  • Strength. Performance. Passion.

    2013 Holcim Beton

    Management Mass Pour Raft Foundation

    Holcim Beton, 2013-02-13 2013 Holcim Beton

    "Innovative concrete solutions, proudly delivered by people you can trust"PT. Holcim Beton

  • 2013 Holcim Beton

    Holcim BetonWhy we have to put more concern

    Holcim Beton, 2013-10-06 2

    Period Project Volume

    (M)

    Status

    May 2007 Menara Bakrie 9,070 Completed

    Jul 2007 Kuningan Place 6,431 Completed

    Aug 2007 Kuningan Place 3,278 Completed

    Sep 2007 Labuan 2 3,747 Completed

    Oct 2007 Plaza Indonesia 1st 6,421 Completed

    Oct 2007 Plaza Indonesia 2nd 6,755 Completed

    Nov 2007 Labuan 2 5.792 Completed

    Jan 2008 ST Regis 6.000 Completed

    Feb 2008 ST Regis 6.000 Completed

    Sep 2008 Kemang Village 6.000 Completed

    Apr 2009 Kemang Village 6080 Completed

    Mar 2013 Provident Park 7200 Completed

    Beton Tebal dan Volumenya Besar

  • 2013 Holcim Beton

    1. Heat of Hydration and Thermal Crack (low initial temperature,

    different temperature and peak temperature)

    2. Mix Design (low cementitious material, low w/c ratio, initial setting time)

    3. Plastic Settlement and bleeding ( low slump )

    4. Cold join ( initial setting time and pouring method)

    5. Pouring management plan to ensure delivery, unloading,

    pouring and compacting to avoid cold join

    What are focus&

    Holcim Beton, 2013-10-06 3

  • 2013 Holcim BetonHolcim Beton, 2013-02-13 4

    Temperature calculation Reff. ACI 305 R 99

  • 2013 Holcim Beton

    Material Temperatur (o C)

    Cement 70

    Fly Ash 45

    Agregate 30

    Water 29

    Exercise 1

    Holcim Beton, 2013-02-13 5

    Initial Temperature w/o ice = 35.45 (o C)

    Initial Temperature with ice (20 Kg) = 31.16 (o C)

    Ada penambahan kenaikan suhu 2-3 o C untuk 1

    jam perjalanan

  • 2013 Holcim BetonHolcim Beton, 2013-02-13 6

    Typical initial concrete temperature: 37 0C

    To achieve low initial concrete around 1oC (ACI 305R-11)

    can be done by lowering the temperature as follow: Cement 8 oC or

    Water 4 oC or

    Aggregate 2 oC

    Low Initial Concrete Temperature &.

  • 2013 Holcim Beton 7Holcim Beton, 2013-02-13

    Maximum different temperature 20 oC between layer

    Different Temperature

  • 2013 Holcim BetonMass Pouring

    Plastic

    Styrofoam/polystyrene 2.5+2.5+5 cm

    Curing Compound

    Beton

    50 C

    Temperature

    Monitoring

    Monitor Temperature - Thermo Couples

  • 2013 Holcim Beton

    Estimated peak Temperature

    Holcim Beton, 2013-10-06 9

    Tp = To + (Cement Content/100) x f Tp = peak temperature To = Fresh Concrete Temperature f = (100 120 C : Fly Ash Concrete)

    (120 140 C Normal Concrete)

    Example: Cementitious content 400 Kg To = 35.45o C Tp = 35.45o C + (466/100) x 12

    = 91.37o C

    To prevent crack related to heat hydration, the difference of temperature per layer () should be < 20 oC. Insulator has to be installed.

    Thermo couples reading on every 4 hours should started 12th hour up to 36th hour then reading on every two hours after 36th hour.

    Cement content 400 KgPeak temperature (0 C) Initial cc fa constanta FA Constanta depth 2-4 m88.01 MIX 15 % FA 35.45 396 70 0.6 12

  • 2013 Holcim Beton

    Mix Design (low cementitious material, low w/c ratio, initial setting time)

    Holcim Beton, 2013-02-13 10

  • 2013 Holcim BetonProvidence Park

    Data Trial Mix

    0%

    20%

    40%

    60%

    80%

    100%

    120%

    140%

    160%

    0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

    Pondok Indah

    Kembangan

    Rambutan

    Perkembangan Kuat Tekan Trial Mix Fc 35 Mpa Fa 20% February 2013

    -10%

    10%

    30%

    50%

    70%

    90%

    110%

    130%

    150%

    0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

    Pondok Indah

    Kembangan

    Rambutan

    Perkembangan Kuat Tekan Trial Mix Fc 35 Mpa Fa 25% February 2013

  • 2013 Holcim BetonProvidence Park

    Reference Project Adiabatic Fc 35 Mpa with Flyash 20 %

    0.0

    10.0

    20.0

    30.0

    40.0

    50.0

    60.0

    70.0

    80.0

    1

    2

    -

    F

    e

    b

    1

    3

    -

    F

    e

    b

    1

    4

    -

    F

    e

    b

    1

    5

    -

    F

    e

    b

    1

    6

    -

    F

    e

    b

    1

    7

    -

    F

    e

    b

    1

    8

    -

    F

    e

    b

    1

    9

    -

    F

    e

    b

    2

    0

    -

    F

    e

    b

    2

    1

    -

    F

    e

    b

    2

    2

    -

    F

    e

    b

    2

    3

    -

    F

    e

    b

    2

    4

    -

    F

    e

    b

    2

    5

    -

    F

    e

    b

    Titik bawah

    titik tengah

    titik atas

    t1mid-bottom

    t2mid-up

    0.0

    10.0

    20.0

    30.0

    40.0

    50.0

    60.0

    70.0

    80.0

    1

    2

    -

    F

    e

    b

    1

    3

    -

    F

    e

    b

    1

    4

    -

    F

    e

    b

    1

    5

    -

    F

    e

    b

    1

    6

    -

    F

    e

    b

    1

    7

    -

    F

    e

    b

    1

    8

    -

    F

    e

    b

    1

    9

    -

    F

    e

    b

    2

    0

    -

    F

    e

    b

    2

    1

    -

    F

    e

    b

    2

    2

    -

    F

    e

    b

    2

    3

    -

    F

    e

    b

    2

    4

    -

    F

    e

    b

    2

    5

    -

    F

    e

    b

    Titik bawah

    titik tengah

    titik atas

    t1mid-bottom

    t2mid-up

    Peak Temp on 71.7C on 3rd day after Pouring

    Peak Temp on 75.8C on 2nd day after Pouring

  • 2013 Holcim BetonProvidence Park

    Pelaksanaan Penempatan titik pengujian suhu dengan termo couple

  • 2013 Holcim Beton

    0

    20

    40

    60

    80

    100

    0 5 10 15 20 25 30 35 40 45 50

    C

    e

    l

    c

    i

    u

    s

    to Hour

    Point 8

    Mid

    Top

    Bottom

    Mid-Top

    Mid-Bottom

    0

    20

    40

    60

    80

    100

    0 5 10 15 20 25 30 35 40 45 50

    C

    e

    l

    c

    i

    u

    s

    to Hour

    Point 9

    Mid

    Top

    Bottom

    Mid-Top

    Mid-Bottom

    Peak Temp on 81C on 39 hour after pouring, t max 19.8 0 C

    Peak Temp on 82C on 33 hour after pouring , t max 19.4 0 C

  • 2013 Holcim Beton

    Preparing at site project

    PT Holcim Beton, 2013-05-28 15

    Cleaning waste concrete cuci talang truk mixer & waste sampling and

    check slump test

    Coordination community by project

    Coordination Policy by Holcim

    Supporting area for check slump test, sample and central dispatch : Tend

    Chair & Table

    Computer

    Power and Listrik

    Survey access road condition

    Survey project location

    Provide washout facility

    Survey traffic and safety

  • 2013 Holcim Beton

    Supply Chain

    PT Holcim Beton, 2013-05-28 16

    NO BATCHING PLANT NUMBER

    OF TRUCK

    PLANT CAPACITY CYCLE

    TYME

    1 SITE PLANT 5 40 M3/HOURS 15 mnt

    2 KUNINGAN 16 60 M3/HOURS 40 mnt

    3 KAMPUNG

    RAMBUTAN

    21 56 M3/HOURS 45 mnt

    4 PLUMPANG 25 84 M3/HOURS 60 mnt

    5 KEMBANGAN 25 84 M3/HOURS 60 mnt

    Batching Plant Holcim Beton

    For continunos supply for mass pouring raft foundation will be

    available total truck 93 units .

  • 2013 Holcim Beton

    Traffic Management

    PT Holcim Beton, 2013-05-28 17

  • 2013 Holcim Beton

    Holcim Beton

    PT Holcim Beton, 2013-05-28 18

    Plant PlumpangPlant Plumpang

    Plant Rambutan

    Plant Kembangan Plant Kuningan

  • 2013 Holcim Beton

    Delivery System

    PT Holcim Beton, 2013-05-28 19

    Dispatching System :

    Central Dispatch Center will be manage and planning concrete from our

    batching plant

    Track monitoring truck with GPS system

    Computerized batching system with command batch

    Central Dispatch on Site

    Project

  • 2013 Holcim Beton

    Course Aggregate & M Sand Source

    PT Holcim Beton, 2013-05-28 20

    Maloko Quarry

    Type : Stone Crusher

    Production Capacity : 1000 m3/day

    Capability : 500 m3/day

    Number of trucks : 68 units

    Trucks capacity : 24 m3

  • 2013 Holcim Beton

    Sand Source

    PT Holcim Beton, 2013-05-28 21

    Sands Quarry at Lampung

    Capacity : 15000 m3

    Capability to supply : 500 m3/day

  • 2013 Holcim Beton

    Suggestion Mass Pouring Raft Foundation Method

    PT Holcim Beton, 2013-05-28 22

    1. Pit Lift raft slab thickness : 4000 mmPouring method : Slab will divided by vertical segment with 3 layer

    1st Layer maximum thickness : 900 mm

    2ndLayer maximum thickness : 900 mm

    3rd Layer maximum thickness : 2200 mm

    2. Other massive raft slab thickness : 2500 mmPouring method : Slab will divided horizontal segment than pour by

    full depth methode or layer by layer

    Full depth with considering of cold join and segregation

    Layer by layer with considering of cold join and unloading method

  • 2013 Holcim Beton

    Truck line up

    Holcim Beton, 2013-02-13 23

  • 2013 Holcim Beton

    Traffic Management

    Holcim Beton, 2013-02-13 24

    Cycle time to Project

    (min)

    Pondok

    Indah

    Kemba

    ngan

    Rambut

    an- - Plant

    Loading

    Time

    Cycle

    time to

    Project

    No of

    Truck

    Loading at plant 10 5 5 Pondok Indah 10 112 11

    Check Slump 2 2 2 Kembangan 5 137 23

    To Project 45 60 60 Rambutan 5 152 27

    Test Slump 5 5 5 - 0 0 #DIV/0!

    Queue 5 5 5 - 0 0 #DIV/0!

    Unload 10 10 10 Total 62

    Out of Project 5 5 5

    Return 30 45 60

    Total 112 137 152 0 0

    1.87 2.28 2.53 - -

    Loading at plant 10 5 5 0 0 No of CP 4 unit

    No of Load per Hour 6 12 10 #DIV/0! #DIV/0! Capacity/CP/hour 25 m3/hour

    Load Size 7 7 7 Total Capacity/hour 100 m3/hour

    Rate Prod/hour

    (m3/hr)42 84 70 #DIV/0! #DIV/0! Experience Factor 62%

    % Contribution 80% 100% 70% 0% 0% 161.29 m3/hour

    Total 34 84 49 #DIV/0! #DIV/0! 167

    Production Capacity (M3) Concrete Pump Capacity

  • 2013 Holcim Beton

    Quality Control

    Holcim Beton, 2013-02-13 25

    1. Check temperatur

    2. Slump test

    3. Taking sample

    Following ACI Standart for frequency

    sample as below :

    ...

    ...

    ....

  • 2013 Holcim Beton

    Course Aggregate & M Sand Source

    Holcim Beton, 2013-02-13 26

    Maloko Quarry

    Type : Stone Crusher

    Production Capacity : 1000 m3/day

    Capability : 500 m3/day

    Number of trucks : 20 units

    Trucks capacity : 22 m3

    Distance from Project : 75 km

  • 2013 Holcim Beton

    Curing Method

    PT Holcim Beton, 2013-05-28 27

    1. Before pouring all area should be cover by terpaulin to prevent from rain

    direct and exposure to sun

    2. Right after complete finishing surface, concrete cover by plastic sheet

    and 3 layer of sterofoam

    3. Sterofoam will use to manage different temperature 20 C and to

    accelerate time to reach steadily and stability temperature

  • 2013 Holcim BetonMass Pouring

    Conclusion

    Key success of Mass Pouring is team work of main contractor,

    CM, concrete supplier, concrete pump, and other related

    parties

    Supply continuity

    To keep () < 20 oC and prevent thermal crack, monitor of

    temperatur through thermo couple and period of insulator

    release within time calculated.

    Work safely and meeting the quality