

    MetroOne Gateway Plaza, 99-24-1Los Angeles, CA 90012

    • Public Hearing: Wednesday, May 17 at 1pm• Metro Headquarters Board Room

    One Gateway Plaza, Los Angeles CA 90012

    Public Engagement in BudgetWe want your input… GET INVOLVED!

    11

  • 12