important notice: main st. north closed at davis In order to begin construction of the vivastations at Main Street and Davis Drive and complete as much road construction as possible prior to the winter months, planned closures of Main Street North will take place next week. To accommodate necessary storm sewer, watermain installation and road widening activities the closures will be in effect overnight and during the weekend to minimize traffic disruptions. Please see below for important detailsTRANSCRIPT
Follow us on twitter. Find us on facebook. Read our blog. Go to vivanext.com.
construction bulletin newmarket
your Community Liaison
Michelle Dudzik Tel: 905.886.6767 Ext. 71096 Cell: 905.716.7663 Email: [email protected]
how to sign up for construction notices
1. Visit vivanext.com2. Click on ‘subscribe’
on left side 3. Under ‘email notices’
select the ‘Davis Drive/Newmarket’ box and any others of interest
4. Provide your contact info 5. Click on ‘Submit’
In order to begin construction of the vivastations at Main Street and Davis Drive and complete as much road construction as possible prior to the winter months, planned closures of Main Street North will take place next week. To accommodate necessary storm sewer, watermain installation and road widening activities the closures will be in effect overnight and during the weekend to minimize traffic disruptions. Please see below for important details.
main street north will be closed at davis overnight:• Wednesday, September 24 at 8:00pm until Thursday, September 25 at 9:00am*
Note: GO Train and early morning commuters, please adjust your travel-times accordingly and give yourself extra time to get to your destination. If you use Main Street please consider Leslie or Yonge Street as alternates
• Saturday, September 27 at 8:00am until Sunday, September 28 at 8:00pm*
what you need to know:• During each closure, through traffic from Main Street North to Davis will not be permitted
• Road closure signs will be posted in the area. Please watch for these signs and stay up-to-date about road closures at vivanext.com
• Please pay close attention to detour signs that will you direct you around the closure
• Directional signs will be in place to guide you to the nearest open sidewalk and/or bus stop
• There will be construction related noise with this work
• Once the road is widened, a gravel surface will be in place until curbs are poured and base-layer paving is completed
• Anticipated start dates have been provided; however as with other road construction projects, work may be rescheduled due to factors such as weather. In the event that work is postponed, we will provide advance notice
Thank you for your patience as we work hard to transform Davis Drive. If you have questions about the rapidway project, please visit vivanext.com.
important notice: main st. north closed at davisSeptember 19, 2014
UnionHotel
CarpetOne
Tannery415Davis
BigDaddy’s
Wimpys/Mac’s
Convenience
Davis Dr
Mai
n St
Supe
rior
St
N
InspiAir
wor
k ar
ea
road closedno thru traffic
entrance/road intermittently closed entrance open
* Please note: As with other road construction projects, some work may be rescheduled due to weather. We’ll provide advance notice whenever possible.
The shops and services along Davis Drive are ready, willing and more than able to help with all your shopping needs. Shop local, Shop Davis.