structured / unstructured market trials weekly update – friday meeting october 25, 2013

39
Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Upload: alban-sanders

Post on 19-Jan-2016

230 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Structured / Unstructured Market Trials

Weekly Update – Friday MeetingOctober 25, 2013

Page 2: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Please Help Minimize Call Disruptions•Mute your phones

• Do not dial-in from a recorded line• If you record the call, your “holds” affect everyone

• Do not put the call on hold even if you are on mute

Please be courteous of everyone’s time•If necessary, SPP will mute all callers and unmute only at certain times for questions

Thank you for your attention to this matter!

2

Page 3: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Agenda• Preliminary Results Oct 21 – 25 (5 min) 9:00 – 9:05A

• Analysis Oct 14 – 18 (30 min) 9:05 – 9:35A

• Settlements (10 min) 9:35 – 9:45A

• Announcements & Outstanding Questions (10 min) 9:45 – 9:55A

• Look-Ahead Oct 28 – Nov 3 (20 min) 9:55 – 10:15A

• Updates (10 min) 10:15 – 10:25A• Release Scorecard• Migration Report• Known Issues Log

• Questions (10 min) 10:25 – 10:35A

3

Page 4: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Preliminary Results from Oct 21 - 25

4Alan Adams

•Scheduled Scenarios• 24 – Re-pricing

• Settlements ‘Scenario’ – DA Market Fails for OD 10-25-13

•Questions?

Page 5: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Analysis: Oct 14 - 18

5Alan Adams

• Structured Market Trials Statistics posted to spp.orgspp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market

Trials Project Documentation Folder > Structured Market Trials Presentations, Statistics, MP Meetings

• Analysis of Oct 14 – 18 Operating Days posted to spp.orgspp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market

Trials Project Documentation Folder > Structured Market Trials Presentations, Statistics, MP Meetings

Page 6: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Settlements Charge Type Scorecard

• The Settlements Charge Type Scorecard for the week of October 25 is posted.

• Includes Operating Days October 7 through October 13.

6Tony Alexander

Page 7: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Settlements Charge Type Scorecard

7Tony Alexander

Charge Type % MPs Hit Scenario % MPs HitDaEnergyHrlyAmt 100% 1 ‘Base’ Energy and Operating Reserve Settlement 98%RtEnergy5MinAmt 100% 2 Make-Whole Payment 50%DaRegUpHrlyAmt 100% 3 Regulation Non-Performance 83%DaRegDnHrlyAmt 100% 4 Contingency Reserve Deployment Failure 96%DaSpinHrlyAmt 100% 5 Day Ahead Non-Asset Energy 46%DaSuppHrlyAmt 100% 6 Real Time Non-Asset Energy 61%RtRegUp5minAmt 100% 7 ‘Base’ Energy Import/Export 98%

RtRegDn5minAmt 100% 8Energy Import/Export – Make Whole Payment Distribution 57%

RtSpin5minAmt 100% 9 Real Time Regulation Adjustment 100%RtSupp5minAmt 100% 10 Out Of Merit Energy and Reserve 100%DaRegUpDistHrlyAmt 100% 11 ‘Base’ Virtual Energy Transaction 18%DaRegDnDistHrlyAmt 100% 12 ‘Base’ TCR Auction Settlements 91%DaSpinDistHrlyAmt 100% 13 TCR Auction Settlement - End of Month 91%DaSuppDistHrlyAmt 100% 14 ‘Base’ TCR Settlement 99%RtRegUpDistHrlyAmt 100% 15 TCR Settlement - End of Month 97%RtRegDnDistHrlyAmt 100% 16 Miscellaneous 39%RtSpinDistHrlyAmt 100% 17 RtSuppDistHrlyAmt 100% RtRegAdj5minAmt 100% DaOclDistHrlyAmt 98% RtOclDistHrlyAmt 100%

Page 8: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Settlements Charge Type Scorecard

8Tony Alexander

DaMwpCpAmt 65% DaMwpDistHrlyAmt 59% RtMwpDistHrlyAmt 98% RtMwpCpAmt 57% RtRegNonPerf5minAmt 85% RtRegNonPerfDistHrlyAmt 100% RtCRDeplFailAmt 100% DaNEnergyHrlyAmt 46% RtNEnergy5minAmt 61% RtCRDeplFailDistHrlyAmt 65% RtOom5minAmt 100% DaVEnergyHrlyAmt 25% RtVEnergy5minAmt 25% DaVTxnFeeAoAmt 28% ArrAucTxnDlyAmt 91% ArrUpliftDlyAmt 91% ArrPaybackMnthlyAmt 91% RtRnuHrlyAmt 45% TcrFundHrlyAmt 99% TcrUpliftDlyAmt 99% TcrPaybackMnthlyAmt 97% TcrAucTxnDlyAmt 99% MiscDlyAmt 39%

Page 9: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Charge Types Not Using Stubbed Data

• All Charge Types are using upstream data from September 25 Operating Date forward.

• 43 Charge Types or 100% of the Charge Types for SMT.

• MPs should validate these Charge Types “Bid to Bill”.

9Tony Alexander

Page 10: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Charge types not using stubbed data

10Tony Alexander

• MPs should validate these Charge Types “Bid to Bill”.

DaEnergyHrlyAmt RtRegDnDistHrlyAmt RtNEnergy5minAmtRtEnergy5minAmt RtSpinDistHrlyAmt RtCRDeplFailDistHrlyAmtDaRegUpHrlyAmt RtSuppDistHrlyAmt RtOom5minAmtDaRegDnHrlyAmt RtRegAdj5minAmt DaVEnergyHrlyAmtDaSpinHrlyAmt DaOclDistHrlyAmt RtVEnergy5minAmtDaSuppHrlyAmt RtOclDistHrlyAmt DaVTxnFeeAoAmtRtRegUp5minAmt DaMwpCpAmt RtRnuHrlyAmtRtRegDn5minAmt DaMwpDistHrlyAmt ArrAucTxnDlyAmtRtSpin5minAmt RtMwpCpAmt ArrUpliftDlyAmtRtSupp5minAmt RtMwpDistHrlyAmt ArrPaybackMnthlyAmtDaRegUpDistHrlyAmt RtRegNonPerf5minAmt TcrFundHrlyAmtDaRegDnDistHrlyAmt RtRegNonPerfDistHrlyAmt TcrUpliftDlyAmtDaSpinDistHrlyAmt RtCRDeplFailAmt TcrPaybackMnthlyAmtDaSuppDistHrlyAmt DaNEnergyHrlyAmt TcrAucTxnDlyAmtRtRegUpDistHrlyAmt MiscDlyAmt

Page 11: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Charge Types Not Included In SMT

• ARR/TCR Annual Charge Types– ArrPaybackYrlyAmt, ArrCloseoutYrlyAmt,

TcrPaybackYrlyAmt, TcrCloseoutYrlyAmt

• Demand Response Load Charge Types– DaDrHrlyAmt, DaDrDistHrlyAmt, RtDr5minAmt,

RtDrDistHrlyAmt

• Other Various Charge Types– RtJoaHrlyAmt, RtRsg5minAmt

– MCRRs/MPRR New Charge Types

11Tony Alexander

Page 12: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Announcements & Outstanding Questions• Settlements to clear Database on Nov 6

– BSS, Meter Data, and Settlement Results Database will not be cleared and will remain available to MPs

– Meter Agents can continue to pull Meter Agent Reports for any OD up to 11-4

– SPP will clear the ETSE Database (Settlements Calculation Engine DB) SPP will not be able to produce Finals or Resettlements for any of the ODs up to 11-4

Settlement will start up again with an Initial Settlement for OD 11-12-13 to be posted on 11-19-13

• MPs can continue to bid/offer Nov 4-11 but there will be no Settlements behind any of these activities

12Ginny Watson

Page 13: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Announcements & Outstanding Questions• Participation in Credit Scenarios 3 &3A is strongly

recommended– SPP expects every MP who will participate in the virtual market to

participate

– SPP does not intend on retesting due to MPs not participating

– Market Participants (including Financial Only MPs) who do not participate on these Operating Days will appear ‘red’ in SPP’s Readiness Metric TRL-01

• DA Tags must still be entered during Parallel Ops (after Nov 3)– Real Time Tags are mirrored, Day Ahead Tags must be entered

13Ginny Watson

Page 14: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Announcements & Outstanding Questions• Parallel Ops - Mock Deployment Test <<< >>>, 9:30-10:30A

– New date pending

• Please submit an RMS Ticket explaining what you liked on Friday calls and what suggestions you have for Parallel Operations’ weekly calls

14Ginny Watson

Page 15: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Wind Resource Offer Parameter PSA• The Day Ahead and Real Time Econ Min and Emergency Min MWs for

Wind Resources will be required to be 0 MWs with the installation of v1.7 of the Market Software today (10/25/2013).

– Offers submitted with non-zero Econ/Emer Min MWs will be rejected once the v1.7 Market Software patch is installed.

– Some wind resources were not registered with 0 MW minimum outputs.

– SPP has overwritten the registration limit to 0 MWs in Prod, so that 0 MW Econ Min offers can be entered. Registration will close the loop on this change.

Protocols -- 4.2.2.5.5 Dispatchable Variable Energy Resources

(1) The Minimum Emergency Capacity Operating Limit and Minimum Economic Operating Capacity Limit submitted as part of the Day-Ahead Market and/or RTBM Resource Offer must be submitted as zero MW. Otherwise, the Resource Offer will be rejected;

15Jarrett Friddle

Page 16: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Holiday ProposalNo SPP staff running DA Market or DA RUC on holidays listed below. Quality of solutions may be less than a normal supported day.

Thanksgiving Day 11/28

•DA Market and DA RUC: run studies on Wed 11/27 for Thurs 11/28, Fri 11/29•ID-RUC (COP True-UP): run at least every 4 hours•RTBM: maintain as normal•RTGEN/EMS: maintain as normal

Christmas Eve 12/24 & Christmas Day 12/25

•DA Market and DA RUC: run Mon 12/23 for Tues 12/24, Wed 12/25, Thurs 12/26•ID-RUC (COP True-Up): run at least every 4 hours•RTBM: maintain as normal•RTGEN/EMS: maintain as normal

New Years Day 1/1

•DA Market and DA RUC: run Tues 12/31 for Wed 1/01 and Tues 1/02•ID-RUC (COP True-Up): run at least every 4 hours•RTBM: maintain as normal•RTGEN/EMS: maintain as normal

16Carrie Simpson

Page 17: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Integrated Marketplace Training: What’s Next?

Special Resource Type Training•Module 1 (DVERs, NDVERs, WGRs, and Quick-Start)

– Thursday, October 31st, 9 – 11:30 a.m.

– Monday, November 5th 2 – 4:30 p.m.

•Module 2 (BDRs, DDRs, EDRs, and Pseudo-Tied)

– Thursday, November 7th , 2 - 4:30 p.m.

– Monday, November 18th, 9 – 11:30 a.m.

•Register via the SPP Learning Center (LMS)

17Becky Gifford

Page 18: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Special Resource Types Module 1

Module 1 (DVERs, NDVERs, WGRs, and Quick-Start)

This course examines the special requirements and procedures for Variable Energy Resources (VERs) and Quick-Start (QS) Qualified Resources related to:

•Registration and modeling

•Offer parameters

•Commitment, dispatch, and deployment

18Becky Gifford

Page 19: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Special Resource Types Module 2

Module 2 (BDRs, DDRs, EDRs, and Pseudo-Tied)

This course examines the special requirements and procedures for Demand Response Resources (DRRs) , External Dynamic Resources (EDRs) , and Pseudo-Tied Resources related to:

•Registration and modeling

•Offer parameters

•Commitment, dispatch, and deployment

19Becky Gifford

Page 20: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Look-Ahead: Oct 28 – Nov 3

20

• Oct 28 – Nov 3 Daily Calendarspp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market

Trials Project Documentation Folder

• Includes some Settlements Dates. All details on Settlements Calendar marketplace.spp.org > Public > Settlements > Calendars

• Scheduled Scenarios• 3a No Violation of Credit Limit – participation expected by all MPs

• 3 Violate the Credit Limit – participation expected by all MPs

• 33A Ramp Reservation – Participation expected by MPs who will be settling settlement locations included on Tagged Interchange Transactions

• 33B Ramp Reservation - Participation expected by who will be settling settlement locations included on Tagged Interchange Transactions

• 35 Daylight Savings Time

• Official Operating Days 7 days / week

• Friday Maintenance & Saturday reserved for MP TestingGinny Watson

Page 21: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

3A Successfully Submit Virtual Bids and OffersScenario Description

•MP successfully submits volume of virtual bids and/or offers whose exposure is determined to not exceed the MPs available credit limit

•Applies to the submission of virtual bids and offers only

Expected Result• MP should be able to verify their Virtual Bid/Virtual Offer was successfully

submitted, successfully credit validated and that they were notified on the final result.

• MPs will be able to verify:

• Their successful submission request for a Virtual Bid and/or Virtual Offer• The Virtual Bid and/or Virtual Offer submission will pass credit validation based on their

available credit limit• The resulting transaction notification

21Alan Adams

Page 22: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

3A Successfully Submit Virtual Bids and OffersExpected Result (continued)• For Virtual Bids/Offers submitted as part of a batch upload:• When a batch upload is submitted successfully, the MP should receive a notification that the

transactions did pass credit approval and the amount they submitted was successful• All transactions part of a batch upload must pass credit approval in order for the batch upload to

be successful. If any transaction as part of a batch upload fails credit validation, the entire batch upload will fail

MP Activities

*Applicable to ALL MPs, including FINANCIAL ONLY MPs•Volume and magnitude of virtual transactions are determined by MP given their credit limit and virtual reference prices on the PortalMarketplaceportal.spp.org > Public > Markets > Day-Ahead Market > Virtual Reference Prices

• If you access from spp.org look for the MARKETPLACE PORTAL in the header• Once the file is opened, the Virtual BID / Virtual OFFER reference prices by settlement location

will appear as is• MPs are to submit Virtual Bids and/or Virtual Offers and confirm notification that submission was

approved

22Alan Adams

Page 23: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

3 Violate the Credit LimitScenario Description

•MP submits volume of virtual bids and/or offers whose exposure is determined to exceed the MPs available credit limit

Expected Result• For those virtual bids/offers which exceed the available credit for the MP, a status of

“Disapproved” is returned in the Markets UI with a reason why it was disapproved

• When a virtual transaction is disapproved due to credit resources, the MP should receive a notification that the transaction did not pass credit approval

• MP should receive confirmation that their bid/offer was received and that it was disapproved due to insufficient credit.

• For virtual bids/offers which are submitted as a batch upload and disapproved due to credit reasons, all transactions included in the batch will be disapproved

• Note – KIL #776: Virtual Bids or Offers rejected due to credit deficiency need to include the deficient dollar amount in the UI/API transaction log as well as the XML Notification (PostTransactionStateChangeSet)

23Alan Adams

Page 24: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

3 Violate the Credit LimitMP Activities

*Applicable to ALL MPs, including FINANCIAL ONLY MPs•Virtual references prices will be calculated by SPP and distributed via the Portal for all MP use. These Virtual Reference prices can be found on the Portal

Marketplaceportal.spp.org > Public > Markets > Day-Ahead Market > Virtual Reference Prices

•If you access from spp.org look for the MARKETPLACE PORTAL in the header•Once the file is opened, the Virtual BID / Virtual OFFER reference prices by settlement location will appear as is

•MPs are assumed to have a reasonable Credit Limit•In preparation for this scenario, SPP will reduce each MPs credit limit after the close of the Day-Ahead Market on OD 10-28-13, the day before the Scenario is to be executed

•This reduction is to ensure virtual submission will be rejected due to credit limit•No RMS request will be necessary for credit limit reduction•MPs will be notified by email when the credit limit adjustment has been completed

24Alan Adams

Page 25: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

3 Violate the Credit LimitMP Activities - continued

*Applicable to ALL MPs, including FINANCIAL ONLY MPs•MPs will submit virtual transactions for the DA Market for OD 10-30-13 to intentionally exceed available credit

– Volume and magnitude of virtual transactions are insignificant.– All credit limits will be set to $0.00

•Submitted offer/bid prices must be less than $1000/MW– Maximum virtual bids and/or virtual offers are limited to $1000.00/MW– Submitting a bid or offer in excess of $1000/MW will result in an error related to the

maximum dollar limit and not the credit limit violation error expected for this scenario

•MPs are to confirm notification that submission was rejected with explanation why•On October 29th after 12:00, each MP will have their credit limit returned to the original value prior to the credit limit reduction by SPP. No RMS request required.

– MPs will be notified by email that the credit limit adjustment has been completed

25Alan Adams

Page 26: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

33 Ramp ReservationWed Oct 30, 9A – 10A: MP Q & A

•Register here

•Bridge: 866-614-3718 – Participant: 2388781 (no webex)

Thurs Oct 31, 9A – 11A: Open Bridge Line for Issues & Problem Resolution

•Register here

•Bridge: 866-614-3718 – Participant: 2388781 (no webex)

Nov 1, 9A – 11A: Open Bridge Line for Issues & Problem Resolution

•Register here

•Bridge: 866-614-3718 – Participant: 2388781 (no webex)

26Shari Brown

Page 27: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

33 Ramp ReservationScenario Description

•This Scenario will allow the MPs to use the new Ramp Reservation System (RRS). MPs reserve ramp under their “Purchasing and Selling Entity (PSE)” code. MPs may view Ramp Reservations created by their respective “PSE”.

•This scenario applies to MPs who will be settling settlement locations that are included on Tagged Interchange Transactions

•MPs that choose to reserve ramp in the Integrated Marketplace will be able to reserve ramp up to seven days prior to the Day Ahead market deadlines and again until one hour prior to the Real Time Operating Hour

•Please review the Ramp Reservation User Guide prior to the Scenario

27Shari Brown

Page 28: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

33 Ramp ReservationExpected Result

•MP will create a Ramp Reservation and see the result of the Reservation on the SPP Balancing Authority Ramp Availability.

•MP will also see the result of a tag created with an associated Reservation.

•The scenario will provide the MP the ability to see results when Ramp is available for the MP’s use and when Ramp is not available for the MP’s use

•Although an MP can enter a Ramp Reservation for large MWs, please use Ramp Reservations that would represent realistic TSR/Tagging Activity

28Shari Brown

Page 29: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

33A – Ramp Availability ScenarioMP Activities – 33A Create a Reservation for period when Ramp is available for the MPs

*Applicable to MPs who will be settling settlement locations included on Tagged Interchange Transactions

•Tested on OD Thurs 10-31

•MP will access the system to create a Ramp Reservation between 9A and 11A. Please do not enter a tag for this Scenario outside of the Scenario timeframe. MPs can choose to enter a DA tag or a Real Time Fixed tag

– 1. Log into WebTrans– 2. Create a Ramp Reservation for the next OD– 3. Click the “Check” Option to view Ramp availability– 4. Click the “Commit” Option to complete the Ramp Reservation– 5. View the “Ramp Availability” display to view results after the reservation is submitted and approved– 6. Log into E-Tag– 7. Create an e-tag for the period of the Ramp Reservation for less than the full amount of reserved ramp.– 8. Submit tag– 9. Upon approval of the tag: view results of remaining Ramp Reservation– 10. Optional: create an additional tag for the period to use remaining reserved ramp.

29Shari Brown

Page 30: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

33B – Ramp Availability ScenarioMP Activities – 33B Create a Reservation for period when Ramp is unavailable for the MPs

*Applicable to MPs who will be settling settlement locations included on Tagged Interchange Transactions

•Tested on OD Fri 11-1

•MP will access the system to create a Ramp Reservation between 9A and 11A. Please do not enter a tag for this Scenario outside of the Scenario timeframe. MPs can choose to enter a DA tag or a Real Time Fixed tag

– 1. Log into WebTrans– 2. Create a Ramp Reservation for the next OD– 3. Click the “Check” Option to view Ramp availability– 4. Click the “Commit” Option to complete the Ramp Reservation– 5. View the “denial” of Ramp Reservation

30Shari Brown

Page 31: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

35 Daylight Savings TimeScenario Description

•Twice a year Daylight Savings creates a “Short Day” that contains only 23 hours and a “Long Day” that contains 25 hours.

•SPP systems are designed to handle both situations.

•This scenario will test the “Long Day” on Nov 3, 2013

Expected Result• MPs should be able to submit all required data

• There should be the option to submit 25 hours worth of data with a granularity of hourly (or less) for all submissions

• SPP shall accept 25 hours worth of data for all hourly (or less) submissions

• SPP shall process all 25 hours worth of data through its systems correctly

• SPP shall publish all results for the 25 hours correctly

• MPs should be able to query all results and correctly see all 25 hours worth of data from all SPP systems

31Alan Adams

Page 32: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

35 Daylight Savings TimeMP Activities• MPs should interact with all of the systems below if they will be utilizing them in

the Integrated Marketplace

• Market User Interface and API (available 7 days prior to the operating day. For 11/3, MPs may begin submitting bids and offers on 10/27).• Submit at least one Bid and Offer for each parameter that is an hourly for the hour

prior, the duplicate hour (HE 0200) and the subsequent hour

• Market Notifications: Review all notifications where appropriate to ensure timestamps are correct

• Scheduling: Submit DA Market dispatchable and Up to TUC schedules prior to the close of the DA Market to ensure that schedules are created for the extra hour correctly

• Ramp Reservation System: Submit for Ramp for extra hour to ensure it is recognized by the system

32Alan Adams

Page 33: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

35 Daylight Savings TimeMP Activities - continued• Day Before Day Ahead will run on 11-1 for 11-3: Review results of study

• Day Ahead will run on 11-2 for 11-3: Review results of study

• RUC will run on 11-2 for 11-3: Review results of study

• RTBM: Review both XML dispatch instructions to ensure timestamps are correct

• RTGEN: Review ICCP timestamps to ensure they are correct

• Settlements: Settlement statements; Bilateral Settlements Schedules; Invoices

• Public Data: Virtual Reference Prices; Binding Constraints; DA LMP Prices by Bus, By Location; DA MCP; Market Clearing; RT LMP Prices by Bus, By Location; RT MCP; MTLF vs Actual; STLF vs Actual; Day Ahead Wind Forecast; Short Term Wind Forecast

33Alan Adams

Page 34: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Release Scorecard

34

Release Scorecard posted to spp.org:spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder

Ginny Watson

Page 35: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Migration and Maintenance Report

35

Migration and Maintenance Report posted to spp.orgspp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder

Annette Holbert

Page 36: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Known Issues Log

36

• Please review the Market Trials Known Issues Log on spp.orgspp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder

Nikki Eason / Shari Brown

Issue # RMS ID # Component Synopsis Severity

781 Markets UI

For JOUs registered under the Combined resource option, the Markets UI/API should validate the Quick Start Max Limit is less than or equal to the registered Max Limit. This differs from the validation used for non-JOUs which verifies the Quick Start Max is less than or equal to the Eco Max.

Severity 3:

Medium

783 Markets UI

VRLs that include resource names such as ramp rate violations are only being displayed in the UI and API for the Asset Owner of the resource. The UI and API should show the ramp rate violation but mask the resource name (display as UNOWNED) if it is not owned by the AO.

Severity 3:

Medium

784 Markets UI

The GetEnergyMitigatedParameterSet and GetEnergyMitigatedParameterSetByDay API calls always return null for Maximum Weekly Starts even when the Markets system has a different value for the resource.

Severity 3:

Medium

785Ramp

Reservation System

In RRS there is an issue when changing multiple date ranges in a filter display

Severity 3:

Medium

Page 37: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Scheduled Scenarios

37

• Oct 28 – Nov 3

• 3a No Violation of the Credit Limit

• 3 Violate the Credit Limit

• 33A & B Ramp Reservation

• 35 Daylight Savings Time

• Nov 4 – Nov 11

• Note: No Settlements behind these days

Ginny Watson

Page 38: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013

Market Trials Useful ResourcesSMT Hotline: 501-482-2222 for critical & high issues Mon-Fri 8A – 5PPlease submit all other inquiries via the Request Management System (RMS)

Settlements Calendarmarketplace.spp.org > Public > Settlements > Calendars

Integrated Marketplace Market Trials Project Documentation Folderspp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder

• Documents found here include: Daily Calendar, Release Scorecard, Migration Report, Known Issues Log, Market Participant Guide

• SMT Presentations, Statistics, MP Meetings Folder• SMT Reference Documents Folder

•Tag Validation Criteria for MT Testing• SMT Scenarios Folder

•SMT Scenarios Schedule

Change Tracker spp.org > Integrated Marketplace > Marketplace Documents

38

Page 39: Structured / Unstructured Market Trials Weekly Update – Friday Meeting October 25, 2013