management report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al...

35
Q G C W O c i W W s f h W T w T o t i t Quarter: 3 rd January Green indicates ac Core Initiative: What we will do Our district emp comprehensive p is in place in eve Why we will do We are committ school-based fac for three years in had three ineffec What we will rep The following S with fidelity? It The Strategic D on track to acco to budget, scope inidcator me the district’s goa March 2011 cceptable progress 1. Effective Tea o ploys about 12,7 plan of action th ery one HISD’s it ted to improving ctor in a child’s n a row were ab ctive teachers in port Strategic Directi measures HISD Direction Manag mplish a Key S e and timeliness ans progress ha als over a multi- Yellow indic acher in Every C 700 teachers in a hat will dramati s classrooms. g student achiev academic succe ble to improve th n a row (Sander ion Managemen D’s accomplishm gement Report is trategy’s quarte . A “Yellow” in s stopped or has -year period, no ates a concern wit Strategic Di Classroom almost 300 diffe cally transform vement across ou ess or failure. S heir performanc s and Rivers, 19 nt Report answe ments and risks f s produced quar erly goals. A “G ndicator mea s a significant d ot all Key Strateg h timeline, budget rection Manag erent schools. W the district’s hu ur district, and r Specifically, stud ce on standardiz 996). rs the question: for each Key St rterly. Color ind Green” indicator ns the district h eficiency. As th gies will have in and scope Re gement Report We are putting in uman capital sys research tells us dies have shown zed tests by more Is HISD acting trategies in supp dicators are used means the di as identified risk he Strategic Dire nformation to co ed indicates a defic nto place a thoug stems and ensur s that teachers ar n that students w e than 50 percen g on the prioritie port of the overa d to as an idicatio istrict has made k with respect to ection builds a f ommunicate in a ciency in time, bud ghtful, bold, sys re that a highly e re by far the mo who had very ef nt in comparison es identified in th all Core Initiativ on of whether a acceptable prog o one or more a foundation towa a given period. dget or scope stemic, and effective teacher ost powerful ffective teachers n to students wh he strategic plan ve. administration is gress with respe aspects. A “Red ards achieveing r s ho n s ect d

Upload: others

Post on 22-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

WOci WWsfh

WTw

Totit

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

What we will doOur district empcomprehensive pis in place in eve

Why we will do We are committschool-based facfor three years inhad three ineffec

What we will repThe following Swith fidelity? It

The Strategic Don track to accoto budget, scopeinidcator methe district’s goa

‐ March 2011 

          

cceptable progress 

1. Effective Tea

o ploys about 12,7plan of action thery one HISD’s

it ted to improvingctor in a child’sn a row were abctive teachers in

port Strategic Directi

measures HISD

Direction Managmplish a Key S

e and timelinessans progress haals over a multi-

                              

 Yellow indic

acher in Every C

700 teachers in ahat will dramatis classrooms.

g student achiev academic succe

ble to improve thn a row (Sander

ion ManagemenD’s accomplishm

gement Report istrategy’s quarte. A “Yellow” ins stopped or has-year period, no

                              

ates a concern wit

Strategic Di

Classroom

almost 300 diffecally transform

vement across ouess or failure. Sheir performancs and Rivers, 19

nt Report answements and risks f

s produced quarerly goals. A “Gndicator meas a significant dot all Key Strateg

                              

h timeline, budget

rection Manag

erent schools. Wthe district’s hu

ur district, and rSpecifically, studce on standardiz996).

rs the question: for each Key St

rterly. Color indGreen” indicator

ns the district heficiency. As thgies will have in

                             

 and scope  Re

gement Report

We are putting inuman capital sys

research tells usdies have shown

zed tests by more

Is HISD actingtrategies in supp

dicators are used means the di

as identified riskhe Strategic Direnformation to co

                              

ed indicates a defic

nto place a thougstems and ensur

s that teachers arn that students we than 50 percen

g on the prioritieport of the overa

d to as an idicatioistrict has made k with respect toection builds a fommunicate in a

                  

ciency in time, bud

ghtful, bold, sysre that a highly e

re by far the mowho had very efnt in comparison

es identified in thall Core Initiativ

on of whether aacceptable prog

o one or more afoundation towaa given period.

dget or scope 

stemic, and effective teacher

ost powerful ffective teachersn to students wh

he strategic planve.

administration isgress with respe

aspects. A “Redards achieveing

 

r

s ho

n

s ect d”

Page 2: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

1

1

1

1

1

AIbsssb Oop Lp

P

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

1.1 Strengthen

1.1.1 Refine rec

1.1.2 Implement

1.1.3 Build awa

1.1.4 Implement

AccomplishmenIn this period, wbudget challengsecondary scienschools includinschools, we are be impacted by

Our work on imorganization to iprocesses. We a

Lastly, we have people have exp

Planned for nex

‐ March 2011 

          

cceptable progress 

1. Effective Tea

recruiting and

cruitment and sta

t improved teac

reness and supp

t a “Talent Acqu

nts we have continueges, we know thance, bilingual edng Michigan Staalso continuing budget cuts and

mplementing the identify all of ouare in the midst

been redesigninperienced in the

xt period

                              

 Yellow indic

acher in Every C

d staffing polici

affing practices

cher recruitment

port among inter

uisition System

ed to focus our at we will still h

ducation, and lanate, Ohio Univerg to look for expd assisting them

Talent Acquisitur current proceof redefining ou

ng our back-endpast.

                              

ates a concern wit

Strategic Di

Classroom

es and practice

Main Ele

and staffing pra

rnal and externa

efforts on recruhave a need to hnguages. To suprsity, Harvard, Cerienced teache

m in finding oppo

tion system has esses that will neur recruitment a

d processes to en

                              

h timeline, budget

rection Manag

es to attract top

ment

actices

al stakeholders

uiting and selectire externally inpport our projecCornell and Texers. Our efforts ortunities within

been strong thiseed changes as wand selection pro

nsure that our re

                             

 and scope  Re

gement Report

p talent

ting highly effecn our critical shocted need we havxas A&M. At thhave also been n HISD.

s period. We hawe implement aocesses based o

ecruits have a m

                              

ed indicates a defic

ctive teachers. Aortage areas inclve targeted our rhe same time wefocused on supp

ave been workina system that alln the efficiencie

more streamlined

                  

ciency in time, bud

Pr

Although we areluding secondarremaining recrue are recruiting fporting our emp

ng with teams aclows us to streames we will gain w

d hiring experie

dget or scope 

rogress

e in the midst ofry math, uitment efforts ofrom these

ployees who wi

cross the mline our with this system

ence than what

 

f

on

ll

m.

Page 3: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

Oost Wome Wrh

Quarter: 3rd January ‐

Green indicates ac

Over the next thopportunities bostaff on resume these employees

We will conducopenings. All omentioned abovefforts for critic

We will also be recruitment and helping to ensur

‐ March 2011 

          

cceptable progress 

hree months, weoth inside and ouwriting, intervies.

t four placemenof these efforts wve, since we knoal shortage area

holding a threeselection proce

re that we hire e

                              

 Yellow indic

e will be workinutside the districewing tips and s

nt events over thwill help to ensuow that not all ofas.

day offsite meeess. We know teffective teacher

                              

ates a concern wit

g hard to work wct. We are condsocial Media. W

he next few monure that we are ff our projected v

eting to gather vthis will be incrers.

                              

h timeline, budget

with our displacducting training We have also dev

nths for principafinding new oppvacancies will b

various memberedibly valuable

                             

 and scope  Re

ced teachers andsessions every veloped a webs

als to meet displportunities for thbe filled with dis

s of the HISD cin shaping the d

                              

ed indicates a defic

d staff to assist tother Wednesdaite that will allo

laced staff and hose people whosplaced staff, we

ommunity to hedesign of the tal

                  

ciency in time, bud

them in finding ay to work with

ow us to provide

consider them fo fit our needs fe will continue

elp design a newlent acquisition

dget or scope 

the right h our displaced e information fo

for current for vacancies. Aour recruitment

w system for thesystem and

 

r

As

e

Page 4: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

1

1

1

1

1

1

1

1

AWFwcwaen

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

1.2 Establish a

1.2.1 Develop a

1.2.2 In-depth re

1.2.3 Design a m

1.2.4 Develop m

1.2.5 Define the

1.2.6 Incorporat

1.2.7 Gather sta

AccomplishmenWe are continuiFoundation, andwork. Through tconversations wwith their HR anactively engagedentailed meetingnine teacher and

‐ March 2011 

          

cceptable progress 

1. Effective Tea

rigorous and f

and implement a

eview of the fac

model of teacher

measures of stud

e teacher perform

te performance a

akeholder input

nts ing to leverage fd competitive puthe completion

with their Schoolnd Professional d stakeholders ags of 250+ Shard principal focus

                              

 Yellow indic

acher in Every C

fair teacher app

a districtwide sta

culty in nine of H

r competency an

dent learning

mance appraisal

appraisal data in

funding resourceublic grants, Teaof the fall 2010 l Improvement ODevelopment S

across the districred Decision-Mas groups, and th

                              

ates a concern wit

Strategic Di

Classroom

praisal system t

Main Ele

aff review proce

HISD’s lowest-p

nd behavior

l process

nto key decision

es from private acher Incentive and spring 201

Officer (SIO) onServices (PDS) tct to discuss a daking Committe

he participation o

                              

h timeline, budget

rection Manag

to inform key d

ment

ess for all teache

performing scho

ns

foundations, suFund (TIF) for 1 Staff Review n the performanteams to retain a

draft proposal ofees (SDMC), theof nearly 3,000

                             

 and scope  Re

gement Report

decisions

ers in every scho

ools

uch as the Arnoldexample, to supprocess, princip

nce of teachers aand develop theif the new teachee District Adviscommunity mem

                              

ed indicates a defic

ool

d Foundation anpport the design pals have been aat their schools air teachers. Thro

er appraisal and ory Committee mbers in a serie

                  

ciency in time, bud

nd Bill & Melinand implement

able to have meaand discuss specough this perioddevelopment sy(DAC), five wo

es of public foru

dget or scope 

Progress

nda Gates ation of this aningful cific strategies d we also have ystem. This orking groups, ums and online

 

Page 5: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

ssr

PFip

Quarter: 3rd January ‐

Green indicates ac

surveys. Cycle submitted to theregular Board of

Planned for nexFollowing Boarimplementation prep, and suppo

‐ March 2011 

          

cceptable progress 

4 recommendate DAC for reviewf Education mee

xt period d approval of thplan, which wilrt for the sustain

                              

 Yellow indic

tions from the Sw. The DAC wieting.

he final proposalll include traininnability of the a

                              

ates a concern wit

SDMC, based onill submit its fin

l for the new apng of trainers, ap

appraisal process

                              

h timeline, budget

n feedback collenal recommenda

ppraisal and deveappraisers, and tes going forward

                             

 and scope  Re

ected during the ations to the sup

elopment systemeachers, alignm

d.

                              

ed indicates a defic

public commenerintendent for

m for teachers, wment of the measu

                  

ciency in time, bud

nt period, have rBoard approval

we will finalize ures of student l

dget or scope 

recently been l at the April 14t

the learning by maj

 

th

or

Page 6: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

1

1

1

1

1

1

1

1

1

ADmc Ass

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

1.3 Provide ind

1.3.1 Identify a

1.3.2 Develop a

1.3.3 Implemen

1.3.4 Establish

1.3.5 Identify a

1.3.6 Develop a

1.3.7 Establish

1.3.8 Identify a

AccomplishmenDuring the sprinmonitor progrescoaching to prin

Additionally, thschools in alignistructure, two te

‐ March 2011 

          

cceptable progress 

1. Effective Tea

dividualized tea

and track central

a long-term cent

nt a long-term ce

PD clearinghou

and track school

a strategy for sc

metrics for mea

and execute train

nts ng 2011 Staff Ress on planned teancipals on schoo

e district has taking high qualityeams will essent

                              

 Yellow indic

acher in Every C

acher support a

lized TSD needs

tralized TSD str

entralized TSD

use

-based TSD nee

hool-based TSD

asuring the effec

ning for principa

eview process, Pacher developm

ol-based profess

ken action to resy, meaningful detially provide bo

                              

ates a concern wit

Strategic Di

Classroom

and developme

Main Ele

s via Staff Revie

rategy

strategy

eds via Staff Rev

D

ctiveness of sch

als to identify an

Professional Dement activities fo

ional developm

structure the PDevelopment oppoth centralized c

                              

h timeline, budget

rection Manag

nt

ment

ew and appraisa

view and apprai

ool-based TSD

nd respond to te

evelopment (PDor the school yea

ment by request.

DS organization ortunities for te

coordination and

                             

 and scope  Re

gement Report

al ratings

isal ratings

eacher developm

S) team membear. Continuing t

to become moreachers to do thed scalability for

                              

ed indicates a defic

ment needs

ers worked with the work started

e effective at preir best work in districtwide too

                  

ciency in time, bud

principals to idd last fall, PDS p

roviding the righthe classroom. Uols and training,

dget or scope 

Progress

dentify and provided

ht support to Under the new , and

 

Page 7: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

ims

PIp

Quarter: 3rd January ‐

Green indicates ac

individualized smove the districsupport to hold p

Planned for nexIn the future, weprofessional dev

‐ March 2011 

          

cceptable progress 

upport to teachect away from a ‘principals accou

xt period e will be workinvelopment will b

                              

 Yellow indic

ers in specific gone-size-fits-alluntable for help

ng to identify dabe evaluated.

                              

ates a concern wit

rades and contel’ workshop apping all teachers

ata sources that c

                              

h timeline, budget

ent areas. This reproach to a systegrow profession

can be used to c

                             

 and scope  Re

epresents a new em that is more nally.

create the metric

                              

ed indicates a defic

vision for profeindividualized a

cs by which all c

                  

ciency in time, bud

essional developand provides the

campus-based a

dget or scope 

pment that will e appropriate

and centralized

 

Page 8: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

1

1

1

1

ATat

PCia

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

1.4 Offer mean

1.4.1 Implemen

1.4.2 Establish

1.4.3 Implemen

AccomplishmenThe ASPIRE Awand adopted by teacher leader ro

Planned for nexChanges to the Aissue a Request and career pathw

‐ March 2011 

          

cceptable progress 

1. Effective Tea

ningful career p

nt the ASPIRE A

career pathway

nt a new compen

nts wards for 2009-the School Boarole, for full-time

xt period ASPIRE Awardfor Proposal (R

ways.

                              

 Yellow indic

acher in Every C

pathways and d

Award program

s

nsation model

-10 were paid ourd in March. In e classroom teac

d model for 2011RFP) to support c

                              

ates a concern wit

Strategic Di

Classroom

differentiated c

Main Ele

ut successfully iaddition, as an

chers with addit

1-12 will be devchanges to the c

                              

h timeline, budget

rection Manag

ompensation to

ment

in January. Chaninitial step into tional compensa

veloped and precompensation st

                             

 and scope  Re

gement Report

o retain and lev

nges to the ASPbuilding career

ation, to support

sented at a futurtructure for teach

                              

ed indicates a defic

verage the mos

PIRE Award mopathways for te

t professional de

re board meetinhers that are alig

                  

ciency in time, bud

st-effective teac

odel for 2010-11eachers, we haveevelopment in s

g. In addition, thgned with differ

dget or scope 

chers

Progress

1 were proposede developed a chools.

he district will rentiated roles

 

d

Page 9: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

WWsptt WTtws WTw

Totit

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

What we will doWe are going tosystem to be moperforming teacthe ongoing suptheir disposal to

Why we will do There is a broadto ensure studenwe have ample eschool students,

What we will repThe following Swith fidelity? It

The Strategic Don track to accoto budget, scopeinidcator methe district’s goa

‐ March 2011 

          

cceptable progress 

2. Effective Prin

o o make sure that ore aggressive inhers and assista

pports, careful evo lead their scho

it d consensus amont success. The evidence of this, even among sc

port Strategic Directi

measures HISD

Direction Managmplish a Key S

e and timelinessans progress haals over a multi-

                              

 Yellow indic

ncipal in Every

we have a highn recruiting talenant principals anvaluations, and ols into becomin

ong educational more challengin

s, as there is brochools with very

ion ManagemenD’s accomplishm

gement Report istrategy’s quarte. A “Yellow” ins stopped or has-year period, no

                              

ates a concern wit

Strategic Di

School

hly effective prinnted individuals

nd supplementedindividualized png the best in th

experts that havng and/or underad variation in t

y similar poverty

nt Report answements and risks f

s produced Quarerly goals. A “Gndicator means a significant dot all Key Strateg

                              

h timeline, budget

rection Manag

ncipal at the heas into principal pd by strong exterprofessional devhe nation.

ving an effectivrprivileged the sthe on-track-to cy levels.

rs the question: for each Key St

rterly. Color indGreen” indicator

ns the district haeficiency. As thgies will have in

                             

 and scope  Re

gement Report

ad of every schopositions, startinrnal candidates.velopment they

e principal at thstudent populatiocollege-readines

Is HISD actingtrategies in supp

dicators are used means the di

as identified riskhe Strategic Direnformation to co

                              

ed indicates a defic

ool. To do that, wng with our own. We will also prneed while also

he head of everyon in the schoolss rates of our el

g on the prioritieport of the overa

d to as an idicatiistrict has made k with respect toection builds a fommunicate in a

                  

ciency in time, bud

we will improven internal pipelinrovide all of our

o placing all the

y school is of utml, the more this ilementary, midd

es identified in thall Core Initiativ

ion of whether aacceptable prog

o one or more afoundation towaa given period.

dget or scope 

e our recruiting ne of best r principals withnecessary tools

most importanceis true. In HISDdle and high

he strategic planve.

administration isgress with respeaspects. A “Redards achieveing

 

h at

e D,

n

s ect d”

Page 10: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

2

2a

2

2n

2

AOfPaow WOaerd

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

2.4 Establish a

2.4.1 Define leaadvance into hig

2.4.2 Assess the

2.4.3 Provide onneed while also

2.4.4 Provide ne

AccomplishmenOver this periodframework that Principal/Dean,administrators. Aoutlines the entrwith two focus g

We launched theOur work with tand complete thexamples. The Rroles in the prepdirect service re

‐ March 2011 

          

cceptable progress 

2. Effective Prin

comprehensive

adership pathwaygher leadership

e strengths and w

ngoing professioaddressing key

ew principals wi

nts d we identified aprovides five po, Intern, ExternaAdditionally, thry and screeninggroups comprise

e district’s first the cohort involvhe district’s manReadiness seminparation of our felationship with

                              

 Yellow indic

ncipal in Every

e instructional

ys/ladders for Hroles

weaknesses of H

onal developmetopics in princi

ith a high-qualit

and continue to ossible pathwayal Candidate an

he support modeg requirements, ed of Chiefs, Sc

Readiness Cohoves helping the

ndatory managemnar is facilitatedfuture school leaschools, thus ha

                              

ates a concern wit

Strategic Di

School

leadership pro

Main Ele

HISD staff and a

HISD’s current s

nt to principals ipal developmen

ty, three-year m

refine developmys for entry into nd Initial Years. el is expanded toprogram design

chool Improvem

ort. This cohort cohort member

ment training sud by the Leadersaders. We are inaving an impact

                              

h timeline, budget

rection Manag

ogram to develo

ment

administrators to

supports to princ

who are alreadynt

mentorship progr

ment strategies thprincipalship inThe framework

o include consuln components, anment Officers and

consists of 56 ars define and honuch as budgetinghip Developmen

ntentional in our t on student achi

                             

 and scope  Re

gement Report

op and retain t

o become princi

cipals

y working in HI

ram

hat will result inn HISD. The patk provides for thltant support beynd curriculum sd Human Resou

administrators wne their leadershg, safety, data annt team with oth

r efforts to have ievement. Cent

                              

ed indicates a defic

op talent

ipals, and for pri

ISD, tailored to

n a comprehensithways are: Tea

hree years of dedyond mentoringstrands. The pathurces personnel.

who are deemed hip style, providnalysis, HR procher Central OffiCentral Office s

tral Office partn

                  

ciency in time, bud

incipals to

individual

ive leadership dacher Leader, Asdicated support g. The work we hway framewor

“ready” for thede interview skicesses and Peopice Departmentsstaff see themse

ners include Bud

dget or scope 

Progress

development ssistant for new have done

rk was shared

e principalship. lls and strategie

pleSoft as s also playing keelves as having adget and Finance

 

es,

ey a e,

Page 11: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

Pa Wswgt Lp P O

Quarter: 3rd January ‐

Green indicates ac

Procurement, Peand Special Edu

We have also msought to enhanwe have not reagrow-our-own lthe scope of lead

Last, training onprincipals, Lead

Planned for nex

Our plans for th

1. Train2. Laun3. Laun4. Laun

‐ March 2011 

          

cceptable progress 

eopleSoft, Humucation to name

met with two univnce our leadershiched a final agreadership develdership and prov

n the new princidership Develop

xt period

he next period in

ning all principaching the Teachching the first inching AP2 (seco

                              

 Yellow indic

man Resources, Ha few.

versity partnersip preparations sreement, the univlopment model. vide quality trai

ipal appraisal sypment Staff mem

nclude:

ls, assistant prinher Leader Acadnternship cohortond year develo

                              

ates a concern wit

HISD Police Dep

; Rice Universitstrategies by invversities have suUltimately, the

ining opportunit

ystem began in lmbers will partic

ncipals and othedemy t

opment for assis

                              

h timeline, budget

partment, Curri

ty and The Univvolving the univubmitted a propse proposed distties for principa

late March. A picipate in the init

er appraisers on

stant principals a

                             

 and scope  Re

culum Instructio

versity of Texasversities in the cposal outlining htrict-university

als at all levels in

ilot group of Schtial training.

the McREL app

and deans)

                              

ed indicates a defic

on and Assessm

. In our meetingco-construction ohow we might wpartnerships win their careers.

hool Improvem

praisal tool in Ju

                  

ciency in time, bud

ment, School Sup

g with these univof our program

work together in ll help us substa

ent Officers, pri

uly and August,

dget or scope 

pport Services

versities we model. Althougbuilding HISD’

antially redefine

incipals, assistan

2011

 

gh ’s e

nt

Page 12: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

WRpal WHcarw WTw

Totit

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

What we will doRedesign the coparticular emphas well as improlowest-performi

Why we will do HISD has a numcollege and careat grade level. Iresulting in onlywho enroll in co

What we will repThe following Swith fidelity? It

The Strategic Don track to accoto budget, scopeinidcator methe district’s goa

‐ March 2011 

          

cceptable progress 

3. Rigorous In

o ourse offerings, casis on giving a

oving instructioning schools.

it mber of outstandeer readiness. OIn addition, study 18% of HISD ommunity colleg

port Strategic Directi

measures HISD

Direction Managmplish a Key S

e and timelinessans progress haals over a multi-

                              

 Yellow indic

nstructional Stan

curriculum, asseall students the sn for students at

ding academic pOur scores showdent EVAAS groeighth-grade stuge require remed

ion ManagemenD’s accomplishm

gement Report istrategy’s quarte. A “Yellow” ins stopped or has-year period, no

                              

ates a concern wit

Strategic Di

ndards and Supp

essment tests, ansame access to et all levels. We

rograms and sup that, dependingowth data showudents successfudial courses in t

nt Report answements and risks f

s produced Quarerly goals. A “Gndicator means a significant dot all Key Strateg

                              

h timeline, budget

rection Manag

ports

nd social/emotioeducational progwill also implem

pports across thg on the grade, o

w a slowing of grully completingtheir first year.

rs the question: for each Key St

rterly. Color indGreen” indicator

ns the district haeficiency. As thgies will have in

                             

 and scope  Re

gement Report

onal supports prgrams and opporment a set of tar

he district, but ononly about 40 torowth in mathemg Algebra I. The

Is HISD actingtrategies in supp

dicators are used means the di

as identified riskhe Strategic Direnformation to co

                              

ed indicates a defic

rovided in schoortunities, regardrgeted reforms i

n the whole doeo 70% of our stumatics progress

end result is tha

g on the prioritieport of the overa

d to as an idicatiistrict has made k with respect toection builds a fommunicate in a

                  

ciency in time, bud

ols throughout Hdless of which scin order to turn a

es not prepare students are readinfrom the fifth toat the majority o

es identified in thall Core Initiativ

ion of whether aacceptable prog

o one or more afoundation towaa given period.

dget or scope 

HISD, with a chool they attenaround HISD’s

tudents for ng or doing mato sixth grades, of HISD student

he strategic planve.

administration isgress with respeaspects. A “Redards achieveing

 

nd,

h

ts

n

s ect d”

Page 13: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

3

3

3s

3

3i

3

ATnFPSAdda Am

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

3.1 Equity i

3.1.1 Ensure th

3.1.2 Broaden asuccess rates

3.1.3 Increase c

3.1.4 Provide spinstructional pro

3.1.5 Launch a

AccomplishmenThe Advanced Pnew Pre-AP andFoundation (MSPre-AP programSecondary G/T Administrators during the AP discuss the goaattending.

AP Celebration meeting by fello

‐ March 2011 

          

cceptable progress 

3. Rigorous Inst

in access to edu

at all schools ha

access to dual cr

consistency of M

pecialized instruograms

post-secondary

nts Placement (AP)d new AP teachSDF) awarded Hms for middle sc

coordinators mreceived a copyLeadership Inst

als of the MSDF

Saturday brougow HISD AP te

                              

 Yellow indic

tructional Stand

ucational progr

ave high quality

redit, Advanced

Magnet Schools

uctional opportu

y access effort

) and Pre-AP Prhers. Spring AHISD a $1.4 michools and high

meeting in Februy of their indivititute. The AP F Grant and str

ght HISD AP teeachers. They t

                              

ates a concern wit

Strategic Di

dards and Suppo

rams

Main Ele

y programs to m

d Placement (A)

unities througho

rogram continueAP Mentor meetillion grant spech schools. A repuary to learn theidual MSDF GrLeadership Ins

rategies on how

achers together then participated

                              

h timeline, budget

rection Manag

orts

ment

eet the diverse n

, and Internation

out the district fo

es focusing on intings occurred tcifically designepresentative frome specific requirrant Goals durinstitute was a mw to achieve tho

in February at d in a celebratio

                             

 and scope  Re

gement Report

needs of student

nal Baccalaurea

or students seek

ncreasing the prthroughout the ed to help improm each campus red activities assng the February

meeting designedose goals held

HSPVA. AP teon recognizing

                              

ed indicates a defic

ts

ate (IB) and imp

king alternative

rovision of profmonth of Februove the district’attended an inf

sociated with thy’s Principal Md to bring secoin February wi

eachers were ledthe most effect

                  

ciency in time, bud

prove exam

fessional develouary. The Mich’s Advanced Plaformation sessiohe MSDF grant

Meeting and discndary administrith 80 Secondar

d through a protive high school

dget or scope 

Progress

opment services hael & Susan Dacement (AP) anon held during tfunds. Seconda

cussed these goarators together ry Administrato

fessional learninl AP programs

 

to ell nd the ary als to

ors

ng as

Page 14: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

wP TawtPOaTTATWfILdtmtAm

Quarter: 3rd January ‐

Green indicates ac

well as the stronPlacement with

The administratallowing our topwould meet studthat was started Planned for nexOver the next padministered. TThe AP VerticaTeam Guides thAlso, we will coThe AP LeadersWe will continufunded by The MIssues/ConcernLast fall, the impdevastating consthis quarter and magnet programtime and energyAdditionally, thmitigate this risk

‐ March 2011 

          

cceptable progress 

ngest AP teacheCollege Board.

ion presented thp magnet progradents' interests wlast fall. xt period eriod, we will c

This will be an inal Teams in Enghat will be utilizeontinue the prepship Institute wiue the work to imMichael & Susans/Requests plications of thesequences acrosit was decided t

ms continue to rey on making touere is concern thk, the district is

                              

 Yellow indic

ers in our distric He is the highe

he Board of Eduams to continue while rejuvenati

continue our woncrease of 19% glish, Math anded by secondary

paration for the aill be offered Junmprove the distran Dell Foundati

e current fiscal css the entire distthat few changeeceive funding agh spending dechat the number taking steps to

                              

ates a concern wit

ct. The special kest ranking AP o

ucation with a pland replacing o

ing neighborhoo

ork related to Aover last year’s

d Science are ply schools to provannual Summer ne 6-9, 2011 wirict’s Advanced ion (MSDF)

crisis were uncltrict, the HISD pes be made to thand transportatiocisions. of teachers that increase commu

                              

h timeline, budget

keynote speakerofficial with Col

lan for retoolingour ineffective pods. The proposa

Advanced Placems 16, 556 AP exalanning to meetvide Pre-AP insInstitute at Rice

ith 16 course offPlacement (AP

ear. As the distrpreliminary recoe magnet prograon next year allo

will attend the unication and pu

                             

 and scope  Re

r for this event llege Board.

g magnet prograprograms with onal was the result

ment. In May, wams administeret in June at Ricstruction to HISDe University andferings on Pre-A

P) and Pre-AP pr

rict faces unprecommendations oams for 2011–2owing our staff

summer Pre-APublication.

                              

ed indicates a defic

was Trevor Pac

ams in a way thanes that hold reat of months of s

we anticipate thaed. ce University toD students. d other participa

AP topics. rograms for mid

cedented budgeton the magnet p012. The recomand stakeholder

P workshops wil

                  

ciency in time, bud

cker, Vice Presi

at encourages faal promise. The

studying, listenin

at over 19,800 A

continue their

ating universitie

ddle schools and

t cuts with potenrograms were h

mmendation wasrs the opportuni

ll be less than an

dget or scope 

dent of Advanc

air competition, ese new options ng, and working

AP exams will

work on Vertic

es in our region.

d high schools

ntially held in abeyance that all current ity to focus their

nticipated. To

 

ed

g

be

cal

e

r

Page 15: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

3

3

3v3c3a3a3d

3

AIT

I

Td

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

3.2 Develop

3.2.1 Communic

3.2.2 Arrange anvalid, and comp3.2.3 Promote acareer readiness3.2.4 Train teachachieving campu3.2.5 Identify a aligned to the di3.2.6 Establish adistrict’s curricu

3.2.7 Pursue an

AccomplishmenIn an effort to inTwo unsolicited

Issues/Concern

The decentralizadistrict will assi

‐ March 2011 

          

cceptable progress 

3. Rigorous Inst

p and implemen

cate high expect

n independent eprehensive curricacademic rigor fos (CCR) hers on implemus and district grobust assessmeistrict curriculuma clearinghouse ulum

online platform

nts ncrease the rigord proposals were

ns/Requests

ation of curriculst in rigorous an

                              

 Yellow indic

tructional Stand

nt an aligned st

tations for instru

external analysisculum

for all students b

enting the aligngoals ent system that wm’s scope and sthat identifies h

m for curriculum

r of the district’e received to pro

lum authority isnd clear expecta

                              

ates a concern wit

Strategic Di

dards and Suppo

tandards-based

Main Ele

uctional deliver

s of the district’s

by updating the c

ned/updated curr

will provide cusequence

high-quality, res

management an

s curriculum, anovide a curriculu

impacting the aations of learnin

                              

h timeline, budget

rection Manag

orts

d curriculum an

ment

ry and establish

s curriculum in

current curriculu

riculum, and tra

stomized predic

search-based ins

nd access

n RFP was deveum audit.

ability to build ang for all childre

                             

 and scope  Re

gement Report

nd assessment

district-manage

order to establis

um to meet stan

in principals on

tive and diagno

structional mate

eloped to solicit

a monitored curren.

                              

ed indicates a defic

plan

ed curriculum gu

sh a well-crafted

ndards for colleg

n supporting teac

stic assessments

rials aligned to

interest in build

riculum. An ali

                  

ciency in time, bud

uidelines

d, focused,

ge and

chers in

s that are

the

ding a robust ass

igned curriculum

dget or scope 

Progress

sessment system

m throughout th

 

m.

he

Page 16: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

Tp

Quarter: 3rd January ‐

Green indicates ac

The building of process. This ef

‐ March 2011 

          

cceptable progress 

a robust assessmffort is depende

                              

 Yellow indic

ment system is int upon clear ex

                              

ates a concern wit

in progress, withxpectations of w

                              

h timeline, budget

h an RFP havingwhat is to be taug

                             

 and scope  Re

g been written tght and allocatio

                              

ed indicates a defic

to align with theon of resoruces.

                  

ciency in time, bud

e data-driven dec

dget or scope 

cision making

 

Page 17: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

3

3

3a

3

3a3a

3

AAbbtp

P

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

3.3 Implem

3.3.1 Train teach

3.3.2 Implementaccurately referr

3.3.3 Improve d

3.3.4 Provide taacademic/social3.3.5 Improve thand solutions to

3.3.6 Articulate

AccomplishmenAcademic and bbe vetted in antibehavior modifithe regular educpersonnel to ass

Planned for nex

• District l

‐ March 2011 

          

cceptable progress 

3. Rigorous Inst

ent Response t

hers and princip

t a school-level ring Tier III stud

district-level solu

actile materials al emotional needhe instructional meet the social

the Intervention

nts behavioral teamsicipation of an oication during pcational setting. sist with loading

xt period

leaders continue

                              

 Yellow indic

tructional Stand

o Intervention

pals on how to d

approach to desdents

utions for Tier I

and supports to ads and challengeclimate by offe

l/emotional need

n Assistance Te

s meet to develoonline applicatiolacement, enhanAll core academ

g IAT/RTI inform

e to meet to disc

                              

ates a concern wit

Strategic Didards and Suppo

model districtw

Main Ele

diagnose student

signing holistic

III students

assist all teacheres ring technologyds of students

eam/Response to

op the Online Pyon. A meeting wnce communicatmic teachers havmation for paren

cuss next steps t

                              

h timeline, budget

rection Managorts

wide to provide

ment

ts’ needs and di

intervention str

rs in determinin

y-based applicat

o Intervention pr

yramid of Intervwas held with Ction with schoolve received an IAnts onto the web

to continue the i

                             

 and scope  Re

gement Report

e early, effectiv

fferentiate supp

rategies for help

ng strategies to m

tions to identify

rocess for paren

vention. These tEP and internalls, and monitoriAT/RTI flipchabsite.

implementation

                              

ed indicates a defic

ve assistance to

port within the c

ing Tier II stude

meet student

research-based

nts

wo teams will ml staff membersing the student oart. The Safe Sc

.

                  

ciency in time, bud

o children

lassroom

ents and

strategies

merge and theirto develop a str

once the studentchools Departme

dget or scope 

Progress

total product wirategy to promott has returned toent has secured

 

ill te

o

Page 18: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

•r•dt

I

•••rt

R

Quarter: 3rd January ‐

Green indicates ac

• A grade/recommendation• A moodldeveloped/supplthe training proc

Issues/Concern

• Budget a• Currentl• There is recommended thtrain on the usag

Risks

• We must

‐ March 2011 

          

cceptable progress 

/Chancery/PEIMns and work witle-based traininglied by Safe Schcess.

ns/Requests

and personnel cuy, funding is una continuing ne

hat the online pyge of this system

t ensure that the

                              

 Yellow indic

MS report has beth campus-basedg for IAT is undhools. A blog fo

uts have significnavailable for theed for human ayramid be move

m.

e Transformation

                              

ates a concern wit

een pulled for ald IAT for intervder developmenor posting questi

cantly affected te development o

and financial caped to year two o

n Turnaround sc

                              

h timeline, budget

ll students in theventions. nt through the Ofions and concern

the ability to proof an online IATpital to ensure thor three of the St

chools receive s

                             

 and scope  Re

e Transformatio

ffice of Professins was created a

ogress in a timelT/RTI model anhat this initiativetrategic Directio

support in imple

                              

ed indicates a defic

on Schools. This

ional Developmand will continu

ly manner. nd other supporte be delivered inon and a level II

ementing IAT/R

                  

ciency in time, bud

s data will be uti

ment utilizing infue to provide sup

ting materials. n a timely mannI moodle trainin

RTI in order to b

dget or scope 

ilized to make

formation pport as part of

ner. It is g take place to

be successful.

 

f

Page 19: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

3

3

3

3

A

EtH T••••••••

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

3.4 School T

3.4.1 Build Tran

3.4.2 Research a

3.4.3 Implement

Accomplishmen

Elementary schotowards implemHISD foundatio

The district rece• High Sch• 263 stud• 327 stud• 204 stud• Out of sc• Math tut• Overall s• Schools

‐ March 2011 

          

cceptable progress 

3. Rigorous Inst

Transformation

nsformation Cor

and identify pro

t a school-wide

nts

ools were selectmentation in the 2on has received a

eived and dissemhools decreased

dent (19%) had gdents (23%) had dents (14%) had chool suspensiotoring has seen schools systemshave implemen

                              

 Yellow indic

tructional Stand

n Turnaround

re Team

oven approaches

transformation

ted and approve2011-2012 schoalmost $2,500,0

minated the Midd the cohort dropgreater than 2.0 between 1.0 anbetween 0.5 an

ons have decreas15% - 29% in gs and proceduresnted stricter disc

                              

ates a concern wit

Strategic Di

dards and Suppo

Plan

Main Ele

s for low-perform

intervention mo

ed by the board fool year. The dis000 in support o

d-Year Network p out rate for 20years of typical

nd 2.0 years of tynd 1.0 years of tysed by over 50%rowth from diags have improvedipline policies a

                              

h timeline, budget

rection Manag

orts

ment

ming schools

odel that would

for the district’sstrict has receivf our transforma

Education Rep010, on an averal growth. ypical growth.ypical growth.

% on average in gnostics in the bd to establish a and uniform pol

                             

 and scope  Re

gement Report

begin with the 2

s transformationed numerous doation turnaround

ort. The prelimiage, by 8%.

our transformatbeginning of thesafer environmeicies.

                              

ed indicates a defic

2010–2011 scho

n program expanonations from oud model.

inary secondary

tion schools. e year for 6th & 9ent focused on l

                  

ciency in time, bud

ool year

nsion. The focusur external partn

y data is encoura

9th grade tutorinearning.

dget or scope 

Progress

s has shifted ners. To date, th

aging as we note

ng.

 

he

e:

Page 20: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

•t•dc•

ITbamcea

Quarter: 3rd January ‐

Green indicates ac

• Schools trackers to track• Implemedifferentiation, acoaching and de• Schools

Issues/ConcernThe district contbenefit from a loare struggling thmath tutoring foconcern and theendorsement of ability to raise fu

‐ March 2011 

          

cceptable progress 

have implemenk mastery. enting Classroomassessing for leaevelopment is becontinue receiv

ns/Requests tinues to commuonger school yehe most. Elemenor fourth-gradersrefore the distrithe Greater Hou

funds.

                              

 Yellow indic

nted PLCs that a

m Management arning, and moveing provided to

ving monthly fee

unicate with all ear, longer days,ntary schools wis and Saturday sct continues to suston Partnershi

                              

ates a concern wit

are looking at 3 w

and Professionaving towards moo schools. edback around s

stakeholders ar intensive 2-on-ill not have an eschool for studeseek additional ip, which is the

                              

h timeline, budget

week district as

al Developmentore student cente

strengths and pri

round the missio-1 math tutoringextended school ents who need thprivate donationcity’s largest bu

                             

 and scope  Re

sessment data to

t plans based onered learning. S

iority areas for g

on & vision of thg and a double d

year or longer she most help in mns. This year ouusiness advocac

                              

ed indicates a defic

o monitor maste

n principal prioriSchools still nee

growth once a m

he program and dose of class timschool days, butmath and/or rea

ur transformationcy organization.

                  

ciency in time, bud

ery and using in

ities for 100% eed growth in the

month.

d success. Seconme for the subjec

t they will offerading. Funding tn effort initiativWe expect this

dget or scope 

ndividual student

engagement, ese areas, but

ndary students cts in which theyr high dosage the effort is a ve earned the

to increase our

 

t

y

Page 21: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

3

3c3g3a3r3h

A

CHficc2

P

T

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

3.5 Implem

3.5.1 Develop acollege and care3.5.2 Establish Pgrade level read3.5.3 Develop aat each grade lev3.5.4 Implementread on- or abov3.5.5 Provide dihow to impleme

Accomplishmen

Completed PhasHoc committee,for parents that initiative was laclassroom suppocommittee deve2011.

Planned for nex

The activities w

‐ March 2011 

          

cceptable progress 

3. Rigorous Inst

ent a comprehe

a comprehensiveeer ready PK-12 reading s

ders and implement avel t PK-12 standarve-grade level ifferentiated andent, monitor and

nts

se 1 of our Liter, elementary anddescribe what st

aunched to faciliort. The training

eloped a process

xt period

we will be undert

                              

 Yellow indic

tructional Stand

ensive literacy

e PK-12 Literacy

standards across

an aligned distric

rd districtwide s

d ongoing trainind support literacy

racy Plan work. d secondary litertudents should kitate quality impg is to be provid for Pre-K, lang

taking in the nex

                              

ates a concern wit

Strategic Di

dards and Suppo

(reading) prog

Main Ele

y Plan to ensure

s the district to b

ctwide student l

creening and pr

ng to teachers, cy framework

The feedback rracy coaches, anknow and be abplementation of ded by instructioguage arts, and E

xt reporting peri

                              

h timeline, budget

rection Manag

orts

gram in grades

ment

e all students hav

be used in the id

literacy pathway

rogress monitori

campus leadersh

eceived was posnd Central Officle to do by the enew reading ad

onal specialists aESL adoptions.

iod will include

                             

 and scope  Re

gement Report

pre-k through

ve the necessary

dentification of a

y to meet the ne

ing reading asse

hip teams and di

sitive. Stakeholdce academic depend of the each goption includingand curriculum sWe plan to imp

e:

                              

ed indicates a defic

h 12

y literacy skills

above-, on- and

eds of individua

essments to ensu

istrict administr

ders included Epartments. Readgrade level, in gg coaching and specialists. A dplement the text

                  

ciency in time, bud

to be

below-

al students

ure students

rators on

lementary SIOsding documents grades K-12. Anmentoring, mod

districtwide textbtbook selection p

dget or scope 

Progress

s, Principal Ad were developed

n ongoing trainindel lessons, and book selection process in the fa

 

d ng

all

Page 22: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

••••

Quarter: 3rd January ‐

Green indicates ac

• “Literacy• Develop• Develop• Develop

‐ March 2011 

          

cceptable progress 

y” will be the ump action steps forp implementationp a training plan

                              

 Yellow indic

mbrella that all r literacy plan frn plan for literacto support scho

                              

ates a concern wit

other disciplineramework throucy work.

ool staff in the im

                              

h timeline, budget

es will integrateugh committee w

mplementation.

                             

 and scope  Re

as reading is thwork.

                              

ed indicates a defic

e threshold skill

                  

ciency in time, bud

l for success for

dget or scope 

r all others.

 

Page 23: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

3

3c3a3s3t

A

LpHeccp

P

Tl

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

3.6 Implem

3.6.1 Provide eqcollege/career re3.6.2 Develop aat each grade lev3.6.3 Provide distakeholders on 3.6.4 Develop atargeted interven

Accomplishmen

Launched in thepartnership withHISD Math Starearned incentiveconferences withcontrol group stpositive correlat

Planned for nex

The activities wliteracy umbrell

‐ March 2011 

          

cceptable progress 

3. Rigorous Inst

ent a comprehe

quitable instructeady

an aligned, distrivel ifferentiated andhow to implem

and implement dntion, based on

nts

e fall, the Houstoh Harvard’s Edurs program remae pay through deh their childrentudents over the tion between Ac

xt period

we will be undertla.

                              

 Yellow indic

tructional Stand

ensive Numera

tion by establish

ictwide Numera

d ongoing traininment, monitor, andistrictwide formassessment data

on ISD Math Stucation Innovatiains strong. At emonstrating m’s mathematics course of the pr

ccelerated Math

taking in the nex

                              

ates a concern wit

Strategic Di

dards and Suppo

acy/mathematic

Main Ele

hing districtwide

acy Coaching M

ng to teachers, pnd support Nummative assessmea

tars program is aon Laboratory athe end of four astery of mathemteachers. Studerogram thus far

h objective maste

xt reporting peri

                              

h timeline, budget

rection Manag

orts

cs program in g

ment

e Numeracy targ

Model, targeted to

principals, Schomeracy instructioents and provide

an experimentaland funded by apay periods, 98matics objectiveents in Math Sta. Students’ hardery and student

iod will include

                             

 and scope  Re

gement Report

grades pre-k th

gets to ensure th

o meet the need

ool Improvemenon e guidelines and

l fifth grade mata private foundat8 percent of Mates. More than 8ars treatment schd work appears performance on

e continuing the

                              

ed indicates a defic

hrough 12

hat all students a

ds of teachers an

nt Officers, and o

standards of pr

thematics incenttion. Student anth Stars students85 percent of Mahools have mastto be paying off

n the middle-of-

work with num

                  

ciency in time, bud

are

nd students

other

actice for

tive program dend parent particis in 25 treatmenath Stars parenttered twice as mff. Preliminary d-year assessmen

meracy through a

dget or scope 

Progress

eveloped in ipation in the

nt schools have ts have attended

many objectives adata suggest a nts.

an integrated

 

d as

Page 24: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

WBd WCF TudP WTw

Totit

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

What we will doBuild robust sysdistrictwide.

Why we will do Currently, relevFurthermore, ma

This creates an ounderstand howdistrict. FundinPhase 1 is a mul

What we will repThe following Swith fidelity? It

The Strategic Don track to accoto budget, scopeinidcator methe district’s goa

‐ March 2011 

          

cceptable progress 

4. Ensure data-d

o stems and proce

it vant data on stuany people acro

opportunity to aw to translate datng for this initiatlti-year program

port Strategic Directi

measures HISD

Direction Managmplish a Key S

e and timelinessans progress haals over a multi-

                              

 Yellow indic

driven accounta

esses that enable

udents, teacheross the district la

arm HISD leadeta into action. Btive is focused o

m of training and

ion ManagemenD’s accomplishm

gement Report istrategy’s quarte. A “Yellow” ins stopped or has-year period, no

                              

ates a concern wit

Strategic Di

ability

e easy access to

rs, and achievemack the expertise

ership with acceBy doing so, weon Phase 1, whid learning throug

nt Report answements and risks f

s produced Quarerly goals. A “Gndicator means a significant dot all Key Strateg

                              

h timeline, budget

rection Manag

and use of key d

ment are diffice to use data to m

ssible, timely ane will get betterich includes mingh use.

rs the question: for each Key St

rterly. Color indGreen” indicator

ns the district haeficiency. As thgies will have in

                             

 and scope  Re

gement Report

data to inform d

cult to access, omake decisions.

nd accurate datar at making the nimal training a

Is HISD actingtrategies in supp

dicators are used means the di

as identified riskhe Strategic Direnformation to co

                              

ed indicates a defic

decisions and m

often not up-to.

a and provide thkey decisions t

and will provide

g on the prioritieport of the overa

d to as an idicatiistrict has made k with respect toection builds a fommunicate in a

                  

ciency in time, bud

anage high leve

o-date, and not

hem with the traithat affect the pee initial reports.

es identified in thall Core Initiativ

ion of whether aacceptable prog

o one or more afoundation towaa given period.

dget or scope 

els of performan

always accura

ining necessary erformance of t Training beyon

he strategic planve.

administration isgress with respeaspects. A “Redards achieveing

 

nce

te.

to the nd

n

s ect d”

Page 25: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

4

4

4

4

AAo (c(mai (am

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

4.1 Build easily

4.1.1 Create a d

4.1.2 Implement

4.1.3 Re-skill an

AccomplishmenA new Chief Teoversee both the

(4.1.3.6) The iniconsulting enga(Chief Informatmillion) will likare underway wimplement them

(4.1.3.1) The RFapproval by cabmentioned by th

‐ March 2011 

          

cceptable progress 

4. Ensure data-d

y accessible and

ata warehouse w

t a data quality

nd implement IT

nts echnology Informe Technology an

itial phase of thegement is underion Security Of

kely be required with key district sm.

FP requirementsbinet prior to mohe CGCS audit r

                              

 Yellow indic

driven accounta

d accurate data

with business in

and data stewar

T infrastructure

mation Officer (nd Research, an

e Information Srway. Penetratifficer) from IBMfor this effort. stakeholders to

s were finalizedoving forward. Grecommendation

                              

ates a concern wit

Strategic Di

ability

a architecture, w

Main Ele

ntelligence interf

rdship program

that supports th

(CTO), Arnold Vd Accountabilit

Security Programon Test is comp

M was brought inISS engagemencatalog the data

d for a Student AGoal is to have ns.

                              

h timeline, budget

rection Manag

warehouse, and

ment

face

he District

Viramontes, waty divisions.

m is in progress,plete and a reporn to lead the secnt also involves aa elements of HI

Assessment tool Pilot in 4Q11 an

                             

 and scope  Re

gement Report

d technology in

as hired and will

with $2MM in rt has been delivcurity program. a data security aISD, drive owne

as part of Instrund tool rollout i

                              

ed indicates a defic

nfrastructure

l report directly

initial funding vered for acceptSubstantial addiassessment and ership, develop

uctional Applicain 1Q12. Format

                  

ciency in time, bud

to the superinte

secured. IBM Stance by HISD. itional investmestrategy programstandards and p

ations Architectutive Assessment

dget or scope 

Progress

endent. He will

Security ServiceAn interim CIS

ent ($10- 15 m. Workshops

policy, and

ure. It is awaitint was a key area

 

es SO

ng a

Page 26: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

(tcB (assy (cpa (cnfds

PTcTf

Quarter: 3rd January ‐

Green indicates ac

Initiative 4.1.3

(4.1.1) Currentlyto pull together central repositorBoard for appro

(4.1.2) Initial ana sustainable dasuch as course, tschool can haveyears, and $1.8 M

(4.1.3.2) In suppcollaborative enplatform. A succan expanded pil

(4.1.3.5) In ordeconnectivity andnetwork design funding in suppodistrict is intervischools is aroun

Planned for NeThe new CTO wconducting dataThe administratfrom past years.

‐ March 2011 

          

cceptable progress 

3 consists of sev

y, critical data orelevant and usery where all crit

oval in 3Q10.

nalysis of emploata repository cateacher, transcri

e different class MM per year on

port of a 21st cennvironment, whicessful collaborot test.

er to support thed information seand architectureort this effort. Siewing Project M

nd $10MM. The

ext Period will start in earlya security and goion will be aske.

                              

 Yellow indic

veral independen

on student and teeful reports to intical data will be

oyee and studentan be built. For iipt and state codperiod structuren an ongoing ba

ntury learning eich will allow strative system pil

e transition to neecurity to ensuree for a new netwSome funding foManagers and Se funds required

y April. The disovernance worked to approve th

                              

ates a concern wit

nt efforts. Acco

eacher performanform decision e stored. The ini

t subject data arinstance, historicding data elemenes. Estimated coasis.

environment, HItudents, teacherslot was conduct

ew IT architectue that the supporwork was complor past eRate ye

Sr. Network Engd to upgrade sch

strict will continshops. Work wie Student Asses

                              

h timeline, budget

omplishments for

ance is housed imaking by leaditial bids for this

reas indicates thcal student reconts are not consost of the effort

ISD needs to devs, and administrted at Lamar HS

ures, HISD mustrting infrastructleted, an RFP reears has been apgineers for the nhools not funded

nue the work in ill be done to sessment requirem

                             

 and scope  Re

r these independ

n various locatidership across ths effort were rec

at a 1-2 year effords are not in coistently represenis $7MM in the

velop a special trators to work onS. This solution

t revamp its existure in place is seleased, and venproved. eRate Y

network implemed through E-Rate

support of the Icure additional

ments. We will a

                              

ed indicates a defic

dent workstream

ons, requiring ehe district. To received and are r

fort to clean andonsistent formatnted, preventinge first year, $3.4

type of instructinline more prodis ready for scal

sting IT architecsafe, secure, andndors finalized. WYear 14 470s weentation projecte are estimated

nformation Secufunding.

also continue to

                  

ciency in time, bud

ms are below:

extensive manuamedy this, HISD

ready for presen

d structure data its throughout thg effective data 4MM in the seco

ional applicationductively across ling to the whol

cture in areas sud easy to access.Work continuesere finalized on t. Matching fundat $12MM-$20M

urity Program s

work to acquire

dget or scope 

al effort and timD will create a tation to the

is required befohe district. Data analysis. Each

ond and third

n called a a common

le High School a

uch as network . A high-level s to secure feder3/22. The

ds for E-rate MM.

uch as

e eRate funds

 

me

re

as

ral

Page 27: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

NTpmr

Quarter: 3rd January ‐

Green indicates ac

Needed to movThe majority of program in suppmaking by leaderesources and fu

‐ March 2011 

          

cceptable progress 

e Red to Yellowf the efforts requport of creating ership across theunding.

                              

 Yellow indic

w uire funding to sa central data ree district. The d

                              

ates a concern wit

secure qualified epository that wdistrict needs to d

                              

h timeline, budget

resources and imill be used to pudetermine priori

                             

 and scope  Re

mplement projeull together relevity of IT infrastr

                              

ed indicates a defic

ects. The districvant and useful ructure projects

                  

ciency in time, bud

ct needs to initiareports to inform and feasibility

dget or scope 

ate a data qualitym decision given current

 

y

Page 28: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

S

C

4

4p

4

4

ATsog PWs

Quarter: 3rd January ‐

Green indicates ac

Strategic Direc

Core Initiative:

4.2 Develop and

4.2.1 Adapt Boaperformance me

4.2.2 – 4.2.6 Cre

4.2.7 End User T

AccomplishmenThe Board Monsupport performoffice employeegoals with those

Planned for nexWork on the Boscheduled for th

‐ March 2011 

          

cceptable progress 

ction Managem

4. Ensure Data –

d implement pe

ard Monitoring easures

eate a dashboard

Training

nts nitoring System mance managemees participating ie of their departm

xt period oard Monitoringhe spring/summe

                              

 Yellow indic

ment Report

– Driven Accou

erformance ma

System to create

d that summariz

metrics were dient in the districin ePerformancement and the dis

System will coer 2011.

                              

ates a concern wit

untability

anagement tool

Main Ele

e a dashboard th

zes important pe

scussed and revct concluded sme Phase II, midystrict.

ontinue. In additi

                              

h timeline, budget

ls and practices

ment

hat provides a sn

erformance metr

viewed at the annmoothly with woyear conversatio

ion, end-of-year

                             

 and scope  Re

s for decision-m

napshot of the m

rics for key distr

nual Board retrerk transitioned t

ons occurred and

r performance re

                              

ed indicates a defic

making

most important d

rict leadership

eat in January. Ato HISD staff god work continue

eviews through

                  

ciency in time, bud

district

A MSDF Foundoing forward. Fes in aligning the

the ePerforman

dget or scope 

Progress

dation grant to or those central eir individual

nce pilot are

 

Page 29: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

4

4s

4

4

AItPc Iwea Fe P

Quarter: 3rd January ‐

Green indicates ac

Core Initiative:

4.3 Design Effe

4.3.1 Design andservices and ma

4.3.2 Design pro

4.3.3 Define a b

AccomplishmenIn this period wto link the InstruProducts & Servcorresponding s

In addition, we dwas designed foexperienced. Scacquisitions of t

Finally, we desievaluation proce

Plans for Next

‐ March 2011 

          

cceptable progress 

4. Ensure Data

ective and Effic

d implement effaterials

ocesses for scho

business process

nts e finalized all suuctional Productvices on-line apppecialist in the C

developed the Dor schools to ratecoreCards will athe same produc

igned the Instrucess once they re

Period

                              

 Yellow indic

a – Driven Accou

cient Business P

fective and effic

ools to evaluate

s for the procure

ubject program ts & Services Qplication so thatCurriculum Dep

District’s ScoreCe and comment also have the prects and services.

ctional Productseceive the compl

                              

ates a concern wit

Strategic Di

untability

Processes and P

Main Ele

cient processes f

and share exper

ement of service

questionnaires fQuestionnaires to

t Suppliers are apartment for the

Card applicationon the success oeviously rated S.

s & Services Evleted questionna

                              

h timeline, budget

rection Manag

Procedures for

ment

for selecting, ob

riences about ve

es and materials

for acquiring Ino the Supplier Rable to completeeir vetting and te

n, which can be or disappointmeSuppliers so that

valuation Busineaires.

                             

 and scope  Re

gement Report

Optimization o

btaining, and eva

endors

off the recomm

nstructional ProdRegistration proce these questionnesting.

found on the Prent in the product other campuse

ess Process. This

                              

ed indicates a defic

of Resources an

aluating instruct

mended vendor li

ducts and Serviccess. Finally, wenaires and subm

rocurement Servcts and services s can view the S

s illustrates the

                  

ciency in time, bud

nd Results

tional

ist

ces. We also dese developed an I

mit them electron

vices website. Tthey have acqu

Suppliers’ rating

Curriculum Dep

dget or scope 

Progress

signed and agreeInstructional nically to the

his application uired and gs prior to their

partment’s

 

ed

Page 30: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

IS Fw

Quarter: 3rd January ‐

Green indicates ac

In the next perioServices Questio

Finally, we are mwhile providing

‐ March 2011 

          

cceptable progress 

od, we plan to uonnaires, thus th

making plans fog the District wit

                              

 Yellow indic

update the Produhese costs can b

or ongoing Suppth a learning lab

                              

ates a concern wit

uct Spend Categbe tracked and ev

plier Fairs that wboratory to test a

                              

h timeline, budget

ories so they mventually linked

will provide suppand interact with

                             

 and scope  Re

match the study pd with performa

pliers with a forh the various sup

                              

ed indicates a defic

programs on theance.

rum to showcasepplier offerings

                  

ciency in time, bud

e Instructional P

e their products .

dget or scope 

Products &

and services,

 

Page 31: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

WWe WAk Diotes WTw

Totit

Quarter: 3rd January ‐

Green indicates ac

Core Initiative: 5.

What we will We will put in pexternal stakeho

Why we will dA powerful sensknow that curren

During the procis more interactiof stakeholders two strategies thensure we have start a new era i

What we will The following Swith fidelity? It

The Strategic Don track to accoto budget, scopeinidcator  meathe district’s goa

‐ March 2011 

          

cceptable progress 

 Culture of Trust 

do place structures,olders, including

do it se of communitynt communicati

ess of developinive and transparshared concerns

hat will enable uauthentic two-wn our communic

report Strategic Directi

measures HISD

Direction Managmplish a Key S

e and timelinessans progress hasals over a multi-

                              

 Yellow indic

Through Action

processes, and g staff, parents,

y and a shared dion structures in

ng the Strategicrent. Throughous, ideas, and sugus to revamp ourway communicacation and relati

ion ManagemenD’s accomplishm

gement Report istrategy’s quarte. A “Yellow” ins stopped or has-year period, no

                              

ates a concern wit

Strategic Dire

 

methods to ensuand community

direction amongn place are insuff

Direction, we hut dozens of meggestions on howr communicatio

ation. By doing sionship with HI

nt Report answements and risks f

s produced Quarerly goals. A “Gndicator  means a significant deot all Key Strateg

                              

h timeline, budget

ection Manag

 

ure that we havey members.

g all stakeholderfficient to foster

have attempted teetings, communw we can impro

on so we can engso, we will provISD’s broad com

rs the question: for each Key St

rterly. Color indGreen” indicator

ns the district haeficiency. As thgies will have in

                             

 and scope  Re

gement Repo

 

e effective two-

rs is crucial to thauthentic engag

to begin the movnication emergeove. Taking all thgage internal anve our commitmmmunity.

Is HISD actingtrategies in supp

dicators are used means the di

as identified riskhe Strategic Direnformation to co

                              

ed indicates a defic

rt 

 

way communic

he successful tragement.

vement towardd as a clear areahis valuable fee

nd external audiement to change, r

g on the prioritieport of the overa

d to as an idicatiistrict has made k with respect toection builds a fommunicate in a

                  

ciency in time, bud

ation to engage

ansformation of

a communicatioa for improvemeedback into accoences in meaninre-build trust an

es identified in thall Core Initiativ

ion of whether aacceptable prog

o one or more afoundation towaa given period.

dget or scope 

both internal an

HISD. Yet, we

ons approach thaent. Thousandsount, we designengful ways and nd confidence, an

he strategic planve.

administration isgress with respespects. A “Red

ards achieveing

 

nd

e

at ed

nd

n

s ect d”

Page 32: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

5

ADanincoprlian Sinshav

Quarter: 3rd January ‐

Green indicates ac

Core Initiative: 5.

5.1 Develop

5.1.1 Es

5.1.2 Us

5.1.3 Bu

5.1.4 De

AccomplishmenDuring this periond State of the Sncluded live linkontent managemrograms have bve, call-in TV snd promoted on

taff members hanitiative, and maheets, Connect Evailable to princ

‐ March 2011 

          

cceptable progress 

 Culture of Trust 

p effective, time

stablish structur

se a variety of m

uild capacity to

efine and implem

nts od, work continuSchools event. Iks to relevant wment system, andeen produced an

show on the budn the main page

ave been providagnet review. PrEd scripts, and scipals on the new

                              

 Yellow indic

Through Action

ely, two-way co

es and protocols

methods to comm

ensure impleme

ment methods to

ued on the redesIn addition to theb pages and vid as of March 3nd posted on thedget crisis also wof the district w

ded with regularrincipals were psample letters—wly established

                              

ates a concern wit

Strategic Dire

ommunication f

Main Ele

s for disseminat

municate with in

entation of time

o evaluate effec

sign of the HISDe print version, deos. Eighty sch1, 26 schools hae district’s webswas held. The rewebsite.

r updates on critprovided with co

—to support theirPrincipal Resou

                              

h timeline, budget

ection Manag

for internal sta

ment

ting information

nternal stakehol

ly, effective, tw

ctiveness of inte

D website. New an enhanced, onhools are in the ave participatedsite. A Legislativevamped HISD T

ical issues and iomprehensive mr communicationurce page on the

                             

 and scope  Re

gement Repo

akeholders

n to and from int

lders

wo-way commun

rnal communica

pages were creanline version of first cohort that

d in training. Adve 101 workshoTV News Upda

initiatives, inclumaterials in mult

ns efforts aroune employee port

                              

ed indicates a defic

rt 

ternal stakehold

nication

ations

ated for the budf the 2010 Annut is implementinditional videos h

op was cablecastate has been inte

uding the budgetiple languages—

nd critical issuestal. In addition,

                  

ciency in time, bud

ders

dget crisis, goverual Report was cng Schoolwires,highlighting scht and streamed o

egrated into the e

t crisis, effective—including talkis. These resourcall principals ar

dget or scope 

Progress

rnment relationscreated that

web hosting anhools and on the web. A employee eNew

e teacher ing points, fact es and more arere being provide

 

s,

nd

ws

e ed

Page 33: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

wTon Tsem

PWemstp

Quarter: 3rd January ‐

Green indicates ac

with a weekly CoThree training sen writing and ef

Thirteen Commuessions were sch

meeting with all

Planned for nexWork is progressmployee electrotandard communartnerships is ne

‐ March 2011 

          

cceptable progress 

ommunications essions were helffective commun

unity Conversatiheduled to be coprincipals and t

xt period sing on the distronic newsletter anications protocearing completio

                              

 Yellow indic

Update summard for principals nications have b

ion meetings weonvenient for emthe principal ad

ict strategic comand the employecols and processon and will be a

                              

ates a concern wit

rizing helpful inon developing

been conducted

ere held to keep mployees. A serihoc group have

mmunications plee portal. Plannises and providesavailable next qu

                              

h timeline, budget

nformation and rand maintainingwith a cohort o

staff, parents, aies of meetings

e provided additi

lan; it will be coing has begun fos useful resourceuarter.

                             

 and scope  Re

resources that thg community paf assistant princ

and community focusing on theional opportunit

ompleted in sprior development es. A webinar fo

                              

ed indicates a defic

hey can share wartnerships. To fcipals.

members update magnet reviewties for face-to-f

ing 2011. Effortof a toolkit for

or principals on

                  

ciency in time, bud

with their school further build cap

ted on the budgew also were held

face, two-way c

ts will continue senior staff thatbuilding comm

dget or scope 

communities. pacity, trainings

et crisis. Multipl. Monthly

communication.

to strengthen tht outlines

munity

 

s

le

he

Page 34: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

C

5

5

5

5

5

ADininvschLHreel Tse

Quarter: 3rd January ‐

Green indicates ac

Core Initiative: 5

5.2 Develop eff

5.2.1 Establish s

5.2.2 Use a varie

5.2.3 Build capa

5.2.4 Define and

AccomplishmenDuring this perionternal as well anformation. Newersion, an enhanchools are in theave participated

Legislative 101 wHISD TV News esources in multlementary schoo

Thirteen Commuessions were sch

‐ March 2011 

          

cceptable progress 

. Culture of Trust

fective, timely, t

structures and pr

ety of methods t

acity to ensure im

d implement me

nts od, work continuas external stakew pages were crnced, online vere first cohort thad in training. Adworkshop was cUpdate has beentiple languages,ols.

unity Conversatiheduled with wo

                              

 Yellow indic

t Through Action

two-way comm

rotocols for diss

to communicate

mplementation

ethods to evaluat

ued on the redeseholders by increeated for the bursion of the 2010at is implementidditional videos ablecast and strn integrated into including a bro

ion meetings weorking parents’

                              

ates a concern wit

Strategic Dire

n

munication for e

Main Ele

seminating infor

e with external s

of timely, effect

te effectiveness

sign of the HISDeasing transpare

udget crisis, gov0 Annual Reporing the Schoolwhighlighting sch

reamed on the wo the communityochure, fact shee

ere held to keep schedules in mi

                              

h timeline, budget

ection Manag

external stakeh

ment

rmation to and f

stakeholders

tive, two-way c

of external com

D website. Efforency while ensuernment relationrt was created th

wires web hostinhools and progr

web. A live, call-y eNews and pret, and video, w

parents, commuind. A series of m

                             

 and scope  Re

gement Repo

holders

from external st

ommunication

mmunications

rts related to theuring all stakehons, and State of hat included liveng and content mrams have been p-in TV show on romoted on the mere developed to

unity members,meetings focusi

                              

ed indicates a defic

rt 

akeholders

e website redesigolders receive thf the Schools evee links to relevan

management systproduced and pthe budget crisi

main page of theo inform and en

and staff updating on the magn

                  

ciency in time, bud

gn positively imhe same timely aent. In addition tnt web pages antem; as of Marcosted on the disis also was helde district websit

ngage parents at

ted on the budgenet review also w

dget or scope 

Progress

mpact both and accurate to the print

nd videos. Eightch 31st, 26 schoostrict’s website. d. The revampedte. Multimedia the 11 Apollo

et crisis. Multiplwere held.

 

ty ols A

d

le

Page 35: Management Report 032011 · writing, intervie. t four placemen f these efforts w e, since we kno al shortage area holding a three selection proce ... inding new opp acancies will

Q

 

 G 

Odi SmhpRw T

PWgredaf

Quarter: 3rd January ‐

Green indicates ac

Ongoing meetingistrict initiatives

everal initiativeminute segment oas been providinartnership with

Renzo Heredia towritten and produ

The biannual par

Planned for nexWork is progressroups across thedition. In additioffecting the dist

‐ March 2011 

          

cceptable progress 

gs have been hels. Twenty-two P

es were launchedon KCOH radiong a weekly artiUnivision Radi

o discuss topics uced by HISD. A

rent and commu

xt period sing on the distre city is being plon, work is conttrict.

                              

 Yellow indic

ld with strategicParent Prep Aca

d to that provideo began in Octobicle to African Ao’s La Tremendof interest. In aAn HISD Twitt

unity survey was

ict strategic comlanned for later tinuing on deve

                              

ates a concern wit

c partners, incluademy workshop

e targeted outreaber 2010; to datAmerican News da 1010AM wheaddition, Univisiter feed in Spani

s finalized and w

mmunications plin the spring. Tlopment of a pil

                              

h timeline, budget

uding civic, busips were held Jan

ach to HISD’s Le, 18 segments hand Issues for tereby HISD wilion TV airs weeish was launche

will be administ

lan; it will be coThe parent newsllot “neighbor-to

                             

 and scope  Re

ness, and faith-bnuary through M

Latino and Africhave aired. Sincthe print and onll be participatin

ekly news segmeed, and a Spanish

ered by phone;

ompleted in spriletter will be lau

o-neighbor” cam

                              

ed indicates a defic

based organizatMarch.

can American coce January 2011line editions. Th

ng in a bimonthlents titled Educah weekly newsc

this year, a web

ing 2011. An edunched in May w

mpaign to dissem

                  

ciency in time, bud

tions to keep the

ommunities. A w, the Office of C

he district has enly, 30-minute timate: Es el Mome

cast will premier

b version also w

ducation summitwith a special en

minate informati

dget or scope 

em apprised of

weekly 30-Communicationntered into a me slot hosted bento that are re in April 2011

ill be available.

t for faith-basednd-of-year ion about issues

 

ns

by

1.

d

s