Purpose of Presentation
To introduce the Small Project Alliance for execution of projects
Vision
DefinitionStrategic objectives
Strategic roadmap
Small Project Alliance key drivers
Overall project development & implementation diagramSimilarities & differences
Generic roles and responsibilities
How will we manage accountability
Procurement
Bidding ProcessEstimating
Planning & Scheduling
Cost Reporting
Invoicing
-
8/14/2019 Mattheys-K-Small project alliance.pdf
3/20
Vision
To be an indispensable and trusted partner in the development andexecution of Sasol Projects
This will be attained through
Responsiveness;
Availability;
Flexibility;
Service Efficiency (cost, schedule, quality and safety); and
Seamless integration of our service delivery, work methodssystems and procedures with that of all stakeholders.
-
8/14/2019 Mattheys-K-Small project alliance.pdf
4/20
Definition of a Small Project
Not new technology
Not complex (not more than two process steps)
Not Sasol core technology
No licensor or proprietary equipment involved
Low technical risk & low business risk
SHE/EIA under existing approvals/agreements
Cost Guideline < R20 million Capex
-
8/14/2019 Mattheys-K-Small project alliance.pdf
5/20
Strategic Objectives
Total alignment with all Sasol Technology StakeholdersImplementation of elegant, Fit for Purpose work methods &
procedures (realising the benefits of low hanging fruit)
Quick turnaround on project development & implementation
Containing cost of services below 20%
Leveraging Sasol Technologys resources on low risk projects
-
8/14/2019 Mattheys-K-Small project alliance.pdf
6/20
Strategic Roadmap
Define the rules of the game and get buy in on theoperating model
Facilitation through learning curves
Internal (Sasol Technology) Change ManagementPerformance metrics & control by Alliance SteeringCommittee(s)
-
8/14/2019 Mattheys-K-Small project alliance.pdf
7/20
Small Projects Alliance Key Drivers
Establish clear focus on Client objectives
Maximise use of Alliance partners resources
Reduce workload of Sasol Technologys resources
Strive for continuous alliance improvement in the SPAexecution system and procedures
Develop trusting relationships between the alliance, itsClients and Sasol Technologys services
All transactions take place in an environment of trust,openness and mutual respect
Responsiveness
Availability
Flexibility
Service Efficiency
-
8/14/2019 Mattheys-K-Small project alliance.pdf
8/20
OVERALL PROJECT DEVELOPMENT &IMPLEMENTATION DIAGRAM
(QUALITY MANAGEMENT PLAN)
Discipline Eng. Work
Procedures
Engineering RequirementsInterference RequirementsDeviation ManagementMaster Documentation &ChecklistsEnd of Job Docs requirements
Operations ProfitabilityImprovement (OPI) WorkManual
Prelim Process ProposaloPFD & MFD requirements
Hazop Studies & Safety FileBasic Economic EvaluationOpportunity DefinitionConceptual ProposalScope of Work definition & doc.
oEng. SpecificationsoBasic EngineeringPackage (BEP)
Technical Integrity
Start-up assistanceEvaluation and handover
Project Management Procedures
& Master Docs/Checklists
Info & Kick-off reqmentsValue Improvement Practices (VIPs)HazopsConstructability ReviewsGate Readiness Review (GRR)Project Execution Plan (PEP)
Ready for Construction (RFC),Ready for Operation (RFO) etc.
Cost EngineeringWork Procedures & Master Docs
Estimating
Cost ControloControl BaseoVariationsoCost Flow
oClose-out & capitalizationProject Execution Planning
Procurement & SupplyManagement Procedures
Procurement of GoodsProcurement of ServicesSurplus MaterialsMaster Documents
oApproved Vendors
oChange ManagementoOrder Authorization
-
8/14/2019 Mattheys-K-Small project alliance.pdf
9/20
Similarities & Differences between the normal way of doing projects and the
Small Project Alliance way of doing projects
More interfaces
Sastech Proper
Owner
Project
ManagementTeam:
Sasol Technology
ProjectExecution
EPC, EPCM
Construction
Owner
Small Projects
SPA
- Front End Loading (FEL)
- Operations Profitability Improvement (OPI)
- Engineering (Eng)
- Engineering Procurement ConstructionMngt (EPCM)
- Construction Contractor
SastechFunctional
Governance
EM(Engineering
Mngt)
CE(Cost
Engineering)
Eng(Engineering)
P&SM(Procurement
& SupplyMngt)
LegalSHER
OPI(OperationsProfitability
Improvement)
Less interfaces
The same
Sastech ExecutionGroup
SastechExecution Group
-
8/14/2019 Mattheys-K-Small project alliance.pdf
10/20
GENERIC ROLES AND RESPONSIBILITIES
FRONT END LOADING EXECUTION
ENG
R/A
R/A
A/C
A/I
SPA
C/I
C/I
R/I
R/C
Detail Engineering & Procurement
Construction & CommissioningAssistance
Process Intent/Engineering Intent
Communication Gateway (Partner)
Project Management, Engineering
Formal Project Actions (e.g
Hazops, VIPs, RFC, RFO)
ENG
C
C
R/A
R/A
C/I
C/I
SPA
R/A
R/A
C/I
C/I
R/A
R/A
Concept Development
Basic Engineering (BE)
- BEP sub-contracted to SPA
PM/Engineering/Construction
input (including Hazops, Area
Classification, VIPs, EIA)
R: Responsible C: To be ConsultedA: Accountable I: To be Informed
ENG = Operations Profitability Improvement/Hub/Process,Mechanical, Civil, Instrumental & Electrical Engineering
-
8/14/2019 Mattheys-K-Small project alliance.pdf
11/20
How will we manage the Accountability
SPA TEAM
Schedule DOWNCost DOWNQuality UP
Apply Scope Definition
Follow interfaceprocedures
Integrate QualityManagement Systemsin all SPAs
Ensure alignmentwith Clients and Sasol
Technology
Good Scope Definition
Reduce turnaround
times by integrating
approvals
Conduct Scope +Resources Analysis
Plan resources
Apply Fit forpurpose systematicprocedures
-
8/14/2019 Mattheys-K-Small project alliance.pdf
12/20
Procurement
Bidders List
Alignment between Sasol Technology & Alliance
Contractors bidders list
Continuous evaluation of bidders on the list
Bidding Process
The SPA team decide on the required shortlist of a specificdiscipline
Determine the nature of the scope
Schedule of ratesProvisional quantities with rates
Measured Bill of Quantities
-
8/14/2019 Mattheys-K-Small project alliance.pdf
13/20
Bidding Process (continued)
Finalise the RFQ Documentation
Commercial Terms
Specs & Standards
Scope Description
Bill of Quantities
Preambles
Invite Bids
Bids must be sealed & addressed to the SPA Team
-
8/14/2019 Mattheys-K-Small project alliance.pdf
14/20
Bidding Process (continued)
Tender Opening
Tenders to be opened by the delegated Small Project
Alliance (SPA) representative in the presence of theProcurement &Supply Management (P&SM)representative and client
Bid adjudication
The relevant SPA Team with the assistance of CostEngineering will adjudicate the bids
The SPA team including the relevant P&SM
representative & client will appoint selected bidder
-
8/14/2019 Mattheys-K-Small project alliance.pdf
15/20
-
8/14/2019 Mattheys-K-Small project alliance.pdf
16/20
Planning & Scheduling
Alliance Partner
Provide a detailed schedule for each project (The type ofProject will determine the level of detail)
Maintain the detailed schedule throughout the project
Cost Engineering Sasol TechnologyCoordination function
Ensure that all schedules are maintained andcommunicated to the relevant parties
-
8/14/2019 Mattheys-K-Small project alliance.pdf
17/20
Cost Reporting
Alliance Partner
Detail information regarding financial movements during
reporting period to be forwarded to the C.E representativeon the SPA Team
VPs Approved
PVPs raised
Site Instructions
Change Orders
Purchase orders placed
Letters of intent issued
-
8/14/2019 Mattheys-K-Small project alliance.pdf
18/20
Cost Reporting (Continued)
Cost Engineering Sasol Technology
Typical information to be transferred to Alliance Partner
All SAP transactions processed during reportingperiod
All Sasol Technology man-hours expended duringreporting period
Cost Report Approval
The cost report will be represented to the weekly teammeeting for approval before it is represented to the client
and signed by Sasol Technology
-
8/14/2019 Mattheys-K-Small project alliance.pdf
19/20
Invoicing
SPA Management Team
The relevant member will submit their invoice, withapproved back-up, on agreed dates to the CE Sasol
Technology for verification
Verified invoices will be tabled for approval by the relevant
SPA Team
The responsible Sasol Technology Officials will do the
required entries into the SAP system to ensure timeous
payment
-