may 16, 2017 -- agenda - bus operations subcommittee...4. metro report annelle albarran (metro)...
TRANSCRIPT
-
Tuesday, May 16, 2017
Agenda
Los Angeles County Metropolitan Transportation Authority
BUS OPERATIONS SUBCOMMITTEE William Mulholland Conference Room – 15th Floor 9:30 am
1. Call to Order (1 minute)
Action Jane Leonard
2. Approval of April 18, 2017 Minutes (1 minute)
Action BOS
3. Chair’s Report (5 minutes)
Information Jane Leonard
4. Metro Report (5 minutes)
Information Annelle Albarran
5. FTA Update (10 minutes)
Information Arianna Valle/Adam Stephenson/Stacy Alameida
6. FAP Approval (10 minutes)
Action Manijeh Ahmadi
7. Update on New Low Income Program (10 minutes)
Information Armineh Saint
8. FY18 Budget Update (15 minutes)
Information Quintin Sumabat
9. Access Update (10 minutes)
Information Matthew Avancena
10. Transit Industry Debriefing/Updates (5 minutes)
Information All
-
Information Items:
90-day Rolling Agenda Summary of Invoices FY 2017 Summary of EZ Pass Invoices FY 2017 Subsidy Matrix FY 2017 TDA-STA Capital Claims FY 2017 TDA-STA Claims FY 2017 FY18 Budget Update
BOS Agenda Packages can be accessed online at: https://www.metro.net/about/bos/ Please call SCOTT HARTWELL at 213-922-2836 or ANNELLE ALBARRAN at 213-922-4025 if you have questions regarding the agenda or meeting. The next BOS meeting will be held on Tuesday, June 20, 2017, at 9:30 am in the Mulholland Conference Room, 15th Floor of the Metro Headquarters Building.
11. New Business Information All
12. Adjournment
-
Bus Operations Subcommittee Minutes/Action Items
April 18, 2017
1 of 10
1. Call to Order The meeting was called to order at 9:40 am. A quorum was
present.
Action Jane Leonard
2. Approval of March 21, 2017 Minutes
A motion to approve the minutes was made by David Feinberg
(Santa Monica Big Blue Bus) and seconded by Dana Pynn
(GTrans). The minutes were approved as submitted.
Action BOS
3. Chair’s Report Dana Pynn reported on the following items from the April 5, 2017
TAC meeting:
Kalieh Honish (Metro) provided an update on the Measure M
Guidelines. The Guidelines reinforce Metro’s fiduciary
responsibility, address any concerns that Measure R did not
address, and will allow Metro to deliver projects and
programs, not to escrow funds. The Draft Guidelines
encompass three core principles: timely use of funds; cash
flow; and multi-year funds partnering and related toolbox.
Comments on the Draft Guidelines must be made in writing.
TAC intends to provide formal comments on the Guidelines.
Time will be budgeted at the next TAC meeting to draft and
develop comments. Jane Leonard (Culver CityBus) added
that the Los Angeles County Municipal Operators Association
(LACMOA) is going to have a meeting next week to bring
together ideas specific to bus operations funds for the
Measure M Guidelines.
Zoe Unruh (Metro) provided a CTC update. A draft State
Transportation Improvement Program (STIP) fund estimate
assumption was brought forward at the CTC meeting. The
draft assumptions include a forecast of four funding scenarios
Information Dana Pynn/ Jane Leonard
-
Bus Operations Subcommittee Minutes/Action Items
April 18, 2017
2 of 10
for the five year 2018 STIP. The recommended alternative
assumes a modest increase in the base excise tax, which
would grow to 18 cents per gallon in 2021-2022.
Desiree Portillo Rabinow (Metro) reported that pending Board
approval, Round 5 of the Transit Oriented Development (TOD)
Planning Grant Program will be released. There will be a total
of $3.1 million available. Eligible applicants include local
municipalities, LA County, and entities that have land use
control to establish regulatory documents.
Michelle Boehm (California High-Speed Rail Authority)
provided an update of all of the work being done to improve
regional rail services in Southern California.
The General Managers’ (GM) meeting for the month of April was
cancelled.
4. Metro Report Annelle Albarran (Metro) noted that the Draft Measure M
Guidelines went to the Board this past month and were released
for public comment.
Information Annelle Albarran
5. STA Efficiency Test Approval of Final Draft
Susan Richan (Metro) distributed and discussed the final draft of
the FY17 STA Fund Efficiency Standards. Based on the efficiency
test, Culver CityBus, Long Beach Transit, MTA, and Big Blue Bus
have passed after turning in some additional exclusions. They can
therefore draw down the full amount. However, Claremont Dial-A-
Ride, Beach Cities Transit, Torrance Transit, and Santa Clarita
Transit will receive a scaled back deduction depending on what
category they didn’t pass.
Action Susan Richan
-
Bus Operations Subcommittee Minutes/Action Items
April 18, 2017
3 of 10
A motion to approve the STA Fund Efficiency Standards was
made by Joseph Loh (GTrans) and seconded by David Feinberg.
The motion was approved.
6. FTA Update Arianna Valle (FTA) provided the following updates:
The upcoming grants application workshop is scheduled for
Monday, April 24 from 8:30am-12:30pm. Information
packages will be sent out later this week. Be advised that
Region 9 will be hosting a Financial Management Oversight
Review (FMO) and a Procurement System Review (PSR)
Workshop on the same day.
The FY17 budget is funded and appropriated through
April 28, 2017. Congress is working on a bill to fund the
government through the full fiscal year (September 30, 2017).
A link to a new performance based planning website will be
sent to BOS members. The website includes roundtable
presentations that were made this past year, webinar
recordings, info on the final planning rule with transit operators
and the Metropolitan Planning Organization, and links to
Transit Asset Management (TAM) and safety plans.
Effective March 21, 2017, the Buy America handbook
solidifies the requirement that by FY20, Buy America content
is required to be 70%. Also, effective March 21, 2017 is
Circular 5010 (awards management).
FTA is collecting information for the Continuity of Operations
Plan (COOP). In a state of emergency, the FTA administrator
needs to be able to reach out to transit agency directors/GMs.
Information Arianna Valle
-
Bus Operations Subcommittee Minutes/Action Items
April 18, 2017
4 of 10
FTA needs cell phone numbers/emergency content
information within the next month. Program Managers will be
reaching out to agencies; the information can be emailed.
A temporary change has occurred in the San Francisco
regional office—the planning and program development group
has been cut in half due to retirements and promotions. As a
result of a decision made on Monday, the LA office will be
processing grant applications for agencies in other regions
within SCAG’s area, until the end of the fiscal year
(September 2017). Program Managers will continue working
on their grants in addition to others.
An advance notice of proposed rulemaking which was
published on October 3, 2013 and included MAP-21 programs
such as the National Safety Program and the transit asset
management requirements (TAM System) was revoked on
Monday, April 17, 2017. However, since the TAM rulemaking
was done separately it will stand. FTA will provide a point of
contact if you have any additional questions.
The following National Transit Institute courses are coming up
as webinars:
o May 11, 2017- Current Trends in Multiagency Transit
Electronic Fare Systems
o July, 2017- Transit Cooperative Research Program
(TCRP) Synthesis: Successful Practice and Training
Initiatives to Reduce Accidents and Incidents at Transit
Agencies
-
Bus Operations Subcommittee Minutes/Action Items
April 18, 2017
5 of 10
Susan Lipman (Santa Clarita Transit) commented that the Transit
Award Management System (TrAMS) is set to Greenwich time,
and this is not clearly articulated to users, therefore, making their
submissions late. Arianna responded that because the program
was written by a company based in Europe the time setting can’t
be changed but a better job can be done to clarify the deadline.
7. FAP Updates Manijeh Ahmadi (Metro) presented the second draft of the FY18
Transit Fund Allocations and asked the Subcommittee to review
the forms for accuracy and email her any comments/changes by
close of business, Thursday, May 4, 2017. The final draft will be
released to the Subcommittee for comments on Tuesday,
May 9, 2017. The final allocations will be presented to the BOS
for approval on Tuesday, May 16, 2017 and to the full Metro
Board on Thursday, June 29, 2017.
Information Manijeh Ahmadi
8. Measure M Draft Guidelines
Michelle Navarro (Metro) provided an update on the Measure M
Draft Guidelines. The Guidelines were released for public
comment last month and are being reviewed by the Policy
Advisory Committee. The Draft Guidelines encompass three core
principles: Timely Use of Funds; Cash Flow; and Multi-Year
Subregional Programs.
The Timely Use of Funds principle consists of two elements:
project readiness requirements and the lapsing policy. Project
readiness involves demonstrating that projects are “ready to go”
before securing funds while the lapsing policy will ensure that
money not being used is reprogrammed to maximize delivery.
Information Michelle Navarro
-
Bus Operations Subcommittee Minutes/Action Items
April 18, 2017
6 of 10
The cashflow management principle will mainly focus on moving
projects based on funding availability. It will ensure that projects
are “shovel ready”, that they stay within the scope of the costs set
forth in the Expenditure Plan, and that there is discipline in
understanding comprehensive assessments and amendments of
projects when changes are needed.
The Multi-Year Subregional Programs (MSP) were developed
from the Mobility Matrices. These projects are consistent with
Guideline definitions, and it will be up to the subregions to deliver
these projects. MSPs will still have to meet the Timely Use of
Funds and Project Readiness requirements. If a MSP exceeds its
scope and needs additional financial assistance from Metro it will
have to comply with other Metro policies.
Eligibility, technical criteria and a competitive process will be
developed for the following capital areas: 2% Active
Transportation Program (ATP), 2% Highway, and 2% Transit;
Countywide Bus Rapid Transit and Visionary Seed Fund. Almost
half (44%) of Measure M funds will go to LA County transit
operators, cities, Access, and Metro to improve mobility.
Staff is currently analyzing potential methods for allocating the
local return funds and is waiting for the Board to adopt guidelines
that will determine the formula split for ADA Paratransit and Metro
discounts for seniors and students. Currently, Metro is working
-
Bus Operations Subcommittee Minutes/Action Items
April 18, 2017
7 of 10
with Metrolink to develop performance metrics which are required
to increase percent allocation in FY39 from 1% to 2%.
Joseph Loh (GTrans) asked for clarification regarding the 3%
local contribution toward transit station construction. Michelle
Navarro responded that the contribution amount will be based on
the total project cost established at 30% design.
A question was asked regarding whether agencies can use transit
as a contribution, and Michelle responded that as the Draft
Guidelines are currently structured, only capital contributions
would be allowable to satisfy the 3% match.
David Feinberg commented that there have been discussions at
TAC about taking a position on the Guidelines and asked if BOS
should consider doing so as well.
Comments on the Draft Guidelines must be made in writing
through the Metro website at http://theplan.metro.net or by email
at [email protected] by May 26, 2017.
9. Access Update Matthew Avancena (Access) provided the following updates:
Metro’s Triennial Review was done last month and there was
no ADA oversight finding
An announcement will be sent out next week regarding the
upcoming Access Board elections. Names for nominees are
being requested for two seats that will open this year.
Information Mathew Avancena
-
Bus Operations Subcommittee Minutes/Action Items
April 18, 2017
8 of 10
Currently, Joyce Rooney (Beach Cities Transit) is the
chairperson for the Municipal Operators Committee and
Kathryn Engel (Glendale Beeline) is the chairperson for Local
Operators Committe.
Access’s Free Fare Paratransit Working Group meeting was
held two weeks ago. Two proposals were made: 1) use funds
from Measure M to address the reimbursement cap, and
2) surplus funds from systems that fall under their cap could
be used for systems that go over their cap. The next Working
Group meeting will be in late May.
Jane Leonard suggested that operators list the Free Fare
Paratransit Working Group as part of their communication with
Access in Triennial Reviews. Jane also suggested that the
Transit Mutual Assistance Systems Compact (TransMAC) group
can be part of agencies’ oversight and collaboration.
10. Transit Industry Debriefing/Updates
Michelle Caldwell (Foothill Transit) announced that Foothill Transit
is having a public hearing on Saturday, April 22, 2017 to accept
comments on a fare change proposal. Cash fares would increase
by 25 cents, the cost of the monthly pass would decrease, and a
day pass would be added to the fare media. Fares for customers
paying with a TAP card would remain the same. One of the
primary goals of the fare change is to encourage use of TAP
cards over cash payments. About 50% of Foothill Transit’s
passengers pay cash, which slows down service. The Board will
vote at the end of May, with implementation in the Fall of 2017.
Information All
-
Bus Operations Subcommittee Minutes/Action Items
April 18, 2017
9 of 10
Enny Chung announced that as of last week Big Blue Bus is
piloting with Token Transit. Customers can now buy passes by
showing their phone to the driver.
Jane Leonard thanked Long Beach Transit for sponsoring the
Disadvantaged Business Enterprise (DBE) workshop.
11. FTA Section 5307 15% Discretionary Capital and 1% ATI Funds Allocation
A total of $37,806,964 was available for the FY 2018 FTA Section
5307 15% Capital Discretionary and 1% Associated Transit
Improvement (ATI) Fund Allocations ($35,421,667 and
$2,385,297 respectively).
The Southern California Regional Transit Training Consortium
(SCRTTC) received their first year allocation in the amount of
$300,000 off the top from the FY18 Section 5307 15% Capital
Discretionary Funds. Metro was awarded 50% of the remaining
$35,121,667. The remaining 50% of the funds ($17,560,833)
was awarded to the following agencies:
Norwalk Transit; Culver CityBus; Santa Monica’s Big Blue
Bus; Gardena’s GTrans; LADOT; and Foothill Transit.
A motion to approve the BOS funding award recommendations for
the Section 5307 15% Capital Discretionary Fund Allocation and
to award the Southern California Regional Transit Training
Consortium (SCRTTC) $300,000 off the top for the first of three
years (FY18, FY19 and FY20) was made by Joseph Loh (GTrans)
and seconded by Judy Fry (AVTA). The motion was approved
Action Jane Leonard
-
Bus Operations Subcommittee Minutes/Action Items
April 18, 2017
10 of 10
unanimously.
Of the $2,385,297 available for 1% ATI projects, Metro was
awarded 50% of the funds. To the remaining 50% ($1,192,648),
the balance of the FY17 5307 1% ATI ($398,527) was added, for
a combined total of $1,591,176 to be awarded to qualifying
municipal agency projects. These funds were awarded as follows:
Norwalk Transit; LADOT; Torrance Transit; Culver CityBus.
There was a balance of $462,832 which the Subcommittee
agreed to split evenly between projects from Culver CityBus
and Norwalk Transit. Each of the two respective projects were
submitted under the 15% Capital Discretionary funds but had
enhancements that qualified under the 1% ATI funds.
A motion was made by Michelle Caldwell (Foothill Transit) and
seconded by Robert Portillo (Montebello Bus Lines) to approve
the 1% ATI funding recommendations and to allocate/split the
remaining balance of $462,832 equally between Norwalk Transit
and Culver CityBus. The motion was approved unanimously.
Final funding awards for the 5307 15% Discretionary and 1% ATI
funds are shown on the attached spreadsheet.
12. New Business No new business report/information was provided. Information All
13. Adjournment The meeting was adjourned at 3:00 pm.
-
Rev: 5/10/2017
BOS Attendance Chart - January-December 2017
Agency 2BRepresentative
Janu
ary
Febr
uary
Mar
ch
Apr
il
May
June
July
Aug
ust
Sept
embe
r
Oct
ober
Nov
embe
r
Dec
embe
r
Antelope Valley SEC: Judy Fry Alt: Colby Konisek
Arcadia Transit Rep: Linda Hui Beach Cities Transit Rep: Joyce Rooney
Alt: Diane Amaya Alt: Amy Ahdi Claremont Dial-A-Ride
Rep.: George Sparks Alt: Nicole Campos
Commerce Municipal Bus Lines
Rep: Martin Gombert Alt: Claude McFerguson
Culver CityBus Chair: Jane Leonard Alt: Samantha Blackshire
Foothill Transit VC: Michelle Caldwell Alt.: David Reyno
G Trans Rep: Joseph Loh Alt: Dana Pynn
LADOT Rep: Brian Lee Alt: Nora Chin La Mirada Transit Rep: Judith Quiñonez
Alt: Lisa Montoya
Long Beach Transit 0BRep: Jennifer Abro Alt: Paul Gonzales
Montebello Bus Lines
Rep: Robert Portillo Alt: Eric Yan
MTA 1BRep: Nancy Saravia Alt: Israel Marin
Norwalk Transit Rep: Theresa Clark Alt: Susan Chow
Santa Clarita Transit Rep: Susan Lipman Santa Monica’s Big Blue Bus
Rep: David Feinberg Alt: Enny Chung
Torrance Transit Rep: James Lee Alt: Ifeanyi Ihenacho
Quorum? (9 Members or more)
-
Upcoming Agenda Items
MetroLos Angeles County
Metropolitan Transportation
Authority
One Gateway Plaza
3rd Floor Board Room
Los Angeles, CA
Ad Hoc Congestion, Highway and Roads Committee
Wednesday, April 19, 2017
Authorize Contract Modification No. 114 by Caltrans for construction
contract of the Segment 3 of the I-5 North Capacity Enhancements
Project between SR-134 and SR-118 (Project) under the Funding
Agreement No. MOU. P0008355/8501A/A6, in the amount of
$552,110.89, using non local fund sources.
2017-0067
Status: CEO Draft Meeting Ready
Authorize Contract Modifications No. 56-1 & No. 112 (CCO 56-1 & CCO
112) by Caltrans for the construction contract of I-5 South Carmenita
Road Interchange Improvements Project (the Project) under the Funding
Agreement No. MOU.P0006376A-03, in the total amount of $4,300,000
within the LOP budget.
2017-0095
Status: CEO Draft Meeting Ready
Receive and File I-710 South Corridor Project EIR/EIS update report.2017-0094
Status: CEO Draft Meeting Ready
Receive and file status report on the HDC project2017-0135
Status: CEO Draft Meeting Ready
CONSIDER:
A. APPROVE $11.8 million of additional programming within the
capacity of the Measure R Highway Subregional Programs and funding
changes via the updated project list,
· Highway Operational Improvements in Arroyo Verdugo
· Highway Operational Improvements in Las Virgenes Malibu
· I-405, I-110, I-105 and SR-91 Ramp and Interchange Imp. (South
Bay)
· I-605 Corridor “Hot Spots” Interchange Imp. in Gateway Cities
· I-710 South and/or Early Action Projects in Gateway Cities
as shown in Attachment A;
B. AUTHORIZING the CEO or his designee to negotiate and execute all
necessary agreements for approved projects;
C. Receive and File the SR-138 Capacity Enhancements (North
County) project list as shown in Attachment B;
2017-0098
Page 1 Printed on 4/3/2017
-
Monday, April 03, 2017
Status: CEO Draft Meeting Ready
Wednesday, May 17, 2017
Authorize Contract Modifications No. 42 (CCO 42) by State of California
Department of Transportation (Caltrans) for the construction contract of
the Segment 5 of I-5 South Capacity Improvements Project from Orange
County Line to I-605 under the Funding Agreement No.
MOU.P0004292A-3, in the total amount of $1,700,000 within the LOP
budget.
2017-0151
Status: Approval Cancelled
Authorize Contract Modifications No. 115 (CCO 115) by State of
California Department of Transportation (Caltrans) for the construction
contract of the Segment 4 of I-5 South Capacity Improvements Project
from Orange County Line to I-605 under the Funding Agreement No.
MOU.P0004292A-3, in the total amount of $577,500 within the LOP
budget.
2017-0229
Status: Draft
Receive and File the status of the State Route 710 North Project2017-0097
Status: Draft
Page 2 Printed on 4/3/2017
-
Monday, April 03, 2017
Board of Directors - Regular Board Meeting
Thursday, April 27, 2017
APPROVE Minutes of the Regular Board Meeting held March 23, 2017.2017-0234
Status: Agenda Ready
Oral Presentation by JPA on High Speed Rail Component of the HDC2017-0184
Status: Draft
A. Hold a Public hearing on the proposed Resolution of Necessity
B. Adopt the Resolution of Necessity authorizing the commencement of
an eminent domain action to acquire Parcel RM-27, consisting of a full
take of the real property for construction of the Project.
2017-0088
Status: Draft
Page 3 Printed on 4/3/2017
-
Monday, April 03, 2017
Budget Public Hearing
Thursday, May 25, 2017
Draft Measure M Guidelines Item 8 (March 23, 2017) Motion Response2017-0226
Status: Draft
Page 4 Printed on 4/3/2017
-
Monday, April 03, 2017
Construction Committee
Thursday, April 20, 2017
A. Authorize the Chief Executive Officer (CEO) to execute a final
Modification to Contract C1013R, with Skanska USA Civil West
California District Inc., for the design and construction of the west
entrance at the North Hollywood Station on the Metro Red Line, in the
amount $1,261,770, adjustingincreasing the total current contract price
from $15,743,901.61 to $17,005,671.61 within the life of project budget.
2017-0137
Status: CEO Draft Meeting Ready
A. Authorize the Chief Executive Officer (CEO) to execute a Contract
Modification to Contract No. C1043 with Griffith Company, for the design
and construction of the Universal City Pedestrian Bridge, in the amount
of $450,000, increasing the total current contract value from
$24,264,752 to24,264,752 to $24,714,752 within the Life of Project
budget.; and
B. Approve an increase in Contract Modification Authority (CMA) for
Contract No. C1043 in the amount of $170,252, increasing the total
CMA from $3,119,500 to $3,289,752 also within the Life of Project
budget.
2017-0138
Status: Approval Review
RECEIVE Oral report by the Program Management Chief Officer.2017-0202
Status: Approval Review
Thursday, May 18, 2017
A. Increase the Life-of-Project Budget (LOP) for the Low Impact
Development Project by $1,000,000, increasing the Life-of-Project
Budget from $940,000 to $1,940,000 due to potential closure of Division
4.
B. Approve change of project name from Permeable Pavement and
Bioretention Pilot Project, Division 4 Maintenance Facility to Permeable
Pavement and Cistern Pilot Project, Central Maintenance Facility due to
potential closure of Division 4.
2016-0933
Status: Draft
Authorize the Chief Executive Officer to execute the a Memorandum of
Understanding (MOU) for Operation and Maintenance Agreement
(OMA) with The City of Santa Monica for operation and maintenance of
Expo II and as approved to form. and as approved to form.
2017-0027
Status: Draft
A. FINDING that use of the design-build contracting delivery approach
pursuant to Public Utilities Code 130242(a) will achieve certain private
2017-0173
Page 5 Printed on 4/3/2017
-
Monday, April 03, 2017
sector efficiencies in the integration of the design and construction of the
Emergency Security Operations Center by providing for the award of a
design-build contract to the lowest responsive responsible bidder;
and
(REQUIRES 2/3 VOTE)
B. APPROVING the use of the design-build contracting delivery
approach pursuant to Public Contract Code 22160-22169 to reduce
project costs, expedite project completion and allow for negotiation and
award of a design-build contract to a responsible proposer whose
proposal is determined to be the best-value to Metro.
Status: Draft
RECEIVE AND FILE status update on the Project Labor Agreement and
Construction Careers Policy programs through the quarter ending March
2017.
2017-0244
Status: Draft
Page 6 Printed on 4/3/2017
-
Monday, April 03, 2017
Executive Management Committee
Thursday, April 20, 2017
ADOPT staff recommended positions:
A. AB 287 (Holden) - State Highway Route 710: Advisory Committee
OPPOSE UNLESS AMENDED
B. AB 91 (Cervantez) - High -Occupancy vehicle lanes OPPOSE
C. AB 344 (Melendez) -- Toll Evasion Violations OPPOSE
D. AB 673 (Chu) - Public transit operators: vehicle safety requirements
OPPOSE UNLESS AMENDED
E. AB 695 (Bocanegra) - Avoidance of on-track equipment SUPPORT
F. AB 1454 (Bloom) - Transportation projects: lease agreements
SUPPORT
G. SB 422 (Wilk) - Transportation projects: comprehensive development
lease agreements SUPPORT (Sponsor)
2017-0201
Status: CEO Draft Meeting Ready
APPROVE amendment of Title 6, Chapter 6-05 of the Los Angeles
County Metropolitan Transportation Authority (“Metro”) Administrative
Code (the “Code”), otherwise known as the Metro Customer Code of
Conduct, as set forth in Attachment A. The amended Code will become
effective May 1, 2017.
2017-0206
Status: Approval Review
RECEIVE AND FILE State and Federal Legislative Report.2017-0218
Status: CEO Draft Meeting Ready
Oral Report on MicroTransit Pilot2017-0178
Status: CEO Draft Meeting Ready
Page 7 Printed on 4/3/2017
-
Monday, April 03, 2017
Finance, Budget and Audit Committee
Wednesday, April 19, 2017
RECEIVE AND FILE report on FY 2018 Budget Development Status.2017-0194
Status: Draft
RECEIVE AND FILE the Los Angeles County Metropolitan
Transportation Authority’s (LACMTA) basic financial statements and
component financial statement audits completed by Crowe Horwath LLP
(Crowe) for the fiscal year ended June 30, 2016.
2017-0220
Status: Approval Review
AUTHORIZE the Chief Executive Officer to negotiate and award All Risk
Property and Boiler and Machinery insurance policies for all property at
the current policy limits at a not to exceed price of $2.4 million for the
12-month period May 10, 2017 through May 10, 2018.
2017-0062
Status: Approval Review
A. APPROVE the SCRRA’s request for additional funding for urgent
structure and rail tie rehabilitation work up to $18,381,025.
B. PROGRAM up to $18,381,025 in Measure R 3% funds.
C. AUTHORIZE the Chief Executive Officer, or his designee, to
negotiate and execute all necessary agreements between LACMTA and
the SCRRA for the approved funding.
2017-0180
Status: Approval Paused
Wednesday, May 17, 2017
AUTHORIZE the Chief Executive Officer (CEO) to execute a seven (7)
year lease agreement (“Lease Agreement”) with The Crossroads School
for Arts & Sciences, (“Crossroads”) to continue leasing Metro-owned
property located adjacent to the Expo Light Rail Line, near 17th Street
and Colorado Avenue, in Santa Monica (“Premises”).
2017-0147
Status: Draft
Authorize the Chief Executive Officer to execute Modification No. 6 to
Contract No. PS30203139 with Axiom xCell, Inc. (Axiom) to provide
additional functionality for the Mobile Phone Validators (MPV) issued by
Metro Transit Court to Law Enforcement and Transit Security for
electronically reading information stored on TAP cards. These
improvements include the ability for Fare Inspectors to activate fare on
TAP cards and enhancements to the Mobile Device Management
(MDM) system for an additional cost of $1,000,000 (estimated), and
extend the monthly support services for an additional two years to
2017-0119
Page 8 Printed on 4/3/2017
-
Monday, April 03, 2017
November 29, 2019, in an amount of $360,000 (estimated). This
modification would increase the total contract value by $1,360,000, from
$1,061,975 to $2,421,975.
Status: Draft
New Fare Subsidy Program2017-0183
Status: Draft
Page 9 Printed on 4/3/2017
-
Monday, April 03, 2017
Planning and Programming Committee
Wednesday, April 19, 2017
Authorize the Chief Executive Officer to execute an Exclusive
Negotiations and Planning Agreement (ENA) with Trammell Crow
Company and Greenland USA (Developer) for the properties at North
Hollywood Station (Site), for 24 months with the option to extend up to
30 months.
2017-0144
Status: CEO Draft Meeting Ready
Receive and file this quarterly status report on the Airport Metro
Connector (AMC) 96th Street Transit Station including an update on the
environmental clearance process and project design.
2017-0139
Status: CEO Draft Meeting Ready
Receive and file the Regional Rail Update through March 20172017-0159
Status: Approval Review
A. APPROVE release of Round 5 of the Transit Oriented Development
(TOD) Planning Grant Program, offering an amount not to exceed
$3,100,000; and
B. APPROVE the Round 5 TOD Planning Grant Program Guidelines
(Attachment A), which include the Transit Supportive Planning Toolkit
and the creation of the Transit Oriented Communities Tax Increment
Financing Pilot Program.
C. ADOPT AND CERTIFY the Strategic Growth Council Final Grant
Report as accurate.
2017-0049
Status: CEO Draft Meeting Ready
1. Adopt the Phase II Metro Bike Share Expansion (Phase II
Expansion) Environmental Analysis findings that the expansion qualifies
for a Categorical Exemption under Section 15303 (Class 3) New
Construction or Conversion of Small Structures (Attachment A);
2. Authorize staff to file the Notice of Exemption for the Phase II
Expansion;
3. Adopt the Phase II Expansion Title VI and Environmental Justice
Analysis findings that there is no Disparate Impact and no
Disproportionate Burden associated with the expansion (Attachment B);
and
4. Augment the Life of Project budget for Phase II Expansion by
$1,713,000 to $4,499,000 to include previously Board approved
pre-launch related costs.
2017-0086
Status: CEO Draft Meeting Ready
Page 10 Printed on 4/3/2017
-
Monday, April 03, 2017
CONSIDER:
A. ADOPTING the Rail to Rail Active Transportation Corridor (ATC) -
Segment A Preliminary Design (Attachment A); the findings of the
environmental analysis that the project qualifies for CEQA Categorical
Exemption under Section 15307 (Class 4) Minor Alterations to Land; and
file the Notice of Exemption (NOE) (Attachment B);
B. AUTHORIZING the use of Design-Build project delivery method for
Segment A, pursuant to Public Utilities Code Section 130242 (a), will
achieve certain private sector efficiencies in the integration of design,
project work and components related to real property renovation,
improvements and construction work for this project; (REQUIRES 2/3
VOTE)
C. ADOPTING the Rail to River ATC - Segment B Locally Preferred
Alternative, Randolph Street Alternative, as described in the Alternative
Analysis (AA) (Attachment C) and advance into the Environmental
Review/Clearance and Preliminary Design phase after more refined cost
estimates for Segment A are developed from 30% design documents.
2017-0089
Status: Approval Review
CONSIDER AUTHORIZING:
A. The Chief Executive Officer authority to execute amendments to the
I-110 and I-105 Operations & Maintenance (O&M) Agreements to allow
Metro to provide enhanced maintenance services for 17 Caltrans park &
ride locations, provided that the necessary resources are allocated in the
FY18 budget process;
B. Amending the proposed FY 18 budget to include 28 additional FTEs
for Facilities Maintenance and Parking Management; and
C. Amending the proposed FY18 budget to include $6,247,000 for initial
upgrades, full maintenance services, non-revenue vehicle purchase,
enforcement and security for the selected park & ride lots
2016-0758
Status: Approval Review
APPROVE the formal commitment of $905 million of accelerated
Measure R funds to Westside Purple Line Extension Section 3
(WSPLE3) to fulfill the Federal Transit Administration’s financial rating
requirements for Metro’s New Starts project request of $1.175 billion.
2017-0191
Status: CEO Draft Meeting Ready
Authorize the Chief Executive Officer to amend Metro’s Second Revised
Amended and Restated Joint Development Agreement (“JDA”) with
MacArthur Park Metro, LLC, (“MPM”) to: (a) extend the term of the JDA
to December 31, 2017, and (b) allow Metro to terminate the JDA if Metro
reasonably determines that the Ground Lease will not be executed prior
to December 31, 2017 or that the mixed-use joint development project
contemplated in the JDA (the “Phase B Project”) is not feasible.
2017-0140
Page 11 Printed on 4/3/2017
-
Monday, April 03, 2017
Status: CEO Draft Meeting Ready
AUTHORIZE the Chief Executive Officer to:
A. APPROVE Project Definition for Environmental Scoping including
four Northern Alignment Options; and
B. RECEIVE AND FILE the West Santa Ana Branch (WSAB) Transit
Corridor Northern Alignment Options Screening Report.
2017-0152
Status: CEO Draft Meeting Ready
A. APPROVE an updated Project Definition for Environmental
Clearance, including three alternatives:
a. SR 60 North Side Design Variation Alternative
b. Washington Boulevard Alternative with Atlantic Below-Grade Option
c. Combined Alternative with both SR 60 and Washington Boulevard
via Atlantic Segments
B. RECEIVE AND FILE the Eastside Phase 2 Technical Study Report.
Attachment D contains the Executive Summary. The full report is
available upon request.
2017-0154
Status: CEO Draft Meeting Ready
Thursday, April 20, 2017
RECEIVE AND FILE this report on Metro’s long-term needs at Division
20 in the Downtown Los Angeles Arts District and the accommodations
necessary for a potential future Arts District passenger rail station.
2017-0130
Status: CEO Draft Meeting Ready
Wednesday, May 17, 2017
A. APPROVE programing of additional funds in the amount of
$11,000,000 using Measure R 3% funds;
B. APPROVE an amendment to increase the Fiscal Year (FY) 2017
budget in the amount of $3,000,000 out of Measure R 3% funds for the
project cost requested above;
2017-0177
Status: Draft
Thursday, May 18, 2017
CONSIDER:
A. ESTABLISHING the Life of Project (LOP) budget in the amount of
$155.3 million for the Rosecrans/Marquardt Grade Separation Project
(Project);
B. APPROVING third party costs of $1,500,000 million using measure R
funds and amend the FY 17 budget in the amount of $500,000 for third
2016-0959
Page 12 Printed on 4/3/2017
-
Monday, April 03, 2017
party costs using Measure R funds; and
C. AUTHORIZING the Chief Executive Officer (CEO), or his designee,
to negotiate and execute all third party agreements necessary for this
action.
Status: CEO Draft Meeting Ready
Thursday, May 25, 2017
APPROVE amendment of the existing repayment schedule agreement
between the County of Los Angeles (County) and the Los Angeles
County Metropolitan Transportation Authority (LACMTA) for State Route
126/Commerce Center Drive Interchange Improvement Project STP-L
fund exchange, as shown in Attachment A.
2017-0245
Status: Draft
Page 13 Printed on 4/3/2017
-
Monday, April 03, 2017
System Safety, Security and Operations Committee
Thursday, April 20, 2017
RECEIVE AND FILE monthly update on Transit Policing performance.2017-0222
Status: Approval Review
Receive and file status report on efforts underway to use technology and
innovation to transform the customer experience of Metro’s Bus and Rail
system, and mobility in the region in general.
2017-0225
Status: CEO Draft Meeting Ready
Operations Employee of the Month2016-0984
Status: Agenda Ready
RECEIVE oral report on System Safety, Security and Operations.2016-0986
Status: CEO Draft Meeting Ready
Thursday, May 18, 2017
RECEIVE AND FILE this second annual condition report on the state of
Metro’s public artworks in response to the Board Motion, Item 44, from
the October 2015 System Safety, Security and Operations Committee.
2017-0013
Status: Agenda Ready
Operations Employee of the Month2016-0985
Status: Draft
RECEIVE oral report on System Safety, Security and Operations.2017-0230
Status: Draft
Establish a life-of-project budget for the P2550 Light Rail Vehicle
Component Overhaul, CP# 214001 in the amount of $20,007,900.
2016-0741
Status: Draft
Thursday, June 15, 2017
APPROVE nominees for membership on Metro’s Service Councils.2017-0036
Status: Draft
Operations Employee of the Month2017-0231
Status: Draft
Page 14 Printed on 4/3/2017
-
Monday, April 03, 2017
RECEIVE oral report on System Safety, Security and Operations.2017-0232
Status: Draft
Page 15 Printed on 4/3/2017
-
CITY OF ARCADIA INVOICE NUMBER SUBJECT INVOICED AMOUNT Prop A 40% Disc Prop C 5% Transit Sec Prop C 40% BSIP
Prop C 40% FTMProp C 40% MOSIPMeasure R 20% Bus OpsTotal $0
ANTELOPE VALLEY TRANSIT AUTHORITY INVOICE NUMBER SUBJECT AMOUNT
PROPADISCGROWTH Prop A 40% Disc $4,193,858PROPCTRANSIT-17 Prop C 5% Transit Sec $192,500PROPC5%TS-BAL Prop C 5% Transit Sec - Capital FY16 $17,653
PROPCBSIP Prop C 40% BSIP $47,026PROPCTRANSITSVC Prop C 40% TSE $370,518
PROPCFOOTHILL Prop C 40% FTM $11,729Prop 1B PTMISEA Prop 1B Transit Sec
MEASURE R20% Measure R 20% Bus Ops $2,356,535PROPCMOSIP Prop C 40% MOSIP $1,128,454
Total $8,318,273
CITY OF CLAREMONT INVOICE NUMBER SUBJECT AMOUNT Prop A 40% DiscretionaryProp C 5% Trans SecProp C 40% FTMProp C 40% MOSIPMeasure R 20% Bus OpsTotal $0
CITY OF COMMERCE INVOICE NUMBER SUBJECT AMOUNT MIS000085 Prop A 40% Discretionary $239,200MIS000083 Prop C 5% Trans Sec $39,038MIS000088 Prop C 40% FTM $10,833MIS000084 Prop C 40% Disc Base Restruct $245,273MIS000086 Prop C 40% Zero-Fare Comp $640,479MIS000082 Prop C 40% MOSIP $72,387MIS000087 Measure R 20% Bus Ops $151,164
Total $1,398,374
CITY OF CULVER CITY INVOICE NUMBER SUBJECT AMOUNT 17-01PADISC Prop A 40% Disc $3,326,445
17-03PCSECURITY Prop C 5% Trans Sec $313,16717-07BSIPOVER Prop C 40% BSIP $165,20917-06PCTREXP Prop C 40% TSE $236,41717-05FOOTMIT Prop C 40% FTM $150,655
17-04PCMOSIPOP Prop C 40% MOSIP $306,64916-PC.MOSIP.CAP Prop C 40% MOSIP $446,34817-02MEASROP Measure R 20% Bus Ops $2,102,170
Prop 1B Transit Security Bridge Funds17-01- prop1B-BR Prop 1B PTMISEA Bridge Funds $402,419
Total $7,449,479
SUMMARY OF INVOICES FOR FY 2017As of May 8, 2017
-
FOOTHILL TRANSIT INVOICE NUMBER SUBJECT AMOUNT OP69-2017-1 Prop A 40% Discretionary $16,081,241OP67-2017-2 Prop A 40% Discretionary-BSCP $4,558,875OP62-2017-6 Prop C 5% Transit Security $918,025
OP74-2017-5 Prop C 40% BSIP $914,207 OP76-2017-4 Prop C 40% TSE $327,222
OP72-2017-3 Prop C 40% Base Restruct $1,963,620OP105-2017-8 Measure R 20% Bus Ops BSCP $1,075,973OP65-2017-7 Measure R 20% Bus Ops $9,335,751
SI004485 Prop C 40% MOSIP $364,908SI004504 Prop C 40% MOSIP $174,785SI003165 Prop 1B Transit Security Bridge Funds $499,516SI003166 Prop 1B PTMISEA Bridge Funds $6,642,369SI004419 Prop 1B PTMISEA Bridge Funds $2,214,123SI004564 Prop C 40% MOSIP $89,919SI004598 Prop C 40% MOSIP $218,255SI004672 Prop C 40% MOSIP $83,651SI004653 Prop C 40% MOSIP $597,474SI004762 Prop C 40% MOSIP $625,513SI004668 Prop C 40% MOSIP $507,935SI004834 Prop C 40% MOSIP $1,356,182SI004919 Prop C 40% MOSIP $117,809
Total $48,667,353
GARDENA MUNICIPAL BUS LINES INVOICE NUMBER SUBJECT AMOUNT
GMBL16-17PA40 Prop A 40% Discretionary $3,290,679GMBL16-17PC3 Prop C 40% BSIP $172,465GMBL16-17PC2 Prop C 40% TSE $679,548GMBL16-17PC1 Prop C 40% FTM $149,035
GMBL16-17MR20 Measure R 20% Bus Ops $2,079,567GMBL16-17TS Prop C 5% Transit Security $231,890
GMBLMOSIP16-05 Prop C 40% MOSIP $309,278GMBLMOSIP16-06 Prop C 40% MOSIP $265,664GMBLMOSIP17-01 Prop C 40% MOSIP $35,177
Total $7,213,304
CITY OF LA MIRADA INVOICE NUMBER SUBJECT AMOUNT Prop A 40% Disc Prop C 5% Trans Sec
Prop C 40% FTMProp C 40% MOSIPMeasure R 20% Bus OpsTotal $0
LADOT INVOICE NUMBER SUBJECT AMOUNT PAG17000043 Prop A 40% Discretionary $19,645,484PAG17000046 Prop C 40% BSIP $147,446PAG17000048 Prop C 40% TSE $2,661,900PAG17000045 Prop C 40% FTM $310,527
94PAG17000057 Measure R 20% Bus Ops $4,636,67394PAG17000052 Prop C 5% Transit Security $1,366,075
PAG17000044 Prop C 40% MOSIP $2,220,32594PAG17000059 Prop 1B PTMISEA Bridge Funds $1,904,961
Total $30,988,430
-
LONG BEACH TRANSIT INVOICE NUMBER SUBJECT AMOUNT 2017-PA40 Prop A 40% Disc $14,546,1272017-SEC Prop C 5% Trans Sec $1,768,3942017-BSIP Prop C 40% BSIP $809,8112017-TSE Prop C 40% TSE $2,243,5182017-FMIT Prop C 40% FTM $658,794
1BFY14SECBridge Prop 1B Transit Security Bridge Funds $243,9352017-1BBridge Prop 1B PTMISEA Bridge Funds $1,383,233
2017MeasureROperating Measure R 20% Bus Ops $9,192,525May16MOS15 Prop C 40% MOSIP $155,940Jul16MOS15 Prop C 40% MOSIP $184,596Jul16MOS16 Prop C 40% MOSIP $8,903Aug16MOS15 Prop C 40% MOSIP $222,132Aug16MOS16 Prop C 40% MOSIP $68,201Sep16MOS15 Prop C 40% MOSIP $213,218Sep16MOS16 Prop C 40% MOSIP $3,568Oct16MOS15 Prop C 40% MOSIP $182,149Oct16MOS16 Prop C 40% MOSIP $40,957Nov16MOS15 Prop C 40% MOSIP $68,709Nov16MOS16 Prop C 40% MOSIP $15,497
Dec16-Feb17MOS15 Prop C 40% MOSIP $151,425Dec16-Feb17MOS16 Prop C 40% MOSIP $41,496
Mar17MOS15 Prop C 40% MOSIP $12,993Mar17MOS16 Prop C 40% MOSIP $10,704
Total $32,226,824
LYNWOOD TROLLEY INVOICE NUMBER SUBJECT AMOUNTProp C 40% TSE
Total
CITY OF MONTEBELLO INVOICE NUMBER SUBJECT AMOUNT PAD4010.40 Prop A 40% Disc $5,236,699PCD4010.55 Prop C 5% Trans Sec $480,191PCD4010.45 Prop C 40% FTM $237,170PCD4010.30 Prop C 40% Base Restruct $1,120,117PCD4010.50 Prop C 40% BSIP $213,765PCD4010.60 Prop C 40% MOSIP $1,584,730MRD4010.65 Measure R 20% Bus Ops $3,309,368
Total $12,182,040
CITY OF NORWALK INVOICE NUMBER SUBJECT AMOUNT NTS17-4082 Prop A 40% Disc $2,155,535
NTS17-4081 Prop C 5% Trans Sec $96,160NTS17-4088 Prop C 40% BSIP $55,308NTS17-4086 Prop C 40% FTM $84,966
NTS17-4087 Prop C 40% MOSIP $567,728 NTS17-4451 Measure R 20% Bus Ops $1,185,578
Total $4,145,275
REDONDO BEACH WAVE INVOICE NUMBER SUBJECT AMOUNT 560809 Prop A 40% Disc $452,879560807 Prop C 40% Disc FTM $20,51156088 Prop C 40% Disc BSIP $3,926560811 Measure R 20% Bus Ops $286,200560980 Prop C 5% Trans Sec $25,361560959 Prop C 40% MOSIP $137,050
Total $925,927
-
CITY OF SANTA CLARITA INVOICE NUMBER SUBJECT AMOUNT PA40SAC16 Prop A 40% Disc $4,427,993
SAC2017FTM Prop C 40% Disc FTM $12,384 SAC2017TSE Prop C 40% Disc TSE $193,792
SAC2017BSIP Prop C 40% Disc BSIP $50,302SAC2017MR20 Measure R 20% Bus Ops $2,488,096SAC2017PC5 Prop C 5% Trans Sec $208,461MOSIP-FY16 Prop C 40% MOSIP $739,488
Total $8,120,516
SANTA MONICA BIG BLUE BUS INVOICE NUMBER SUBJECT AMOUNT
690-C Prop A 40% Disc $12,407,511694-C Prop C 5% Trans Sec $1,179,188692-C Prop C 40% BSIP $783,496691-C Prop C 40% FTM $561,936693-C Measure R 20% Bus Ops $7,841,012
Prop 1B PTMISEA Bridge FundsProp 1B Transit Security Bridge FundsTotal $22,773,143
CITY OF TORRANCE INVOICE NUMBER SUBJECT AMOUNT 2017-00151268 Prop A 40% Disc $4,008,1812017-00151262 Prop C 40% Disc FTM $181,5302017-00151266 Prop C 40% Disc TSE $795,6772017-00151265 Prop C 40% Disc Base Restruct $712,7312017-00151263 Prop C 40% Disc BSIP $236,5622017-00151264 Prop C 5% Trans Sec $255,2842017-00151267 Prop C MOSIP $784,7272017-00151261 Measure R 20% Bus Ops $2,532,998
Prop 1B Transit Security Bridge FundsProp 1B PTMISEA Bridge FundsTotal $9,507,690
-
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
201608232212 Jul-16 6,494 $7,341.88 $10,646.50 $17,988.38201609292240 Aug-16 8,513 $12,595.01 $10,986.00 $23,581.01201610132248 Sep-16 9,042 $15,402.34 $9,644.00 $25,046.34201611212276 Oct-16 9,035 $15,198.15 $10,009.50 $25,207.6520161214EZ Nov-16 8,685 $14,562.15 $9,669.00 $24,231.15
201612282297 Jul-Sep, 2016 $480.98 $0.00 $480.9820170120EZ Dec-16 7,849 $13,219.71 $8,679.00 $21,898.71
Jan-17 $0.0020170103EZ Feb-17 7,028 $11,726.12 $7,882.00 $19,608.12
Mar-17 $0.00Total 56,646 $90,526.34 $67,516.00 $158,042.34
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
Jul-16 $0.00 $0.00Aug-16 $0.00 $0.00Sep-16 $0.00 $0.00Total 0 $0.00 $0.00 $0.00
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
Jul-16 $0.00Aug-16 $0.00Sep-16 $0.00Total 0 $0.00 $0.00 $0.00
Summary of EZ Transit Pass Invoices FY 2017As of May 8, 2017
ANTELOPE VALLEY
CITY OF CARSON
Burbank
-
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
EZ-CCB071416 Jul-16 24,399 $18,409.69 $1,353.50 $19,763.19EZ-CCB081416 Aug-16 24,808 $17,620.82 $1,977.50 $19,598.32EZ-CCB091416 Sep-16 25,426 $18,299.04 $1,787.50 $20,086.54EZ-CCB101416 Oct-16 26,278 $19,256.12 $1,503.50 $20,759.62EZ-CCB111416 Nov-16 25,390 $18,884.60 $1,173.50 $20,058.10EZ-CCB121416 Dec-16 24,234 $18,165.36 $979.50 $19,144.86EZ-CCB011417 Jan-17 24,940 $18,329.10 $1,373.50 $19,702.60EZ-CCB021417 Feb-17 24,195 $17,698.55 $1,415.50 $19,114.05EZ-CCB031417 Mar-17 21,854 $16,217.16 $1,047.50 $17,264.66
Total 221,524 $162,880.44 $12,611.50 $175,491.94
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
SI004521 Jul-16 38,360 $15,896.00 $43,562.00 $59,458.00SI004587 Aug-16 39,365 $15,680.25 $45,335.50 $61,015.75SI004643 Sep-16 38,790 $16,040.00 $44,084.50 $60,124.50SI004674 Oct-16 36,877 $9,411.35 $47,748.00 $57,159.35SI004732 Nov-16 36,877 $11,971.35 $45,188.00 $57,159.35SI004784 Dec-16 34,154 $8,822.20 $44,116.50 $52,938.70SI004837 Jan-17 33,996 $11,189.80 $41,504.00 $52,693.80SI004885 Feb-17 34,616 $10,529.30 $43,125.50 $53,654.80
Mar-17 $0.00Total 293,035 $99,540.25 $354,664.00 $454,204.25
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
EZ0716G Jul-16 9,061 $6,053.63 $1,467.00 $7,520.63EZ0816G Aug-16 10,299 $5,764.67 $2,783.50 $8,548.17EZ0916G Sep-16 9,454 $7,177.48 $1,047.50 $8,224.98EZ1016G Oct-16 10,587 $8,179.19 $1,031.50 $9,210.69EZ1116G Nov-16 9,706 $7,234.72 $1,209.50 $8,444.22EZ1216G Dec-16 9,058 $6,716.96 $1,163.50 $7,880.46EZ0117G Jan-17 8,985 $7,345.95 $471.00 $7,816.95EZ0217G Feb-17 8,943 $6,952.91 $827.50 $7,780.41
Mar-17 $0.00Total 76,093 $55,425.51 $10,001.00 $65,426.51
CULVER CITY
FOOTHILL TRANSIT
GARDENA MUNICIPAL BUS LINES
-
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
Jul-16 $0.00Aug-16 $0.00Sep-16 $0.00Total 0 $0.00 $0.00 $0.00
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
94PAG17000028 Jul-Sep, 2016 111,362 $69,797.80 $73,771.50 $143,569.3094PAG17000033 Oct-Dec, 2016 98,538 $78,863.40 $46,240.50 $125,103.9094PAG17000066 Jan-Mar, 2017 93,853 $59,972.75 $64,863.00 $124,835.75
$0.00pTotal 303,753 $208,633.95 $184,875.00 $393,508.95
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
2117258748 Jul-Dec, 2015 4,631 $35,484.81 $0.00 $35,484.812117258748 Jan-Jun, 2016 2,331 $15,306.25 $0.00 $15,306.252117265197 Jan-Jun, 2016 underbill $5,878.85 $0.00 $5,878.852117265267 Jul-Dec, 2016 2,542 $21,300.74 $0.00 $21,300.74
Total 6,962 $77,970.65 $0.00 $77,970.65
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
I0006241 Jul-16 64,397 $11,304.15 $49,873.00 $61,177.15I0006266 Aug-16 68,156 $14,661.70 $50,086.50 $64,748.20I0006292 Sep-16 68,793 $12,919.85 $52,433.50 $65,353.35I0006327 Oct-16 68,770 $12,820.50 $52,511.00 $65,331.50I0006346 Nov-16 63,205 $6,051.75 $53,993.00 $60,044.75I0006367 Dec-16 60,477 $8,524.65 $48,928.50 $57,453.15I0006388 Jan-17 55,864 $5,369.30 $47,701.50 $53,070.80I0006411 Feb-17 54,087 $3,773.15 $47,609.50 $51,382.65i0006438 Mar-17 66,044 $16,022.30 $46,719.50 $62,741.80
Total 569,793 $91,447.35 $449,856.00 $541,303.35
GLENDALE
LADOT
LOS ANGELES WORLD AIRPORT
LONG BEACH TRANSIT
-
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
2017-00000016 Jul-16 20,879 $13,015.35 $556.00 $13,571.35 2017-00000027 Aug-16 22,576 $15,195.20 $608.00 $15,803.20 2017-00000035 Sep-16 22,312 $14,480.16 $692.00 $15,172.16 2017-00000043 Oct-16 21,509 $13,814.62 $811.50 $14,626.12 2017-00000052 Nov-16 21,588 $13,682.58 $565.50 $14,248.08 2017-00000063 Dec-16 19,781 $12,859.58 $591.50 $13,451.08 2017-00000068 Jan-17 18,378 $13,491.56 $659.50 $14,151.06 2017-00000075 Feb-17 18,027 $12,361.94 $617.50 $12,979.44
Mar-17 $0.00 Total 165,050 $108,900.99 $5,101.50 $114,002.49
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
*REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
EZ07-16-4582 Jul-16 5,166 $1,187.40 $3,462 $4,649.40EZ08-164582 Aug-16 6,323 $2,601.47 $3,026 $5,627.47EZ09-164582 Sep-16 5,364 $1,034.84 $3,310 $4,344.84EZ10-16-4582 Oct-16 5,595 $1,685.85 $2,958 $4,643.85EZ11-16-4582 Nov-16 5,196 $1,144.64 $3,220 $4,364.64
EZ1212-16-4582 Dec-16 4,661 $907.68 $3,194 $4,101.68EZ01-17-4582 Jan-17 4,629 $899.81 $3,220 $4,119.81EZ02-17-4582 Feb-17 4,504 $628.40 $3,200 $3,828.40EZ03-17-4582 Mar-17 4,410 $596.50 $3,152 $3,748.50
Total 45,848 $10,686.59 $28,742.00 $39,428.59
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
FY17EZ01 Jul-16 329 $602.07 $0 $602.07FY17EZ02 Aug-16 376 $688.08 $0 $688.08
Sep-16 $0 $0.00Oct-16 $0 $0.00Nov-16 $0 $0.00
FY17EZ06 Dec-16 355 $607.05 $0 $607.05FY17EZ07 Jan-17 519 $887.49 $0 $887.49 FY'17EZ8 Feb-17 400 $684.00 $0 $684.00
FY'176EZ13 FY 2016 Audit $2,496.00 $0 $2,496.00 Mar-17 $0 $0.00Total 1,979 $5,964.69 $0.00 $5,964.69
CITY OF MONTEBELLO
NORWALK TRANSIT
PALOS VERDES PENINSULA TRANSIT AUTHORITY
-
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
Jul-16 $0 $0.00Aug-16 $0 $0.00Sep-16 $0 $0.00Total 0 $0.00 $0.00 $0.00
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
0716BCT Jul-16 2,002 1,561.56 $0 $1,561.560816BCT Aug-16 2,229 1,805.49 $0 $1,805.490916BCT Sep-16 2,189 $1,773.09 $0 $1,773.091016BCT Oct-16 1,820 $1,474.20 $0 $1,474.201116BCT Nov-16 1,764 $1,428.84 $0 $1,428.841216BCT Dec-16 1,986 $1,622.07 $0 $1,622.070117BCT Jan-17 1,893 $1,533.33 $0 $1,533.330217BCT Feb-17 1,710 $1,385.10 $0 $1,385.10
Mar-17 $0 $0.00Total 15,593 $12,583.68 $0.00 $12,583.68
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
SC-EZ-2017-July16 Jul-16 2,918 $4,079.10 $2,077.50 $6,156.60SC-EZ-2017-Aug16 Aug-16 3,949 $6,100.40 $1,831.00 $7,931.40SC-EZ-2017-Sept16 Sep-16 4,027 $5,965.80 $1,989.00 $7,954.80SC-EZ-2017-Oct16 Oct-16 3,547 $5,505.25 $1,850.00 $7,355.25SC-EZ-2017-Nov16 Nov-16 2,967 $4,498.35 $2,010.00 $6,508.35
SCEZFY16Final July2015-Jun2016 $6,870.98Dec-16 $0.00Total 17,408 $26,148.90 $9,757.50 $42,777.38
PASADENA
REDONDO BEACH - BEACH CITIES TRANSIT
SANTA CLARITA TRANSIT
-
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
688-C Jul-16 63,228 $29,411.64 $19,166.00 $48,577.64696-C Aug-16 66,140 $45,632.10 $16,295.00 $61,927.10697-C Sep-16 64,258 $39,724.66 $20,296.50 $60,021.16698-C Jan-Jul, 2016 $75,894.90 $0.00 $75,894.90699-C Oct-16 63,122 $40,497.04 $18,416.00 $58,913.04
Nov-16 $0.00701-C Dec-16 58,706 $35,460.16 $18,985.50 $54,445.66702-C Jan-17 57,427 $39,072.19 $14,372.00 $53,444.19
Feb-17 $0.00Mar-17 $0.00Total 372,881 $305,692.69 $107,531.00 $413,223.69
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
2017-00150531 Jul-16 11,648 $7,474.46 $1,494.50 $8,968.962017-00150935 Aug-16 12,730 $8,087.60 $1,714.50 $9,802.102017-00151346 Sep-16 11,496 $7,360.42 $1,491.50 $8,851.922017-00151717 Oct-16 11,881 $7,944.87 $1,203.50 $9,148.372017-00152616 Nov-16 11,174 $7,367.98 $1,236.00 $8,603.982017-00152618 Dec-16 10,561 $6,879.47 $1,252.50 $8,131.972017-00152620 Jan-17 10,045 $6,353.15 $1,381.50 $7,734.65 2017-00153141 Feb-17 9,555 $5,949.85 $1,407.50 $7,357.352017-00153199 Mar-17 11,165 $6,553.55 $2,043.50 $8,597.05
Total 100,255.00 $63,971.35 $13,225.00 $77,196.35
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
Total - $0.00 $0.00 $0.00
INVOICE NUMBER MONTH BOARDINGS
TOTAL NET AMOUNT PAID TO
AGENCY
REVENUE COLLECTED BY AGENCY
TOTAL AMOUNT
OWED BY MTA TO AGENCY
Jul-16 $0.00Total - $0.00 $0.00 $0.00
Grand Totals 2,246,820 $1,320,373.38 $1,243,880.50 $2,571,124.86
COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS
CITY OF TORRANCE
CITY OF WHITTIER
SANTA MONICA BIG BLUE BUS
-
NAMEProp A
40%Prop A
40%MOSIP MOU
MOSIP SIP
MOSIP Invoice Prop C Prop C Prop C TDA Claim
MOU Invoice Serv
ice
Impv
. Pl
an
Foothill Transit
Mitigation
Transit Service
ExpansionDisc. Base Restruct. BSIP 40% MOU 5 % MOU 5% Invoice
Antelope Valley Transit X X X X X X X N/A X X X X N/AArcadia Transit X X N/A N/A X XClaremont Dial - A - Ride X X N/A N/A N/A X XCommerce Municipal Bus Lines X X X X X X N/A X N/A X X XCulver City Municipal Bus Lines X X X X X X X N/A X X X X XFoothill Transit X X X N/A X X X X X X XGardena Municipal Bus Lines X X X X X N/A X X X X XLa Mirada Transit X X N/A N/A N/A XL.A.D.O.T X X X X X X X N/A X X X X N/ACity of Lynwood N/A N/A N/A N/A N/A N/A N/A N/A X N/A N/A N/ALong Beach Public Transportation Co. X X X X X N/A X X X X XMetro N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A P N/A XMontebello Bus Lines X X X X X X N/A X X X X X XNorwalk Transit System X X X X X X N/A N/A X X X X XRedondo Beach - Beach Cities Transit X X X X X X N/A N/A X X X X XSanta Clarita Transit X X X X X N/A X X X X N/ASanta Monica Big Blue Line X X X X N/A N/A X X X X XTorrance Transit System X X X X X X X X X X X X XX = DOCUMENT RECEIVED P = Partnership with relevant law enforcement agency(ies).
LOS ANGELES COUNTY MUNICIPAL OPERATORSSubsidy Tracking Matrix Fiscal Year 2017
As of May 8, 2017
Prop C 40% Discretionary - Invoices
-
NAME
20% Ops. MOU
20% Ops. Invoice
20% Ops. Service Plan
Clean Fuel Bus MOU
Clean Fuel Bus Invoice
Clean Fuel Bus
Plan
Prop 1B PTMISEA
MOU
Prop 1B PTMISEA Invoice
Caltrans Approval
Letter
Prop 1B Security
MOU
Prop 1B Security Invoice
OHS Approval
LetterAntelope Valley Transit X X X X X XCity of Arcadia X X N/A N/A N/A N/A N/A N/ACity of Claremont X X X XCity of Commerce X X X X N/A N/A N/A N/A N/A N/ACity of Culver City X X X X X XFoothill Transit X X X X X X X XCity of Gardena X X X X X XCity of La Mirada X X N/A N/A N/A N/A N/A N/AL.A.D.O.T X X X X X N/A X N/ALong Beach Transit X X X X X X X X X XCity of Montebello X X X X X XCity of Norwalk X X X X X XCity of Redondo Beach X X X X X XCity of Santa Clarita X X X X X N/A X N/ACity of Santa Monica X X X X X XCity of Torrance X X X X X XX = DOCUMENT RECEIVED
LOS ANGELES COUNTY MUNICIPAL OPERATORSSubsidy Tracking Matrix Fiscal Year 2017
As of May 8, 2017
Measure R Funds- FY 17 Prop C 40% Discretionary Funds - Prop 1B Bridge FY 12
-
CITY OF ARCADIA INVOICE NUMBER SUBJECT INVOICED AMOUNT
Total $0
CITY OF COMMERCE INVOICE NUMBER SUBJECT AMOUNT
Total $0
CITY OF CULVER CITY INVOICE NUMBER SUBJECT AMOUNT STA Capital
Total $0
FOOTHILL TRANSIT INVOICE NUMBER SUBJECT AMOUNT TDA CapitalTDA Capital
Total $0
GARDENA MUNICIPAL BUS LINES INVOICE NUMBER SUBJECT AMOUNT
TDAGAR16-02 TDA Capital $10,333TDAGAR17-01 TDA Capital $14,208
Total $24,541
CITY OF LA MIRADA INVOICE NUMBER SUBJECT AMOUNT
Total $0
LACMTA INVOICE NUMBER SUBJECT AMOUNT TDA Capital $10,774,981TDA Capital $118,551TDA Capital $4,487,031TDA Capital $1,117,910TDA Capital $39,056,335TDA Capital $5,362,670
Total $60,917,478
CITY OF MONTEBELLO INVOICE NUMBER SUBJECT AMOUNT TDA REIMB.July1,2015-JUNE30,2016 TDA Capital $383,979
Total $383,979
CITY OF NORWALK INVOICE NUMBER SUBJECT AMOUNT
Total $383,979
REDONDO BEACH WAVE INVOICE NUMBER SUBJECT AMOUNT
Total $0
SANTA MONICA BIG BLUE BUS INVOICE NUMBER SUBJECT AMOUNT
TDA CapitalTDA Capital
Total $0
CITY OF TORRANCE INVOICE NUMBER SUBJECT AMOUNT
Total $0
SUMMARY OF TDA & STA Capital Claims for FY 2017
As of May 8, 2017
-
ANTELOPE VALLEY TRANSIT AUTHORITY N/A
CITY OF ARCADIA SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $0STA $13,965 $13,965
Subtotal $0 $0 $13,965 $13,965
CITY OF CLAREMONT SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $232,336 $232,336STA $29,160 $29,160
Subtotal $0 $0 $261,496 $261,496
CITY OF COMMERCE SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $0 $0STA $0 $0
Subtotal $0 $0 $0 $0
CITY OF CULVER CITY SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $5,165,678 $5,165,678STA $474,727 $37,424 $512,151
Subtotal $5,640,405 $0 $37,424 $5,677,829
FOOTHILL TRANSIT SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $22,940,811 $14,033 $22,954,844STA $1,841,803 $1,841,803
Subtotal $24,782,614 $0 $14,033 $24,796,647
GARDENA MUNICIPAL BUS LINES SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $5,110,136 $25,603 $5,135,739STA $410,267 $355,633 $765,900
Subtotal $5,520,403 $0 $381,235 $5,901,638
CITY OF LA MIRADA SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $0 $0STA $118,097 $118,097
Subtotal $0 $0 $118,097 $118,097
LONG BEACH TRANSIT SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $22,588,861 $22,588,861STA $1,813,547 $1,813,547
SCRTTC TDA $250,000 $250,000Subtotal $24,652,408 $0 $0 $24,652,408
LADOT N/A
METRO SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $152,767,173 $111,670,686 $272,133,190 $536,571,049STA $21,732,177 $4,773,874 $26,506,051
STA Pop. share $29,665,148 $29,665,148Subtotal $204,164,498 $111,670,686 $276,907,064 $592,742,248
CITY OF MONTEBELLO SUBJECT OPERATING CAPITAL RESERVE* TOTAL
TDA $7,758,946 $373,189 $2,873,422 $11,005,557STA $652,889 $707,534 $1,360,423
Subtotal $8,411,835 $373,189 $3,580,956 $12,365,980
CITY OF NORWALK SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $2,913,330 $2,913,330
TDA/STA CLAIM SUMMARY FOR FY 2017As of May 8, 2017 - all claims received for FY17 funds.
-
TDA/STA CLAIM SUMMARY FOR FY 2017As of May 8, 2017 - all claims received for FY17 funds.
STA $233,897 $233,897Subtotal $3,147,227 $0 $0 $3,147,227
REDONDO BEACH - CITIES TRANSIT SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $703,281 $703,281STA $56,463 $0 $56,463
Subtotal $759,744 $0 $0 $759,744
CITY OF SANTA CLARITA N/A
SANTA MONICA BIG BLUE BUS SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $19,267,778 $21,922,376 $41,190,154STA $1,546,914 $0 $257,140 $1,804,054
Subtotal $20,814,692 $0 $22,179,516 $42,994,208
CITY OF TORRANCE SUBJECT OPERATING CAPITAL RESERVE* TOTALTDA $6,224,354 $193,862 $6,418,216STA $499,722 $499,722
Subtotal $6,724,076 $0 $193,862 $6,917,938
*Includes prior year reserves. Actual balance may be different due to capital claims that were recently processed.* Amounts include total monthly deposits from funds reserved for future capital expenditures.
-
FY18 Budget - DiscussionMay 2017 Bus Operators Subcommittee
-
FY18 Proposed Budget: $6.1 Billion
22
Subsidy Funding Programs > Transit Operators> Access and Metrolink> 88 cities and
unincorporated areas
Congestion Mgmt> ExpressLanes, Freeway
Service Patrol, Call BoxMetro Operations> Bus and Rail Services as
adjusted by Service Councils and Board
Metro Construction and State of Good Repair> New Transit Projects> Metro State of Good Repair> Highway Projects> Regional Rail Projects
Debt Service> Obligations from current and past projects
General Planning & Programming> Identify regional mobility needs
and solutions
6.3%
27.9%
3.3%
1.6%
24.7%
36.3%
-
High level summary of Budget
3
Program Type ($ in millions) FY17 Budget FY18 Proposed Variance $ Variance %% of Total
FY18 Budget1 Metro Operations 1,607.8$ 1,706.0$ 98.2$ 6.1% 27.9%2 Metro Construction and SGR 2,511.9 2,215.7$ (296.2) ‐11.8% 36.3%3 Subsidy Funding Programs 1,305.1 1,509.9$ 204.9 15.7% 24.7%4 Congestion Management 112.9 97.7$ (15.2) ‐13.5% 1.6%5 General Planning and Programs 170.0 199.1$ 29.1 17.1% 3.3%6 Debt Service 320.1 383.2$ 63.1 19.7% 6.3%7 Grand Total 6,027.8$ 6,111.6$ 83.8$ 1.4% 100.0%
• Targeting a balanced budget for FY18• Net $83.1M increase, at 1.4%, is lower than CPI while absorbing cost increases, new
Measure M initiatives, increased security and state of good repair improvements• Subsidy funding and Planning costs increase due to Measure M• Debt service increase to fund Measure R/Measure M construction projects• Performance Measures to ensure accountability
-
Revenue Assumptions
4
• FY18 sales tax growth increase of 2.8%, total sales tax revenue is estimated at $3.6 billion‒ Includes new funding from Measure M‒ Only 38% or $1.4 billion is eligible for Metro Operations and State
of Good Repair
• Federal CMAQ and State Cap-and-Trade funds continue for Gold Line Foothill Extension 2A and Expo Phase II operations
• Federal Grants and TIFIA loans for Crenshaw/LAX, Regional Connector and Purple Line Extension construction
• CPI of +1.75% based on Beacon Economics forecast
-
FY18 Capital Program
Deliver Transit Expansion Projects and Support State of Good Repair
5
1) Transit Expansion: • Design and construction: Continued progress for Crenshaw/LAX, Regional
Connector & the Westside Subway Purple Line Ext (PLE) Sections 1 and 2; Advancement of PLE Sec 3 for Full Funding Grant Agreement; Airport Metro Connector; Gold Line Foothill Extension 2B.
2) State of Good Repair:• Facility, System and Maintenance of Way: Bus, Blue, Gold, Green, Red & Purple
projects that focus on reliability improvements. Includes rail communications, systems, stations and trackwork.
• Vehicle Maintenance / Acquisitions: New articulated bus and zero emission bus acquisition, bus midlife, engine replacements, continue light rail delivery & heavy rail acquisitions / component / midlife overhauls.
• Technology Improvements: TAP/Bike Share integration, connected buses web infrastructure, tablet POS system, software/hardware refresh, mobile phone validator app.
-
Planning and Engineering
Projects Under Planning/Engineering in FY18
6
TRANSIT> East San Fernando Valley Transit Corridor> South Bay Metro Green Line Extension> West Santa Ana Branch> Eastside Extension Phase II> Crenshaw Northern Extension> Orange Line grade separation operational improvements> Sepulveda Pass Transit Corridor
ACTIVE TRANSPORTATION/JOINT DEVELOPMENT PROJECTS> Bikeshare and Bike program > Parking program> Willowbrook/Rosa Parks Station improvements> Rail to River Active Transportation Corridor
-
Metro Bus and Rail Services
What’s Happening in FY18?
7
BUS No change in overall Revenue Service Hours from the FY17 Budget 7,005,960 Bus Revenue Service Hours scheduled Although there is no increase in Revenue Service hours, service has been
right-sized to increase peak frequencies on priority bus lines, improve efficiency of our Owl Network, maximize the amount of Revenue Service Miles run, and incorporate service support for rail line maintenance and special events
Initiate manufacture and delivery of ten Electric Zero Emission Buses for demonstration on the Orange and Silver lines, as well as initiation of a procurement for additional electric and ultra low emission CNG Buses
-
Subsidy Funding Passed to Cities
About 25% goes to cities to improve transit and mobility (Local Return Money)
8
Public TransitDial-A-RideParatransitShuttle Service
Fare Subsidy ProgramsYouth and Senior Recreational TransitTaxi subsidies
Bus Stop Improvements/MaintenanceBus SheltersSafety ImprovementsTransit Center Parking
Bikeways, Bike trails, lanes, boulevardsBicycle parking and lockersCitywide Bikeshare programs
-
Subsidy Funding Passed to Cities
Many projects are underway by each of the cities to improve transit and mobility
Pedestrian ImprovementsCrosswalk programsTraffic signals near schoolsSafe Routes to school
Street Repair and MaintenanceStreet Lighting ProjectsComplete Streets ProjectsPavement RehabStreetscape Improvements
Traffic Signal Enhancements & InstallationsTraffic Signal SynchronizationBicycle Infrastructure
9
-
Congestion Management
Freeway Operations
10
> ExpressLanes - Toll operations> Caltrans Operations and Maintenance> California Highway Patrol (CHP)> Freeway Service Patrol> Call Box Program> Regional Integration of Intelligent Transportation System
OTHER CORRIDOR FUNDED PROGRAMS> Bus service enhancement (Metro, Foothill Transit, Gardena Transit, Torrance Transit)> ExpressLanes Revenue Reinvestment Grant Program> Marketing and Outreach> Professional services contracts to support existing and evaluate new ExpressLanes
-
• Public comments can also be submitted by mail or email.
• Deadline for written comments is Friday, May 12 at 5pm
• Submit to• [email protected] or • Attn: FY18 Budget
MetroOne Gateway Plaza, 99-24-1Los Angeles, CA 90012
• Public Hearing: Wednesday, May 17 at 1pm• Metro Headquarters Board Room
One Gateway Plaza, Los Angeles CA 90012
Public Engagement in BudgetWe want your input… GET INVOLVED!
11
-
12