Managing a Project and OutsideManaging a Project and Outside Contractors for Success
J l 20 2011July 20, 2011A Society of Broadcast Engineers Webinar
John Luff ConsultantJohn Luff, ConsultantHD Consulting, Pittsburgh
![Page 2: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/2.jpg)
TopicsTopics
What does it take to manage a project?Project management processTools you can useWorking with outside resources
![Page 3: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/3.jpg)
Where to Start?Where to Start?
What has to be managed?“Scope, Dollars, Dates”
Wh t b h b h ith h t…What, by whom, by when, with what resources
Process:Define the problem carefullyDecide what success will look likeBreak the problem into bite sized chunksBreak the problem into bite sized chunksCreate structure matching the projectPick tools and communications strategies
![Page 4: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/4.jpg)
Project management j gfundamentals
Successful project management requires:Careful definition of the problem to be solvedAssembly of a team of experts with defined rolesB ki j t i t ifi il t dBreaking project into specific milestones and assigning them to team members
![Page 5: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/5.jpg)
Project management j gfundamentals
Successful project management requires:Thoughtful communications on status and issues to b l dbe resolvedRespectful and non-confrontational management style – NOT AUTHORITARIAN!style NOT AUTHORITARIAN!Attention to detailThorough documentationWillingness to adapt to changing reality“no dog in the hunt”
![Page 6: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/6.jpg)
Creating a project teamCreating a project team
Project championChairman of the board, CEO
Project managerChief operating officer and chief financial ffiofficer
Operating departmentsEngineering finance installationEngineering, finance, installation, documentation
![Page 7: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/7.jpg)
Steps in a projectSteps in a projectBuild a business case and conceptual plan.p pOptimize the plan and formal decision to move to implementation.Develop GoalsDetail the design.A fi l d i d b d tApprove final design and budget.Move to implementation.Test commission and trainTest, commission and train.
![Page 8: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/8.jpg)
The project teamThe project team
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 9: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/9.jpg)
The project teamThe project team
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 10: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/10.jpg)
The project teamThe project team
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 11: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/11.jpg)
The project teamThe project team
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 12: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/12.jpg)
The project teamThe project team
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 13: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/13.jpg)
The project teamThe project team
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 14: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/14.jpg)
The project teamThe project team
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 15: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/15.jpg)
The project teamThe project team
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 16: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/16.jpg)
Process …Before you “Begin”
Establish the business caseObtain approval to proceedE t bli h th TEstablish the TeamThe Team establishes the GOALSBreakdown the work and assign tasksgGet it Done!Review the Goals - were they met?Celebrate SuccessCelebrate Success
![Page 17: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/17.jpg)
Setting GoalsSetting Goals
1st step after team is assembledGoal setting precedes detailed project d l tdevelopmentEveryone ContributesAll input is captured; no one’s ideas are superiorp p pPurpose: determine what will define a successful conclusionDefine the concrete deliverablesDefine the concrete deliverables
Budget, drawings, bids, operational plans, training, system test results
![Page 18: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/18.jpg)
Setting GoalsSetting Goals
![Page 19: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/19.jpg)
Setting GoalsSetting Goals
![Page 20: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/20.jpg)
Project ManagerProject Manager
Keeps the project schedule and budgetCommunicates regularly with the whole team
d ll t idand all outside resourcesProactively assigns tasks to team members and monitors their progressp gKeeps project goals and objectives in mind in all decisionsSuccess of the project is the PM’s responsibilitySuccess of the project is the PM s responsibility. The PM works through the Team
![Page 21: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/21.jpg)
TasksTasks
Assign tasks that are quantitative, measurable and short in duration.Build a detailed timeline showing all tasks.Set regular meetings to review successes and issues to be confrontedissues to be confronted.
![Page 22: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/22.jpg)
Stage 1Stage 1O t t d tOutput documents
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 23: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/23.jpg)
Stage 2Stage 2
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 24: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/24.jpg)
Stage 3Stage 3
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 25: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/25.jpg)
Stage 4Stage 4
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 26: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/26.jpg)
The work breakdownThe work breakdown
No milestones longer than 2 weeksDetail is essential
“Create drawings” is too broad and not manageable. “C t i t i t ti d i ”“Create intercom interconnection drawing”works!
![Page 27: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/27.jpg)
Tracking projectsTracking projects
Keep track of task assignments and progressTime and task relationships
Gantt chartsPert charts
![Page 28: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/28.jpg)
Gantt chartGantt chart
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 29: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/29.jpg)
Excel “Gantt chart”Excel Gantt chart
(http://office.microsoft.com/en-us/excel/HA010346051033.aspx)
![Page 30: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/30.jpg)
Excel “Gantt chart”Excel Gantt chart
![Page 31: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/31.jpg)
The project planThe project plan
Project management softwareMuch more than pretty charts
Track personnel (Resource) utilizationDisplay critical path – task that “holds project h t ”hostage”Performance against budget
![Page 32: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/32.jpg)
![Page 33: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/33.jpg)
Resource allocationResource allocation
![Page 34: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/34.jpg)
Resource allocationResource allocation
![Page 35: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/35.jpg)
Resource allocationResource allocation
![Page 36: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/36.jpg)
Resource allocationResource allocation
![Page 37: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/37.jpg)
CommunicatingCommunicating
Keep communications regularSend report out on the same day every weekI i t t t tInsist on status reports Do nothing without documenting it – nothing “verbal only”yRespectful, thoughtful communication onlyFirm but reasonable tone
![Page 38: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/38.jpg)
CommunicatingCommunicating
Keep communications regular(Weekly) report contains
Meeting minutesStatus of tasks scheduled for completion this
i dperiodTasks assigned at meeting (who and when)Tasks expected before next meetingTasks expected before next meeting
![Page 39: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/39.jpg)
Regular Project MeetingsRegular Project Meetings
Meetings must have an agenda Keep it short; 30 minutes idealCelebrate successesNote failures, and move forwardRemain strictly factual; deal with management issues offline and in personDon’t use email to avoid communicatingDon t use email to avoid communicating ….
![Page 40: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/40.jpg)
Weekly Status UpdateWeekly Status Update
Include:Expected milestones in near term Detailed meeting minutesTask assignments addedTasks completedStatus of schedule and budgetRisks to sched leRisks to scheduleTime and place of next meeting
![Page 41: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/41.jpg)
Managing for resultsManaging for results
Involve key players indefining and maintaining goalsbenchmarks for success
Develop consensus“Winning” could risk developing a team
At points of stress, go back to consensus building based on original goalsbuilding based on original goals
![Page 42: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/42.jpg)
Project management j gsoftware
Microsoft Project 2010 • http://office.microsoft.com
Primavera Project Planner (P3)• www.primavera.com
BaseCamp (Web based tool)BaseCamp (Web-based tool)• www.basecamphq.com
EasyProjects.net (Web-based tool)y j ( )• www.easyprojects.net
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 43: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/43.jpg)
Today’s ProjectsToday s Projects
Less focus on hardwareMore than “rack and stack and wirelists”
M f ft i t ti d ftMore focus on software integration and software development (customization)Handling metadata and file formats is criticalgData flow is the new schematicCareful attention to standards is criticalProcess is especially important and foreignProcess is especially important, and foreign…
![Page 44: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/44.jpg)
“The quality of a system is highly influenced by the quality of the process used to acquire develop andquality of the process used to acquire, develop, and maintain it.”
Software Engineering Institute, Carnegie Mellon University, 2007
![Page 45: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/45.jpg)
Software projectsSoftware projects
Engage all vendors in one team.Define your expectations carefully.
Detailed workflow and I/O from systemsMay be subproject led by separate committeeResearch “agile software development.”
![Page 46: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/46.jpg)
Agile software gdevelopment
Scrum DevelopmentGoal is speed over complexityControl scopeGuaranteed delivery of workable versionsShort timeline — two to three weeksDaily meetings with no chairs
Comprehensive status reports
![Page 47: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/47.jpg)
Agile software gdevelopment
Each “scrum” produces deliverable versionWell suited to incremental development and testing of complex systemsAdaptable to deployment of some broadcast systemssystems
![Page 48: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/48.jpg)
G tti th tGetting the most from Outside Resources
![Page 49: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/49.jpg)
Why?Why?Overworked staff Project might deplete operations staff
M t ll t lMay actually cost lessAccess to key skills
Experience in design/build projects not commonExperience in design/build projects not common to broadcastersNew technology to be implemented
Reduce risk in project
![Page 50: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/50.jpg)
Possible ResourcesPossible Resources
Consultants generally don’t buildM ll i l titiMany small or single practitionersSome large firms with depth, and large payrollpayroll
Integratorsalso offer consultinggDetailed engineering and documentationInstallation and commissioningEquipment resale
![Page 51: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/51.jpg)
Their business modelsTheir business models
Consultants bill for labor only.Don’t expect Volume discount …
Integrators depend on:Labor volume and marginEquipment volume and marginBalancing multiple projects
![Page 52: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/52.jpg)
How much will it cost?How much will it cost?Hourly billing can grow … exponentially.Fixed price bids = lowest price?
“Unknowns” are priced into bids.Joint confidence in scope reduces cost
O li ti ti lOne supplier = negotiation leverageMatch services to vendor’s core expertise
Avoid subcontractorsAvoid subcontractors… you lose control
![Page 53: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/53.jpg)
Choosing an integratorChoosing an integratorRequest for Proposal (RFP)
Asks for binding proposalCannot be vague
Request for Information (RFI)D ib h t t d l tiDescribes what you want and leaves options openLeaves binding price to a separate negotiationLeaves binding price to a separate negotiation
![Page 54: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/54.jpg)
RFP ProcessRFP ProcessCreate an RFP with proposed major equipment. Requires up-front planning Does not facilitate vendor “creative engineering”Vendor add “insurance dollars”
![Page 55: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/55.jpg)
RFI ProcessRFI ProcessDesign an RFI.Gathers key data on candidatesAllows flexibility and creativity in solution approachAsk for “preliminary price estimate”
![Page 56: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/56.jpg)
RFI contentsRFI contentsDescribe your project, including project goals Request information, such as:
Company history, size, location(s)Description of their processes
P j t tProject management Engineering Prebuild and on-site installationPrebuild and on-site installation Commissioning and training
![Page 57: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/57.jpg)
RFI contentsRFI contents
Ask for a list of manufacturers equipment offered.Get staff details.
Proposed project managerP d k i i lProposed key engineering personnel
Request sample contract copy.Get references for similar projectsGet references, for similar projects.
![Page 58: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/58.jpg)
RFI contentsRFI contentsDo they supply electronic (editable) document copies?D th h i ith hit t dDo they have experience with architects and engineers?Ask for creative narrative project approachAsk for creative narrative project approach.Ask why they are uniquely qualified.Ask for order of magnitude price.g pGet proposed schedule.
![Page 59: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/59.jpg)
RFI contentsRFI contents
Ask about software integration.How do they approach integrating software from multiple vendors?Get a clear impression of past success/issuessuccess/issues.
![Page 60: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/60.jpg)
The whole processThe whole processAfter conceptual plan completion, write RFI
Issue it to three to six firmsGive two full business weeks for responsesOrganize a review committee
PM l d th k i di id lPM leads other key individualsAvoid conflicts of interest, including personal relationships with vendorsrelationships with vendors
![Page 61: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/61.jpg)
The whole processThe whole processEach person scores each answerRank for overall score
Key issues might elevate or kill individual responses
Check referencesCheck referencesCall each one, on the recordKeep thorough notesKeep thorough notes
![Page 62: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/62.jpg)
The whole processThe whole process
Ask manufacturers about each integrator“Who in the firm do you trust the most, the least.”
Pick top two and request a formal presentation.All fi d ti f t ti (45 i t )Allow fixed time for presentation (45 minutes).Allow similar time for questions.Allow vendor to summarize and closeAllow vendor to summarize and close.
Why are they best for your project
![Page 63: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/63.jpg)
The whole processThe whole process
Pick top respondent for negotiating a binding proposal.
Refine price proposal and payment schedule.Lock in staffing.N ti t t t d tNegotiate contract and terms.
THEN, setup kickoff meeting with ALL parties involved.involved.
![Page 64: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/64.jpg)
The project teamThe project team
![Page 65: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/65.jpg)
The project teamThe project team
![Page 66: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/66.jpg)
CommunicationsCommunications
Primary path PM to PMSpecialists directlyCustomer Services Representative
![Page 67: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/67.jpg)
The project teamThe project team
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.
![Page 68: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/68.jpg)
Managing integratorsManaging integratorsKeep change orders off the table.
Insist all COs must be approved in advanceDefine the CO process and unit pricing approach in writing
Watch out for personnel changesWatch out for personnel changesYou bought a specific team
Insist on list and sell pricing on all hardware.Insist on list and sell pricing on all hardware.
![Page 69: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/69.jpg)
Managing integratorsManaging integratorsRetain the ability to negotiate with manufacturers … with integrator present
K t l ti hi ith t h i l dKeep a strong relationship with technical and sales staff of all key manufacturers
Insist integrator take responsibility for softwareInsist integrator take responsibility for software implementation
HUGE part of all modern projects
![Page 70: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/70.jpg)
A word on pricingA word on pricing …Labor is an integrator’s product
Pay them adequatelyCutting margin will change the relationshipHighly skilled consultants and engineers ARE expensiveexpensive
Equipment marginOften <10% … little room for deeper discountsOften 10% … little room for deeper discountsYou are paying for logistics costs, value added
![Page 71: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/71.jpg)
A word on pricingA word on pricing …Consider cost up pricing.
Integrator’s cost plus fixed markup“Material handling fee”
Fixed percentage for owner supplied hardwareC tti th t f th l l th t f thCutting them out of the sale leaves them out of the loop when problems arise.
Delivery?Delivery?Software?
![Page 72: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/72.jpg)
Other consultantsOther consultants
ArchitectsValuable skills in defining and managing constructionFind a professional with broadcast experienceexperience.Acoustics experience is key.Check references.Check references.Visit projects if possible.
![Page 73: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/73.jpg)
ContractorsContractors
Use an architect or construction management firm — it will keep you sane.Don’t attempt to “design/build” unless you know them well.Check the details religiouslyCheck the details religiously.
Acoustic detailsElectrical detailsElectrical details
![Page 74: Managing a Project and OutsideManaging a Project and](https://reader031.vdocuments.us/reader031/viewer/2022012409/616a497811a7b741a350dacd/html5/thumbnails/74.jpg)
ResourcesResources“NAB Engineering Handbook.” Focal Press 2007.“The AMA Handbook of Project Management.” Paul C. Dinsmore. Bladwells Book Services, ISBN 0814401066.“Effective Project Management: How to Plan, Manage, and Deliver Projects On Time and Within Budget.” Robert K. Wysocki, Robert Beck, Jr., David B. Crane. New York. Wiley c1995.y“Getting a Project Done on Time: Managing People, Time, and Results.” Paul B. Willams. New York. Amacom. c1996.“Project Management.” Andy Bruce, Ken Langdon. New York Dorling Kindersley 2000York. Dorling Kindersley. 2000.“Project Management: A Systems Approach to Planning, Scheduling, and Controlling.” Harold Kerzner. New York. Wiley. c1998.
Originally published in the NAB Engineering Handbook, (c) Elsevier 2007. Used with permission.