market trials weekly update – friday meeting november 15, 2013

37
Market Trials Weekly Update – Friday Meeting November 15, 2013

Upload: aleesha-tate

Post on 19-Jan-2016

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Market Trials Weekly Update – Friday Meeting November 15, 2013

Market Trials

Weekly Update – Friday MeetingNovember 15, 2013

Page 2: Market Trials Weekly Update – Friday Meeting November 15, 2013

Agenda*The weekly Market Trials 9A Meeting was not held on 11/15/13.

For MP Reference:

•Look Ahead Nov 18-24

•Preliminary Results

•Scenario Tracker Slides

•Settlements •Announcements

•Updates• Release Scorecard• Migration Report• Known Issues Log

•Parallel Ops Approach for Tagging

2

Page 3: Market Trials Weekly Update – Friday Meeting November 15, 2013

Look-Ahead: Nov 18 – Nov 24

3

• Parallel Ops Calendar on spp.orgspp.org > Integrated Marketplace > Market Trials > Parallel Operations Test> Integrated Marketplace Parallel

Operations Project Documents

• Mon Nov 18: IDT Prep Call 3:00P CPT Known Issues Log Call 9:00A CPT

• Tues Nov 19: 2 Hour Integrated Deployment Test Bridge Open 8:00A – 12:30P CPT

• Wed Nov 20: IDT Prep Call & Debrief 3:00P CPT

• Tues Nov 21: 2 Hour Integrated Deployment Test Bridge Open 8:30A – 12:30P CPT

• Fri Nov 22: IDT Debrief & Market Trials Call 9:00A CPT

For Reference Only

Page 4: Market Trials Weekly Update – Friday Meeting November 15, 2013

IDT Tuesday Nov 19• Mon Nov 18: Pre-Test Call at 3P CPT

• Tues Nov 19: Open MP Conference Call 8A -12:30P CPT Dial-In: 866-614-3718 Participant: 2388781 2nd Separate conference bridge for current EIS BA Real-Time operations personnel 3rd Separate conference bridge for SPP Vendors and SPP Internal IT

–7:30A – 9:30A: Prepare for IDT Join IDT Call. Participate in Roll Call Match IM and EIS offers as close to exact as possible starting 2 hrs prior to the test Verify IM deployments are being received

–9:30A – 11:30A: Respond to SPP IM Deployment Instructions Provide and request IDT status updates every 15 minutes Participate in Roll Call to ensure exit is on schedule

–11:30A – 12:30P: Participate in preliminary debrief

• Wed Nov 20: Post-Test Call at 3P CPT

4For Reference Only

Page 5: Market Trials Weekly Update – Friday Meeting November 15, 2013

IDT Thursday Nov 21• Wed Nov 20: Pre-Test Call at 3P CPT

• Thurs Nov 21: Open MP Conference Call 8:30A -12:30P CPT Dial-In: 866-614-3718 Participant: 2388781 2nd Separate conference bridge for current EIS BA Real-Time operations personnel 3rd Separate conference bridge for SPP Vendors and SPP Internal IT

–7:30A – 9:30A: Prepare for IDT Join IDT Call. Participate in Roll Call Match IM and EIS offers as close to exact as possible starting 2 hrs prior to the test Verify IM deployments are being received

–9:30A – 11:30A: Respond to SPP IM Deployment Instructions Provide and request IDT status updates every 15 minutes Participate in Roll Call to ensure exit is on schedule

–11:30A – 12:30P: Participate in preliminary debrief

• Fri Nov 22: Post-Test Call and Market Trials Call at 9A

5For Reference Only

Page 6: Market Trials Weekly Update – Friday Meeting November 15, 2013

IDT Reminders• BA / Reliability Call: Please ensure your BA is represented

6

BA Reliability Attendance:Begin IDT

Go/No-Go

End IDT

Go/No-Go

AEP (CSWS) – American Electric Power Service Corp.

NPPD – Nebraska Public Power District

SPS (XCEL) – Southwestern Public Service Company

CUS (SPRM) – City Utilities of Springfield

OKGE – Oklahoma Gas and Electric

WFEC – Western Farmers

WR – Westar Energy

SECI – Sunflower Electric Power Corp.

LES – Lincoln Electric System Marketing

KBPU (KACY) – Kansas City Board of Public Utilities

EDE – Empire District Electric

INDN – City of Independence

KCPL – Kansas City Power and Light

MPS – Missouri Public Services (KCPL)

OPPD – Omaha Public Power District (On MP Call)

GRDA – Grand River Dam Authority (On MP Call)

For Reference Only

Page 7: Market Trials Weekly Update – Friday Meeting November 15, 2013

IDT Reminders• MP / Open Market Call: The Marketing representative for the EIS BAs

should be on this call

7

BA Marketing Attendance:Begin IDT

Go/No-Go

End IDT

Go/No-Go

OPPD – Omaha Public Power District – Reliability

GRDA – Grand River Dam Authority – Reliability

AEP (CSWS) Marketing – American Electric Power Service Corp.

NPPD – Nebraska Public Power District (TEA)

CUS (SPRM) – City Utilities of Springfield (TEA)

SPS (XCEL) – Southwestern Public Service Company

OKGE – Oklahoma Gas and Electric

WFEC – Western Farmers (ACES)

SECI – Sunflower Electric Power Corp. (ACES)

WR – Westar Energy

LES – Lincoln Electric System Marketing

OPPD – Omaha Public Power District – Reliability

KBPU (KACY) – Kansas City Board of Public Utilities

EDE – Empire District Electric

INDN – City of Independence

KCPL – Kansas City Power and Light

MPS – Missouri Public Services (KCPL)

For Reference Only

Page 8: Market Trials Weekly Update – Friday Meeting November 15, 2013

IDT Reminders• MP / Open Market Call: MPs with Resources should be represented

8

MP Attendance:Begin IDT

Go/No-Go

End IDT

Go/No-Go

AECC - Arkansas Electric Cooperative Corp.

BCV - Blue Canyon Wind Power

BUFF - Buffalo Dunes Wind Project (ENEL)

CALP - Calpine Energy Services

CHSM - Chisholm View Wind Project (ENEL)

CMRN - Cimarron Wind Energy

CHAN - City of Chanute

FREM - City of Fremont

DRDG - Dempsey Ridge Wind Farm

DGPM - Dogwood Power Management

EXGN - Exelon Generation Company

FR2W - Flat Ridge Wind Energy

GSEC - Golden Spread Electric Cooperative (ACES)

GOOG - Google Energy

MJST - High Majestic Wind

KMEA - Kansas Municipal Energy Agency

For Reference Only

Page 9: Market Trials Weekly Update – Friday Meeting November 15, 2013

IDT Reminders• MP / Open Market Call: MPs with Resources should be represented

9

MP Attendance:Begin IDT

Go/No-Go

End IDT

Go/No-Go

KPP - Kansas Power Pool

MLCI - Merrill Lynch Commodities

MIDW - Midwest Energy

MNCO - Minco Wind

MEUC - Missouri Joint Municipal Electric Commission

MEAN - Municipal Energy Agency of Nebraska

FPLP - Nextera Energy Power Marketing

NGP1 - Noble Great Plains Windpark

OMPA - Oklahoma Municipal Power Authority

CORP - Shell Energy North America

SHWF - Smoky Hills Wind Project

SWE - Southern Company Services

SUSP - Sustaining Power Solutions

TPS - Tenaska Power Services

BEPM - Basin Electric Power Cooperative (Load Only)

REMC - Rainbow Energy Marketing Corp. (Load Only)

For Reference Only

Page 10: Market Trials Weekly Update – Friday Meeting November 15, 2013

IDT Reminders• MPs are encouraged to exercise end-to-end Market processes

– However, MPs are not required to bring Resources online solely for testing purposes.

• Echo Process: If a small MP or BA that represents Resources is unable to follow IM set-point instructions, but still able to disable ACE control then the IDT can still move forward if it is determined that reliability will not be adversely affected. These MPs will control their resources in manual mode.

• Importance of Control Status– If 1-2 Resources send the wrong control status, a mismatch will cause unnecessary

discrepancies in solutions– Please remind your staff:

0: Resource is offline 1: Resources is online, dispatchable and able to provide contingency reserves 2: Resources is online, dispatchable and able to provide operating reserves (including

Reg) 3: Resource is not dispatchable (coming online, going offline, test, or having issues that

cannot follow dispatch)

10For Reference Only

Page 11: Market Trials Weekly Update – Friday Meeting November 15, 2013

IDT Reminders• EIS Market will continue to operate in parallel

– LIPs will continue to be calculated normally based upon EIS Resource Offers– LIPs will be used for all Energy Settlement during IDTs– During IDTs, Unstructured Resource Deviation penalties will not apply in EIS

Market Settlements

• Commit Resources as if the IDT was not occurring– MP should notify SPP that their Resource is coming online or offline and update

the commit status in IM For instance, self commit a resource coming on

• Submit Resource offers for use in RTBM to minimize mismatches– Resource offers should be consistent with operational parameters in EIS– Reg Ramp Rate curves and Contingency Reserve Ramp Rate curves should be set

equal to the Ramp Rate Curve submitted for use in the Up direction in the EIS Market

11For Reference Only

Page 12: Market Trials Weekly Update – Friday Meeting November 15, 2013

IDT Reminders• COP populated using Resource and Ancillary Service Plans in the EIS

– Resources should self commit in real time based on actual commitment– Resources identified in the EIS Ancillary Service Plans as providing Reg will be

selected to provide Reg in the COP MPs should submit a fixed amount for Reg-Up and Reg-Down with a zero Offer price so RTBM will

allow clearing of Reg-Up and Reg-Down on the selected resources identified in the COP

• MP should set themselves to Fixed for Reserves (SPP will not do this for you)

• Operating Reserve Reqs set at the same level as those in the EIS Market– Reg-Up Dispatch Status: set to “Fixed” at specified MW– Reg-Down Dispatch Status: set to “Fixed” at specified MW– SPIN Dispatch Status: set to “Fixed” at specified MW– Online Supp: submit zero Supp Reserve Offer and zero price– Offline Supp: submit “Fixed” Offer at zero price– Not supplying ORs: submit reasonable offers based on actual current capability

12For Reference Only

Page 13: Market Trials Weekly Update – Friday Meeting November 15, 2013

IDT Reminders• Always follow IM Setpoints

– Going into and coming out of IDTs, SPP wants MPs to be as close to EIS dispatches as possible

• RTBM Dispatch Instructions and cleared Operating Reserve will be sent to RTGEN system every 5 min

– RTGEN will create Setpoint Instructions that will consist of the sum of the RTBM Dispatch Instruction, Reg Deployment and CRD

– LMPs and MCPs will be generated for information purposes and will not be used for Settlement during IDTs

• Test Schedules should not be submitted during IDTs

13For Reference Only

Page 14: Market Trials Weekly Update – Friday Meeting November 15, 2013

IDT Reference DocumentsIntegrated Deployment Test (as part of Parallel Ops)spp.org > Integrated Marketplace > Market Trials > Integrated Deployment Test

–Deployment Script

–SPP IDT Activities

–IDT MP Guide

–IM BA Cutover Activities

14For Reference Only

Page 15: Market Trials Weekly Update – Friday Meeting November 15, 2013

Schedule

15

• Nov 18 - 24Nov 18: Known Issues Log Call 9-10ANov 18: IDT Prep Call 3:00PNov 19: IDT 8:00A (test begins at 9:30A)Nov 20: IDT Debrief and Prep Call 3:00PNov 21: IDT 8:30A (test begins at 9:30A)Nov 22: IDT Debrief and Market Trials Call 9:00A

• Nov 25 – Dec 1Nov 26: Scenario 15 Commitment Mismatch Part 2Nov 28: SPP HolidayNov 29: SPP Holiday

For Reference Only

Page 16: Market Trials Weekly Update – Friday Meeting November 15, 2013

Preliminary Results

16

• Scenario 7 Must Offer• From initial analysis it appears that most MPs were short of their demand bids

and were in emergency conditions that should trigger Must Offer penalties

• From here, it is a manual process for the Market Monitor to determine if they were actually short and send out all of the notifications

For Reference Only

Page 17: Market Trials Weekly Update – Friday Meeting November 15, 2013

Preliminary Results

17

• Scenario 28a Nonfunctional Testing: CMS Outage CMS was disabled for about 15 or 20 minutes while the MPs continued to submit

virtual transactions from the Markets User Interface.

When CMS was disabled, the credit check from Markets was disabled.

When the scenario was over, SPP brought CMS back online, and the DA Markets Desk approved the pending transactions and re-enabled the credit check from the Markets side. That triggered the auto-approve and re-synch process between Markets and CMS, and all processed successfully.

9 virtual transactions were pending credit approval for 6 asset owners. All 9 transactions approved with the operator manual approval action.

The manual notifications were sent successfully

There is a known defect with Enable Link button command. SPP believes this should be corrected with the next PRD release.

For Reference Only

Page 18: Market Trials Weekly Update – Friday Meeting November 15, 2013

Scenario Tracker as of Nov 14 page 1 of 2

18

Scenario ID Scenario Title SPP

SuccessfulSPP

Unsuccessful MP Status Comments MP Fail Details

1 Delay Market X   Insufficient MP Response

2 Failure to Publish OR X   Fail 3 MPs requested retest

3 Violate Credit Limit X   Insufficient MP Response 1 MP requested retest

3A Don't Violate Credit X   Insufficient MP Response

4 Outage Simulation X   Pass 5.1 DA Capacity Shortage Pending R1.8. SPP will work with MPs to address concerns. 5.2 RUC Cap Shortage X Pending R1.8. SPP will work with MPs to address concerns. 6.1 DA Capacity Excess Pending R1.8. SPP will work with MPs to address concerns. 6.2 RUC Capacity Excess Pending R1.8. SPP will work with MPs to address concerns. 8 DA Scarcity Pricing X   Insufficient MP Response

11 EDR Deployment   X To be retested in P Ops Rescheduled ?? 12 OOME X Fail 2 MPs requested retest MPs did not have ICCP working13 Demand Response X   Pass  

14.1 Low Load High Wind X Pass   14.2 Low Load High Wind X Pass

15 Commitment Mismatch p1 X Insufficient MP Response

15 Commit Mismatch p2   X To be retested in P Ops Rescheduled 11/26 16.1 DA Mitigation MPs can retest independently after R1.9 16.2 RUC Mitigation X Insufficient MP Response 16.3 RTBM Mitigation MPs can retest independently after R1.9 17.3 Reserve Cap Testing X Fail 1 MP retesting 11/25

18 Failure Modes X   Pass   19 Emergency Logic X   Insufficient MP Response 20 CRD Event X Insufficient MP Response 21 RTBM Scarcity #1, 3-8 X Insufficient MP Response  

21 RTBM Scarcity #2 X   N/A 22 Manual RUC X Insufficient MP Response

For Reference Only

Page 19: Market Trials Weekly Update – Friday Meeting November 15, 2013

Scenario Tracker as of Nov 14 page 2 of 2

19

Scenario ID Scenario Title SPP

SuccessfulSPP

Unsuccessful MP Status Comments MP Fail Details

23.1 Spring Load Profile Removed from scope

23.2 Spring Load Profile Removed from scope

24 Re-Pricing X Insufficient MP Response

25.1 Fall Load Profile X Pass  

25.2 Fall Load Profile X   Pass  

26.1 Winter Load Profile X   Pass  

26.2 Winter Load Profile X   Pass  

27.1 Summer Load Profile X   Pass  

27.2 Summer Load Profile X   Pass  

28 Non-Funct Test. b,c,d,e X   Insufficient MP Response

30 Loss of ICCP X   Insufficient MP Response

31 Block Demand Response X   Pass

32 Day Before DA RUC X   Fail 1 MP retesting 11/16

33 Ramp Reservations X   Fail 1 MP requested retest MP system not ready

34 Off Supp Deployment X Fail 6 MPs requested retest

35 Daylight Savings Time Defects will be fixed and tested in Alstom DST environment. No pass/fail emails sent.

For Reference Only

Page 20: Market Trials Weekly Update – Friday Meeting November 15, 2013

Scenario Tracker as of Nov 14

20

• Summary - Successful:– 30 Scenarios Successful

– 2 partial Scenarios (15 part 1 and 28b-e) Successful

• Summary - Retests:– 15 individual retest requests pending

– 1 entire Scenario (11) and 1 partial Scenario (15 part 2) applicable MPs will retest during Parallel Ops

– 2 Scenarios (16.1 and 16.3) will be available for MP Unstructured testing after R1.9

– SPP will work with MPs on 3 Scenarios (5.1, 6.1, 6.2) in Parallel Ops to address concerns after R1.8 is installed in SPP lower environments

– Scenario 35 (DST) defects will be fixed and tested in the Alstom DST environment

For Reference Only

Page 21: Market Trials Weekly Update – Friday Meeting November 15, 2013

Scenario Tracker Metrics page 1 of 2

21

Scenario# Emails

Sent# Responses

Received% Responses

Received# No

Response% No

Response # Passed% Passed (of Resp. Rec'd) # Fail

% Fail (of Resp. Rec'd)

1 - Delay Market 56 37 66% 19 34% 37 100% 0 0%2 - Failure to Publish OR 50 34 68% 16 32% 31 91% 3 9%3 - Violate Credit Limit 101 63 62% 38 38% 62 98% 1 2%3a - Don't Violate Credit Limit 102 61 60% 41 40% 61 100% 0 0%4 - Outage Simulation 51 35 69% 16 31% 35 100% 0 0%5.1 - Day Ahead Capacity Shortage N/A N/A N/A N/A N/A N/A N/A N/A N/A5.2 - RUC Capacity Shortage 40 34 85% 6 15% 31 91% 3 9%6.1 - DA Capacity Excess N/A N/A N/A N/A N/A N/A N/A N/A N/A6.2 - RUC Capacity Excess N/A N/A N/A N/A N/A N/A N/A N/A N/A8 - Day Ahead Scarcity Pricing 42 36 86% 6 14% 36 100% 0 0%11 - EDR Deployment N/A N/A N/A N/A N/A N/A N/A N/A N/A12 - OOME 32 30 94% 2 6% 28 93% 2 7%13 - Demand Response 1 1 100% 0 0% 1 100% 0 0%14.1 - Low load High Wind 51 36 71% 15 29% 36 100% 0 0%14.2 - Low Load High Wind 36 33 92% 3 8% 33 100% 0 0%15 - Commitment Mismatch p1 23 21 91% 2 9% 21 100% 0 0%15 - Commitment Mismatch p2 N/A N/A N/A N/A N/A N/A N/A N/A N/A16.1 - DA Offer Curve Mitigation N/A N/A N/A N/A N/A N/A N/A N/A N/A16.2 - RUC Offer Curve 26 24 92% 2 8% 23 96% 1 4%16.3 - RTBM Mitigation N/A N/A N/A N/A N/A N/A N/A N/A N/A17.3 - Reserve Cap testing 22 22 100% 0 0% 21 95% 1 5%18 - Failure Modes 0 N/A N/A N/A N/A N/A N/A N/A N/A19 - Emergency Logic 26 24 92% 2 8% 24 100% 0 0%20 - CRD Event 21 20 95% 1 5% 20 100% 0 0%

For Reference Only

Page 22: Market Trials Weekly Update – Friday Meeting November 15, 2013

Scenario Tracker Metrics page 2 of 2

22

Scenario# Emails

Sent# Responses

Received% Responses

Received# No

Response% No

Response # Passed% Passed (of Resp. Rec'd) # Fail

% Fail (of Resp. Rec'd)

21 - RTBM Scarcity #1, 3-8 33 21 64% 12 36% 21 100% 0 0%22 - Manual and ID RUC commitment 40 21 53% 12 30% 21 100% 0 0

21 - RTBM Scarcity Shortages #2 N/A N/A N/A N/A N/A N/A N/A N/A N/A

22 - Manual RUC 17 13 76% 4 24% 13 100% 0 0%23.1 - Spring Load Profile N/A N/A N/A N/A N/A N/A N/A N/A N/A

23.2 - Spring Load Profile N/A N/A N/A N/A N/A N/A N/A N/A N/A

24 - LMP Repricing 44 22 50% 22 50% 20 91% 2 9%

25.1 - Fall Load Profile 50 34 68% 16 32% 34 100% 0 0%

25.2 - Fall Load Profile 50 34 68% 16 32% 34 100% 0 0%

26.1 - Winter Load Profile 51 35 69% 16 31% 35 100% 0 0%

26.2 - Winter Load Profile 51 35 69% 16 31% 35 100% 0 0%

27.1 - Summer Load Profile 51 35 69% 16 31% 35 100% 0 0%

27.2 - Summer Load Profile 51 35 69% 16 31% 35 100% 0 0%

28b, c, d, e - Non-Functional Test 87 28 32% 52 60% 28 100% 0 0%

30 - Loss of ICCP 25 24 96% 1 4% 24 100% 0 0%

31 - Block Demand Response 1 0 0% 1 100% 0 0% 0 0%

32 -Day before DA RUC 25 15 60% 10 40% 14 93% 1 7%

33 - Ramp Reservation System 53 20 38% 33 62% 19 95% 1 5%

34 - Off Supp Deployment 14 12 86% 2 14% 7 58% 5 42%

35 - Daylight Savings Time N/A N/A N/A N/A N/A N/A N/A N/A N/A

For Reference Only

Page 23: Market Trials Weekly Update – Friday Meeting November 15, 2013

Settlements - Parallel Operations

• Accelerated posting schedule for Finals (OD+14) still being discussed.– Discussed at CWG this week.

– Will be discussed with SUG November 19.

• Settlement system brought back up 11/14 as planned.

• No new Known Issues.

• Throughout Nov Settlements will continue to use OD+2 Data. Starting Dec 1 transition will be made to OD+4.

23For Reference Only

Page 24: Market Trials Weekly Update – Friday Meeting November 15, 2013

Announcements

24

Modeling Reports•The following reports were available on spp.org during SMT and have been moved permanently to the Marketplace portal:

marketplace.spp.org > Public > Marketplace > Modeling ReportsSL to Pnode to Zone Mapping SL EIR Mapping SMT FAQ SMT Quick Facts

Scheduling Changes•3 Hour IDT Thursday, Dec 12 5:30 – 10:30A CPT (IDT Test 6:30 – 9:30A)

Actual test is now 3 hours instead of 4 hours

•Web mirroring turns off Dec 16 Originally scheduled to turn off mid-January. Detailed slides follow.

For Reference Only

Page 25: Market Trials Weekly Update – Friday Meeting November 15, 2013

Migration and Maintenance Report

25

Migration and Maintenance Report posted to spp.orgspp.org > Integrated Marketplace > Market Trials > Parallel Operations Test> Integrated Marketplace Parallel Operations Project Documents

For Reference Only

Page 26: Market Trials Weekly Update – Friday Meeting November 15, 2013

26

Release Scorecard posted to spp.org:spp.org > Integrated Marketplace > Market Trials > Parallel Operations Test> Integrated Marketplace Parallel Operations Project Documents

Release Scorecard

For Reference Only

Page 27: Market Trials Weekly Update – Friday Meeting November 15, 2013

Known Issues Log

27

• Please review the Market Trials Known Issues Log on spp.orgspp.org > Integrated Marketplace > Market Trials > Parallel Operations Test> Integrated Marketplace Parallel Operations Project Documents

For Reference Only

Page 28: Market Trials Weekly Update – Friday Meeting November 15, 2013

Market Trials Useful ResourcesIntegrated Marketplace Parallel Operations Project Documents spp.org > Integrated Marketplace > Market Trials > Parallel Operations Test> Integrated Marketplace Parallel Operations Project Documents

•Parallel Ops Presentations, Statistics, MP Meetings Folder•Parallel Ops Reference Documents Folder•Scenarios in Parallel Ops Folder > Scenarios Schedule•Parallel Ops Communication Plan•Parallel Ops MP Guide•Parallel Ops Calendar•Known Issues Log•Release Scorecard•Migration Report

Integrated Deployment Test (as part of Parallel Ops)spp.org > Integrated Marketplace > Market Trials > Integrated Deployment Test

•IDT MP Guide•Parallel Ops Calendar

Additional documents:•Settlements Calendar marketplace.spp.org > Public > Settlements > Calendars•Change Tracker spp.org > Integrated Marketplace > Marketplace Documents•Integrated Marketplace Structured/Unstructured Test Project Documents spp.org > Integrated Marketplace > Market Trials > Structured / Unstructured Test> Integrated Marketplace Structured / Unstructured Test Project Documents

28

Page 29: Market Trials Weekly Update – Friday Meeting November 15, 2013

Tag Mirror/Replicate Process

• SPP is currently mirroring (copying) Production Tags from the EIS Market into the Integrated Marketplace Systems

• Process also modifies the tags to allow them to pass certain Marketplace Business Rules

• Copied tags are used to calculate the SPP CBA Net Scheduled Interchange (NSI) for use in the ACE equation

• Copied tags are used in RTBM to simulate activity from the current Balancing Authority activities

29For Reference Only

Page 30: Market Trials Weekly Update – Friday Meeting November 15, 2013

Tag Mirror/Replicate Process Benefits

• The NSI calculated by the copied tags closely matches the aggregate 16 BA NSI for the current SPP EIS footprint

• Allows the SPP Engineers to study the Balancing Activities and compare those against the overall CBA NSI during the testing processes

• Important tool for Inadvertent verification purposes during deployment testing

• Lessened burden on MP not required to create tags

30For Reference Only

Page 31: Market Trials Weekly Update – Friday Meeting November 15, 2013

Tag Mirror/Replicate Process - Costs

• Small number of MP have created test tags

• Tag Mirror Process renders Tariff validations invalid

• Test tags were approved regardless of tagging errors or failed evaluations necessary for CBA

• MP were trained on new Business Rules but have not been able to practice these new rules

• Errors and confusion for hundreds of tags for Go-live if MP do not begin the real tag submission process well in advance of Go-live

31For Reference Only

Page 32: Market Trials Weekly Update – Friday Meeting November 15, 2013

Tag Mirror Process - Changes

• SPP will continue to Copy Tags for the first part of Parallel Operations

– Tags Mirrored/copied – Nov. 12 thru Dec. 16

– Tag Mirror/copy will be turned off December 16

– Tag Mirror/copy will take days to wind down

– Tag Mirror/Copy will not be reinstated for remainder of time to Go-live

• MP will enter tags January/February 2014

32For Reference Only

Page 33: Market Trials Weekly Update – Friday Meeting November 15, 2013

IM Tagged Transaction entered by MP

• Import Tags into the SPP CBA (Required)– Consist of Load Serving Contractual obligations for SPP BA

– Necessary for accurate NSI

• Export Tags out of the SPP CBA (Required)– Consist of Load Serving Contractual obligations for neighboring BA

– Necessary for accurate NSI

• Internal SPP CBA tags (not allowed)

• Wheel/Through (not required/optional)

33For Reference Only

Page 34: Market Trials Weekly Update – Friday Meeting November 15, 2013

IM Tagged Transactions - BP for approval

• SPP Operators will evaluate for new Business Practices:

– Accurate Transmission Service

– Accurate GCA and LCA for “SWPP” BA

– Accurate Marketplace Protocols evaluation

– Ramp Availability

– Accurate Physical Path

– Must include SWPP Transmission Service

• MP were previously trained on the new rules

• Operators will deny tags that do not pass

34For Reference Only

Page 35: Market Trials Weekly Update – Friday Meeting November 15, 2013

IM Tagged Transaction Process – Getting Started

• MP will begin entering “Daily and Monthly” Import and Export tags for January Operating Month

– Entry of tags between December 23rd and December 31

– MP Will see evaluation failures to be remedied to gain approval

– SPP Operators will assist MP/PSE with modifying tags for entry errors

– When Tag is accurate SPP Operator will approve

• Optional - PSE adjust tags throughout January for Real Time

• Same process for month of February

35For Reference Only

Page 36: Market Trials Weekly Update – Friday Meeting November 15, 2013

Impacts on Market Participants

• For the months of January and February MP will be required to “dual” enter. One tag in EIS Real time and an additional tag in IM Training

• Tag entered for Training will not need to be updated for real time.

• An average contractual mw profile will be adequate.

• Additional Tags are encouraged for Financial Market

• MP encouraged to compare EIS and IM settlement statements for strategy planning

36For Reference Only

Page 37: Market Trials Weekly Update – Friday Meeting November 15, 2013

Impacts on Market Participants

• Required Tagged Transactions have been identified– Current EIS Tagged Transactions – 600 to 800

– Required Tagged Transactions – approximately 75

• Impacted CPSE have been identified- CPSE involved in required transactions – approximately 12

• CPSE are being contacted by SPP staff to communicate requirements for tag entry

• Tag entry also being coordinated with GP and LSE associated with required tags

37For Reference Only