Maturation of Processes and Maturity Models. Presenter Name Presentation Date. Capability Maturity Model. Developed in preliminary form by Watts Humphries (published in a book he wrote that appeared in 1989) - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/1.jpg)
MATURATION OF PROCESSES AND
MATURITY MODELSPresenter NamePresentation Date
![Page 2: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/2.jpg)
Capability Maturity Model
• Developed in preliminary form by Watts Humphries (published in a book he wrote that appeared in 1989)
• Refined by the SEI (Software Engineering Institute) , a spin-off of Carnegie Mellon University in Pittsburgh
• Known as the CMM• Discussed in Schwalbe, page 344-347 (approx)
![Page 3: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/3.jpg)
Immature Software Organizations
• Processes are ad hoc, and occasionally chaotic.• Processes are improvised by practitioners ON THE
FLY.• Testing, reviews and walkthroughs usually curtailed
under stress.• Quality is unpredictable.
![Page 4: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/4.jpg)
Immature Software Organizations, Cont’d
• Costs and schedules are usually exceeded.• Reactionary management is usually
firefighting.• Success rides on individual talent and heroic
effort.• Technology benefits are lost in the noise.
![Page 5: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/5.jpg)
Mature Software Organizations• Processes are defined and documented.• Roles and responsibilities are clear.• Product and process are measured.• Processes and projects finish on time and within
budget• Management has time to plan, monitor, and
communicate.
![Page 6: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/6.jpg)
Mature Software Organizations, Cont’d• Quality, costs, and schedules are predictable• Management committed to continuous
improvement.• Technology is used effectively within defined
processes.
![Page 7: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/7.jpg)
Software Process Definition
• Project Planning• Project Management• Software Engineering Procedures• Software standards• Software Quality Evaluation• Software Configuration management
![Page 8: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/8.jpg)
The Five Levels of Software Process Maturity
• INITIAL• REPEATABLE • DEFINED • MANAGED• OPTIMIZING
![Page 9: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/9.jpg)
Five Levels
![Page 10: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/10.jpg)
Initial
• Software processes are ad hoc, even chaotic• The software processes are not defined• Success depends on individual effort• The environment is not stable
![Page 11: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/11.jpg)
Initial, Continued
• The benefits of software engineering practices are undermined
• Planning is nonexistent or ineffective• Process capability is unpredictable because the
software process is constantly changed or modified as the work progresses
![Page 12: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/12.jpg)
Repeatable
• Basic project management policies and procedures are established
• Cost, schedule and functionality (scope) are tracked by module and task
• A process discipline is put in place to repeat earlier successes
• Managing new projects is based on experience with similar projects
![Page 13: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/13.jpg)
Repeatable, Continued
• Basic software management controls are installed• Estimations of cost and time to complete are based
on history for similar projects• Problems are identified and documented• Software requirements are baselined (made tough
to change)
![Page 14: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/14.jpg)
Repeatable, Continued
• Project standards are defined• Project teams work with their customers and
subcontractors to establish stable, managed working environments
• Process is under the control of a project management system that is driven by performance on previous projects
• A project performance database is defined and populated
![Page 15: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/15.jpg)
Defined
• Software processes are documented• Software processes are standardized and integrated
organization-wide• All projects use documented and approved versions
of the organization’s processes of developing and maintaining software
• A Software Engineering Process Group (SEPG) is created to facilitate process definition and improvement efforts
![Page 16: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/16.jpg)
Defined, Continued
• Organization-wide training programs are implemented
• Organization-wide standard software processes can be refined to encompass the unique characteristics of the project
• A peer review process is used to enhance product quality
• Process capability is stable and based on a common understanding of processes, roles, and responsibilities in a defined process
![Page 17: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/17.jpg)
Managed
• Quantitative quality goals are defined• Product quality and productivity are measured and
collected• Both processes and products are quantitatively
understood• Both processes and products are controlled using
detailed measures• A productivity and quality database is defined
![Page 18: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/18.jpg)
Managed, Continued• Projects achieve control by narrowing the
variation in performance to within acceptable boundaries
• Process variation is controlled by use of a strategic business plan that details which product lines to pursue
• Risks associated with moving up the learning curve of a new application domain are known and carefully managed
• Process capability is measured and operating within measurable limits
![Page 19: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/19.jpg)
Optimizing
• Continuous process improvement is enabled by quantitative feedback
• Continuous process improvement is assessed from testing innovative ideas and technologies
• Weak process elements are identified and strengthened
• Defect prevention is explicit
![Page 20: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/20.jpg)
Optimizing, Cont’d
• Statistical evidence is available on process effectiveness
• Innovations that exploit the best software engineering practices are identified
• Improvement occurs from– INCREMENTAL ADVANCEMENTS IN EXISTING PROCESSES– INNOVATIONS USING NEW TECHNOLOGIES AND
METHODS
![Page 21: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/21.jpg)
How are firms doing??
• Many U.S. firms have reached the highest level, OPTIMIZING
• Indian firms may be doing better
![Page 22: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/22.jpg)
Organizational Project Management Maturity Model (OPM3)
1. Ad-Hoc: The project management process is described as disorganized, and occasionally even chaotic. The organization has not defined systems and processes, and project success depends on individual effort. There are chronic cost and schedule problems.
2. Abbreviated: There are some project management processes and systems in place to track cost, schedule, and scope. Project success is largely unpredictable and cost and schedule problems are common.
3. Organized: There are standardized, documented project management processes and systems that are integrated into the rest of the organization. Project success is more predictable, and cost and schedule performance is improved.
4. Managed: Management collects and uses detailed measures of the effectiveness of project management. Project success is more uniform, and cost and schedule performance conforms to plan.
5. Adaptive: Feedback from the project management process and from piloting innovative ideas and technologies enables continuous improvement. Project success is the norm, and cost and schedule performance is continuously
improving.
![Page 23: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/23.jpg)
Enter CMMI: Capability Maturity Model Integration• In 2007, the SEI asserted that it would no
longer support the old SW-CMM.• On Dec 31, 2007 all SW-CMM appraisal
results were expired• The purpose of the CMMI was to focus
process maturity more towards project performance
• Organizations must now upgrade to the CMMI
• The CMMI is vastly improved over the CMM Emphasis is on business needs, integration and
institutionalization
![Page 24: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/24.jpg)
Slide 24 of 146
CMMI Staged Representation - 5 Maturity Levels
Level 5
Initial
Level 1
Processes are unpredictable, poorly controlled, reactive.
Managed
Level 2
Processes are planned, documented, performed, monitored, and controlled at the project level. Often reactive.
Defined
Level 3 Processes are well characterized and understood. Processes, standards, procedures, tools, etc. are defined at the organizational (Organization X ) level. Proactive.
Quantitatively Managed
Level 4
Processes are controlled using statistical and other quantitative techniques.
Optimizing
Proce
ss
Mat
urity
Process performance continually improved through incremental and innovative technological improvements.
![Page 25: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/25.jpg)
CMMI Origins• The CMMI was derived from the
1. SW-CMM—capability maturity model for software2. EIA/IS – electronic Industries Alliance Interim
Standard3. IPD-CMM—Capability Maturity Model for
Integrated Product Development
1.CMMI architecture is open and designed to accommodate additional disciplines, like1. CMMI-DEV – processes for development2. CMMI-ACQ—processes required for supplier
sourcing3. CMMI-SVC—processes required for services
![Page 26: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/26.jpg)
CMMI: cap mat model integration• Level 0: Incomplete• No goal.• Level 1: Performed• The process supports and enables achievement of the specific goals of
the process area by transforming identifiable input work products to produce identifiable output work products.
• Level 2: Managed• The process is institutionalized as a managed process.• Level 3: Defined• The process is institutionalized as a defined process.• Level 4: Quantitatively Managed• The process is institutionalized as a quantitatively managed process.• Level 5: Optimizing• The process is institutionalized as an optimizing process.
![Page 27: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/27.jpg)
Use of this tool has shown…
• The Engineering and Construction Industries have a higher level of maturity than do the information systems and software development disciplines
![Page 28: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/28.jpg)
New Employee Orientation
• Getting to know your new assignment• Familiarizing yourself with your new
environment• Meeting new colleagues
![Page 29: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/29.jpg)
New Work
![Page 30: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/30.jpg)
New Environment
![Page 31: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/31.jpg)
New Colleagues
![Page 32: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/32.jpg)
Welcome
![Page 33: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/33.jpg)
• Familiarize yourself with your new assignment1
• Explore your new environment2
• Meet your new colleagues3
Today’s Overview
![Page 34: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/34.jpg)
Learning Objectives
• Technology • Procedure• Policies• Benefits
![Page 35: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/35.jpg)
NEW WORK
![Page 36: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/36.jpg)
New WorkThe technology learning curve
New Em-
ployee
1 yr 2 yr 3 yr
![Page 37: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/37.jpg)
Who’s Who
Lead Contact informationJim [email protected]
Mavis [email protected]
Doug [email protected]
![Page 38: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/38.jpg)
Time Spent
Proj
ects
Wor
ked
On
Get Familiar
Achieve Mastery
Working Toward Mastery
Get Experience
d
![Page 39: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/39.jpg)
Doing Your Best Work
• Working from home• Working offsite• Technology
requirements
![Page 40: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/40.jpg)
Case Study
• Jeremy– His first day– Mistakes made– Successes achieved– The moral of the story
![Page 41: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/41.jpg)
Discussion
• What we can learn from Jeremy
• Best practices• Take-aways
![Page 42: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/42.jpg)
Summary
• Define your challenges– Technological as well as personal
• Set realistic expectation– Mastery is not achieved overnight
• Keep your eye on the goal– Mentorship programs
![Page 43: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/43.jpg)
Resources
• <Intranet site text here><hyperlink here>
• <Additional reading material text here><hyperlink here>
• This slide deck and related resources:<hyperlink here>
![Page 44: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/44.jpg)
QUESTIONS?
![Page 45: Maturation of Processes and Maturity Models](https://reader030.vdocuments.us/reader030/viewer/2022020721/56813a06550346895da1d0b0/html5/thumbnails/45.jpg)
APPENDIX