march 26, 2014 space weather product team (swpt) kick off meeting

13
March 26, 2014 Space Weather Product Team (SWPT) Kick Off Meeting

Upload: rolf-atkins

Post on 24-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

March 26, 2014

Space Weather Product Team (SWPT)

Kick Off Meeting

Outline

2

• Space Weather Product Team (SWPT)

• SWPT Membership

• Support Team Interactions

• POSST SWPT Scope

• PLT/PLTP Links

• PLT/PLPT Test Forms (5 slides)

• Schedule (Notional)

SWx Products Team

3

• The Space Weather Product Team (SWPT) consists of relevant subject matter experts and GOES-R program engineers supporting the effective handover/management of the GOES-R series space weather sensors and validation of GOES-R SWx L1b products. The SWPT operates under the auspices of the CWG but reports directly to the POSST Operations Manager.

• Principal Duties of the SWPT are to:– Develop procedures for Post-Launch Tests (PLTs) of the GOES-R sensors

and Post-Launch Product Tests (PLPTs) for GOES-R L1b products.– Conduct analyses from assigned PLTs and PLPTs to verify nominal

instrument performance and validate L1b products.– Report instances of L1b product non-compliance or anomalous behavior. – Advise Program on the efficacy of GS performance monitor tools at OSPO.– Provide needed information and support to Program and Project system

integration, operations, transition and handover reviews.

SWPT Membership [TBD]

4

NGDC- Bill Denig, Team Lead- William Rowland, SWT SE- Juan Rodriguez, SEISS- Jon Darnel, SUVI- Janet Machol, EXIS/EUVS- Alysha Reinard, EXIS/XRS- Paul Loto’aniu, MAG- Rob Redmon, MAG- New hire, SEISS

MIT/LL- Monica Coakley, Organizational Lead- Fred Rich, MAG, SEISS- New assignee, EXIS, SUVI

CWG- Changyong Cao, CWG Chair

MOST- Stan Markelov- Alicia Moore- Matt Garhart- Melissa Frederick

Flight Project- Monica Todirita- Kumar Tadikonda- Dennis Chesters- Gus Comeyne, EXIS, SUVI- Dan Flanagan, SEISS

Ground Segment Project- Randy Race- Farida Adimi

DOST- Marge Ripley

Bob Iacovazzi, POSST Ops Manager

Vendor participation – TBD / Missing OSPO participation

Support Team Interactions

GOES-R System Validation

Success

• Mission Operations Support Team (MOST) – Flight segment certification with support from Flight Systems Engineering, and mission operations validation [POC – Mission Operations Manager]

• Data Operations Support Team (DOST) – Product generation, distribution, and monitoring operations validation [POC- Data Operations Manager]

• Product Operations Science Support Team (POSST) – Calibration, image navigation and registration (INR), and product science validation [POC – POSST Operations Manager]

You Are Here

5

Not to be confused with

6

Data Operations Tests (DOT

Post-Launch Testing (PLT)

Post-Launch Product Testing 1 (PLPT-1)

Post-Launch Product Testing 2 (PLPT-2)

O&M Handoff toOSPO

Scope

Utilize Mission Validation Test Data Sets (MVT-DS) and verify access to L1b products

Validate instrument performance, including GS[?] calibration

Product performance validation (GS/OSPO)

Validate product science performance to the maturity expected at handover

Operational product monitoring, analysis and anomaly resolution functions; ongoing product science performance validation

Lead Organization

DOST; supported by POSST

MOST; supported by vendors and POSST

POSST; supported by MOST, DOST and OSPO

POSST; supported by MOST and DOST

TBD

Deliverables

L1b Data Validation Reports

Test forms and procedures; calibration analysis reports

L1b product performanceassessment

Test forms and procedures; L1b data product reports

Logistics support report

Responsible for

Deliverables

Originator of input scenes, with assistance from recipients

Assigned test lead and engineers

POSST/SWPT Assigned test lead

TBD

POSST SWPT ScopeTimeline

7

DOST

POSST (GS Cal Capabilities Val)

Instr. Vendor

MOST

OSPO

Propose and evaluate Test plans

Develop necessary test procedures.

Coordinate, schedule, and execute Test.

Perform and required analysis and create Test report.

Cal/Val Pre-Incident Report Anomaly Triage and Exploration (PIRATE) and GOES Incident

Report (IR) Processes

Recommend Inspection or Demonstration Approval

(Test Team Lead)

Test Approval (MOM or Program Scientist)

Coordinate, schedule, and perform Inspection or Demonstration.

POSST (Cal, INR & Product Val)

Propose and evaluate Inspection and

Demonstration plans.

Create Inspection

and Demonstration Report.

Inspection or Demonstration Approval (DOM)

Recommend Test Approval (Test Team Lead)

Cal, INR, & Product Val

GS Cal Capabilities Val

PLT / PLPT Links (per Bob)

PLT / PLPT Forms

Test Name Short Title

POSST_PLT_Test_Form_SEIS001 SEISS In-flight Calibration

POSST_PLT_Test_Form_SEIS002 MPS-LO Microchannel Plate Bias Voltage

POSST_PLT_Test_Form_SEIS003 EHIS Sample Pulse Height Analysis

POSST_PLT_Test_Form_SEIS004 SGPS D3-D1 Contamination Correction

POSST_PLT_Test_Form_SEIS005 MPS-HI/LO Inter-telescope Correction

POSST_PLT_Test_Form_SEIS006 MPS-LO Overlapping Zone Comparison

POSST_PLT_Test_Form_SEIS007 MPS-HI/LO Pitch Angle Distribution

POSST_PLT_Test_Form_SEIS008 Solar Energetic Particle Anisotropy

POSST_PLT_Test_Form_SEIS009 MPS-HI/LO Inter-satellite Calibration

POSST_PLT_Test_Form_SEIS010 SEISS Backgrounds Trending

POSST_PLT_Test_Form_SEIS011 SEISS Ops in Storage Mode

POSST_PLT_Test_Form_SEIS012 SEISS Sensitivity to Interference

SEISS (as submitted)

MOST & DOST will assign PLTs and PLPTs

PLT/PLPT Forms

Test Name Short Title

POSST_PLT_Test_Form_SUVI001 CCD Dark Current Characteristics

POSST_PLT_Test_Form_SUVI002 SUVI Camera Charactization

POSST_PLT_Test_Form_SUVI003 SUVI Thermal Characterization

POSST_PLT_Test_Form_SUVI004 SUVI LED Flat Field Characterization

POSST_PLT_Test_Form_SUVI005 Off Band Signal Characterization

POSST_PLT_Test_Form_SUVI006 SUVI E/W Scan Flat Field Characterization

POSST_PLT_Test_Form_SUVI007 SUVI N/S Scan Flat Field Characterization

POSST_PLT_Test_Form_SUVI008 Kuhn Raster Flat Field Charactization

POSST_PLT_Test_Form_SUVI009 SUVI Guide Telescope Alignment

SUVI

PLT/PLPT Forms

Test Name Short Title

POSST_PLT_Test_Form_EXIS001 Monitor all L1b EXIS Irradiances

POSST_PLT_Test_Form_EXIS002 EXIS FOV Mapping

POSST_PLT_Test_Form_EXIS003 XRS/SUVI Co-alignment

POSST_PLT_Test_Form_EXIS004 XRS/EUVS/SPS Co-alignment

POSST_PLT_Test_Form_EXIS005 XRS Cross-talk (Cruciform scan)

POSST_PLT_Test_Form_EXIS006 XRS Cross-talk (Flare)

POSST_PLT_Test_Form_EXIS007 XRS Inter-satellite Calibration

POSST_PLT_Test_Form_EXIS008 EUVS Inter-satellite Calibration

POSST_PLT_Test_Form_EXIS009 XRS High & Low Gain Comparisons

POSST_PLT_Test_Form_EXIS010 XRS Quad-diode Characterization

POSST_PLT_Test_Form_EXIS011 XRS and EUVS Inter-satellite Calibrations

EXIS (1 of 2)

PLT/PLPT Forms

Test Name Short Title

POSST_PLT_Test_Form_EXIS012 EUVS-C Channel Cross-calibration

POSST_PLT_Test_Form_EXIS013 EUVS 5-nm Proxy Model Comparison

POSST_PLT_Test_Form_EXIS014 XRS Dark Calibration

POSST_PLT_Test_Form_EXIS015 Filter Motor Opto-coupler Calibration

POSST_PLT_Test_Form_EXIS016 EXIS Particle Background Interference

POSST_PLT_Test_Form_EXIS017 XRS-EUVS Offset Characterization

POSST_PLT_Test_Form_EXIS018 EUVS Flat-field Response

POSST_PLT_Test_Form_EXIS019 EXIS In-flight Calibration

POSST_PLT_Test_Form_EXIS020 EUVS Bootstrap Method Test

EXIS (2 of 2)

PLT/PLPT Forms

Test Name Short Title

POSST_PLT_Test_Form_MAGN001 MAG Bias and Alignment

POSST_PLT_Test_Form_MAGN002 MAG In-flight Calibration

POSST_PLT_Test_Form_MAGN003 MAG Sensitivity to Interference

POSST_PLT_Test_Form_MAGN004 MAG Boom Deployment Analysis

POSST_PLT_Test_Form_MAGN005 MAG Comparison to Quiet Fields

POSST_PLT_Test_Form_MAGN006 Yaw-Flip Data Comparison

POSST_PLT_Test_Form_MAGN007 MAG Inter-satellite Calibration

POSST_PLT_Test_Form_MAGN008 MAG MLT-based Inter-satellite Calibration

POSST_PLT_Test_Form_MAGN009 MAG Sensor Difference Comparison

POSST_PLT_Test_Form_MAGN010 MAG Sensor Ratio Comparison

POSST_PLT_Test_Form_MAGN011 MAG Inter-sensor Contamination

POSST_PLT_Test_Form_MAGN012 MAG Diurnal Variations

POSST_PLT_Test_Form_MAGN013 MAG Eclipse Effects

POSST_PLT_Test_Form_MAGN014 MAG Gradiometer Method Test

MAG

13

Schedule (Notional)

NOTIONAL O

NLY