major capital projects 2010 to 2014 - the city of belleville · vet-major capital projects 2010 to...

8
Vet- Major Capital Projects 2010 to 2014 Engineering & Development Services

Upload: others

Post on 18-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Major Capital Projects 2010 to 2014 - The City of Belleville · Vet-Major Capital Projects 2010 to 2014 Engineering & Development Services ... Frank Street Sewer Separation & Reconstruction

Vet-

Major Capital Projects

2010 to 2014

Engineering & Development Services

Page 2: Major Capital Projects 2010 to 2014 - The City of Belleville · Vet-Major Capital Projects 2010 to 2014 Engineering & Development Services ... Frank Street Sewer Separation & Reconstruction

Veterans Memorial Bridge

Bell Boulevard East Extension and

Feedermain Phase 1

Dundas Street West CPR Overhead

Rehabilitation

Sidney Street CNR Overhead

Rehabilitation

Moira Street East Reconstruction

and Northeast Feedermain Phase 2

(Olive St. to Elvins St.)

Church Street Retaining Wall

West Riverside Park Illumination

Veterans Memorial Bridge

Bell Blvd. East Extension Feedermain

Engineering & Development Services

Harder Drive Reconstruction (Palmer Rd. to Avondale Rd.)

Cloverleaf Drive Servicing & Reconstruction

Purdy Street Sewer Separation & Reconstruction

Frank Street Sewer Separation & Reconstruction

Chatham Street Sewer Separation & Reconstruction (Victoria St. to Pine St.)

Bongard Crescent Watermain & Road Reconstruction

Wallbridge Crescent Watermain (Moira St. to Harriett St.)

James Street Sanitary Trunk Sewer Relocation

2010 Sidewallk Program, including Cannifton Road North (North of Quinte Sports

& Wellness Centre) Moira Street West (Elgin St. to Tripp Ave.) Dundas Street East

( at Hastings Dr.) and Adam Street ( at Centre St.)

2010 Completed Projects

Page 3: Major Capital Projects 2010 to 2014 - The City of Belleville · Vet-Major Capital Projects 2010 to 2014 Engineering & Development Services ... Frank Street Sewer Separation & Reconstruction

Engineering & Development Services

Palmer Road Reconstruction (Bridge St. West to Moira St. West) includ-

ing trunk watermain

Avonlough Road Watermain Replacement (Champagne Dr. to Hastings

Park Dr.)

North Front Street Resurfacing (Donald St. to Craig St.)

Moira Street West, turning lane at Palmer Road

College Street East at Cannifton Road Intersection

Improvements

Mary Street Reconstruction

Willard Street Reconstruction

Brock Street Reconstruction

Charles Street Reconstruction

(Victoria Ave. to Pine St.)

Meggisons Bridge Rehabilitation

Palmer Rd. Reconstruction

Charles St. Reconstruction

Meggisons Bridge Rehabilitation

Airport Parkway

Reconstruction

2011 Completed Projects

Page 4: Major Capital Projects 2010 to 2014 - The City of Belleville · Vet-Major Capital Projects 2010 to 2014 Engineering & Development Services ... Frank Street Sewer Separation & Reconstruction

Engineering & Development Services

Dundas-Palmer Sewage Pumping Station

Reconstruction & Sewer Forcemain

Dundas-Palmer Storm Sewer Extension

(Under C.P. Railway line)

Highway 62 Watermain Extension

(Millennium Pkwy. to 1.8km North)

Lingham Street Sewer Separation & Road

Reconstruction (Pine St. to Emily St.)

Tracey Street at North Front Street

Intersection Improvements

Old Kingston Road Rehabilitation (O’Neill

Drive to Old Hwy 2)

Dundas Street East Watermain Replacement (Front

St. to Foster Ave.)

Haig Road Watermain Extension

Putman (Cannifton) Bridge Rehabilitation (Crossing

the Moira River connecting Cannifton Rd. North to

Maitland Dr.)

Bay Bridge Road CPR Overhead Structure Rehabili-

tation/Replacement Environmental Assessment (EA)

College Street East Extension EA

Cannifton Planning Area Water Pressure Study &

Storage Master Plan EA

Bronk Road Bridge Replacement EA

Jane Forrester Park Pier Reinstatement Project

Dundas-Palmer SPS

Putman Bridge Rehabilitation

2012 Completed Projects

Page 5: Major Capital Projects 2010 to 2014 - The City of Belleville · Vet-Major Capital Projects 2010 to 2014 Engineering & Development Services ... Frank Street Sewer Separation & Reconstruction

Engineering & Development Services

Harriett Street Sewer Separation & Road Reconstruction

(Wallbridge Cr. to Boswell St.)

Boswell Street Sewer Separation & Road Reconstruction

Hanna Court Sewage Pumping Station Elimination

Old Madoc Road Rehabilitation (Hwy 62 to 1.8km Southerly)

Dundas Street West (Bay Bridge Rd. to Coleman St.) EA

James Street Reconstruction

Sidney Street & Maitland Drive Trunk Watermain

Extension (Sidney St., Cloverleaf Dr. to Maitland Dr.

Maitland Dr., Sidney St. to Hwy 62)

North Park Gardens Reconstruction Phase 1 (North

Park St. to 100m Easterly)

Harriett St. Sewer Separation & Road Reconstruction

Old Madoc Rd. Rehabilitation

James St. Reconstruction

2013 Completed Projects

Page 6: Major Capital Projects 2010 to 2014 - The City of Belleville · Vet-Major Capital Projects 2010 to 2014 Engineering & Development Services ... Frank Street Sewer Separation & Reconstruction

Engineering & Development Services

Bell Boulevard service extension for 808

Bell Boulevard (by developer)

College Street East Extension & Municipal

Servicing, 600m Easterly

North Park Gardens Reconstruction, North

Park Street to Moira Street East including

new sidewalk on North side

Adam Street Water Booster Station

Improvements

Moira Street West Bridge Rehabilitation

Airport Parkway Traffic Signals at

Elmwood Drive and Mitchell Road, (by CN

Rail)

North Park Gardens Reconstruction

Adam Street Booster Station Improvements

2014

Completed Projects

Moira Street West Bridge Rehabilitation

Page 7: Major Capital Projects 2010 to 2014 - The City of Belleville · Vet-Major Capital Projects 2010 to 2014 Engineering & Development Services ... Frank Street Sewer Separation & Reconstruction

Design

Sidney Street Watermain Replacement, College

Street to Maple Avenue

Strachan Street Reconstruction and Sewer

Separation

Jones & Reid Streets Watermain Replacement

Grove Street Reconstruction and Sewer

Separation

Haig Road and Station Street Extension EA &

Detailed Design

Coleman Street Reconstruction & Sewer

Separation

Airport Parkway & Elmwood Drive Drainage

Study

Catharine Street Footbridge Replacement EA

Engineering & Development Services

Construction

Black Diamond Road Watermain Extension

Dundas Street West Sanitary Trunk Sewer

Extension

2014 Sidewalk Repair Program including new

sidewalk from Bradgate Road Easterly

Bridge Street Bridge (Lower

Bridge) Rehabilitation

Maitland Drive servicing for

Heritage Park Estates Subdivision

(by developer)

Dundas Street West Sanitary Trunk Sewer Extension

Ongoing Projects 2014

Bridge Street Bridge Rehabilitation

Page 8: Major Capital Projects 2010 to 2014 - The City of Belleville · Vet-Major Capital Projects 2010 to 2014 Engineering & Development Services ... Frank Street Sewer Separation & Reconstruction

Engineering & Development Services

2014

Design

Ongoing Build Belleville Projects

Construction

North East Feedermain including Yeomans Street

(including Bike Lanes) Lane Avenue and Donald Street

Reconstruction

Downtown Riverside Parking Lot Entranceway

Improvements

Old Highway 2 Rehabilitation, East of Point Anne Road

to City Limits

Bronk Road Rehabilitation Phase 1, Blessington Road to

Thrasher Road

Build Belleville Project Centre—116 Pinnacle Street

Downtown Revitalization and Redevelopment Project,

Design and Consultation

Sidney Street Corridor Improvements, EA &

Preliminary Design

Bronk Road Rehabilitation Phase 2, Thrasher Road to

Scuttlehole Road including Bridge Reconstruction

Grass Boulevard Reconstruction

North East Industrial Park Roads Rehabilitation

Herchimer Avenue South Reconstruction

Mineral Road & Maitland Drive EA & Detailed Design

Farnham Road EA & Preliminary Design

Bay Bridge Road/CPR Overhead Structure Replace-

ment and Dundas Street West Reconstruction, Holden

Street to Coleman Street

Build Belleville Project Centre