EDDEngineering Design and Development

PERSPECTIVE

SM BAGUIO MALL EXPANSION and RENOVATION

EDDEngineering Design and Development

SM CITY BAGUIOMALL EXPANSIONMAIN MALL RENOVATION FOOD COURT RENOVATIONSCMC MALL RENOVATION / EXPANSION

November 20, 2013

EDDEngineering Design and Development

Description

STATUSREMARK

SBUDGET APPROV

AL

PERMIT PLANS BID PLANS

PROJECTED

TIMELINE

MALL EXPANSION

Approved by HTS1

Initial commitment on Oct. 31, 2013. Confirmed released last Oct. 30, 2013.

Permit Forms was transmitted to SM Legal for their checking.

Commitment of AOR for issuance of Bid/Implementation Plans on 2nd week of December. Requested to issue in advance buying specifications for equipment long lead items.

January 2014 – Sept. 2016

MALL RENOVATION

Approved by HTS1

Architectural already issued. Awaiting released for Fire Protection and Electrical Permit Plans and documents on Nov. 27, 2013.

Architectural will be released on Nov. 19, 2013

Fire Protection and Electrical will be on Nov. 27, 2013

January 2014 – Oct. 2014

FOODCOURT RENOVATION

Approved by HTS1.

Building Permit One-Time Application with Mall Renovation

Bid Plans: TBC June 6, 2014 – August 20, 2014

Concept plan for presentation to HTS on Nov. 19, 2013.

SCMC RENOVATION

Waiting for revised/ approved Concept Plan

Building Permit One-Time Application with Mall Renovation

Block Plans: TBC Bid Plans: TBC

For Confirmation with Mall Operation

UPCOMING PROJECTS

SM CITY BAGUIO

EDDEngineering Design and Development

SM CITY BAGUIOMALL EXPANSION

November 20, 2013

EDDEngineering Design and Development

SM CITY BAGUIO

MALL EXPANSION

ITEM / DESCRIPTION STATUS TARGET DATES

DESIGN CONCEPT DRAWINGS Approved by HTS September 30, 2013

DESIGN ISSUANCE OF PLANS PERMIT PLANS : October 30, 2013

BID / CONSTRUCTION PLANS : December 16, 2013

October 30, 2013

BUDGET (BASED ON AREA TAB) Approved by HTS1. Mall Ops to prepare and present Business

Case Budget to HTS.

January 20, 2014(deadline)

DETAILED BUDGET (CONSTRUCTION and DESIGN)

Awaiting Final Implementation Plan

Expected issuance on December 16, 2013

30 January 2014

HTS BUDGET APPROVAL (Business Case)

For Mall Ops presentation. 29 November 2013

PROJECT CREATION ON SAP  Upon the Approval of the Detailed Budget

20 January 2014

BIDDING AWARDING Target : Last Quarter of 2013 NOV. 2013 – MAR. 2014

PROJECT START (PROJECTED) For finalization with DAAA. January 20, 2014

PROJECT TURNOVER (PROPOSED)

Duration: 3 YEARS September 2016

(for finalization with DAAA)

SM CITY BAGUIO : UPCOMING PROJECTSM BAGUIO

EXPANSION

EDDEngineering Design and Development

SM CITY BAGUIO

MALL EXPANSION

SM CITY BAGUIO : GROSS FLOOR AREASM BAGUIO

EXPANSION

DESCRIPTION based on DSGN area tab received last 15.August.2013

based on JSLA area tab emailed last

08.November.2013

GROSS LEASABLE AREA 15,493.00 11,834.16

SM Supermarket Expansion

829.00

228.66

SM Department Store Expansion

2,056.00

331.81

Upper Shops

2,853.00

283.57

Restaurants (excl. terraces)

8,864.00

10,424.83

Junior Anchors

275.00 -

Auditorium

456.00

565.29

Lower Shops

160.00 -

COMMON AREA / EMB / ADMIN 14,351.00 20,211.47

SKYGARDEN 4,150.00 4,872.37

PARKING 37,829.00 31,205.75

TOTAL GROSS FLOOR AREA

71,823.00

68,123.75

AREA DOES NOT INCLUDE OVERLAPPING WITH EXISTING MALL

EDDEngineering Design and Development

SM CITY BAGUIO

MALL EXPANSION

SM CITY BAGUIO : GROSS FLOOR AREASM BAGUIO

EXPANSIONBASEMENT 2

and 3 2F

3FDECK

EDDEngineering Design and Development

SM CITY BAGUIO

MALL EXPANSION

SM CITY BAGUIO : GROSS FLOOR AREASM BAGUIO

EXPANSIONUGF LGF

UB LB

BASEMENT - 1

EDDEngineering Design and Development

SIGNED FORMS

SIGNED PERMIT PLANS

PTR / PRC(PHOTOCO

PY)

SPECIFICATION REMARKS

BUILDING PERMIT√

NOV. 5, 2013

√NOV. 5, 2013

√NOV. 5, 2013

√NOV. 5, 2013

DATE TRANSMITTED TO DAAA

MECHANICAL

A/C and VENTILATION

√NOV. 5, 2013

√NOV. 5, 2013

√NOV. 5, 2013

√NOV. 5, 2013

DATE TRANSMITTED TO DAAA

FIRE PROTECTION

√NOV. 5, 2013

√NOV. 5, 2013

√NOV. 5, 2013

√NOV. 5, 2013

DATE TRANSMITTED TO DAAA

ELECTRICAL√

NOV. 5, 2013

√NOV. 5, 2013

√NOV. 5, 2013

√NOV. 5, 2013

DATE TRANSMITTED TO DAAA

PLUMBING / SANITARY

√NOV. 5, 2013

√NOV. 5, 2013

√NOV. 5, 2013

√NOV. 5, 2013

DATE TRANSMITTED TO DAAA

ECC (AMENDED)

ONGOING DATA FINALIZATION WITH TEAM TOGETHER WITH LEGAL.

TARGET TO SECURE TREE CUTTING ON NOV. 15, 2013

ZONING and LOCATIONAL CLEARANCE

N / A NOV. 4, 2013 N / A N/A C/ O MALL OPSSM CITY BAGUIO

MALL EXPANSION

SM CITY BAGUIO : PERMITTING STATUSSM BAGUIO

EXPANSION

EDDEngineering Design and Development

SM CITY BAGUIO

MALL EXPANSION

SM CITY BAGUIO : PROPOSED BUDGETSM BAGUIO

EXPANSION

EDDEngineering Design and Development

SM CITY BAGUIOMALL RENOVATION

November 20, 2013

EDDEngineering Design and Development

SM CITY BAGUIO

MAIN MALL RENOVATION

ITEM / DESCRIPTION STATUS DUE DATES

DESIGN CONCEPT DRAWINGS Waiting for updated concept plan.

30 September 2013

DESIGN ISSUANCE OF PLANS Permit Plans: Balance Fire Pro and Electrical

Commitment on Nov. 27, 2013

27 November 2013

BUDGET (BASED ON AREA TAB) Approved by HTS1. 04 November 2013

DETAILED BUDGET (CONSTRUCTION and DESIGN)

For General Fit-Out: On-going estimates.

29 November 2013

HTS BUDGET APPROVAL (Business Case)

Mall Ops to present to HTS. 19 November 2013

PROJECT CREATION ON SAP  Upon the Approval of the Budget

18 November 2013

BIDDING AWARDING Balance Fire Pro and Electrical.

Commitment on Nov. 27, 2013

NOV. 2013 – JAN. 2014

PROJECT START (PROJECTED) 6 January 2014

PROJECT TURNOVER (PROPOSED) 31 October 2014

SM CITY BAGUIO : UPCOMING PROJECTSM BAGUIO RENOVATION

MAIN MALL

EDDEngineering Design and Development

SIGNED FORMS

SIGNED PERMIT PLANS

PTR / PRC(PHOTOCO

PY)

SPECIFICATION REMARKS

BUILDING PERMIT√

NOV. 4, 2013

√NOV. 4, 2013

√NOV. 4, 2013

√NOV. 4, 2013

DATE SECURED FROM DESIGN

GROUP

MECHANICAL

A/C and VENTILATION

X X X X NOT APPLICABLE

FIRE PROTECTION

NOV. 27, 2013

NOV. 27, 2013

NOV. 27, 2013 NOV. 27, 2013COMMITMENT FROM DESIGN

GROUP

ELECTRICAL NOV. 27, 2013

NOV. 27, 2013

NOV. 27, 2013 NOV. 27, 2013COMMITMENT FROM DESIGN

GROUP

PLUMBING / SANITARY

X X X X NOT APPLICABLE

ECC (AMENDED) X X X X NOT APPLICABLE

ZONING and LOCATIONAL CLEARANCE

X X X X NOT APPLICABLE

SM CITY BAGUIO : PERMITTING STATUS

SM CITY BAGUIO

MAIN MALL RENOVATION

SM BAGUIO RENOVATION

MAIN MALL

EDDEngineering Design and Development

SM CITY BAGUIO

MAIN MALL RENOVATION

SM CITY BAGUIO : PROPOSED BUDGETSM BAGUIO RENOVATION

MAIN MALL

EDDEngineering Design and Development

SM CITY BAGUIO

MAIN MALL RENOVATION

SM CITY BAGUIO : PROPOSED BUDGETSM BAGUIO RENOVATION

SCMC OFFICE

EDDEngineering Design and Development

SM CITY BAGUIO

MAIN MALL RENOVATION

PROPOSED PHASE SCHEDULE SM BAGUIO RENOVATION

MAIN MALL

EDDEngineering Design and Development

SM CITY BAGUIO

MAIN MALL RENOVATION

PROPOSED PHASE SCHEDULE SM BAGUIO RENOVATION

MAIN MALL

EDDEngineering Design and Development

SM CITY BAGUIOFOODCOURT RENOVATION

November 20, 2013

EDDEngineering Design and Development

LOCATION PLAN

UPPER GROUND FLOORSM CITY BAGUIO

FOODCOURT RENOVATION

EDDEngineering Design and Development

ITEM / DESCRIPTION STATUS DUE DATES

DESIGN CONCEPT DRAWINGS Full Renovation and ExpansionRevision of Concept Plans

19 November 2013

DESIGN ISSUANCE OF PLANS Waiting confirmation from Design Group.

15 December 2013

(Upon approval of Concept Plans, 1 month to issue)

BUDGET (BASED ON AREA TAB) Approved by HTS1 19 November 2013

DETAILED BUDGET (CONSTRUCTION and DESIGN)

Awaiting revised drawings. TBA

HTS BUDGET APPROVAL (Business Case)

For Finalization with Design Group.

29 November 2013

PROJECT CREATION ON SAP  Upon Approval of the Budget

BIDDING AWARDING Will start upon issuance of Bid Plans.

January 2014

PROJECT START (PROJECTED) Mall Operation requested to start renovation on June 2014.

06 June 2014

PROJECT TURNOVER (PROPOSED) 19 August 2014

SM CITY BAGUIO : UPCOMING PROJECTSM BAGUIO RENOVATION

FOOD COURT

SM CITY BAGUIO

FOODCOURT RENOVATION

EDDEngineering Design and Development

SM CITY BAGUIO : PROPOSED BUDGETSM BAGUIO RENOVATION

FOOD COURT

SM CITY BAGUIO

FOODCOURT RENOVATION

EDDEngineering Design and Development

SM CITY BAGUIO : PROPOSED BUDGET COMPARISON

SM BAGUIO RENOVATION

FOOD COURT

SM CITY BAGUIO

FOODCOURT RENOVATION

EDDEngineering Design and Development

FOODCOURT PHASING SCHEDULEMONTH LAST QTR

20131ST QTR 2014

JUNE 2014

JULY 2014 AUG 2014

WEEKS 1 2 3 4 1 2 3 4 1 2 3 4

ITEM / DESCRIPTION

Month 1 Month 2 Month 3

A. Issuance of Implementation Plans

B. Preparation and Budget Approval

C. Bidding, Negotiation and Awarding

D. Application of Permits

E. OSM Deliveries

F. Phase 1 – 45 days

a. Tenant Renovation (1-5)

b. Ceiling Renovation (incl. Wall)

c. Floor Re-Tiling (incl. Column)

G. Phase 2 – 45 days

a. Tenant Renovation (6-11)

b. Ceiling Renovation (incl. Wall)

c. Floor Re-Tiling (incl. Column)

H. Back Alley Renovation

1. STAINLESS SKIRTING

2. LAMINATES3. COUNTERT

OPS4. ACP and

STRIP MIRROR

LIGHTING FIXTURES

1. CHAIRS and TABLES

2. GRAPHICAL SIGNAGES

1. FLOOR TILES DELIVERY

2. GLASS PARTITION for TENANT

LAST QTR - 2013

LAST QTR - 2013

LAST QTR - 2013LAST QTR - 2013

SM CITY BAGUIO

FOODCOURT RENOVATION

EDDEngineering Design and Development

SM CITY BAGUIO

FOODCOURT RENOVATION

BEFORE

AFTER

TENANT RENOVATION – SCHEME 2

1

PHASE SCHEDULE

PHASE SCHEDULEPHASE 1

PHASE 2

Duration : 90 days

TOTAL

LEGEND:- Phase 1 Tenant Board Up (1 to 5) –

30 days- Phase 2 Tenant Board Up (6 to 11) –

30 days- Shaded areas will be night works -

35 days each1 2 3 4 5

EE ROOM

TOILETS

BR

OW

NIE

S

9

10

11

TENANTS TO BE RELOCATED TO THE MALL EXPANSION AREA

FOOD COURT EXPANSION.TOILETS and EE ROOM WILL BE RELOCATED.

ADD’L TWO TENANTS

7 86