mastering solar planning permits presentation
TRANSCRIPT
-
8/12/2019 mastering solar planning permits presentation
1/313
www.ener center.or
Mastering Solar Planning & Permits
City of San DiegoCounty of San Diego
October 18, 2011
-
8/12/2019 mastering solar planning permits presentation
2/313
www.e e ce te .o
2www.energycenter.org
California Center for Sustainable EnergyVision:
To create a sustainable energy future.Mission:
To foster public policies and provideprograms, services, information and forums
that facilitate the adoption of clean, reliable,renewable, sustainable and efficient energytechnologies and practices.
-
8/12/2019 mastering solar planning permits presentation
3/313
3www.energycenter.org
CCSE Programs
California Solar Initiative
Multi-Family Affordable Solar
Housing Project Solar Water Heating Program
Clean Vehicle Rebate Project
Energy Upgrade California
CCSE operates in five focus areas: energy efficiency,renewable energy, climate change, transportation andgreen building.
Self-Generation Incentive Program(Wind and Fuel Cells)
Energy Advisory Services Urban Forestry Advisory Services Energy Resource Center
-
8/12/2019 mastering solar planning permits presentation
4/313
4www.energycenter.org
CCSE Services Workshops and Events Tool Lending & Resource Library Expanded Display Space Energy Advisory Services Technical Assistance Vendor Database Green Career Network
-
8/12/2019 mastering solar planning permits presentation
5/313
5www.energycenter.org
Upcoming Events
Oct 20 CSI Thermal Contractor and Self-Install Training
Oct 26 Skips Tips Advanced Solar Thermal Workshop
Nov 1 Energy Upgrade California Orientation Workshop
Nov 15 Passing the CSI Inspection Protocol
-
8/12/2019 mastering solar planning permits presentation
6/313
6www.energycenter.org
CCSE Housekeeping
Please sign in Turn off your cell phones Refreshments Recycle and compost Restrooms down the hall Fill out your Evaluation Forms
Tell people about CCSE! Presentation will be available online atwww.energycenter.org/csi-presentations
-
8/12/2019 mastering solar planning permits presentation
7/313
Mastering Solar Planning &Permits
Among the things that make an installation easier,is a better understanding of municipal processes,
permitting and issues related to safety.
Installing a solar PV system in San Diego?
-
8/12/2019 mastering solar planning permits presentation
8/313
Introduction-
Patrick HealyChief EPM Inspector*DPLU, Building div. - County of San Diego
19 years experience combination inspector County of San Diego 7 years as Electrical Specialist County of San Diego Past President - So Cal Chapter, International Association of Electrical
Inspectors Past President - International Code Council, San Diego Area Chapter Code Advisory Committee - CBSC
-
8/12/2019 mastering solar planning permits presentation
9/313
Marisa SmithPlanner 1DPLU Planning div. - County of San Diego
-
8/12/2019 mastering solar planning permits presentation
10/313
Agenda Trends in Solar Permits Personal History with Solar in SD County Agencies involved in solar regulations Codes Applicable to Solar State Code Process Local Ordinances Local Interpretation Local Policies Standards applicable to Solar Equipment Plan Submittal Requirements and Permitting Documentation and County Handouts Plan Submittal requirements and Process Most common solar systems
Plan technical basics
Common plan errors Commercial project requirements Q/A
-
8/12/2019 mastering solar planning permits presentation
11/313
-
8/12/2019 mastering solar planning permits presentation
12/313
-
8/12/2019 mastering solar planning permits presentation
13/313
-
8/12/2019 mastering solar planning permits presentation
14/313
-
8/12/2019 mastering solar planning permits presentation
15/313
-
8/12/2019 mastering solar planning permits presentation
16/313
-
8/12/2019 mastering solar planning permits presentation
17/313
Practical?
-
8/12/2019 mastering solar planning permits presentation
18/313
Practical? Depends
-
8/12/2019 mastering solar planning permits presentation
19/313
Coastal areas ?
Dont see as much solar oncoast?
Is Fog and Clouds theDetermining Factor, or is it
the lower HVAC costs inthe coastal area?
-
8/12/2019 mastering solar planning permits presentation
20/313
-
8/12/2019 mastering solar planning permits presentation
21/313
5 Acres?
-
8/12/2019 mastering solar planning permits presentation
22/313
5 Acres?300 Acre Project coming to SD County
-
8/12/2019 mastering solar planning permits presentation
23/313
5 Acres?300 Acre Project coming to SD County6000 Acre Project coming to Central CA 540 MW
-
8/12/2019 mastering solar planning permits presentation
24/313
FRANCE
-
8/12/2019 mastering solar planning permits presentation
25/313
FRANCE - Mountains
-
8/12/2019 mastering solar planning permits presentation
26/313
-
8/12/2019 mastering solar planning permits presentation
27/313
-
8/12/2019 mastering solar planning permits presentation
28/313
-
8/12/2019 mastering solar planning permits presentation
29/313
Whats with all the interest in solar?
-
8/12/2019 mastering solar planning permits presentation
30/313
"Comparing finite and rene wable planetary energy reserves
(Terawatt-years). Total rec overable reserves are shown forhe finite resources. Yearly potential is shown for the
renewables." (source: Pere z & Perez, 2009a)
"Comparing finite and renewable planetary energy reserves(Terawatt -years). Total recoverable reserves are shown for thefinite resources. Yearly potential is shown for the renewables."(*source: Perez & Perez, 2009) *
http://c1.cleantechnica.com/files/2011/08/energy-resources-renewables-fossil-fuel-uranium.pnghttp://c1.cleantechnica.com/files/2011/08/energy-resources-renewables-fossil-fuel-uranium.pnghttp://c1.cleantechnica.com/files/2011/08/energy-resources-renewables-fossil-fuel-uranium.pnghttp://c1.cleantechnica.com/files/2011/08/energy-resources-renewables-fossil-fuel-uranium.pnghttp://c1.cleantechnica.com/files/2011/08/energy-resources-renewables-fossil-fuel-uranium.pnghttp://c1.cleantechnica.com/files/2011/08/energy-resources-renewables-fossil-fuel-uranium.png -
8/12/2019 mastering solar planning permits presentation
31/313
-
8/12/2019 mastering solar planning permits presentation
32/313
Once you know the size of the reserves it easy tosee the number of years those reserves wouldlast. At the end of 2009 the estimates were
Oil: 46 years (depleted in 2055)
Natural gas: 63 years (depleted in 2072)
Coal: 119 years (depleted in 2128)
-
8/12/2019 mastering solar planning permits presentation
33/313
Total Solar Irradiance upon Earthwas measured by satellite to be
roughly 1.361 Kilowatts per
square meter1 MW of PV generates 1,500,000 kWh per year
-
8/12/2019 mastering solar planning permits presentation
34/313
-
8/12/2019 mastering solar planning permits presentation
35/313
Other Factors
Incentives - The federal and state financialincentives have undoubtedly fueled the rise in the
solar industry and the economy
Interest - People just like solar and being involved indoing something good for the environment
-
8/12/2019 mastering solar planning permits presentation
36/313
Trends in Solar
-
8/12/2019 mastering solar planning permits presentation
37/313
-
8/12/2019 mastering solar planning permits presentation
38/313
After standing at 17 gigawatts in July 2011, the US non-residential pipeline increased to 24 GW by September 2011
California currently accounts for 61% of the total US project pipeline*New Projects in California, Some in SD County
-
8/12/2019 mastering solar planning permits presentation
39/313
After standing at 17 gigawatts in July 2011, the US non-residentialpipeline increased to 24 GW by September 2011
California currently accounts for 61% of the total US project pipelineUtility-driven activity is now evident across 35 states *
-
8/12/2019 mastering solar planning permits presentation
40/313
-
8/12/2019 mastering solar planning permits presentation
41/313
Personal Experience with Solar
Past 7 years as the County Electrical Specialist
First year about 3 -5 permits a week Currently an average of about 10- 15 a Day Recent Surge in Commercial Recent Interest in Solar Farms and Utility Grade Plants
Solar Photovoltaic Permits Issued
-
8/12/2019 mastering solar planning permits presentation
42/313
131 167 169219
279
382
433
954
981
1336
0
200
400
600
800
1000
1200
1400
1600
(Includes: Groun d-Mount PV, Roof-Mount PV, & Solar Water Heaters) (Current FY Annualized)
-
8/12/2019 mastering solar planning permits presentation
43/313
ACTUALSSOLAR PV RESIDENTIALPERMITS ISSUED 952
TOTAL RENEWABLE ENERGY PERMITS 981TOTAL FEE'S WAIVED $322,401
RENEWABLE ENERGY CAPACITY AND GENERATION: AMOUNT OF PV GENERATING CAPACITY INSTALLED (MW) 5.44
EMISSIONS REDUCTIONS (TONS) (CO2 EQUIVALENTS) IN CARBON:
PHOTOVOLTAIC 6029.035
TOTAL 6086.886
Renewable Energy Permits FY 10/11
-
8/12/2019 mastering solar planning permits presentation
44/313
ACTUAL PROJECTIONRESIDENTIAL SOLAR PV PERMITS 330 1320
TOTAL FEE'S WAIVED $112,211 $448,844
AMOUNT OF PV GENERATING CAPACITY INSTALLED 1.7885 7.15400
:EMISSIONS REDUCTION (TONS) (CO2 EQUIVALENTS) IN CARBON 1982.105 7928.421
Renewable Energy Permits FY 11/12
-
8/12/2019 mastering solar planning permits presentation
45/313
-
8/12/2019 mastering solar planning permits presentation
46/313
-
8/12/2019 mastering solar planning permits presentation
47/313
http://c1.cleantechnica.com/files/2011/08/solar-pv-cost-trend.png -
8/12/2019 mastering solar planning permits presentation
48/313
http://c1.cleantechnica.com/files/2011/08/solar-pv-cost-trend.pnghttp://c1.cleantechnica.com/files/2011/08/solar-pv-cost-trend.png -
8/12/2019 mastering solar planning permits presentation
49/313
Though State and Federal Incentives have decreased,so have the costs of Solar Modules*
http://c1.cleantechnica.com/files/2011/08/solar-pv-cost-trend.png -
8/12/2019 mastering solar planning permits presentation
50/313
New Technologies in Solar productsSolar Sand
Thin Film
Organic Modules
Concentrating PanelsCopper, Indium, Gallium, Selenide (CIGS Panels)
Many, many others
-
8/12/2019 mastering solar planning permits presentation
51/313
-
8/12/2019 mastering solar planning permits presentation
52/313
What Do Building Departments Do and
What Rules and Codes Do They Apply
Lets take a look
-
8/12/2019 mastering solar planning permits presentation
53/313
Promote safe and sanitarybuildings, utilities, and
structures, and regulatetheir use in a manner thatbest serves the individual,the environment and the
community
-
8/12/2019 mastering solar planning permits presentation
54/313
NFPA in response to GM:In the effort to rapidly change the country to Green technologies, the
last thing we need is for Building Codes and the Local BuildingDepartment to become obstructionists to the change.
-
8/12/2019 mastering solar planning permits presentation
55/313
While Building Department personnel have a duty to stay in touch with thelatest trends and technologies, codes may not entirely keep up with these
quickly evolving renewable industries.It is sometimes necessary to use education, experience, and expertise in
interpreting the purpose and intent of these codes
Our primary responsibility is the health, safety, and well being of the residentsof our communities.
*
-
8/12/2019 mastering solar planning permits presentation
56/313
Personal History with Solar
25 years ago in Julian I saw my first solarsystem.
Stand alone with Batteries 150K
Lost in Cedar Fire Rebuilt - w/solar
-
8/12/2019 mastering solar planning permits presentation
57/313
Types of Solar Permits
Residential Roof Mount Residential Ground Mount
Commercial Roof Mount Commercial Ground Mount Agricultural Solar Farm/Utility Grade Solar Plant, Off-Site
Permit Fees within the County of
-
8/12/2019 mastering solar planning permits presentation
58/313
Permit Fees within the County ofSan Diego
Residential Roof Mount - Residential Ground Mount - Commercial Roof Mount - Commercial Ground Mount - Agricultural -
Solar Farm/Utility Grade Solar Plant -
Permit Fees within the County of
-
8/12/2019 mastering solar planning permits presentation
59/313
Permit Fees within the County ofSan Diego
Residential Roof Mount - $0 Residential Ground Mount - Commercial Roof Mount - Commercial Ground Mount - Agricultural -
Solar Farm/Utility Grade Solar Plant -
Permit Fees within the County of
-
8/12/2019 mastering solar planning permits presentation
60/313
Permit Fees within the County ofSan Diego
Residential Roof Mount - $0 Residential Ground Mount - $0 (could be fees charged by DEH and DPW) Commercial Roof Mount - Commercial Ground Mount - Agricultural -
Solar Farm/Utility Grade Solar Plant -
Permit Fees within the County of
-
8/12/2019 mastering solar planning permits presentation
61/313
Permit Fees within the County ofSan Diego
Residential Roof Mount - $0 Residential Ground Mount - $0 (could be fees charged by DEH and DPW) Commercial Roof Mount - Based on Size/ Percentage of Valuation Commercial Ground Mount - Based on Size/ Percentage of Valuation Agricultural - Based on Size/ Percentage of Valuation
Solar Farm/Utility Grade Solar Plant -
Permit Fees within the County of
-
8/12/2019 mastering solar planning permits presentation
62/313
Permit Fees within the County ofSan Diego
Residential Roof Mount - $0 Residential Ground Mount - $0 (could be fees charged by DEH and DPW) Commercial Roof Mount - Based on Size/ Percentage of Valuation Commercial Ground Mount - Based on Size/ Percentage of Valuation Agricultural - Based on Size/ Percentage of Valuation
Solar Farm/Utility Grade Solar Plant - Based on Size/ Percentage of Valuation,&/or the cost of providing the services
-
8/12/2019 mastering solar planning permits presentation
63/313
Fees for Residential Solar permits are Waived under The County of San DiegosGreen Building Program and Homeowners Relief Act.
These programs were created by the County Board of Supervisors to AidHomeowners, and Promote the Use of Green Technology.
Additional Funding Provided by the Federal,American Reinvestment and Recovery Act,
Providing Grants to Local Government
GOVERNMENTAL REGULATORY AGENCIES &
-
8/12/2019 mastering solar planning permits presentation
64/313
GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES
OVERSEEING SOLAR INSTALLATIONS State of CA,Local Bldg DeptLocal Planning and Zoning
Local Fire DeptLocal Health DeptLocal Public Works Dept Area-wide Policies and Interpretation Authorities such as the local ICC ChapterPUC, CECOTHER AGENCIES
GOVERNMENTAL REGULATORY AGENCIES &
-
8/12/2019 mastering solar planning permits presentation
65/313
GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES
GOVERNMENTAL:State of CA -
GOVERNMENTAL REGULATORY AGENCIES &
-
8/12/2019 mastering solar planning permits presentation
66/313
GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES
State of CA Adopts the State Building Codes
-
8/12/2019 mastering solar planning permits presentation
67/313
-
8/12/2019 mastering solar planning permits presentation
68/313
-
8/12/2019 mastering solar planning permits presentation
69/313
-
8/12/2019 mastering solar planning permits presentation
70/313
-
8/12/2019 mastering solar planning permits presentation
71/313
-
8/12/2019 mastering solar planning permits presentation
72/313
-
8/12/2019 mastering solar planning permits presentation
73/313
GOVERNMENTAL REGULATORY AGENCIES &
-
8/12/2019 mastering solar planning permits presentation
74/313
GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES
State of CA
GOVERNMENTAL REGULATORY AGENCIES &
-
8/12/2019 mastering solar planning permits presentation
75/313
GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES
GOVERNMENTAL:State of CA Adopts the State Building Codes. State Agencies California Building StandardsCommission (CBSC) - Ca Fire Marshal, HCD, Others. All have an impact on whatgoes into the CA Codes.
GOVERNMENTAL REGULATORY AGENCIES &
-
8/12/2019 mastering solar planning permits presentation
76/313
GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES
GOVERNMENTAL:State of CA Adopts the State Building Codes. State Agencies California Building StandardsCommission (CBSC) - Ca Fire Marshal, HCD, Others. All have an impact on whatgoes into the CA Codes.
GOVERNMENTAL REGULATORY AGENCIES &
-
8/12/2019 mastering solar planning permits presentation
77/313
GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES
GOVERNMENTAL:State of CA Adopts the State Building Codes. State Agencies California Building StandardsCommission (CBSC) - Ca Fire Marshal, HCD, Others. All have an impact on whatgoes into the CA Codes.
GOVERNMENTAL REGULATORY AGENCIES &
-
8/12/2019 mastering solar planning permits presentation
78/313
GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES
State of CA
THE 2011 MODELCODE WILLBECOME
GOVERNMENTAL REGULATORY AGENCIES &
-
8/12/2019 mastering solar planning permits presentation
79/313
GOVERNMENTAL REGULATORY AGENCIES & AUTHORITIES
State of CA
THE 2011 MODELCODE WILLBECOME
THE 2013 CALIFORNIAELECTRICAL CODE
-
8/12/2019 mastering solar planning permits presentation
80/313
ALL CITIES AND COUNTIES IN CALIFORNIA ARE MANDATED TO ENFORCE THECALFORNIA BUILDING CODES
-
8/12/2019 mastering solar planning permits presentation
81/313
Local Bldg. Dept
Local Bldg. Dept
Interprets and applies the state codes
Enacts local ordinances for topics not covered in code.Sets policies for functions and operationsPerforms plan-check and inspection to verify code compliance.
-
8/12/2019 mastering solar planning permits presentation
82/313
http://www.sdcounty.ca.gov/dplu/bldgforms/index.html
San Diego County Websitefor forms and handouts
Solar Ordinance
http://www.sdcounty.ca.gov/dplu/ceqa/POD09006.html
Building Div Forms and Handouts
http://www.sdcounty.ca.gov/dplu/bldgforms/index.htmlhttp://www.sdcounty.ca.gov/dplu/ceqa/POD09006.htmlhttp://www.sdcounty.ca.gov/dplu/ceqa/POD09006.htmlhttp://www.sdcounty.ca.gov/dplu/bldgforms/index.html -
8/12/2019 mastering solar planning permits presentation
83/313
-
8/12/2019 mastering solar planning permits presentation
84/313
-
8/12/2019 mastering solar planning permits presentation
85/313
-
8/12/2019 mastering solar planning permits presentation
86/313
-
8/12/2019 mastering solar planning permits presentation
87/313
-
8/12/2019 mastering solar planning permits presentation
88/313
-
8/12/2019 mastering solar planning permits presentation
89/313
OTHER LOCAL AGENCY INVOLVEMENT Planning/Zoning regulations Fire regulations Health Department (DEH) for septic systems Public Works for flood plains, drainage courses
DEH Requirements for Ground Mount Systems
-
8/12/2019 mastering solar planning permits presentation
90/313
q y
Two primary concerns are addressed when DEH reviews ground mounted solar arrays. The first being the array itself and its proximity tothe septic system. Second being the utility trench to the electric panel and its proximity to the septic system. Below are the reviewstandards for DEH.
Ground Mount Array The array is considered a structure. The minimum setback for a leach line to a structure is 8 feet. The setback should be measured fromthe outermost point of the array whether it be the footing or the solar panel itself. Reasoning here is adequate room to maneuverequipment for a septic system repair. This setback must also take into account reserve leach field area. Setbacks for solar arrays to septictanks are 5 feet. Here again to the outer most edge of the array allowing for equipment access.
Utility Trench The utility trench from the solar array cannot cross over a primary or reserve leach field area. The utility trench should maintain a 5:1setback to a leach line for every foot of depth (2 ft deep utility trench = 10 ft setback to leach line). This would include reserve leach fieldareas. Utility trenches cannot cross over septic tanks and require a minimum 5 ft setback to the edge of the tank.
Plans need to identify the location of the septic tank and leach field. Then the accuracy needs to be verified by DEH records, or in the casewhere there is no record a DEH visit to the site
Good records from property owner or DEH showing no issues, sign-off is over the counter (OTC). Usually larger lots with lots of room. No records. Need licensed contractor to find system and produce an as-built (signed and dated by contractor). If DEH is comfortable
with this then an OTC is done, if not comfortable DEH may charge a 2 hr minimum consultation to do a site check. Impacts to septic system will require relocation of solar array. Impacts to septic system that cannot be mitigated with a relocation will
not be approved
-
8/12/2019 mastering solar planning permits presentation
91/313
County Fire MarshallRequirements for Solar
Installations
-
8/12/2019 mastering solar planning permits presentation
92/313
-
8/12/2019 mastering solar planning permits presentation
93/313
-
8/12/2019 mastering solar planning permits presentation
94/313
-
8/12/2019 mastering solar planning permits presentation
95/313
-
8/12/2019 mastering solar planning permits presentation
96/313
-
8/12/2019 mastering solar planning permits presentation
97/313
-
8/12/2019 mastering solar planning permits presentation
98/313
-
8/12/2019 mastering solar planning permits presentation
99/313
ACCESS
-
8/12/2019 mastering solar planning permits presentation
100/313
-
8/12/2019 mastering solar planning permits presentation
101/313
ACCESSFOR SERVICINGFOR FIREFIGHTERS
-
8/12/2019 mastering solar planning permits presentation
102/313
Department of Public Works
Solar panels and equipment mustbe mounted a minimum of 12about the recorded flood plain
-
8/12/2019 mastering solar planning permits presentation
103/313
PUBLIC UTILITIES PUC, CECCODE WRITING PANELS AND COMMITTEESSTANDARDS AGENCIES AND TECHNICAL COMMITTEES( UL, ANSI, ETC )*
NRTLs - NATIONALLY RECOGNIZED TESTING AGENCIESTHIRD-PARTY FIELD EVALUATORSCCSE AND OTHER AGENCIES OVERSEEING GREEN PROGRAMS LOCAL ORGANIZATIONS LIKE ICC AND CALBOOTHERS?
NON- GOVERNMENTAL AGENCIES &
AUTHORITIES ON SOLAR
-
8/12/2019 mastering solar planning permits presentation
104/313
San Diego Area Electrical Newsletters
Drafted by the San Diego Chapter of ICC
www. iccsandiego .org/uploads/2005%20Electrical%20 Newsletter %20Final%201-10-06.pdf
http://www.iccsandiego.org
Newsletters Link
http://www.iccsandiego.org/uploads/2005%20Electrical%20Newsletter%20Final%201-10-06.pdfhttp://www.iccsandiego.org/uploads/2005%20Electrical%20Newsletter%20Final%201-10-06.pdfhttp://www.iccsandiego.org/uploads/2005%20Electrical%20Newsletter%20Final%201-10-06.pdfhttp://www.iccsandiego.org/uploads/2005%20Electrical%20Newsletter%20Final%201-10-06.pdfhttp://www.iccsandiego.org/uploads/2005%20Electrical%20Newsletter%20Final%201-10-06.pdfhttp://www.iccsandiego.org/http://e/sdaenl%20jan08.pdfhttp://e/sdaenl%20jan08.pdfhttp://www.iccsandiego.org/http://www.iccsandiego.org/uploads/2005%20Electrical%20Newsletter%20Final%201-10-06.pdf -
8/12/2019 mastering solar planning permits presentation
105/313
UL STANDARDS FOR SOLAR PRODUCTS
UL1703* For flat plate modules and panelsUL 1741* Grid Tied InvertersUL 2703 Solar Racking Systems and Grounding
*ANSI approved Standard
UL is testing products to safety standards, but isshowing an interest in testing to efficiency standards
also. This to help certify the claims made bymanufacturers of solar products
-
8/12/2019 mastering solar planning permits presentation
106/313
-
8/12/2019 mastering solar planning permits presentation
107/313
-
8/12/2019 mastering solar planning permits presentation
108/313
S d d M i i l P
-
8/12/2019 mastering solar planning permits presentation
109/313
Standard Municipal Process:Plan Check Review
Permit IssuanceInspection
The level of Plan review depends on the scope of the project
Typical roof mount residential plan review includes:
Roof Plan - overall layout of modules, electricalpanels/equipment, and conduit runsElectrical plan review single line electrical diagramElectrical Calculations Voltage, Amperage, Derating factors,
Overcurrent and conductors sizing.Structural roof attachment review racking systemEquipment Data SheetsProperty history review and zoning reviewPermit issuance 0 fees *Inspection Most residential roof-mounts are a singleinspection, performed when the job is complete
St d d M i i l P
-
8/12/2019 mastering solar planning permits presentation
110/313
Standard Municipal Process:Plan Check Review
Permit Issuanceand Inspection
Typical residential ground mount includes most items shown fora roof mount and additionally:
Plot Plan reviewStructural foundation review and support attachmentsDpt of Environmental Health review for septic concernsDpt of Public Works Review for flood plain setbacksPermit issuance $0 Building Div fees*
Inspection Most ground-mounts require multiple inspectionsFoundation, U/G Electric, and Final Inspection
*If additional electrical work needs to be performed, regular electrical fees apply* Fees apply to DEH and DPW review
St d d M i i l P i
-
8/12/2019 mastering solar planning permits presentation
111/313
Standard Municipal Process isPlan Check Review
Permit Issuanceand Inspection
Typical Commercial and Agricultural On-site Solar would includemost of the previous items and additionally;
Professionally designed electrical and structural plansZoning Review and possible zoning criteria administeredPossible Fire Department ReviewPossible Submittal of Plans
Permit issuance Fees Apply
St d d M i i l P i
-
8/12/2019 mastering solar planning permits presentation
112/313
Standard Municipal Process isPlan Check Review
Permit Issuanceand Inspection
Typical Solar Farm and Utility Grade Off-site Solar would includemost of the previous items and additionally;
Use Permit/Admin Permit reviewFire Department ReviewSubmittal of PlansPermit issuance Fees Apply
-
8/12/2019 mastering solar planning permits presentation
113/313
Sample PlansROOF MOUNTED SYSTEM
-
8/12/2019 mastering solar planning permits presentation
114/313
-
8/12/2019 mastering solar planning permits presentation
115/313
-
8/12/2019 mastering solar planning permits presentation
116/313
Sample Plan # 2ROOF MOUNTED SYSTEM
-
8/12/2019 mastering solar planning permits presentation
117/313
-
8/12/2019 mastering solar planning permits presentation
118/313
-
8/12/2019 mastering solar planning permits presentation
119/313
IDENTIFY THE LOCATION OF THECONDUIT RUN
-
8/12/2019 mastering solar planning permits presentation
120/313
-
8/12/2019 mastering solar planning permits presentation
121/313
-
8/12/2019 mastering solar planning permits presentation
122/313
REQUIRED
-
8/12/2019 mastering solar planning permits presentation
123/313
REQUIREDREQUIRED
-
8/12/2019 mastering solar planning permits presentation
124/313
REQUIRED
2 GROUND RODSREQUIRED
REQUIRED
-
8/12/2019 mastering solar planning permits presentation
125/313
REQUIRED
2 GROUND RODSREQUIRED
REQUIRED
AC DISCONNECT ?
-
8/12/2019 mastering solar planning permits presentation
126/313
The Combined maximum output ofinverters on the AC side X 1.25%indicates the minimum size breaker.Conductor size is determined by thebreaker rating and derating of theconductors. Derating is needed for morethan 3 conductors in a raceway, distance
mounted off the surface of the roof, andthe ambient temperature for the area ofthe installationMaximum Breaker size is determined bythe rating of the main breaker and therating of the solar breakers notexceeding the rating of the buss bar X120%
-
8/12/2019 mastering solar planning permits presentation
127/313
-
8/12/2019 mastering solar planning permits presentation
128/313
-
8/12/2019 mastering solar planning permits presentation
129/313
2 1/2 IMBEDMENT
-
8/12/2019 mastering solar planning permits presentation
130/313
-
8/12/2019 mastering solar planning permits presentation
131/313
-
8/12/2019 mastering solar planning permits presentation
132/313
-
8/12/2019 mastering solar planning permits presentation
133/313
-
8/12/2019 mastering solar planning permits presentation
134/313
-
8/12/2019 mastering solar planning permits presentation
135/313
-
8/12/2019 mastering solar planning permits presentation
136/313
-
8/12/2019 mastering solar planning permits presentation
137/313
Sample Plan # 3GROUND MOUNTED SYSTEMgmspdf
http://e/Ground%20Mount%20Sample%20%20Plan.pdfhttp://e/Ground%20Mount%20Sample%20%20Plan.pdf -
8/12/2019 mastering solar planning permits presentation
138/313
Sample Plan # 4ROOF MOUNTED SYSTEMgmspdf1
http://e/Roof%20Sample%20Reduced.pdfhttp://e/Roof%20Sample%20Reduced.pdf -
8/12/2019 mastering solar planning permits presentation
139/313
Sample Plan # 5GROUND MOUNTED SYSTEMgmspdf2
http://e/SolarCity%20Roof%20MT.pdfhttp://e/SolarCity%20Roof%20MT.pdf -
8/12/2019 mastering solar planning permits presentation
140/313
-
8/12/2019 mastering solar planning permits presentation
141/313
Third-Party Grounding Devices
Must be specifically mentioned in the installation
instructions for the modules
Grounding Clips tested in conjunction with a rackingsystem thats listed to UL 2703 must specifically identifythe modules that it was tested with.
-
8/12/2019 mastering solar planning permits presentation
142/313
-
8/12/2019 mastering solar planning permits presentation
143/313
Class-A roofing?
-
8/12/2019 mastering solar planning permits presentation
144/313
Class-A roofing?
Some modules have a class-A rating
-
8/12/2019 mastering solar planning permits presentation
145/313
Class-A roofing?
Some modules have a class-A rating
Most require a class-A roof underneath (new construction)
-
8/12/2019 mastering solar planning permits presentation
146/313
-
8/12/2019 mastering solar planning permits presentation
147/313
CLASS A ROOF?
-
8/12/2019 mastering solar planning permits presentation
148/313
Target Fire Bakersfield
-
8/12/2019 mastering solar planning permits presentation
149/313
g
Link
http://e/Target%20PV%20Fire.pdfhttp://e/Target%20PV%20Fire.pdf -
8/12/2019 mastering solar planning permits presentation
150/313
-
8/12/2019 mastering solar planning permits presentation
151/313
Metal Roofs
-
8/12/2019 mastering solar planning permits presentation
152/313
-
8/12/2019 mastering solar planning permits presentation
153/313
-
8/12/2019 mastering solar planning permits presentation
154/313
http://buysolarpowernow.com/review/product/B002TJFGD6/buysolarnow-20/solartech-spm040p-n-40-watt-12-volt-polycrystalline-pv-solar-panel -
8/12/2019 mastering solar planning permits presentation
155/313
http://buysolarpowernow.com/review/product/B002TJFGD6/buysolarnow-20/solartech-spm040p-n-40-watt-12-volt-polycrystalline-pv-solar-panel -
8/12/2019 mastering solar planning permits presentation
156/313
-
8/12/2019 mastering solar planning permits presentation
157/313
-
8/12/2019 mastering solar planning permits presentation
158/313
-
8/12/2019 mastering solar planning permits presentation
159/313
INDIA
-
8/12/2019 mastering solar planning permits presentation
160/313
-
8/12/2019 mastering solar planning permits presentation
161/313
-
8/12/2019 mastering solar planning permits presentation
162/313
-
8/12/2019 mastering solar planning permits presentation
163/313
-
8/12/2019 mastering solar planning permits presentation
164/313
-
8/12/2019 mastering solar planning permits presentation
165/313
-
8/12/2019 mastering solar planning permits presentation
166/313
-
8/12/2019 mastering solar planning permits presentation
167/313
-
8/12/2019 mastering solar planning permits presentation
168/313
Teaching the Basics
Want to teach your kids about renewable energy in a way thats relevant andinteresting?
If youre installing a new solar power system for your home, its a perfect
opportunity to talk about how it works, why its important for the environment,and you can throw in some math lessons too. Solar power is complicated enoughthat older children and adults can learn plenty, but it can also be explained in a
way that even younger kids can understand
NOW SERVING
SOLAR POWER IN SAN DIEGO
-
8/12/2019 mastering solar planning permits presentation
169/313
SOLAR POWER IN SAN DIEGO
-
8/12/2019 mastering solar planning permits presentation
170/313
Thank You
Q & ATime Permitting
NEXT UP
-
8/12/2019 mastering solar planning permits presentation
171/313
Marisa SmithPlanner 1
DPLU Planning Div. - County of San Diego
NEXT UP
County of San Diego Planning
-
8/12/2019 mastering solar planning permits presentation
172/313
y g g
Requirements for Solar
-
8/12/2019 mastering solar planning permits presentation
173/313
1) roof-mount
2) ground-mount on-site3) ground-mount off-site
Roof Mount Solar PV
-
8/12/2019 mastering solar planning permits presentation
174/313
Ground Mount Solar PV - residential
-
8/12/2019 mastering solar planning permits presentation
175/313
Roof mount - Solar PV - commercial
-
8/12/2019 mastering solar planning permits presentation
176/313
Ground Mount Off-Site
-
8/12/2019 mastering solar planning permits presentation
177/313
-
8/12/2019 mastering solar planning permits presentation
178/313
-
8/12/2019 mastering solar planning permits presentation
179/313
-
8/12/2019 mastering solar planning permits presentation
180/313
-
8/12/2019 mastering solar planning permits presentation
181/313
N
-
8/12/2019 mastering solar planning permits presentation
182/313
Typical Plot Plan
-
8/12/2019 mastering solar planning permits presentation
183/313
Typical Plot Plan
-
8/12/2019 mastering solar planning permits presentation
184/313
Typical Plot Plan show all existing structure
-
8/12/2019 mastering solar planning permits presentation
185/313
Existing SFD
Typical Plot Plan - setbacks
-
8/12/2019 mastering solar planning permits presentation
186/313
Typical Plot Plan
-
8/12/2019 mastering solar planning permits presentation
187/313
Typical Plot Plan
-
8/12/2019 mastering solar planning permits presentation
188/313
-
8/12/2019 mastering solar planning permits presentation
189/313
EXPIRED PERMITS
-
8/12/2019 mastering solar planning permits presentation
190/313
Summary
-
8/12/2019 mastering solar planning permits presentation
191/313
-
8/12/2019 mastering solar planning permits presentation
192/313
Q & A?
Development Services DepartmentDivision of Building, Safety & Construction
-
8/12/2019 mastering solar planning permits presentation
193/313
1
PhotovoltaicInformation Session
Mar t in Mon tess oro
Oc to b er 18, 2011
Development Services DepartmentDivision of Building, Safety & Construction
Resources
-
8/12/2019 mastering solar planning permits presentation
194/313
3
Resources Information Bulletin 301 Plan Template
Inspection Guidelines SD Area Electrical Newsletterhttp://www.sandiego.gov/development-services/
Development Services DepartmentDivision of Building, Safety & Construction
-
8/12/2019 mastering solar planning permits presentation
195/313
4
Submit Plans and Documents
Over-the-Counter by Appointment(SFR Per Template) Master Plan
Options For Plan Review
-
8/12/2019 mastering solar planning permits presentation
196/313
Development Services DepartmentDivision of Building, Safety & Construction
Plan Submittal
-
8/12/2019 mastering solar planning permits presentation
197/313
Plan Submittal Check in on the third floor of DSC Walk- in or Appointment at Submittal
Plan Check fees have to be paid at thetime of Submittal
Plans are distributed to all reviewers
(Structural and Electrical)
6
Development Services DepartmentDivision of Building, Safety & Construction
Over-the-Counter by
-
8/12/2019 mastering solar planning permits presentation
198/313
7
Plans and Documents per Plan
Template Call (619) 446-5300 for appointment Appointments are for one hour Maximum of two appointments per
day per customer Check-in at least 30 minutes prior to
your appointment
Over-the-Counter byAppointment
Development Services DepartmentDivision of Building, Safety & Construction
Master Plans
-
8/12/2019 mastering solar planning permits presentation
199/313
Master Plans
8
Establish Master Plan Submit Plans on Third Floor of
DSC 10-Day Review
Fee - Hourly Plan Check Only
Development Services DepartmentDivision of Building, Safety & Construction
Master Plan
-
8/12/2019 mastering solar planning permits presentation
200/313
9
Master Plan Installations Per Established Master Plan
Site Plan Issued Over-the-Counter at
Screening (3 rd Floor, DSC) Fees
Issuance
Records Permit Fee
Development Services DepartmentDivision of Building, Safety & Construction
Rechecks
-
8/12/2019 mastering solar planning permits presentation
201/313
10
Rechecks
By Appointment with the reviewer Walk-In, Over-the-Counter
Electrical Counter (3 rd Floor,DSC)
Development Services DepartmentDivision of Building, Safety & Construction
Issuance
-
8/12/2019 mastering solar planning permits presentation
202/313
11
Issuance
By Appointment with the Issuancestaff
Walk-In Over-the-CounterThird floor DSCPermit fees
Development Services DepartmentDivision of Building, Construction and Safety
Solar Photovoltaic Plan
-
8/12/2019 mastering solar planning permits presentation
203/313
Solar Photovoltaic PlanReview Process
Complying Template Projects Roof Mounted SFD
12
Development Services DepartmentDivision of Building, Construction and Safety
DSD Residential Plan Template for
-
8/12/2019 mastering solar planning permits presentation
204/313
DSD Residential Plan Template forSolar Photovoltaic
The Purpose is to reduce plan review time by: Establishing a standard format and layout Suggesting standard notes
13
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template General Project
-
8/12/2019 mastering solar planning permits presentation
205/313
14
Residential PV TemplateInformation
Notes for each
page on the
right-hand sideof the page
Plans need to be in a simple legible format
(11 X 17)
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template PV Company Name
-
8/12/2019 mastering solar planning permits presentation
206/313
15
Residential PV Template& Logo
Designer Name
Signature
License #
Project
Location
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template Notes font large
-
8/12/2019 mastering solar planning permits presentation
207/313
16
Residential PV Template enough to belegible
Identify Property
Lines
PageReference
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template
-
8/12/2019 mastering solar planning permits presentation
208/313
17
Residential PV TemplateLocate Building ,Plumbing
and Mechanical VentsArray layout custom
to each project
showing the number
of modules
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template
-
8/12/2019 mastering solar planning permits presentation
209/313
18
Residential PV Template
Identify the location of
the conduit. If DC
conductors are routed
within the building
they must be within a
metallic conduit
marked CAUTION DC
CIRCUIT every five
feet.
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template
-
8/12/2019 mastering solar planning permits presentation
210/313
19
Residential PV Template
Show Meter Location
Show Inverter Location
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template
-
8/12/2019 mastering solar planning permits presentation
211/313
20
pStructural
calculations are
required for the roof
or structure mounted
PV systems if theweight of the PV
system exceeds five
pounds per square
foot.
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template
-
8/12/2019 mastering solar planning permits presentation
212/313
21
Residential PV Template
Roof Framing and
the Rack lay out
Typical Detail to
show the
attachment
Provide a Water Proofing Detail
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template Single Line
-
8/12/2019 mastering solar planning permits presentation
213/313
22
Residential PV Template Single Line
Identify the wire type
and size
Show the number ofmodules per string
and the number of
strings per system
Show the module
manufactures' name
and the model
number
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template Single Line
-
8/12/2019 mastering solar planning permits presentation
214/313
23
Residential PV Template Single Line
Identify the wire type,
and size
Identify the conduit
type, and size
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template Single Line
-
8/12/2019 mastering solar planning permits presentation
215/313
p g
24
Identify the wire type
and size
Identify the conduit
type and size
Show the inverter
manufactures' name
and the model
number
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template Single Line
-
8/12/2019 mastering solar planning permits presentation
216/313
p g
25
If a combiner box is
used identify the
ampere rating of the
bus and OCP
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template Single Line
-
8/12/2019 mastering solar planning permits presentation
217/313
26
Identify the ampere rating of
the bus, main breaker and
back-fed PV breaker
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template Single Line
-
8/12/2019 mastering solar planning permits presentation
218/313
27
Systems with micro inverters
need to show disconnects incompliance with (CEC 609.14 ( D))
If micro inverter system is
installed show the module
manufactures' name and the
model number
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template Single Line
-
8/12/2019 mastering solar planning permits presentation
219/313
28
Identify DC and AC
disconnects and where fuses
are required show the ampere
rating of the fuses
Development Services DepartmentDivision of Building, Construction and Safety
Residential PV Template
-
8/12/2019 mastering solar planning permits presentation
220/313
Manufacturer Information Sheets
29
Include 8.5 by 11copies of the
Manufacturersspecifications
Verify that allcomponents are
listed by a NationallyRecognized TestingLaboratory for theintended use .
Development Services DepartmentDivision of Building, Construction and Safety
Technical Data
-
8/12/2019 mastering solar planning permits presentation
221/313
30
Identify the short circuit current ( Isc ) and the open circuitvoltage ( Voc ).
Module Info Inverter Info
Development Services DepartmentDivision of Building, Construction and Safety
DSD Residential Plan Template for
-
8/12/2019 mastering solar planning permits presentation
222/313
DSD Residential Plan Template forSolar Photovoltaic
QUESTIONS?
31
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
223/313
Inspection Guidelines and
Suggested Practices
Development Services DepartmentDivision of Building, Construction and Safety
Inspection Process
-
8/12/2019 mastering solar planning permits presentation
224/313
p To verify that the installation is in
conformance with the design of theapproved set of plans
To verify that the installation is incompliance with the California ElectricalCode and other applicable codes andregulations
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
225/313
Purpose of the Code.the practical safeguarding of
persons and property fromhazards arising from the use ofelectricity
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
226/313
2010 CaliforniaElectrical Code
2008 National Electrical Code with amendments from State agencies California Code of Regulations, Title 24, Part 3
Effective date January 1, 2011
Development Services DepartmentDivision of Building, Construction and Safety
Inspection Process
-
8/12/2019 mastering solar planning permits presentation
227/313
p Contractor/owner responsibility to
schedule and coordinate all requiredinspections
Responsible party on site Provide access to all elements of
system installation
Development Services DepartmentDivision of Building, Construction and Safety
Inspection
-
8/12/2019 mastering solar planning permits presentation
228/313
p Ground-mounted
1. footings for array frame
2. underground raceways3. final
Observe regulations for -
Brush Management Zones,Environmentally Sensitive Lands, andMultiple Habitat Planning Areas
Development Services DepartmentDivision of Building, Construction and Safety
Inspection (continued)
-
8/12/2019 mastering solar planning permits presentation
229/313
Roof mounted arraysRough electrical (for any concealed
work)Roof array and bond (for integratedsystems or for tile roofs)
Final inspection
Development Services DepartmentDivision of Building, Construction and Safety
Necessary Paperwork on Site
-
8/12/2019 mastering solar planning permits presentation
230/313
y p
Approved plans Inspection record card (DS-1798) Manufacturers Installation instructions
modules, racking, inverter
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
231/313
Development Services DepartmentDivision of Building, Construction and Safety
Installation manuals inverters,
-
8/12/2019 mastering solar planning permits presentation
232/313
modules
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
233/313
Roof Mounted Systems
-
8/12/2019 mastering solar planning permits presentation
234/313
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
235/313
44
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
236/313
45
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
237/313
Tile roofs
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
238/313
47
Development Services DepartmentDivision of Building, Construction and Safety
Building Integrated PV
-
8/12/2019 mastering solar planning permits presentation
239/313
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
240/313
49
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
241/313
50
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
242/313
51
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
243/313
52
Development Services DepartmentDivision of Building, Construction and Safety
Micro-inverters
-
8/12/2019 mastering solar planning permits presentation
244/313
53
Development Services DepartmentDivision of Building, Construction and Safety
Other Systems
-
8/12/2019 mastering solar planning permits presentation
245/313
54
Development Services DepartmentDivision of Building, Construction and Safety
Other Systems
-
8/12/2019 mastering solar planning permits presentation
246/313
55
-
8/12/2019 mastering solar planning permits presentation
247/313
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
248/313
Racking system and grounding57
Development Services DepartmentDivision of Building, Construction and Safety
Flashing and Weather Protection
-
8/12/2019 mastering solar planning permits presentation
249/313
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
250/313
Rolled roofing penetrationProperly flashed and sealed
59
Development Services DepartmentDivision of Building, Construction and Safety
Clearance to Vents
-
8/12/2019 mastering solar planning permits presentation
251/313
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
252/313
61
Development Services DepartmentDivision of Building, Construction and Safety
Plumbing VentsPlumbing vents cannot be coveredby module installationVents shall terminate a minimum
f
-
8/12/2019 mastering solar planning permits presentation
253/313
of6 above or 1 away horizontallyfrom adjacent PV modulesTermination shall not be higherthat the highest point of the existingroofVents less than 3 can beextended /offset but shall beproperly and independentlysupportedAll extensions shall meet therequirements of the CaliforniaPlumbing CodeExtension on any plumbing vent 3diameter or larger is not allowed
62
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
254/313
Using Identified grounding points and approveddevices and materials
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
255/313
Unapproved Grounding MeansNot approved braided copper with sheet metal screw into themodule frame
64
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
256/313
65
Development Services DepartmentDivision of Building, Construction and Safety
Combiner Boxes, Junction Boxesd h d
-
8/12/2019 mastering solar planning permits presentation
257/313
and Wiring Methods Listed equipment
Installed per manufacturer's installationinstructions
Cable Management
Conduit support
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
258/313
Combiner boxes, wiring methodCombiner boxes shall be listedInstalled per the manufacturers instructions
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
259/313
68
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
260/313
69
Development Services DepartmentDivision of Building, Construction and Safety
Conduit support
-
8/12/2019 mastering solar planning permits presentation
261/313
Development Services DepartmentDivision of Building, Construction and Safety
Conduit Support
-
8/12/2019 mastering solar planning permits presentation
262/313
71
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
263/313
Wiring methods and materials
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
264/313
73
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
265/313
74
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
266/313
75
Development Services DepartmentDivision of Building, Construction and Safety
PV Wire
-
8/12/2019 mastering solar planning permits presentation
267/313
76
Development Services DepartmentDivision of Building, Construction and Safety
Cable Management
-
8/12/2019 mastering solar planning permits presentation
268/313
Development Services DepartmentDivision of Building, Construction and Safety
Conductor De-rating
-
8/12/2019 mastering solar planning permits presentation
269/313
Derating for conductorampacity is required pernew Table 310.15(B)(2)
Use the ASHRAE tablesfor the ambienttemperature used for thecorrection factor
Air inside the raceway issignificantly hotter than thesurrounding air
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
270/313
Development Services DepartmentDivision of Building, Construction and Safety
Inverters and DC Disconnects
-
8/12/2019 mastering solar planning permits presentation
271/313
Listed utility interactive inverters As-built conforms to the design
Installed per manufacturers installationinstructions or recommendations System grounding electrode conductor
properly terminated
-
8/12/2019 mastering solar planning permits presentation
272/313
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
273/313
82
Development Services DepartmentDivision of Building, Construction and Safety
Conductor terminations
-
8/12/2019 mastering solar planning permits presentation
274/313
Development Services DepartmentDivision of Building, Construction and Safety
Inverter locations
-
8/12/2019 mastering solar planning permits presentation
275/313
Development Services DepartmentDivision of Building, Construction and Safety
Service Equipment bus rating
-
8/12/2019 mastering solar planning permits presentation
276/313
bus rating existing main overcurrent protection PV overcurrent protection
manufacturer breakers cable or conduit entry labeling
multiwire branch circuit relocation andbalanced load on bus
grounding system
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
277/313
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
278/313
EXISTING Panel
Whats the rating of the bus? Total Sum of the Over-currentDevices Permitted 87
-
8/12/2019 mastering solar planning permits presentation
279/313
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
280/313
89
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
281/313
90
Development Services DepartmentDivision of Building, Construction and Safety
PV breakers and new and
existing multi wire circuits
-
8/12/2019 mastering solar planning permits presentation
282/313
existing multi-wire circuits
Development Services DepartmentDivision of Building, Construction and Safety
Service Upgrades involving
Scheduled Outages with SDG&E
-
8/12/2019 mastering solar planning permits presentation
283/313
Scheduled Outages with SDG&E Schedule DSD inspection for day of the
scheduled outage Contact the inspector re: time frame Equipment installed, framing weather-protected,
grounded, service entrance raceway or riser and service
entrance conductors installed
Development Services DepartmentDivision of Building, Construction and Safety
Ready for reconnection?
-
8/12/2019 mastering solar planning permits presentation
284/313
-
8/12/2019 mastering solar planning permits presentation
285/313
Development Services DepartmentDivision of Building, Construction and Safety
Grounding
-
8/12/2019 mastering solar planning permits presentation
286/313
Verify acceptable grounding for existingservice equipment or provide asupplemental electrode
Provide service and system groundingcompliant with the Code
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
287/313
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
288/313
Water piping ground must be supplemented
Development Services DepartmentDivision of Building, Construction and Safety
Driven Ground Rod
-
8/12/2019 mastering solar planning permits presentation
289/313
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
290/313
Irreversible Splicing Devices For grounding electrode conductors Micro-inverter installations - #8 or #6 Cu system grounding
conductors
99
Development Services DepartmentDivision of Building, Construction and Safety
DC and AC wiring through a
structure
-
8/12/2019 mastering solar planning permits presentation
291/313
structure
100
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
292/313
CAUTION Notching andBoring Wood Members
101
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
293/313
Load-bearing 2 x 12 floor joists @ 12 OCnotched in middle 1/3 of spa n
102
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
294/313
103
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
295/313
Properly fire stop around all penetrations ofrated assemblies 104
Development Services DepartmentDivision of Building, Construction and Safety
Fire-resistive Exit Enclosures andPassageways
-
8/12/2019 mastering solar planning permits presentation
296/313
105
Development Services DepartmentDivision of Building, Construction and Safety
Signage and Placarding
-
8/12/2019 mastering solar planning permits presentation
297/313
Alternate power source placard DC raceways and DC disconnects
Cautionary Site specific design PV disconnect for utility operation
Development Services DepartmentDivision of Building, Construction and Safety
Alternate Power Source Placard
-
8/12/2019 mastering solar planning permits presentation
298/313
-
8/12/2019 mastering solar planning permits presentation
299/313
-
8/12/2019 mastering solar planning permits presentation
300/313
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
301/313
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
302/313
111
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
303/313
Development Services DepartmentDivision of Building, Construction and Safety
Suggested practices
-
8/12/2019 mastering solar planning permits presentation
304/313
Survey the site verify the adequacyand condition of the existing electrical
system to accommodate a PV system A service upgrade or other corrections
may be required
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
305/313
Inadequate work space
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
306/313
115
Development Services DepartmentDivision of Building, Construction and Safety
Service Disconnects Maximum Six
Handles without a Main Disconnect
-
8/12/2019 mastering solar planning permits presentation
307/313
Development Services DepartmentDivision of Building, Construction and Safety
Existing Service Entrance
-
8/12/2019 mastering solar planning permits presentation
308/313
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
309/313
Existing service
Development Services DepartmentDivision of Building, Construction and Safety
-
8/12/2019 mastering solar planning permits presentation
310/313
Service supplied by SIDA cable
Development Services DepartmentDivision of Building, Construction and Safety
Alternative
EnergySystems
-
8/12/2019 mastering solar planning permits presentation
311/313
gySystemsinstalled with
safeguardinglife andproperty in
mind
Development Services DepartmentDivision of Building, Construction and Safety
Resources Photovoltaic Systems, 2
nd
ed. Dunlop IAEI News (www iaei org)
-
8/12/2019 mastering solar planning permits presentation
312/313
IAEI News (www.iaei.org) IREC ( www.IRECUSA.org ) Field Inspection
Guidelines for PV Systems (Brooks Engg) Photovoltaic Power Systems: Suggested
Practices, Southwest TechnologyDevelopment Institute , NMSU(John Wiles)
NEC Handbooks - NFPA NFPAs NEC Plus City of San Diego Inspection Guidelines 121
Development Services DepartmentDivision of Building, Construction and Safety
http://www.irecusa.org/http://www.irecusa.org/ -
8/12/2019 mastering solar planning permits presentation
313/313
Q ti ?