    Mastering Solar Planning & Permits

    City of San DiegoCounty of San Diego

    October 18, 2011

  • 8/12/2019 mastering solar planning permits presentation

    2/313

    www.e e ce te .o

    2www.energycenter.org

    California Center for Sustainable EnergyVision:

    To create a sustainable energy future.Mission:

    To foster public policies and provideprograms, services, information and forums

    that facilitate the adoption of clean, reliable,renewable, sustainable and efficient energytechnologies and practices.

  • 8/12/2019 mastering solar planning permits presentation

    3/313

    3www.energycenter.org

    CCSE Programs

    California Solar Initiative

    Multi-Family Affordable Solar

    Housing Project Solar Water Heating Program

    Clean Vehicle Rebate Project

    Energy Upgrade California

    CCSE operates in five focus areas: energy efficiency,renewable energy, climate change, transportation andgreen building.

    Self-Generation Incentive Program(Wind and Fuel Cells)

    Energy Advisory Services Urban Forestry Advisory Services Energy Resource Center

  • 8/12/2019 mastering solar planning permits presentation

    4/313

    4www.energycenter.org

    CCSE Services Workshops and Events Tool Lending & Resource Library Expanded Display Space Energy Advisory Services Technical Assistance Vendor Database Green Career Network

  • 8/12/2019 mastering solar planning permits presentation

    5/313

    5www.energycenter.org

    Upcoming Events

    Oct 20 CSI Thermal Contractor and Self-Install Training

    Oct 26 Skips Tips Advanced Solar Thermal Workshop

    Nov 1 Energy Upgrade California Orientation Workshop

    Nov 15 Passing the CSI Inspection Protocol

  • 8/12/2019 mastering solar planning permits presentation

    6/313

    6www.energycenter.org

    CCSE Housekeeping

    Please sign in Turn off your cell phones Refreshments Recycle and compost Restrooms down the hall Fill out your Evaluation Forms

    Tell people about CCSE! Presentation will be available online atwww.energycenter.org/csi-presentations

  • 8/12/2019 mastering solar planning permits presentation

    7/313

    Mastering Solar Planning &Permits

    Among the things that make an installation easier,is a better understanding of municipal processes,

    permitting and issues related to safety.

    Installing a solar PV system in San Diego?

  • 8/12/2019 mastering solar planning permits presentation

    8/313

    Introduction-

    Patrick HealyChief EPM Inspector*DPLU, Building div. - County of San Diego

    19 years experience combination inspector County of San Diego 7 years as Electrical Specialist County of San Diego Past President - So Cal Chapter, International Association of Electrical

    Inspectors Past President - International Code Council, San Diego Area Chapter Code Advisory Committee - CBSC

  • 8/12/2019 mastering solar planning permits presentation

    9/313

    Marisa SmithPlanner 1DPLU Planning div. - County of San Diego

  • 8/12/2019 mastering solar planning permits presentation

    10/313

    Agenda Trends in Solar Permits Personal History with Solar in SD County Agencies involved in solar regulations Codes Applicable to Solar State Code Process Local Ordinances Local Interpretation Local Policies Standards applicable to Solar Equipment Plan Submittal Requirements and Permitting Documentation and County Handouts Plan Submittal requirements and Process Most common solar systems

    Plan technical basics

    Common plan errors Commercial project requirements Q/A

  • 8/12/2019 mastering solar planning permits presentation

    11/313

  • 8/12/2019 mastering solar planning permits presentation

    12/313

  • 8/12/2019 mastering solar planning permits presentation

    13/313

  • 8/12/2019 mastering solar planning permits presentation

    14/313

  • 8/12/2019 mastering solar planning permits presentation

    15/313

  • 8/12/2019 mastering solar planning permits presentation

    16/313

  • 8/12/2019 mastering solar planning permits presentation

    17/313

    Practical?

  • 8/12/2019 mastering solar planning permits presentation

    18/313

    Practical? Depends

  • 8/12/2019 mastering solar planning permits presentation

    19/313

    Coastal areas ?

    Dont see as much solar oncoast?

    Is Fog and Clouds theDetermining Factor, or is it

    the lower HVAC costs inthe coastal area?

  • 8/12/2019 mastering solar planning permits presentation

    20/313

  • 8/12/2019 mastering solar planning permits presentation

    21/313

    5 Acres?

  • 8/12/2019 mastering solar planning permits presentation

    22/313

    5 Acres?300 Acre Project coming to SD County

  • 8/12/2019 mastering solar planning permits presentation

    23/313

    5 Acres?300 Acre Project coming to SD County6000 Acre Project coming to Central CA 540 MW

  • 8/12/2019 mastering solar planning permits presentation

    24/313

    FRANCE

  • 8/12/2019 mastering solar planning permits presentation

    25/313

    FRANCE - Mountains

  • 8/12/2019 mastering solar planning permits presentation

    26/313

  • 8/12/2019 mastering solar planning permits presentation

    27/313

  • 8/12/2019 mastering solar planning permits presentation

    28/313

  • 8/12/2019 mastering solar planning permits presentation

    29/313

    Whats with all the interest in solar?

  • 8/12/2019 mastering solar planning permits presentation

    30/313

    "Comparing finite and rene wable planetary energy reserves

    (Terawatt-years). Total rec overable reserves are shown forhe finite resources. Yearly potential is shown for the

    renewables." (source: Pere z & Perez, 2009a)

    "Comparing finite and renewable planetary energy reserves(Terawatt -years). Total recoverable reserves are shown for thefinite resources. Yearly potential is shown for the renewables."(*source: Perez & Perez, 2009) *

    http://c1.cleantechnica.com/files/2011/08/energy-resources-renewables-fossil-fuel-uranium.pnghttp://c1.cleantechnica.com/files/2011/08/energy-resources-renewables-fossil-fuel-uranium.pnghttp://c1.cleantechnica.com/files/2011/08/energy-resources-renewables-fossil-fuel-uranium.pnghttp://c1.cleantechnica.com/files/2011/08/energy-resources-renewables-fossil-fuel-uranium.pnghttp://c1.cleantechnica.com/files/2011/08/energy-resources-renewables-fossil-fuel-uranium.pnghttp://c1.cleantechnica.com/files/2011/08/energy-resources-renewables-fossil-fuel-uranium.png
  • 8/12/2019 mastering solar planning permits presentation

    31/313

  • 8/12/2019 mastering solar planning permits presentation

    32/313

    Once you know the size of the reserves it easy tosee the number of years those reserves wouldlast. At the end of 2009 the estimates were

    Oil: 46 years (depleted in 2055)

    Natural gas: 63 years (depleted in 2072)

    Coal: 119 years (depleted in 2128)

  • 8/12/2019 mastering solar planning permits presentation

    33/313

    Total Solar Irradiance upon Earthwas measured by satellite to be

    roughly 1.361 Kilowatts per

    square meter1 MW of PV generates 1,500,000 kWh per year

  • 8/12/2019 mastering solar planning permits presentation

    34/313

  • 8/12/2019 mastering solar planning permits presentation

    35/313

    Other Factors

    Incentives - The federal and state financialincentives have undoubtedly fueled the rise in the

    solar industry and the economy

    Interest - People just like solar and being involved indoing something good for the environment

  • 8/12/2019 mastering solar planning permits presentation

    36/313

    Trends in Solar

  • 8/12/2019 mastering solar planning permits presentation

    37/313

  • 8/12/2019 mastering solar planning permits presentation

    38/313

    After standing at 17 gigawatts in July 2011, the US non-residential pipeline increased to 24 GW by September 2011

    California currently accounts for 61% of the total US project pipeline*New Projects in California, Some in SD County

  • 8/12/2019 mastering solar planning permits presentation

    39/313

    After standing at 17 gigawatts in July 2011, the US non-residentialpipeline increased to 24 GW by September 2011

    California currently accounts for 61% of the total US project pipelineUtility-driven activity is now evident across 35 states *

  • 8/12/2019 mastering solar planning permits presentation

    40/313

  • 8/12/2019 mastering solar planning permits presentation

    41/313

    Personal Experience with Solar

    Past 7 years as the County Electrical Specialist

    First year about 3 -5 permits a week Currently an average of about 10- 15 a Day Recent Surge in Commercial Recent Interest in Solar Farms and Utility Grade Plants

    Solar Photovoltaic Permits Issued

  • 8/12/2019 mastering solar planning permits presentation

    42/313

    131 167 169219

    279

    382

    433

    954

    981

    1336

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    (Includes: Groun d-Mount PV, Roof-Mount PV, & Solar Water Heaters) (Current FY Annualized)

  • 8/12/2019 mastering solar planning permits presentation

    43/313

    ACTUALSSOLAR PV RESIDENTIALPERMITS ISSUED 952

    TOTAL RENEWABLE ENERGY PERMITS 981TOTAL FEE'S WAIVED $322,401

    RENEWABLE ENERGY CAPACITY AND GENERATION: AMOUNT OF PV GENERATING CAPACITY INSTALLED (MW) 5.44

    EMISSIONS REDUCTIONS (TONS) (CO2 EQUIVALENTS) IN CARBON:

    PHOTOVOLTAIC 6029.035

    TOTAL 6086.886

    Renewable Energy Permits FY 10/11

  • 8/12/2019 mastering solar planning permits presentation

    44/313

    ACTUAL PROJECTIONRESIDENTIAL SOLAR PV PERMITS 330 1320

    TOTAL FEE'S WAIVED $112,211 $448,844

    AMOUNT OF PV GENERATING CAPACITY INSTALLED 1.7885 7.15400

    :EMISSIONS REDUCTION (TONS) (CO2 EQUIVALENTS) IN CARBON 1982.105 7928.421

    Renewable Energy Permits FY 11/12

  • 8/12/2019 mastering solar planning permits presentation

    45/313

  • 8/12/2019 mastering solar planning permits presentation

    46/313

  • 8/12/2019 mastering solar planning permits presentation

    47/313

    http://c1.cleantechnica.com/files/2011/08/solar-pv-cost-trend.png
  • 8/12/2019 mastering solar planning permits presentation

    48/313

    http://c1.cleantechnica.com/files/2011/08/solar-pv-cost-trend.pnghttp://c1.cleantechnica.com/files/2011/08/solar-pv-cost-trend.png
  • 8/12/2019 mastering solar planning permits presentation

    49/313

    Though State and Federal Incentives have decreased,so have the costs of Solar Modules*

    http://c1.cleantechnica.com/files/2011/08/solar-pv-cost-trend.png
  • 8/12/2019 mastering solar planning permits presentation

    50/313

    New Technologies in Solar productsSolar Sand

    Thin Film

    Organic Modules

    Concentrating PanelsCopper, Indium, Gallium, Selenide (CIGS Panels)

    Many, many others

  • 8/12/2019 mastering solar planning permits presentation

    51/313

  • 8/12/2019 mastering solar planning permits presentation

    52/313

    What Do Building Departments Do and

    What Rules and Codes Do They Apply

    Lets take a look

  • 8/12/2019 mastering solar planning permits presentation

    53/313

    Promote safe and sanitarybuildings, utilities, and

    structures, and regulatetheir use in a manner thatbest serves the individual,the environment and the

    community

  • 8/12/2019 mastering solar planning permits presentation

    54/313

    NFPA in response to GM:In the effort to rapidly change the country to Green technologies, the

    last thing we need is for Building Codes and the Local BuildingDepartment to become obstructionists to the change.

  • 8/12/2019 mastering solar planning permits presentation

    55/313

    While Building Department personnel have a duty to stay in touch with thelatest trends and technologies, codes may not entirely keep up with these

    quickly evolving renewable industries.It is sometimes necessary to use education, experience, and expertise in

    interpreting the purpose and intent of these codes

    Our primary responsibility is the health, safety, and well being of the residentsof our communities.

    *

  • 8/12/2019 mastering solar planning permits presentation

    56/313

    Personal History with Solar

    25 years ago in Julian I saw my first solarsystem.

    Stand alone with Batteries 150K

    Lost in Cedar Fire Rebuilt - w/solar

  • 8/12/2019 mastering solar planning permits presentation

    57/313

    Types of Solar Permits

    Residential Roof Mount Residential Ground Mount

    Commercial Roof Mount Commercial Ground Mount Agricultural Solar Farm/Utility Grade Solar Plant, Off-Site

    Permit Fees within the County of

  • 8/12/2019 mastering solar planning permits presentation

    58/313

    Permit Fees within the County ofSan Diego

    Residential Roof Mount - Residential Ground Mount - Commercial Roof Mount - Commercial Ground Mount - Agricultural -

    Solar Farm/Utility Grade Solar Plant -

    Permit Fees within the County of

  • 8/12/2019 mastering solar planning permits presentation

    59/313

    Permit Fees within the County ofSan Diego

    Residential Roof Mount - $0 Residential Ground Mount - Commercial Roof Mount - Commercial Ground Mount - Agricultural -

    Solar Farm/Utility Grade Solar Plant -

    Permit Fees within the County of

  • 8/12/2019 mastering solar planning permits presentation

    60/313

    Permit Fees within the County ofSan Diego

    Residential Roof Mount - $0 Residential Ground Mount - $0 (could be fees charged by DEH and DPW) Commercial Roof Mount - Commercial Ground Mount - Agricultural -

    Solar Farm/Utility Grade Solar Plant -

    Permit Fees within the County of

  • 8/12/2019 mastering solar planning permits presentation

    61/313

    Permit Fees within the County ofSan Diego

    Residential Roof Mount - $0 Residential Ground Mount - $0 (could be fees charged by DEH and DPW) Commercial Roof Mount - Based on Size/ Percentage of Valuation Commercial Ground Mount - Based on Size/ Percentage of Valuation Agricultural - Based on Size/ Percentage of Valuation

    Solar Farm/Utility Grade Solar Plant -

    Permit Fees within the County of

  • 8/12/2019 mastering solar planning permits presentation

    62/313

    Permit Fees within the County ofSan Diego

    Residential Roof Mount - $0 Residential Ground Mount - $0 (could be fees charged by DEH and DPW) Commercial Roof Mount - Based on Size/ Percentage of Valuation Commercial Ground Mount - Based on Size/ Percentage of Valuation Agricultural - Based on Size/ Percentage of Valuation

    Solar Farm/Utility Grade Solar Plant - Based on Size/ Percentage of Valuation,&/or the cost of providing the services

  • 8/12/2019 mastering solar planning permits presentation

    63/313

    Fees for Residential Solar permits are Waived under The County of San DiegosGreen Building Program and Homeowners Relief Act.

    These programs were created by the County Board of Supervisors to AidHomeowners, and Promote the Use of Green Technology.

    Additional Funding Provided by the Federal,American Reinvestment and Recovery Act,

    Providing Grants to Local Government

    GOVERNMENTAL REGULATORY AGENCIES &

  • 8/12/2019 mastering solar planning permits presentation

    64/313

    GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES

    OVERSEEING SOLAR INSTALLATIONS State of CA,Local Bldg DeptLocal Planning and Zoning

    Local Fire DeptLocal Health DeptLocal Public Works Dept Area-wide Policies and Interpretation Authorities such as the local ICC ChapterPUC, CECOTHER AGENCIES

    GOVERNMENTAL REGULATORY AGENCIES &

  • 8/12/2019 mastering solar planning permits presentation

    65/313

    GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES

    GOVERNMENTAL:State of CA -

    GOVERNMENTAL REGULATORY AGENCIES &

  • 8/12/2019 mastering solar planning permits presentation

    66/313

    GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES

    State of CA Adopts the State Building Codes

  • 8/12/2019 mastering solar planning permits presentation

    67/313

  • 8/12/2019 mastering solar planning permits presentation

    68/313

  • 8/12/2019 mastering solar planning permits presentation

    69/313

  • 8/12/2019 mastering solar planning permits presentation

    70/313

  • 8/12/2019 mastering solar planning permits presentation

    71/313

  • 8/12/2019 mastering solar planning permits presentation

    72/313

  • 8/12/2019 mastering solar planning permits presentation

    73/313

    GOVERNMENTAL REGULATORY AGENCIES &

  • 8/12/2019 mastering solar planning permits presentation

    74/313

    GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES

    State of CA

    GOVERNMENTAL REGULATORY AGENCIES &

  • 8/12/2019 mastering solar planning permits presentation

    75/313

    GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES

    GOVERNMENTAL:State of CA Adopts the State Building Codes. State Agencies California Building StandardsCommission (CBSC) - Ca Fire Marshal, HCD, Others. All have an impact on whatgoes into the CA Codes.

    GOVERNMENTAL REGULATORY AGENCIES &

  • 8/12/2019 mastering solar planning permits presentation

    76/313

    GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES

    GOVERNMENTAL:State of CA Adopts the State Building Codes. State Agencies California Building StandardsCommission (CBSC) - Ca Fire Marshal, HCD, Others. All have an impact on whatgoes into the CA Codes.

    GOVERNMENTAL REGULATORY AGENCIES &

  • 8/12/2019 mastering solar planning permits presentation

    77/313

    GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES

    GOVERNMENTAL:State of CA Adopts the State Building Codes. State Agencies California Building StandardsCommission (CBSC) - Ca Fire Marshal, HCD, Others. All have an impact on whatgoes into the CA Codes.

    GOVERNMENTAL REGULATORY AGENCIES &

  • 8/12/2019 mastering solar planning permits presentation

    78/313

    GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES

    State of CA

    THE 2011 MODELCODE WILLBECOME

    GOVERNMENTAL REGULATORY AGENCIES &

  • 8/12/2019 mastering solar planning permits presentation

    79/313

    GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES

    State of CA

    THE 2011 MODELCODE WILLBECOME

    THE 2013 CALIFORNIAELECTRICAL CODE

  • 8/12/2019 mastering solar planning permits presentation

    80/313

    ALL CITIES AND COUNTIES IN CALIFORNIA ARE MANDATED TO ENFORCE THECALFORNIA BUILDING CODES

  • 8/12/2019 mastering solar planning permits presentation

    81/313

    Local Bldg. Dept

    Local Bldg. Dept

    Interprets and applies the state codes

    Enacts local ordinances for topics not covered in code.Sets policies for functions and operationsPerforms plan-check and inspection to verify code compliance.

  • 8/12/2019 mastering solar planning permits presentation

    82/313

    http://www.sdcounty.ca.gov/dplu/bldgforms/index.html

    San Diego County Websitefor forms and handouts

    Solar Ordinance

    http://www.sdcounty.ca.gov/dplu/ceqa/POD09006.html

    Building Div Forms and Handouts

    http://www.sdcounty.ca.gov/dplu/bldgforms/index.htmlhttp://www.sdcounty.ca.gov/dplu/ceqa/POD09006.htmlhttp://www.sdcounty.ca.gov/dplu/ceqa/POD09006.htmlhttp://www.sdcounty.ca.gov/dplu/bldgforms/index.html
  • 8/12/2019 mastering solar planning permits presentation

    83/313

  • 8/12/2019 mastering solar planning permits presentation

    84/313

  • 8/12/2019 mastering solar planning permits presentation

    85/313

  • 8/12/2019 mastering solar planning permits presentation

    86/313

  • 8/12/2019 mastering solar planning permits presentation

    87/313

  • 8/12/2019 mastering solar planning permits presentation

    88/313

  • 8/12/2019 mastering solar planning permits presentation

    89/313

    OTHER LOCAL AGENCY INVOLVEMENT Planning/Zoning regulations Fire regulations Health Department (DEH) for septic systems Public Works for flood plains, drainage courses

    DEH Requirements for Ground Mount Systems

  • 8/12/2019 mastering solar planning permits presentation

    90/313

    q y

    Two primary concerns are addressed when DEH reviews ground mounted solar arrays. The first being the array itself and its proximity tothe septic system. Second being the utility trench to the electric panel and its proximity to the septic system. Below are the reviewstandards for DEH.

    Ground Mount Array The array is considered a structure. The minimum setback for a leach line to a structure is 8 feet. The setback should be measured fromthe outermost point of the array whether it be the footing or the solar panel itself. Reasoning here is adequate room to maneuverequipment for a septic system repair. This setback must also take into account reserve leach field area. Setbacks for solar arrays to septictanks are 5 feet. Here again to the outer most edge of the array allowing for equipment access.

    Utility Trench The utility trench from the solar array cannot cross over a primary or reserve leach field area. The utility trench should maintain a 5:1setback to a leach line for every foot of depth (2 ft deep utility trench = 10 ft setback to leach line). This would include reserve leach fieldareas. Utility trenches cannot cross over septic tanks and require a minimum 5 ft setback to the edge of the tank.

    Plans need to identify the location of the septic tank and leach field. Then the accuracy needs to be verified by DEH records, or in the casewhere there is no record a DEH visit to the site

    Good records from property owner or DEH showing no issues, sign-off is over the counter (OTC). Usually larger lots with lots of room. No records. Need licensed contractor to find system and produce an as-built (signed and dated by contractor). If DEH is comfortable

    with this then an OTC is done, if not comfortable DEH may charge a 2 hr minimum consultation to do a site check. Impacts to septic system will require relocation of solar array. Impacts to septic system that cannot be mitigated with a relocation will

    not be approved

  • 8/12/2019 mastering solar planning permits presentation

    91/313

    County Fire MarshallRequirements for Solar

    Installations

  • 8/12/2019 mastering solar planning permits presentation

    92/313

  • 8/12/2019 mastering solar planning permits presentation

    93/313

  • 8/12/2019 mastering solar planning permits presentation

    94/313

  • 8/12/2019 mastering solar planning permits presentation

    95/313

  • 8/12/2019 mastering solar planning permits presentation

    96/313

  • 8/12/2019 mastering solar planning permits presentation

    97/313

  • 8/12/2019 mastering solar planning permits presentation

    98/313

  • 8/12/2019 mastering solar planning permits presentation

    99/313

    ACCESS

  • 8/12/2019 mastering solar planning permits presentation

    100/313

  • 8/12/2019 mastering solar planning permits presentation

    101/313

    ACCESSFOR SERVICINGFOR FIREFIGHTERS

  • 8/12/2019 mastering solar planning permits presentation

    102/313

    Department of Public Works

    Solar panels and equipment mustbe mounted a minimum of 12about the recorded flood plain

  • 8/12/2019 mastering solar planning permits presentation

    103/313

    PUBLIC UTILITIES PUC, CECCODE WRITING PANELS AND COMMITTEESSTANDARDS AGENCIES AND TECHNICAL COMMITTEES( UL, ANSI, ETC )*

    NRTLs - NATIONALLY RECOGNIZED TESTING AGENCIESTHIRD-PARTY FIELD EVALUATORSCCSE AND OTHER AGENCIES OVERSEEING GREEN PROGRAMS LOCAL ORGANIZATIONS LIKE ICC AND CALBOOTHERS?

    NON- GOVERNMENTAL AGENCIES &

    AUTHORITIES ON SOLAR

  • 8/12/2019 mastering solar planning permits presentation

    104/313

    San Diego Area Electrical Newsletters

    Drafted by the San Diego Chapter of ICC

    www. iccsandiego .org/uploads/2005%20Electrical%20 Newsletter %20Final%201-10-06.pdf

    http://www.iccsandiego.org

    Newsletters Link

    http://www.iccsandiego.org/uploads/2005%20Electrical%20Newsletter%20Final%201-10-06.pdfhttp://www.iccsandiego.org/uploads/2005%20Electrical%20Newsletter%20Final%201-10-06.pdfhttp://www.iccsandiego.org/uploads/2005%20Electrical%20Newsletter%20Final%201-10-06.pdfhttp://www.iccsandiego.org/uploads/2005%20Electrical%20Newsletter%20Final%201-10-06.pdfhttp://www.iccsandiego.org/uploads/2005%20Electrical%20Newsletter%20Final%201-10-06.pdfhttp://www.iccsandiego.org/http://e/sdaenl%20jan08.pdfhttp://e/sdaenl%20jan08.pdfhttp://www.iccsandiego.org/http://www.iccsandiego.org/uploads/2005%20Electrical%20Newsletter%20Final%201-10-06.pdf
  • 8/12/2019 mastering solar planning permits presentation

    105/313

    UL STANDARDS FOR SOLAR PRODUCTS

    UL1703* For flat plate modules and panelsUL 1741* Grid Tied InvertersUL 2703 Solar Racking Systems and Grounding

    *ANSI approved Standard

    UL is testing products to safety standards, but isshowing an interest in testing to efficiency standards

    also. This to help certify the claims made bymanufacturers of solar products

  • 8/12/2019 mastering solar planning permits presentation

    106/313

  • 8/12/2019 mastering solar planning permits presentation

    107/313

  • 8/12/2019 mastering solar planning permits presentation

    108/313

    S d d M i i l P

  • 8/12/2019 mastering solar planning permits presentation

    109/313

    Standard Municipal Process:Plan Check Review

    Permit IssuanceInspection

    The level of Plan review depends on the scope of the project

    Typical roof mount residential plan review includes:

    Roof Plan - overall layout of modules, electricalpanels/equipment, and conduit runsElectrical plan review single line electrical diagramElectrical Calculations Voltage, Amperage, Derating factors,

    Overcurrent and conductors sizing.Structural roof attachment review racking systemEquipment Data SheetsProperty history review and zoning reviewPermit issuance 0 fees *Inspection Most residential roof-mounts are a singleinspection, performed when the job is complete

    St d d M i i l P

  • 8/12/2019 mastering solar planning permits presentation

    110/313

    Standard Municipal Process:Plan Check Review

    Permit Issuanceand Inspection

    Typical residential ground mount includes most items shown fora roof mount and additionally:

    Plot Plan reviewStructural foundation review and support attachmentsDpt of Environmental Health review for septic concernsDpt of Public Works Review for flood plain setbacksPermit issuance $0 Building Div fees*

    Inspection Most ground-mounts require multiple inspectionsFoundation, U/G Electric, and Final Inspection

    *If additional electrical work needs to be performed, regular electrical fees apply* Fees apply to DEH and DPW review

    St d d M i i l P i

  • 8/12/2019 mastering solar planning permits presentation

    111/313

    Standard Municipal Process isPlan Check Review

    Permit Issuanceand Inspection

    Typical Commercial and Agricultural On-site Solar would includemost of the previous items and additionally;

    Professionally designed electrical and structural plansZoning Review and possible zoning criteria administeredPossible Fire Department ReviewPossible Submittal of Plans

    Permit issuance Fees Apply

    St d d M i i l P i

  • 8/12/2019 mastering solar planning permits presentation

    112/313

    Standard Municipal Process isPlan Check Review

    Permit Issuanceand Inspection

    Typical Solar Farm and Utility Grade Off-site Solar would includemost of the previous items and additionally;

    Use Permit/Admin Permit reviewFire Department ReviewSubmittal of PlansPermit issuance Fees Apply

  • 8/12/2019 mastering solar planning permits presentation

    113/313

    Sample PlansROOF MOUNTED SYSTEM

  • 8/12/2019 mastering solar planning permits presentation

    114/313

  • 8/12/2019 mastering solar planning permits presentation

    115/313

  • 8/12/2019 mastering solar planning permits presentation

    116/313

    Sample Plan # 2ROOF MOUNTED SYSTEM

  • 8/12/2019 mastering solar planning permits presentation

    117/313

  • 8/12/2019 mastering solar planning permits presentation

    118/313

  • 8/12/2019 mastering solar planning permits presentation

    119/313

    IDENTIFY THE LOCATION OF THECONDUIT RUN

  • 8/12/2019 mastering solar planning permits presentation

    120/313

  • 8/12/2019 mastering solar planning permits presentation

    121/313

  • 8/12/2019 mastering solar planning permits presentation

    122/313

    REQUIRED

  • 8/12/2019 mastering solar planning permits presentation

    123/313

    REQUIREDREQUIRED

  • 8/12/2019 mastering solar planning permits presentation

    124/313

    REQUIRED

    2 GROUND RODSREQUIRED

    REQUIRED

  • 8/12/2019 mastering solar planning permits presentation

    125/313

    REQUIRED

    2 GROUND RODSREQUIRED

    REQUIRED

    AC DISCONNECT ?

  • 8/12/2019 mastering solar planning permits presentation

    126/313

    The Combined maximum output ofinverters on the AC side X 1.25%indicates the minimum size breaker.Conductor size is determined by thebreaker rating and derating of theconductors. Derating is needed for morethan 3 conductors in a raceway, distance

    mounted off the surface of the roof, andthe ambient temperature for the area ofthe installationMaximum Breaker size is determined bythe rating of the main breaker and therating of the solar breakers notexceeding the rating of the buss bar X120%

  • 8/12/2019 mastering solar planning permits presentation

    127/313

  • 8/12/2019 mastering solar planning permits presentation

    128/313

  • 8/12/2019 mastering solar planning permits presentation

    129/313

    2 1/2 IMBEDMENT

  • 8/12/2019 mastering solar planning permits presentation

    130/313

  • 8/12/2019 mastering solar planning permits presentation

    131/313

  • 8/12/2019 mastering solar planning permits presentation

    132/313

  • 8/12/2019 mastering solar planning permits presentation

    133/313

  • 8/12/2019 mastering solar planning permits presentation

    134/313

  • 8/12/2019 mastering solar planning permits presentation

    135/313

  • 8/12/2019 mastering solar planning permits presentation

    136/313

  • 8/12/2019 mastering solar planning permits presentation

    137/313

    Sample Plan # 3GROUND MOUNTED SYSTEMgmspdf

    http://e/Ground%20Mount%20Sample%20%20Plan.pdfhttp://e/Ground%20Mount%20Sample%20%20Plan.pdf
  • 8/12/2019 mastering solar planning permits presentation

    138/313

    Sample Plan # 4ROOF MOUNTED SYSTEMgmspdf1

    http://e/Roof%20Sample%20Reduced.pdfhttp://e/Roof%20Sample%20Reduced.pdf
  • 8/12/2019 mastering solar planning permits presentation

    139/313

    Sample Plan # 5GROUND MOUNTED SYSTEMgmspdf2

    http://e/SolarCity%20Roof%20MT.pdfhttp://e/SolarCity%20Roof%20MT.pdf
  • 8/12/2019 mastering solar planning permits presentation

    140/313

  • 8/12/2019 mastering solar planning permits presentation

    141/313

    Third-Party Grounding Devices

    Must be specifically mentioned in the installation

    instructions for the modules

    Grounding Clips tested in conjunction with a rackingsystem thats listed to UL 2703 must specifically identifythe modules that it was tested with.

  • 8/12/2019 mastering solar planning permits presentation

    142/313

  • 8/12/2019 mastering solar planning permits presentation

    143/313

    Class-A roofing?

  • 8/12/2019 mastering solar planning permits presentation

    144/313

    Class-A roofing?

    Some modules have a class-A rating

  • 8/12/2019 mastering solar planning permits presentation

    145/313

    Class-A roofing?

    Some modules have a class-A rating

    Most require a class-A roof underneath (new construction)

  • 8/12/2019 mastering solar planning permits presentation

    146/313

  • 8/12/2019 mastering solar planning permits presentation

    147/313

    CLASS A ROOF?

  • 8/12/2019 mastering solar planning permits presentation

    148/313

    Target Fire Bakersfield

  • 8/12/2019 mastering solar planning permits presentation

    149/313

    g

    Link

    http://e/Target%20PV%20Fire.pdfhttp://e/Target%20PV%20Fire.pdf
  • 8/12/2019 mastering solar planning permits presentation

    150/313

  • 8/12/2019 mastering solar planning permits presentation

    151/313

    Metal Roofs

  • 8/12/2019 mastering solar planning permits presentation

    152/313

  • 8/12/2019 mastering solar planning permits presentation

    153/313

  • 8/12/2019 mastering solar planning permits presentation

    154/313

    http://buysolarpowernow.com/review/product/B002TJFGD6/buysolarnow-20/solartech-spm040p-n-40-watt-12-volt-polycrystalline-pv-solar-panel
  • 8/12/2019 mastering solar planning permits presentation

    155/313

    http://buysolarpowernow.com/review/product/B002TJFGD6/buysolarnow-20/solartech-spm040p-n-40-watt-12-volt-polycrystalline-pv-solar-panel
  • 8/12/2019 mastering solar planning permits presentation

    156/313

  • 8/12/2019 mastering solar planning permits presentation

    157/313

  • 8/12/2019 mastering solar planning permits presentation

    158/313

  • 8/12/2019 mastering solar planning permits presentation

    159/313

    INDIA

  • 8/12/2019 mastering solar planning permits presentation

    160/313

  • 8/12/2019 mastering solar planning permits presentation

    161/313

  • 8/12/2019 mastering solar planning permits presentation

    162/313

  • 8/12/2019 mastering solar planning permits presentation

    163/313

  • 8/12/2019 mastering solar planning permits presentation

    164/313

  • 8/12/2019 mastering solar planning permits presentation

    165/313

  • 8/12/2019 mastering solar planning permits presentation

    166/313

  • 8/12/2019 mastering solar planning permits presentation

    167/313

  • 8/12/2019 mastering solar planning permits presentation

    168/313

    Teaching the Basics

    Want to teach your kids about renewable energy in a way thats relevant andinteresting?

    If youre installing a new solar power system for your home, its a perfect

    opportunity to talk about how it works, why its important for the environment,and you can throw in some math lessons too. Solar power is complicated enoughthat older children and adults can learn plenty, but it can also be explained in a

    way that even younger kids can understand

    NOW SERVING

    SOLAR POWER IN SAN DIEGO

  • 8/12/2019 mastering solar planning permits presentation

    169/313

    SOLAR POWER IN SAN DIEGO

  • 8/12/2019 mastering solar planning permits presentation

    170/313

    Thank You

    Q & ATime Permitting

    NEXT UP

  • 8/12/2019 mastering solar planning permits presentation

    171/313

    Marisa SmithPlanner 1

    DPLU Planning Div. - County of San Diego

    NEXT UP

    County of San Diego Planning

  • 8/12/2019 mastering solar planning permits presentation

    172/313

    y g g

    Requirements for Solar

  • 8/12/2019 mastering solar planning permits presentation

    173/313

    1) roof-mount

    2) ground-mount on-site3) ground-mount off-site

    Roof Mount Solar PV

  • 8/12/2019 mastering solar planning permits presentation

    174/313

    Ground Mount Solar PV - residential

  • 8/12/2019 mastering solar planning permits presentation

    175/313

    Roof mount - Solar PV - commercial

  • 8/12/2019 mastering solar planning permits presentation

    176/313

    Ground Mount Off-Site

  • 8/12/2019 mastering solar planning permits presentation

    177/313

  • 8/12/2019 mastering solar planning permits presentation

    178/313

  • 8/12/2019 mastering solar planning permits presentation

    179/313

  • 8/12/2019 mastering solar planning permits presentation

    180/313

  • 8/12/2019 mastering solar planning permits presentation

    181/313

    N

  • 8/12/2019 mastering solar planning permits presentation

    182/313

    Typical Plot Plan

  • 8/12/2019 mastering solar planning permits presentation

    183/313

    Typical Plot Plan

  • 8/12/2019 mastering solar planning permits presentation

    184/313

    Typical Plot Plan show all existing structure

  • 8/12/2019 mastering solar planning permits presentation

    185/313

    Existing SFD

    Typical Plot Plan - setbacks

  • 8/12/2019 mastering solar planning permits presentation

    186/313

    Typical Plot Plan

  • 8/12/2019 mastering solar planning permits presentation

    187/313

    Typical Plot Plan

  • 8/12/2019 mastering solar planning permits presentation

    188/313

  • 8/12/2019 mastering solar planning permits presentation

    189/313

    EXPIRED PERMITS

  • 8/12/2019 mastering solar planning permits presentation

    190/313

    Summary

  • 8/12/2019 mastering solar planning permits presentation

    191/313

  • 8/12/2019 mastering solar planning permits presentation

    192/313

    Q & A?

    Development Services DepartmentDivision of Building, Safety & Construction

  • 8/12/2019 mastering solar planning permits presentation

    193/313

    1

    PhotovoltaicInformation Session

    Mar t in Mon tess oro

    Oc to b er 18, 2011

    Development Services DepartmentDivision of Building, Safety & Construction

    Resources

  • 8/12/2019 mastering solar planning permits presentation

    194/313

    3

    Resources Information Bulletin 301 Plan Template

    Inspection Guidelines SD Area Electrical Newsletterhttp://www.sandiego.gov/development-services/

    Development Services DepartmentDivision of Building, Safety & Construction

  • 8/12/2019 mastering solar planning permits presentation

    195/313

    4

    Submit Plans and Documents

    Over-the-Counter by Appointment(SFR Per Template) Master Plan

    Options For Plan Review

  • 8/12/2019 mastering solar planning permits presentation

    196/313

    Development Services DepartmentDivision of Building, Safety & Construction

    Plan Submittal

  • 8/12/2019 mastering solar planning permits presentation

    197/313

    Plan Submittal Check in on the third floor of DSC Walk- in or Appointment at Submittal

    Plan Check fees have to be paid at thetime of Submittal

    Plans are distributed to all reviewers

    (Structural and Electrical)

    6

    Development Services DepartmentDivision of Building, Safety & Construction

    Over-the-Counter by

  • 8/12/2019 mastering solar planning permits presentation

    198/313

    7

    Plans and Documents per Plan

    Template Call (619) 446-5300 for appointment Appointments are for one hour Maximum of two appointments per

    day per customer Check-in at least 30 minutes prior to

    your appointment

    Over-the-Counter byAppointment

    Development Services DepartmentDivision of Building, Safety & Construction

    Master Plans

  • 8/12/2019 mastering solar planning permits presentation

    199/313

    Master Plans

    8

    Establish Master Plan Submit Plans on Third Floor of

    DSC 10-Day Review

    Fee - Hourly Plan Check Only

    Development Services DepartmentDivision of Building, Safety & Construction

    Master Plan

  • 8/12/2019 mastering solar planning permits presentation

    200/313

    9

    Master Plan Installations Per Established Master Plan

    Site Plan Issued Over-the-Counter at

    Screening (3 rd Floor, DSC) Fees

    Issuance

    Records Permit Fee

    Development Services DepartmentDivision of Building, Safety & Construction

    Rechecks

  • 8/12/2019 mastering solar planning permits presentation

    201/313

    10

    Rechecks

    By Appointment with the reviewer Walk-In, Over-the-Counter

    Electrical Counter (3 rd Floor,DSC)

    Development Services DepartmentDivision of Building, Safety & Construction

    Issuance

  • 8/12/2019 mastering solar planning permits presentation

    202/313

    11

    Issuance

    By Appointment with the Issuancestaff

    Walk-In Over-the-CounterThird floor DSCPermit fees

    Development Services DepartmentDivision of Building, Construction and Safety

    Solar Photovoltaic Plan

  • 8/12/2019 mastering solar planning permits presentation

    203/313

    Solar Photovoltaic PlanReview Process

    Complying Template Projects Roof Mounted SFD

    12

    Development Services DepartmentDivision of Building, Construction and Safety

    DSD Residential Plan Template for

  • 8/12/2019 mastering solar planning permits presentation

    204/313

    DSD Residential Plan Template forSolar Photovoltaic

    The Purpose is to reduce plan review time by: Establishing a standard format and layout Suggesting standard notes

    13

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template General Project

  • 8/12/2019 mastering solar planning permits presentation

    205/313

    14

    Residential PV TemplateInformation

    Notes for each

    page on the

    right-hand sideof the page

    Plans need to be in a simple legible format

    (11 X 17)

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template PV Company Name

  • 8/12/2019 mastering solar planning permits presentation

    206/313

    15

    Residential PV Template& Logo

    Designer Name

    Signature

    License #

    Project

    Location

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template Notes font large

  • 8/12/2019 mastering solar planning permits presentation

    207/313

    16

    Residential PV Template enough to belegible

    Identify Property

    Lines

    PageReference

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template

  • 8/12/2019 mastering solar planning permits presentation

    208/313

    17

    Residential PV TemplateLocate Building ,Plumbing

    and Mechanical VentsArray layout custom

    to each project

    showing the number

    of modules

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template

  • 8/12/2019 mastering solar planning permits presentation

    209/313

    18

    Residential PV Template

    Identify the location of

    the conduit. If DC

    conductors are routed

    within the building

    they must be within a

    metallic conduit

    marked CAUTION DC

    CIRCUIT every five

    feet.

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template

  • 8/12/2019 mastering solar planning permits presentation

    210/313

    19

    Residential PV Template

    Show Meter Location

    Show Inverter Location

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template

  • 8/12/2019 mastering solar planning permits presentation

    211/313

    20

    pStructural

    calculations are

    required for the roof

    or structure mounted

    PV systems if theweight of the PV

    system exceeds five

    pounds per square

    foot.

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template

  • 8/12/2019 mastering solar planning permits presentation

    212/313

    21

    Residential PV Template

    Roof Framing and

    the Rack lay out

    Typical Detail to

    show the

    attachment

    Provide a Water Proofing Detail

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template Single Line

  • 8/12/2019 mastering solar planning permits presentation

    213/313

    22

    Residential PV Template Single Line

    Identify the wire type

    and size

    Show the number ofmodules per string

    and the number of

    strings per system

    Show the module

    manufactures' name

    and the model

    number

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template Single Line

  • 8/12/2019 mastering solar planning permits presentation

    214/313

    23

    Residential PV Template Single Line

    Identify the wire type,

    and size

    Identify the conduit

    type, and size

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template Single Line

  • 8/12/2019 mastering solar planning permits presentation

    215/313

    p g

    24

    Identify the wire type

    and size

    Identify the conduit

    type and size

    Show the inverter

    manufactures' name

    and the model

    number

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template Single Line

  • 8/12/2019 mastering solar planning permits presentation

    216/313

    p g

    25

    If a combiner box is

    used identify the

    ampere rating of the

    bus and OCP

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template Single Line

  • 8/12/2019 mastering solar planning permits presentation

    217/313

    26

    Identify the ampere rating of

    the bus, main breaker and

    back-fed PV breaker

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template Single Line

  • 8/12/2019 mastering solar planning permits presentation

    218/313

    27

    Systems with micro inverters

    need to show disconnects incompliance with (CEC 609.14 ( D))

    If micro inverter system is

    installed show the module

    manufactures' name and the

    model number

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template Single Line

  • 8/12/2019 mastering solar planning permits presentation

    219/313

    28

    Identify DC and AC

    disconnects and where fuses

    are required show the ampere

    rating of the fuses

    Development Services DepartmentDivision of Building, Construction and Safety

    Residential PV Template

  • 8/12/2019 mastering solar planning permits presentation

    220/313

    Manufacturer Information Sheets

    29

    Include 8.5 by 11copies of the

    Manufacturersspecifications

    Verify that allcomponents are

    listed by a NationallyRecognized TestingLaboratory for theintended use .

    Development Services DepartmentDivision of Building, Construction and Safety

    Technical Data

  • 8/12/2019 mastering solar planning permits presentation

    221/313

    30

    Identify the short circuit current ( Isc ) and the open circuitvoltage ( Voc ).

    Module Info Inverter Info

    Development Services DepartmentDivision of Building, Construction and Safety

    DSD Residential Plan Template for

  • 8/12/2019 mastering solar planning permits presentation

    222/313

    DSD Residential Plan Template forSolar Photovoltaic

    QUESTIONS?

    31

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    223/313

    Inspection Guidelines and

    Suggested Practices

    Development Services DepartmentDivision of Building, Construction and Safety

    Inspection Process

  • 8/12/2019 mastering solar planning permits presentation

    224/313

    p To verify that the installation is in

    conformance with the design of theapproved set of plans

    To verify that the installation is incompliance with the California ElectricalCode and other applicable codes andregulations

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    225/313

    Purpose of the Code.the practical safeguarding of

    persons and property fromhazards arising from the use ofelectricity

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    226/313

    2010 CaliforniaElectrical Code

    2008 National Electrical Code with amendments from State agencies California Code of Regulations, Title 24, Part 3

    Effective date January 1, 2011

    Development Services DepartmentDivision of Building, Construction and Safety

    Inspection Process

  • 8/12/2019 mastering solar planning permits presentation

    227/313

    p Contractor/owner responsibility to

    schedule and coordinate all requiredinspections

    Responsible party on site Provide access to all elements of

    system installation

    Development Services DepartmentDivision of Building, Construction and Safety

    Inspection

  • 8/12/2019 mastering solar planning permits presentation

    228/313

    p Ground-mounted

    1. footings for array frame

    2. underground raceways3. final

    Observe regulations for -

    Brush Management Zones,Environmentally Sensitive Lands, andMultiple Habitat Planning Areas

    Development Services DepartmentDivision of Building, Construction and Safety

    Inspection (continued)

  • 8/12/2019 mastering solar planning permits presentation

    229/313

    Roof mounted arraysRough electrical (for any concealed

    work)Roof array and bond (for integratedsystems or for tile roofs)

    Final inspection

    Development Services DepartmentDivision of Building, Construction and Safety

    Necessary Paperwork on Site

  • 8/12/2019 mastering solar planning permits presentation

    230/313

    y p

    Approved plans Inspection record card (DS-1798) Manufacturers Installation instructions

    modules, racking, inverter

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    231/313

    Development Services DepartmentDivision of Building, Construction and Safety

    Installation manuals inverters,

  • 8/12/2019 mastering solar planning permits presentation

    232/313

    modules

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    233/313

    Roof Mounted Systems

  • 8/12/2019 mastering solar planning permits presentation

    234/313

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    235/313

    44

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    236/313

    45

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    237/313

    Tile roofs

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    238/313

    47

    Development Services DepartmentDivision of Building, Construction and Safety

    Building Integrated PV

  • 8/12/2019 mastering solar planning permits presentation

    239/313

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    240/313

    49

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    241/313

    50

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    242/313

    51

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    243/313

    52

    Development Services DepartmentDivision of Building, Construction and Safety

    Micro-inverters

  • 8/12/2019 mastering solar planning permits presentation

    244/313

    53

    Development Services DepartmentDivision of Building, Construction and Safety

    Other Systems

  • 8/12/2019 mastering solar planning permits presentation

    245/313

    54

    Development Services DepartmentDivision of Building, Construction and Safety

    Other Systems

  • 8/12/2019 mastering solar planning permits presentation

    246/313

    55

  • 8/12/2019 mastering solar planning permits presentation

    247/313

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    248/313

    Racking system and grounding57

    Development Services DepartmentDivision of Building, Construction and Safety

    Flashing and Weather Protection

  • 8/12/2019 mastering solar planning permits presentation

    249/313

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    250/313

    Rolled roofing penetrationProperly flashed and sealed

    59

    Development Services DepartmentDivision of Building, Construction and Safety

    Clearance to Vents

  • 8/12/2019 mastering solar planning permits presentation

    251/313

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    252/313

    61

    Development Services DepartmentDivision of Building, Construction and Safety

    Plumbing VentsPlumbing vents cannot be coveredby module installationVents shall terminate a minimum

    f

  • 8/12/2019 mastering solar planning permits presentation

    253/313

    of6 above or 1 away horizontallyfrom adjacent PV modulesTermination shall not be higherthat the highest point of the existingroofVents less than 3 can beextended /offset but shall beproperly and independentlysupportedAll extensions shall meet therequirements of the CaliforniaPlumbing CodeExtension on any plumbing vent 3diameter or larger is not allowed

    62

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    254/313

    Using Identified grounding points and approveddevices and materials

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    255/313

    Unapproved Grounding MeansNot approved braided copper with sheet metal screw into themodule frame

    64

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    256/313

    65

    Development Services DepartmentDivision of Building, Construction and Safety

    Combiner Boxes, Junction Boxesd h d

  • 8/12/2019 mastering solar planning permits presentation

    257/313

    and Wiring Methods Listed equipment

    Installed per manufacturer's installationinstructions

    Cable Management

    Conduit support

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    258/313

    Combiner boxes, wiring methodCombiner boxes shall be listedInstalled per the manufacturers instructions

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    259/313

    68

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    260/313

    69

    Development Services DepartmentDivision of Building, Construction and Safety

    Conduit support

  • 8/12/2019 mastering solar planning permits presentation

    261/313

    Development Services DepartmentDivision of Building, Construction and Safety

    Conduit Support

  • 8/12/2019 mastering solar planning permits presentation

    262/313

    71

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    263/313

    Wiring methods and materials

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    264/313

    73

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    265/313

    74

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    266/313

    75

    Development Services DepartmentDivision of Building, Construction and Safety

    PV Wire

  • 8/12/2019 mastering solar planning permits presentation

    267/313

    76

    Development Services DepartmentDivision of Building, Construction and Safety

    Cable Management

  • 8/12/2019 mastering solar planning permits presentation

    268/313

    Development Services DepartmentDivision of Building, Construction and Safety

    Conductor De-rating

  • 8/12/2019 mastering solar planning permits presentation

    269/313

    Derating for conductorampacity is required pernew Table 310.15(B)(2)

    Use the ASHRAE tablesfor the ambienttemperature used for thecorrection factor

    Air inside the raceway issignificantly hotter than thesurrounding air

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    270/313

    Development Services DepartmentDivision of Building, Construction and Safety

    Inverters and DC Disconnects

  • 8/12/2019 mastering solar planning permits presentation

    271/313

    Listed utility interactive inverters As-built conforms to the design

    Installed per manufacturers installationinstructions or recommendations System grounding electrode conductor

    properly terminated

  • 8/12/2019 mastering solar planning permits presentation

    272/313

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    273/313

    82

    Development Services DepartmentDivision of Building, Construction and Safety

    Conductor terminations

  • 8/12/2019 mastering solar planning permits presentation

    274/313

    Development Services DepartmentDivision of Building, Construction and Safety

    Inverter locations

  • 8/12/2019 mastering solar planning permits presentation

    275/313

    Development Services DepartmentDivision of Building, Construction and Safety

    Service Equipment bus rating

  • 8/12/2019 mastering solar planning permits presentation

    276/313

    bus rating existing main overcurrent protection PV overcurrent protection

    manufacturer breakers cable or conduit entry labeling

    multiwire branch circuit relocation andbalanced load on bus

    grounding system

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    277/313

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    278/313

    EXISTING Panel

    Whats the rating of the bus? Total Sum of the Over-currentDevices Permitted 87

  • 8/12/2019 mastering solar planning permits presentation

    279/313

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    280/313

    89

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    281/313

    90

    Development Services DepartmentDivision of Building, Construction and Safety

    PV breakers and new and

    existing multi wire circuits

  • 8/12/2019 mastering solar planning permits presentation

    282/313

    existing multi-wire circuits

    Development Services DepartmentDivision of Building, Construction and Safety

    Service Upgrades involving

    Scheduled Outages with SDG&E

  • 8/12/2019 mastering solar planning permits presentation

    283/313

    Scheduled Outages with SDG&E Schedule DSD inspection for day of the

    scheduled outage Contact the inspector re: time frame Equipment installed, framing weather-protected,

    grounded, service entrance raceway or riser and service

    entrance conductors installed

    Development Services DepartmentDivision of Building, Construction and Safety

    Ready for reconnection?

  • 8/12/2019 mastering solar planning permits presentation

    284/313

  • 8/12/2019 mastering solar planning permits presentation

    285/313

    Development Services DepartmentDivision of Building, Construction and Safety

    Grounding

  • 8/12/2019 mastering solar planning permits presentation

    286/313

    Verify acceptable grounding for existingservice equipment or provide asupplemental electrode

    Provide service and system groundingcompliant with the Code

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    287/313

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    288/313

    Water piping ground must be supplemented

    Development Services DepartmentDivision of Building, Construction and Safety

    Driven Ground Rod

  • 8/12/2019 mastering solar planning permits presentation

    289/313

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    290/313

    Irreversible Splicing Devices For grounding electrode conductors Micro-inverter installations - #8 or #6 Cu system grounding

    conductors

    99

    Development Services DepartmentDivision of Building, Construction and Safety

    DC and AC wiring through a

    structure

  • 8/12/2019 mastering solar planning permits presentation

    291/313

    structure

    100

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    292/313

    CAUTION Notching andBoring Wood Members

    101

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    293/313

    Load-bearing 2 x 12 floor joists @ 12 OCnotched in middle 1/3 of spa n

    102

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    294/313

    103

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    295/313

    Properly fire stop around all penetrations ofrated assemblies 104

    Development Services DepartmentDivision of Building, Construction and Safety

    Fire-resistive Exit Enclosures andPassageways

  • 8/12/2019 mastering solar planning permits presentation

    296/313

    105

    Development Services DepartmentDivision of Building, Construction and Safety

    Signage and Placarding

  • 8/12/2019 mastering solar planning permits presentation

    297/313

    Alternate power source placard DC raceways and DC disconnects

    Cautionary Site specific design PV disconnect for utility operation

    Development Services DepartmentDivision of Building, Construction and Safety

    Alternate Power Source Placard

  • 8/12/2019 mastering solar planning permits presentation

    298/313

  • 8/12/2019 mastering solar planning permits presentation

    299/313

  • 8/12/2019 mastering solar planning permits presentation

    300/313

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    301/313

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    302/313

    111

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    303/313

    Development Services DepartmentDivision of Building, Construction and Safety

    Suggested practices

  • 8/12/2019 mastering solar planning permits presentation

    304/313

    Survey the site verify the adequacyand condition of the existing electrical

    system to accommodate a PV system A service upgrade or other corrections

    may be required

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    305/313

    Inadequate work space

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    306/313

    115

    Development Services DepartmentDivision of Building, Construction and Safety

    Service Disconnects Maximum Six

    Handles without a Main Disconnect

  • 8/12/2019 mastering solar planning permits presentation

    307/313

    Development Services DepartmentDivision of Building, Construction and Safety

    Existing Service Entrance

  • 8/12/2019 mastering solar planning permits presentation

    308/313

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    309/313

    Existing service

    Development Services DepartmentDivision of Building, Construction and Safety

  • 8/12/2019 mastering solar planning permits presentation

    310/313

    Service supplied by SIDA cable

    Development Services DepartmentDivision of Building, Construction and Safety

    Alternative

    EnergySystems

  • 8/12/2019 mastering solar planning permits presentation

    311/313

    gySystemsinstalled with

    safeguardinglife andproperty in

    mind

    Development Services DepartmentDivision of Building, Construction and Safety

    Resources Photovoltaic Systems, 2

    nd

    ed. Dunlop IAEI News (www iaei org)

  • 8/12/2019 mastering solar planning permits presentation

    312/313

    IAEI News (www.iaei.org) IREC ( www.IRECUSA.org ) Field Inspection

    Guidelines for PV Systems (Brooks Engg) Photovoltaic Power Systems: Suggested

    Practices, Southwest TechnologyDevelopment Institute , NMSU(John Wiles)

    NEC Handbooks - NFPA NFPAs NEC Plus City of San Diego Inspection Guidelines 121

    Development Services DepartmentDivision of Building, Construction and Safety

    http://www.irecusa.org/http://www.irecusa.org/
  • 8/12/2019 mastering solar planning permits presentation

    313/313

    Q ti ?