    Small Project Alliance forexecution of projects

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    2/20

    Purpose of Presentation

    To introduce the Small Project Alliance for execution of projects

    Vision

    DefinitionStrategic objectives

    Strategic roadmap

    Small Project Alliance key drivers

    Overall project development & implementation diagramSimilarities & differences

    Generic roles and responsibilities

    How will we manage accountability

    Procurement

    Bidding ProcessEstimating

    Planning & Scheduling

    Cost Reporting

    Invoicing

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    3/20

    Vision

    To be an indispensable and trusted partner in the development andexecution of Sasol Projects

    This will be attained through

    Responsiveness;

    Availability;

    Flexibility;

    Service Efficiency (cost, schedule, quality and safety); and

    Seamless integration of our service delivery, work methodssystems and procedures with that of all stakeholders.

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    4/20

    Definition of a Small Project

    Not new technology

    Not complex (not more than two process steps)

    Not Sasol core technology

    No licensor or proprietary equipment involved

    Low technical risk & low business risk

    SHE/EIA under existing approvals/agreements

    Cost Guideline < R20 million Capex

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    5/20

    Strategic Objectives

    Total alignment with all Sasol Technology StakeholdersImplementation of elegant, Fit for Purpose work methods &

    procedures (realising the benefits of low hanging fruit)

    Quick turnaround on project development & implementation

    Containing cost of services below 20%

    Leveraging Sasol Technologys resources on low risk projects

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    6/20

    Strategic Roadmap

    Define the rules of the game and get buy in on theoperating model

    Facilitation through learning curves

    Internal (Sasol Technology) Change ManagementPerformance metrics & control by Alliance SteeringCommittee(s)

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    7/20

    Small Projects Alliance Key Drivers

    Establish clear focus on Client objectives

    Maximise use of Alliance partners resources

    Reduce workload of Sasol Technologys resources

    Strive for continuous alliance improvement in the SPAexecution system and procedures

    Develop trusting relationships between the alliance, itsClients and Sasol Technologys services

    All transactions take place in an environment of trust,openness and mutual respect

    Responsiveness

    Availability

    Flexibility

    Service Efficiency

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    8/20

    OVERALL PROJECT DEVELOPMENT &IMPLEMENTATION DIAGRAM

    (QUALITY MANAGEMENT PLAN)

    Discipline Eng. Work

    Procedures

    Engineering RequirementsInterference RequirementsDeviation ManagementMaster Documentation &ChecklistsEnd of Job Docs requirements

    Operations ProfitabilityImprovement (OPI) WorkManual

    Prelim Process ProposaloPFD & MFD requirements

    Hazop Studies & Safety FileBasic Economic EvaluationOpportunity DefinitionConceptual ProposalScope of Work definition & doc.

    oEng. SpecificationsoBasic EngineeringPackage (BEP)

    Technical Integrity

    Start-up assistanceEvaluation and handover

    Project Management Procedures

    & Master Docs/Checklists

    Info & Kick-off reqmentsValue Improvement Practices (VIPs)HazopsConstructability ReviewsGate Readiness Review (GRR)Project Execution Plan (PEP)

    Ready for Construction (RFC),Ready for Operation (RFO) etc.

    Cost EngineeringWork Procedures & Master Docs

    Estimating

    Cost ControloControl BaseoVariationsoCost Flow

    oClose-out & capitalizationProject Execution Planning

    Procurement & SupplyManagement Procedures

    Procurement of GoodsProcurement of ServicesSurplus MaterialsMaster Documents

    oApproved Vendors

    oChange ManagementoOrder Authorization

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    9/20

    Similarities & Differences between the normal way of doing projects and the

    Small Project Alliance way of doing projects

    More interfaces

    Sastech Proper

    Owner

    Project

    ManagementTeam:

    Sasol Technology

    ProjectExecution

    EPC, EPCM

    Construction

    Owner

    Small Projects

    SPA

    - Front End Loading (FEL)

    - Operations Profitability Improvement (OPI)

    - Engineering (Eng)

    - Engineering Procurement ConstructionMngt (EPCM)

    - Construction Contractor

    SastechFunctional

    Governance

    EM(Engineering

    Mngt)

    CE(Cost

    Engineering)

    Eng(Engineering)

    P&SM(Procurement

    & SupplyMngt)

    LegalSHER

    OPI(OperationsProfitability

    Improvement)

    Less interfaces

    The same

    Sastech ExecutionGroup

    SastechExecution Group

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    10/20

    GENERIC ROLES AND RESPONSIBILITIES

    FRONT END LOADING EXECUTION

    ENG

    R/A

    R/A

    A/C

    A/I

    SPA

    C/I

    C/I

    R/I

    R/C

    Detail Engineering & Procurement

    Construction & CommissioningAssistance

    Process Intent/Engineering Intent

    Communication Gateway (Partner)

    Project Management, Engineering

    Formal Project Actions (e.g

    Hazops, VIPs, RFC, RFO)

    ENG

    C

    C

    R/A

    R/A

    C/I

    C/I

    SPA

    R/A

    R/A

    C/I

    C/I

    R/A

    R/A

    Concept Development

    Basic Engineering (BE)

    - BEP sub-contracted to SPA

    PM/Engineering/Construction

    input (including Hazops, Area

    Classification, VIPs, EIA)

    R: Responsible C: To be ConsultedA: Accountable I: To be Informed

    ENG = Operations Profitability Improvement/Hub/Process,Mechanical, Civil, Instrumental & Electrical Engineering

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    11/20

    How will we manage the Accountability

    SPA TEAM

    Schedule DOWNCost DOWNQuality UP

    Apply Scope Definition

    Follow interfaceprocedures

    Integrate QualityManagement Systemsin all SPAs

    Ensure alignmentwith Clients and Sasol

    Technology

    Good Scope Definition

    Reduce turnaround

    times by integrating

    approvals

    Conduct Scope +Resources Analysis

    Plan resources

    Apply Fit forpurpose systematicprocedures

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    12/20

    Procurement

    Bidders List

    Alignment between Sasol Technology & Alliance

    Contractors bidders list

    Continuous evaluation of bidders on the list

    Bidding Process

    The SPA team decide on the required shortlist of a specificdiscipline

    Determine the nature of the scope

    Schedule of ratesProvisional quantities with rates

    Measured Bill of Quantities

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    13/20

    Bidding Process (continued)

    Finalise the RFQ Documentation

    Commercial Terms

    Specs & Standards

    Scope Description

    Bill of Quantities

    Preambles

    Invite Bids

    Bids must be sealed & addressed to the SPA Team

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    14/20

    Bidding Process (continued)

    Tender Opening

    Tenders to be opened by the delegated Small Project

    Alliance (SPA) representative in the presence of theProcurement &Supply Management (P&SM)representative and client

    Bid adjudication

    The relevant SPA Team with the assistance of CostEngineering will adjudicate the bids

    The SPA team including the relevant P&SM

    representative & client will appoint selected bidder

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    15/20

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    16/20

    Planning & Scheduling

    Alliance Partner

    Provide a detailed schedule for each project (The type ofProject will determine the level of detail)

    Maintain the detailed schedule throughout the project

    Cost Engineering Sasol TechnologyCoordination function

    Ensure that all schedules are maintained andcommunicated to the relevant parties

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    17/20

    Cost Reporting

    Alliance Partner

    Detail information regarding financial movements during

    reporting period to be forwarded to the C.E representativeon the SPA Team

    VPs Approved

    PVPs raised

    Site Instructions

    Change Orders

    Purchase orders placed

    Letters of intent issued

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    18/20

    Cost Reporting (Continued)

    Cost Engineering Sasol Technology

    Typical information to be transferred to Alliance Partner

    All SAP transactions processed during reportingperiod

    All Sasol Technology man-hours expended duringreporting period

    Cost Report Approval

    The cost report will be represented to the weekly teammeeting for approval before it is represented to the client

    and signed by Sasol Technology

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    19/20

    Invoicing

    SPA Management Team

    The relevant member will submit their invoice, withapproved back-up, on agreed dates to the CE Sasol

    Technology for verification

    Verified invoices will be tabled for approval by the relevant

    SPA Team

    The responsible Sasol Technology Officials will do the

    required entries into the SAP system to ensure timeous

    payment

  • 8/14/2019 Mattheys-K-Small project alliance.pdf

    20/20

    Small Project Alliance forexecution of projects