madigan gate express - image upgrade · image upgrade madigan gate express bldg 9052 jblm ft. lewis...
TRANSCRIPT
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
SCALE:SCALE:SCALE:SCALE: SHEET:SHEET:SHEET:SHEET:
EXCHANGE
Project Team
DHB&LAW
GSH
100% SOLICITATION SET
MARCH 06, 2014
G-001
COVER AND DRAWINGINDEX
Madigan Gate Express -Image UpgradeMadigan Gate Express Bldg 9052JBLM Ft. Lewis
4915-12-008
Madigan Gate Express - Image UpgradeMadigan Gate Express Bldg 9052 JBLM Ft. Lewis
4915-12-008
100% SOLICITATION SET
MARCH 06, 2014
OWNER - ARMY AND AIR FORCE EXCHANGE SERVICE (AAFES)CONTACT - J. DAVID IVEY3911 S. WALTON WALKER BLVD.DALLAS TX, 75236-1598214.312.3284 214.213.6297 [email protected]
ALSC ARCHITECTS, P.S.CONTACT - DAVID BUESCHER203 N. WASHINGTON STREET, #400SPOKANE, WA 99201509.838.8568 509.458.3710 [email protected]
MECHANICAL ENGINEER - NORTHWEST MECHANICAL ENGINEERINGCONTACT - MICHAEL HUBBARD8817 E. MISSION AVE.SPOKANE, WA 99212509.343.6963 509.343.6968 [email protected]
ELECTRICAL ENGINEER - DEI ELECTRICAL CONSULTANTS, INC.CONTACT -ERIC SHIRLEY2205 N. WOODRUFF RD, SUITE 5SPOKANE VALLEY, WA 99206509.747.5139 509.6231555 [email protected]
DRAWING INDEXARCHITECTURAL
G-001 COVER AND DRAWING INDEX
G-002 ABBREVIATIONS / SYMBOLS AND MATERIAL LEGEND
G-003 PHASING PLAN
ARCHITECTURAL
A-100 DEMO PLAN
A-101 FLOOR PLAN
A-111 REFLECTED CEILING PLAN
A-150 OVERALL FIXTURE PLAN
A-251 INTERIOR ELEVATIONS - FINISH & EQUIPMENT SCHEDULES
A-401 ENLARGED TOILET ROOM PLANS & ELEVATIONS
PLUMBING
P-001 MECHANICAL LEGEND, ABBREVIATINS & NOTES
P-101 SCHEDULES - PLUMBING
P-201 FOUNDATION - PLUMBING DEMO
P-301 FOUNDATION - PLUMBING
P-302 FLOOR PLAN - PLUMBING
ELECTRICAL
E-201 ENLARGED SNACK AVENUE - ELECTRICAL
Revision Schedule
Revision #
Revision
Description Revision Date
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SHEET:SHEET:SHEET:SHEET:
2 3 4 5 61
A
B
C
D
E
1 2 3 4 5 6
DHB
GSH
100% SOLICITATION SET
MARCH 06, 2014
G-002
ABBREVIATIONS /SYMBOLS ANDMATERIAL LEGEND
Madigan Gate Express -Image Upgrade
Madigan Gate Express Bldg 9052JBLM Ft. Lewis
4915-12-008
CLCL
LEGENDS & SYMBOLS
UNRATED WALL
FIRE RATED WALL RATING BASED ON TYPE
THERMAL OR ACOUSTICAL
WALL LEGENDCONCRETE WALL C.I.P.C/P.C.C.
CMU WALL
EXISTING CONCRETE OR CMU
WALL REFERENCE
COLUMN REFERENCE/GRID BUBBLES
MATCHLINE
SECTION REFERENCE
ELEVATION REFERENCE
DETAIL & ENLARGED PLAN REFERENCE
WINDOW REFERENCE
DOOR REFERENCE
ROOM NAME & NUMBER REFERENCE
FINISH/MATERIAL REFERENCE
ELEVATION INDICATORS
REVISION INDICATOR & NORTH ARROW
PROPERTY LINE
CENTER LINE
CONTOUR LINES
SIGNAGE SYMBOL
KEYNOTE SYMBOL
SPECIALTY EQUIPMENT
REFERENCE SYMBOL LEGEND
MATCHLINE - SEE SHEET A100
ICON LEGENDFLOOR DRAIN
FIRE EXTINGUISHER & HOSE CABINET
FIRE EXTINGUISHER CABINET
FIRE SPRINKLER HEAD
RETURN/EXCHANGE AIR GRILL 2' x 2'
SUPPLY AIR GRILL 2' x 2'
RECESSED FLUORESCENT 2' x 2'
RECESSED FLUORESCENT 2' x 4'
RECESSED FLUORESCENT 1' x 4'
SURFACE MOUNTED FLUORESCENT
RECESSED CAN
1
A100SHEET REFERENCE
1
A100
SHEET REFERENCE
1
A100
1
A100SHEET REFERENCE
WINDOW ALPHA DESIGNATION1t
DOOR NUMBER
ROOM NAME
101
ROOM NAME
ROOM NUMBER
SQUARE FOOTAGE
MM 101 REFERENCE NUMBER
FINISH TYPE
NAME
TYPEHEIGHT
1
NORTH
PR
OJE
CT
300 WALL TYPE
SECTION REFERENCE
ELEVATION REFERENCE
24
3
EXTERIOR INTERIOR
CALLOUT REFERENCE
150 SF
ELEVATIONSECTION/ELEVATION/FLOOR PLAN
A VARIES
FLOOR/CEILING PLAN
TRUE
FD
FEHC
FEC
EARTHWORK CONCRETE & MASONRY WOOD
METAL
EARTHWORK - UNMOVED
INSULATION
EARTHWORK - BACKFILLED
GRAVEL/POROUS FILL
FINISH
ROUGH
BLOCKING
PLYWOOD
PRECAST/CAST IN PLACE
STEEL
SAND/MORTAR/PLASTER
BATT/LOOSE FILL
RIGID
CONCRETE BLOCK
BRICK
A
1 2NUMBERS FOR VERTICAL GRIDSLETTERS FOR HORIZONTAL GRIDS
NEW
EXISTING
76
72
203B
1
1
XXX
SIGN DESIGNATION PER SPECIFICATIONS
SIGN DESIGNATION PER SPECIFICATIONS
ARCHITECTURAL ABBREVIATIONS& AND
ANGLE@ ATC CENTER LINEO DIAMTER or ROUND┴ PERPENDICULAR# POUNDS or NUMBERx TIMES or BYP PROPERTY LINE
'A'AB ANCHOR BOLTABC AGGREGATE BASE COURSEABV ABOVEAC ASPHALTIC CONCRETEA/C AIR CONDITIONINGACC ACCESSACFL ACCESS FLOORACID RES ACID RESISTANTACP ACOUSTICAL PANELACT ACOUSTICAL TILEAD AREA DRAINADD ADDENDUMADH ADHESIVEADJT ADJUSTABLEAF ACCESS FLOORAFF ABOVE FINISH FLOORAFG ABOVE FINISH GRADEAFS ABOVE FINISH SLABAGGR AGGREGATEALT ALTERNATEALUM ALUMINUMANOD ANODIZEDAP ACCESS PANELAPC ACOUSTICAL PANEL CEILINGAPPROX APPROXIMATE(LY)ARCH ARCHITECT(URAL)ASB ASBESTOSASKLR AUTOMATIC SPRINKLERASPH ASPHALTASSY ASSEMBLYASTM AMERICAN SOCIETY for TESTING
& MATERIALSATC ACOUSTICAL TILE CEILINGATF ATHLETIC FLOORINGAUTO AUTOMATICAWP ACOUSTICAL WALL PANEL
'B'BALC BALCONYBB BULLETIN BOARDBD BOARDBEL BELOWBET BETWEENBITUM BITUMINOUSBKG BACKINGBJT BED JOINTBLDG BUILDINGBLKG BLOCKINGBLTN BUILT-INBM BEAMBOD BOTTOM OF DECKBOF BOTTOM OF FOOTINGBOH BACK OF HOUSEBOJ BOTTOM OF JOISTSBOT BOTTOMBPL BEARING PLATEBR BEDROOMBRCG BRACINGBRG BEARINGBRK BRICKBRZ BRONZEBS BOTH SIDESBSMT BASEMENTBUR BUILT-UP ROOF(ING)BVL BEVELBW BOTH WAYS
'C'CAB CABINETCB CATCH BASIN, CORNER BEADCAN CANOPYCANTIL CANTILEVERCBB CEMENTITIOUS (BACKER)
BOARDCEM CEMENTCER CERAMICCF CONTRACTOR FURNISHEDCF/CI CONTRACTOR FURNISHED/
CONTRACTOR INSTALLEDCF/OI CONTRACTOR FURNISHED/
OWNER INSTALLEDCFE CONTRACTOR FURNISHED
EQUIPMENTCFLG COUNTERFLASH(ING)CFT CUBIC FOOTCG CORNER GUARDCH BD CHALKBOARDCHFR CHAMFERCHT CEILING HEIGHTCI CAST IRONCIP(C) CAST-IN-PLACE (CONCRETE)CIR CIRCLE/CIRCULARCIRC CIRCUMFERENCECJ CONTROL JOINT,
CONSTRUCTION JOINGCK CAULK(ING)CLG CEILINGCLL CONTRACT LIMIT LINECLR CLEAR(ANCE)CLRM CLASSROOMCLS CLOSURECMT CERAMIC MOSAICCMU CONCRETE MASONRY UNIT(S)CMPST COMPOSITECNTR COUNTERCO CLEANOUT, CASED OPENING,
CUTOUTCOL COLUMNCOMB COMBINE/COMBINATIONCOMP COMPRESS(ED/ION/IBLE)COMPO COMPOSITION/COMPOSITECOMPT COMPARTMENTCONC CONCRETECONF CONFERENCECONN CONNECTCONST CONSTRUCTIONCONT CONTINUE/CONTINUOUSCONTR CONTRACTORCOR CORRIDORCORR CORRUGATEDCOTG CLEANOUT TO GRADECPLP CEMENT PLASTER (PORTLAND)CPR COPPERCPT CARPETCR CLOSET RODCRG CROSS GRAINCRS COURSECRT YD COURTYARDCSK COUNTERSINK(SUNK)CSMT CASEMENTCST CAST STONECSWK CASEWORKCT CERAMIC TILECTB CERAMIC TILE BASECTR CENTERCU FT CUBIC FEETCU YD CUBIC YARD(S)CW COLD WATER
'D'D DEEP, DEPTHDBL DOUBLEDEG DEGREEDEMO DEMOLISH/DEMOLITIONDET DETAILDEP DEPRESSEDDF DRINKING FOUNTAINDH DIAGONAL HUNGDIA DIAMETERDIAG DIAGONAL, DIAGRAMDIAM DIAMETERDIM DIMENSIONDISP DISPENSERDIV DIVISIONDL DEAD LOADDMPF DAMPROOF(ING)DMT DEMOUNTABLEDN DOWNDP DAMP PROOFINGDPR DAMPERDR DOOR, DINING ROOM,
DRESSING ROOM, DRIVEDRN DRAINDRST DOOR STOPDS DOWNSPOUTDSP DRY STANDPIPEDSPL DISPOSALDT DRAIN TILEDTA DOVETAIL ANCHORDTL DETAILDTS DOVETAIL ANCHOR SLOTDW DUMBWAITERDWG DRAWINGDWR DRAWER
'E"E EAST(E) EXISTINGEA EACHEHD ELECTRIC HAND DRYEREIFS EXTERIOR INSULATION
FINISH SYSTEMEJ EXPANSION JOINTEL ELEVATIONELEC ELECTRIC(AL)
ELEV ELEVATOREMER EMERGENCYENCL ENCLOSUREENGR ENGINEERENTR ENTRANCEESMT EASEMENTEP ELECTRICAL PANELEQ EQUALEQUIP EQUIPMENTEST ESTIMATEEW EACH WAYEWC ELECTRICAL WATER COOLEREXCA EXCAVATE(ION)EXH FN EXHAUST FANEXH HD EXHAUST HOODEXIST EXISTINGEXP EXPANSION, EXPOSED,
EXPOSUREEXP BT EXPANSION BOLTEXT EXTERIOREXT LT EXIT LIGHT
'F'FA FIRE ALARM, FRESH AIRFACP FIRE ALARM CONTROL PANELFAS FASTEN(ER)FB FLAT BARFBD FIRE BOARDFBRK FIRE BRICKFBO FURNISHED BY OTHERSFD FLOOR DRAINFDC FIRE DEPARTMENT CONNECTIONFDTN FOUNDATIONFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FACTORY FINISHFF EL FINISH FLOOR ELEVATIONFF&E FURNITURE, FIXTURE &
EQUIPMENTFFL FINISHED FLOOR LINEFGL FIBERGLASSFH FIRE HYDRANTFHC FIRE HOSE CABINETFIN FINISH(ED)FIN FLR FINISH FLOORFIN GR FINISH GRADEFJT FLUSH JOINTFLA FLASHINGFLCO FLOOR CLEAN OUTFLG FLASHINGFLR FLOOR, FILLERFLUOR FLUORESCENTFND FOUNDATIONFO FINISH OPENINGFOB FACE OF BRICKFOC FACE OF CONCRETEFOF FACE OF FINISHFOM FACE OF MASONRYFOS FACE OF STUD(S)FP FIREPROOFFPL FLOOR PLATEFRMG FRAMINGFR FRAME(D)/FRAMINGFRA FRESH AIRFRC FIRE-RESISTANT COATINGFRP FIBER REINFORCED POLYESTERFRR FIRE-RESISTANCE RATINGFRTW FIRE RETARDENT
TREATED WOODFRZ FREEZERFS FULL SIZE, FULL SCALEFT FOOT or FEET, FIRE TREATEDFTD FACIAL TISSUE DISPENSERFTG FOOTINGFUR FURR(ED/ING)FUT FUTUREFWC FABRIC WALLCOVERING
'G'GA GAUGEGALV GALVANIZED, GALVANICGB GRAB BARGC GENERAL CONTRACTORGD GRADE, GRADINGGDR GUARD RAILGEN GENERAL, GENERATORGF GROUND FACEGFCI GROUND FAULT
CIRCUIT INTERRUPTERGFRC GLASS FIBER REINFORCED
CONCRETEGI GALVANIZED IRONGKT GASKT(ED)GL GLASS/GLAZINGGL BLK GLASS BLOCKGLU LAM GLU-LAMINATED BEAM/WOODGP GALVANIZED PIPEGPDW GYPSUM DRYWALLGPL GYPSUM LATHGPPL GYPSUM PLASTERGR FL GROUND FLOORGR LN GRADE LINEGRN GRANITEGSB GYPSUM SHEATHING BOARDGSM GALVANIZED SHEET METALGSS GLAZED STRUCTURAL SHEETGST GLAZED STRUCTURAL TILEGT GROUTGUT GUTTERGV GALVANIZEDGVL GRAVELGYM GYMNASIUMGYP GYPSUMGYP BD GYPSUM BOARD
'H'HB HOSE BIBBHBD HARDBOARDHC HANDICAP, HOLLOW COREHD HAND DRYER, HEAVY DUTYHDR HEADERHDW HARDWAREHDWD HARDWOODHES HIGH EARLY STRENGTH CEMENTHK HOOKHM HOLLOW METALHNDRL HANDRAILHO HOLD-OPENHORIZ HORIZONTALHT HEIGHTHTG HEATINGHVAC HEATING VENTILATING
AIR CONDITIONINGHW HOTWATERHWT HOTWATER TANKHEX/HX HEXAGONAL
'I'ID INSIDE DIAMETER,
INSIDE DIMENSIONINCANDINCANDESCENTINCIN INCINERATORINCL INCLUDEDINSUL INSULATIONINT INTERIORINTM INTERMEDIATEINV INVERT(ED)IPS IRON PIPE SIZEIS ISLAND, INSECT SCREENISO ISOMETRICIWH INSTANTANEOUS
WATER HEATER
'J'J JOISTJC JANITOR'S CLOSETJF JOINT FILLERJT JOINTJ-BOX JUNCTION BOX
'K'KO KNOCK OUTKIT KITCHENKPL KICKPLATE
'L'L LENGTHLAB LABORATORYLAD LADDERLAM LAMINATELAV LAVATORYLB POUNDLBL LABELLC LIGHT CONTROLLD BRG LOAD BEARINGLGT LIGHT(ING)LH LEFT HANDEDLIB LIBRARYLINO LINOLEUMLKR LOCKERLKR RM LOCKER ROOMLL LIVE LOAD, LOWER LEVELLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLMS LIMESTONELOC LOCATIONLOUV LOUVERLP LIGHT POLELPT LOW POINTLPG LIQUID PETROLEUM GASLRG LARGELT LIGHTLT SW LIGHT SWITCHLTG LIGHTINGLTL LINTEL
LT LIGHT(ING)LVR LOUVERLW LIGHTWEIGHTLWC LIGHTWEIGHT CONCRETE
'M'M METERMAINT MAINTENANCEMAS MASONRYMATL MATERIALMAX MAXIMUMMB MACHINE BOLT, MAIL BOXMBR MEMBERMC MEDICINE CABINET,
MANHOLE COVER, METAL-CLADMECH RM MECHANICAL ROOMMECH MECHANICALMED MEDIUM, MEDICALMEL MELAMINEMEMB MEMBRANEMET METALMFD METAL FLOOR DECKINGMEZZ MEZZANINEMFR MANUFACTURE(R)MFR REC MANUFACTURER'S
RECOMMENDATIONMH MANHOLEMIN MINIMUMMIRR MIRRORMISC MISCELLANEOUSMLDG MOLDING (MOULDING)MLWK MILLWORKMMB MEMBRANEMO MASONRY OPENING,
MOTOR OPERATEDMOD MODIFYMOD MODULARMOPR MOP RACKMOV MOVABLEMR MAP RECEPTORMRB MARBLEMRD METAL ROOF DECK(ING)MS MOP SINK, MACHINE SCREWMT MOUNT(ED/ING)MTFR METAL FURRINGMTHR METAL THRESHOLDMTL METALMTLR METAL ROOFMULL MULLIONMVBL MOVABLEMWK MILLWORK
'N'N NORTHNAT NATURALNCOMBL NONCOMBUSTIBLENIC NOT IN CONTRACTNL NIGHT LIGHTNMT NONMETALLICNO NUMBERNOM NOMINALNR NOISE REDUCTIONNRC NOISE REDUCTION COEFFICIENTNS NO SCALENTS NOT TO SCALE
'O'OA OVERALL, OUTSIDE AIROBS OBSCUREOC ON CENTEROCC OCCUPYOD OUTSIDE DIAMETER,
OUTSIDE DIMENSIONOF OUTSIDE FACEOF/CI OWNER FURNISHED/
CONTRACTOR INSTALLEDOF/OI OWNER FURNISHED/
OWNER INSTALLEDOFD OVERFLOW DRAINOFF OFFICEOFS OUTSIDE FACE OF STUDOGL OBSCURE GLASSOH OVER(HANG/HEAD)OH DR OVERHEAD (COILING) DOOROPNG OPENINGOPH OPPOSITE HANDOPP OPPOSITEOPS OPPOSITE SURFACEOPT OPTIONALORD OVERFLOW ROOF DRAIN
'P'P PAINTPA PUBLIC ADDRESSPAR PARALLELPAT PATTERNPB PANIC BAR, PANELBOARDPBD PARTICLE BOARDPCC PRECAST CONCRETEPCF POUNDS PER CUBIC FOOTPE PEDESTALPED PEDESTALPEND PENDANTPERF PERFORATE(D)PERIM PERIMETERPERM PERMANENTPFB PREFABRICATEDPFL POUNDS PER LINEAR FOOTPFM PREFINISHEDPG PLATE GLASSPH PHASEPIL PILASTERPK GAR PARKING GARAGEPK LOT PARKING LOTPL PROPERTY LINEPLAM PLASTIC LAMINATEPLAS PLASTICPLST PLASTERPLY PLYWOODPNL PANELPNT PAINT(ED)POL POLISH(ED)PORC PORCELAINPR PAIR, PIPE RAILPRCST PRECASTPREFAB PREFABRICATE(D)PREFIN PREFINISHEDPRELIM PRELIMINARYPRF PREFORMEDPRKG PARKINGPROP PROPERTYPSC PRE-STRESSED CONCRETEPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPSL PIPE SLEEVEPT PRESSURE TREATEDPTD PAPER TOWEL DISPENSERPTDR PAPTER TOWEL DISPENSER
& RECEPTACLEPTN PARTITIONPTR PAPER TOWEL RECEPTACLEPV PAVE(D)PVC POLYVINYL CHLORIDEPVMT PAVEMENTPWR POWER
'Q'QT QUARRY TILEQTB QUARRY TILE BASEQTR QUARTERQTY QUANTITYQUAD QUADRANTQUAL QUALITY
'R'R RADIUS, RISER, RANGERA RETURN AIRRAD RADIUSRB RUBBER BASERB HK ROBE HOOKRBL RUBBLE STONERBT RUBBER TILERCP REFLECTED CEILING PLANRCPTN RECEPTIONRD ROOF DRAIN, ROADREBAR REINFORCING STEEL BARSREC RECESSEDRECPT RECEPTACLEREF REFERENCEREFG REFRIGIRATORREFL REFLECTEDREG REGISTERREINF REINFORCE(D)REM REMOVE(ABLE)REQD REQUIREDRESIL RESILIENTREST RESTROOMREV REVISED, REVISIONRF RESILIENT FLOORINGRFG ROOFINGRFH ROOF HATCHRFL REFLECT(ED/IVE/OR)RH RIGHT HANDEDRH ROOF HATCHRL RAIL(ING)RM ROOMRO ROUGH OPENINGROW RIGHT OF WAYRT RIGHTRTF RUBBER TILE FLOORRVS REVERSERWL RAIN WATER LEADERRWR RECESSED WASTE RECEPTACLE
'S'S SOUTHSA SUPPLY AIRSAN SANITARYSC SOLID CORESCD SEAT COVER DISPENSERSCHED SCHEDULESCP SCUPPERSCR SHOWER CURTAIN RODSCRN SCREENSCT STRUCTURAL CLAY TILESD SMOKE DETECTOR,
STORM DRAIN,SOAP DISPENSER
SDG SIDINGSECT SECTIONSF SQUARE FOOT (FEET)SFGL SAFETY GLASSSG SHEET GLASSSGD SLIDING GLASS DOORSH SHELFSHFT SHAFT (ELEVATOR)SHO SHORE(D/ING)SHR SHOWERSHT SHEETSHTHG SHEATHINGSHV SHELVINGSIM SIMILARSKLT SKYLIGHTSL SIDELIGHTSLNT SEALANTSM SHEET METAL, SMALL, SMOOTHSMP SUMP PUMPSND SANITARY NAPKIN DISPENSERSND INS SANITARY NAPKINDISPOSAL UNITSOV SHUTOFF VALVESP STANDPIPE, SUMP PITSPC SPACE(R)SPM SOLID PLASTIC MATERIALSPEC SPECIFICATIONSPKLR SPRINKLERSPKR SPEAKERSPRT SUPPORTSPL SPECIALSQ SQUARESS SANITARY SEWER, STORM SEWERSSK SERVICE SINKSST STAINLESS STEELST STAIR(S), STREETSTA STATIONSTC SOUND TRANSMISSION CLASSSTD STANDARDSTG SEATINGSTL STEELSTL LNTL STEEL LINTELSTL PL STEEL PLATESTL RF DK STEEL ROOF DECKSTOR STORAGESTR STRAIGHT, STRINGER(S)STRUCT STRUCTURALSUB FL SUB FLOORSUSP SUSPEND(ED)SV SHEET VINYLSW SIDEWALK, SWITCHSYMM SYMMETRICALSYN SYNTHETICSYS SYSTEM
'T'T TREADT&B TOP & BOTTOMT&G TONG & GROOVET/S TUB / SHOWERTB TOWEL BAR, THROUGH BOLTTBD TO BE DETERMINEDTD TRENCH DRAINTDR TOWEL DISPENSER &RECEPTACLETEL TELEPHONETEMP TEMPORARYTER TERRAZZOTFF TOP OF FINISH FLOORTHK THICK(NESS)THR THRESHOLDTHRU THROUGHTK BD TACKBOARDTKS TACK STRIPTO TOP OFTOB TOP OF BEAMTOC TOP OF CONCRETE/CURBTOC FTG TOP OF CONCRETE FOOTINGTOC WALL TOP OF CONCRETE WALLTO FDN TOP OF FOUNDATIONTOL TOLERANCETOM TOP OF MASONRYTOP TOP OF PARAPET,
TOP OF PAVEMENTTOPO TOPOGRAPHYTOS TOP OF SLAB, TOP OF STEELTOT TOP OF TRUSSTOW TOP OF WALLTP TELEPHONE POLETPD TOILET PAPER DISPENSERTPH TOILET PAPER HOLDERTPTN TOILET PARTITIONTR TOWEL RACKTRANS TRANSOM, TRANSPARENTTRTD TREATEDTS TUBE STEELTSTAT THERMOSTATTTB TELEPHONE TERMINAL BOARDTV TELEVISIONTYP TYPICAL
'U'UC UNDERCUTUGND UNDERGROUNDUL UNDERWRITERS
LABORATORIESUNFIN UNFINISH(ED)UNIF UNIFORMUNO UNLESS NOTED OTHERWISEUR URINALUTIL UTILITY
'V'V VOLTVAR VARIES, VARIATIONVB VINYL BASEVCT VINYL COMPOSITION TILEVERT VERTICALVEST VESTIBULEVF VINYL FABRICVG VERTICAL GRAINVIF VERIFY IN FIELDVIN VINYLVJ V-JOINT(ED)VNR VENEERVOLT VOLTAGEVP VENEER PLASTERVR VAPOR RETARDERVRM VERMICULITEVRFY VERIFYVT VINYL TILEVWC VINYL WALLCOVERING
'W'W WEST, WIDE, WASTE, WATTW/ WITHW/O WITHOUTWB WOOD BASEWC WATER CLOSET,
WALL COVERINGWD WOODWDW WINDOWWGL WIRED GLASSWH WATER HEATER, WEEP HOLE,
WALL HYDRANT, WALL HUNGWHB WHEEL BUMPERWHSE WAREHOUSEWI WROUGHT IRONWIN WINDOWWLD WELDEDWM WIRE MESHWO WHERE OCCURS, WITHOUTWP WATERPROOF(ED/ING)WPT WORKING POINTWPM WATERPROOF MEMBRANEWR WEATHER RESISTANTWS WEATHER STRIPWSCT WAINSCOTWT WEIGHT, WATERTIGHTWW WINDOW WALLWWF WELDED WIRE FABRICWWM WELDED WIRE MESH
'X'XFMR TRANSFORMER
'Y'YH YARD HYDRANT
'Z'Z ZEBRA
L
L
Revision Schedule
Revision #
Revision
Description Revision Date
PHASE 1 PHASE 2 PHASE 3MPA: UPGRADES IN LIGHTING, WALL BASEWHERE MISSING OR DAMAGED AND WALLFINISH.
JANITOR: REMOVE RFP AND WALL EQUIPMENTRACKS. PROVIDE NEW RFP WALL FINISH ANDFIXTURES.
RESTROOM: REMOVE EXISTING FLOOR & WALLFINISHES, ACCESSORIES, TOILET ANDLAVATORY. PROVIDE NEW PORCELAIN FLOORTILE, TILE BASE, WALL & CEILING FINISH, ANDACCESSORIES. TOILET & LAVATORY TO BEINSTALLED IN EXISTING LOCATION.
OFFICE: REMOVE EXISTING CARPET. PROVIDENEW PAINT ON WALLS AND CARPET TILES.
BREAK ROOM: NEW PAINT ON WALLS. EXISTINGSINK AND CABINETRY TO BE REMOVED.PROVIDE NEW PORCELAIN FLOOR TILE,CASEWORK AND SINK.
RETAIL SALES: REMOVE EXISTING VCT FLOOR FINISH, WALLBASE, WALL FINISH, FIXTURES, EQUIPMENT, & DECOR ANDFIRE EXTINGUISHER CABINET. PROVIDE NEW WALL BASE,WALL FINISH AND CEILING PANELS. EXISTING CONCRETESLAB TO BE DIAMOND POLISHED FINISH.
SNACK AVE: EXISTING CASEWORK AND EQUIPMENT TO BEREUSED, COORDINATE RELOCATION AND STORAGE WITHTHE EXCHANGE NEW PAINT ON WALLS. PROVIDE NEWWALL BASE, WALL & CEILING FINISH . EXISTING CONCRETESLAB TO BE DIAMOND POLISHED FINISH.
SNACK AVE PREP: NEW PAINT ON WALLS. EXISTING SINKAND CABINETRY TO BE REMOVED. BAG-N-BOX TO REMAININ THIS ROOM. INSTALL THREE BASIN SINK. PROVIDE NEWWALL BASE, WALL FINISH, CEILING PANELS ANDEQUIPMENT. EXISTING CONCRETE SLAB TO BE DIAMONDPOLISHED FINISH.
RETAIL SALES: REMOVE EXISTING VCT FLOOR FINISH,WALL BASE, WALL FINISH, FIXTURES, EQUIPMENT, &DECOR AND FIRE EXTINGUISHER CABINET. PROVIDE NEWWALL BASE, WALL FINISH, CEILING PANELS, FIXTURESAND EQUIPMENT. EXISTING CONCRETE SLAB TO BEDIAMOND POLISHED FINISH.
RESTROOM: REMOVE EXISTING FLOOR & WALL FINISHES,ACCESSORIES, TOILET AND LAVATORY. PROVIDE NEWPORCELAIN FLOOR TILE, TILE BASE, WALL & CEILINGFINISH, AND ACCESSORIES. TOILET & LAVATORY TO BEINSTALLED IN EXISTING LOCATION.
COOLER/FREEZER: UPGRADES IN LIGHTING, ELECTRICAL& DOOR SEALS TO EXISTING WALK-INS.
GENERAL NOTES
1. CONTRACTOR RESPONSIBILITIES: THE CONTRACTOR ISRESPONSIBLE FOR THE MEANS AND METHODS OFCONSTRUCTION AND ALL JOB RELATED SAFETY STANDARDS(i.e. OSHA AND UFC). CONTRACTOR IS RESPONSIBLE FOR THESTRENGTH AND STABILITY OF THE STRUCTURE DURINGCONSTRUCTION. CONTRACTOR SHALL PROVIDE TEMPORARYSHORING, BRACING AND OTHER ELEMENTS REQUIRED TOMAINTAIN STABILITY UNTIL THE STRUCTURE IS COMPLETE. ITIS THE CONTRACTOR'S RESPONSIBILITY FOR EXECUTING ITPROPERLY. CONTRACTOR SHALL AT HIS DISCRETION EMPLOYA REGISTERED STRUCTURAL ENGINEER FOR DESIGN OFTEMPORARY BRACING AND SHORING.
2. EXPRESS SALES SERVICE WILL CONTINUE OPERATIONTHROUGHOUT CONSTRUCTION PERIOD. COORDINATE WITHEXPRESS MANAGER REGARDING HOURS OF OPERATION, ANDMAINTAIN PUBLIC ACCESS TO STORE AT ALL TIMES.
3. CONTRACTOR TO CONSTRUCT FULLY SEALEDTEMPORARY CONSTRUCTION BARRIER BETWEEN PHASEDCONSTRUCTION AND SALES OPERATIONS. PROVIDESUPPLEMENTAL UTILITIES AND HVAC VENTILATION ASREQUIRED TO ACCOMMODATE BUSINESS OPERATIONS DURINGCONSTRUCTION. REFERENCE DETAIL E1/A-151.
4. CONTRACTOR TO TRANSPORT DEMOLISHED MATERIALSOFF BASE AND LEGALLY DISPOSE OF THEM.
5. PROTECT ALL EXISTING CONSTRUCTION, ITEMS TOREMAIN AND ITEMS TO BE SALVAGED.
6. CONTRACTOR SHALL FIELD VERIFY EXISTINGCONDITIONS TO VERIFY THE EXTENT OF DEMOLITION, TYPESOF CONSTRUCTION & MATERIALS USED AND CRITICALDIMENSIONS PRIOR TO BID.
7. CONTRACTOR TO MAINTAIN CONTINUOUS ACCESS TOALL SIGNED EXITS WHEN THE STORE IS OPEN.
8. MAINTAIN CONTINUOUS EMPLOYEE ACCESS TOADMINISTRATION AREA AND MERCHANDISE PROCESSINGAREAS (MPA) AT ALL TIMES.
9. CONTRACTOR TO COORDINATE WITH EXCHANGEMANAGER AND FACILITIES MAINTENANCE OPERATIONS (FMO),REGARDING PHASING SCHEDULE. ALL EQUIPMENT ANDFIXTURES TO BE REMOVED/DEMOLISHED ARE TO BESALVAGED BACK TO THE EXCHANGE. EXISTING EQUIPMENTTO REMAIN WILL BE MOVED AND RELOCATED BY THEEXCHANGE.
10. FMO REQUIRES 3 DAYS NOTICE PRIOR TO THE START OFEACH PHASE TO RELOCATE FIXTURES.
11. ALLOW 72 HOURS FOR NEW FLOORING TO CURE PRIORTO THE END OF EACH PHASE. DURING THIS TIME, PROTECTNEW FLOORING PRIOR TO TURN OVER TO OWNER.
12. REFER TO ALL OTHER DISCIPLINES TO COORDINATEADDITIONAL DEMOLITION REQUIREMENTS THAT MAY NOT BESHOWN ON ARCHITECTURAL SHEETS.
13. PATCH ALL WALLS AND FLOORS ADJACENT TODEMOLITION OR EQUIPMENT REMOVAL TO MATCH EXISTINGADJACENT SURFACES, OR PREP FOR NEW FINISHES AS NOTEDIN DRAWINGS.
14. VERIFY STRUCTURAL SHORING OF BEARING MEMBERSPRIOR TO DEMOLITION.
15. DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS.
16. DIMENSIONS ARE TO FACE OF FINISH, GRID LINES, ANDCENTERLINE OF COLUMNS U.N.O.
17. FIXTURES & EQUIPMENT SHOWN ARE EF/EI UNLESSNOTED OTHERWISE, AND ARE FOR REFERENCE ONLY.REFERENCE FLOOR PLANS AND EQUIPMENT SCHEDULES FORINSTALLATION RESPONSIBILITY.
18. CONTRACTOR TO PROVIDE ALL NECESSARY ELECTRICAL& MECHANICAL CONNECTIONS AND FINAL HOOK-UPS FOREXCHANGE FURNISHED/EXCHANGE INSTALLED FIXTURES ANDEQUIPMENT. REFERENCE ELECTRICAL AND MECHANICALDRAWINGS FOR ADDITIONAL INFORMATION.
19. ALL CASEWORK TO BE NON-LOCKING UNLESS NOTEDOTHERWISE.
20. ALL WALL FINISH TRANSITIONS TO OCCUR AT NEARESTINSIDE CORNER OR REVEAL JOINT U.N.O.
21. VERIFY ALL EQUIPMENT MEASUREMENTS ANDPLACEMENT WITH EXCHANGE.
22. VERIFY ALL CASEWORK OPENINGS AS PER EQUIPMENTMEASUREMENTS.
23. REFERENCE MECHANICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL FLOOR DRAINS, SINKS AND PLUMBINGCONNECTIONS.
24. REFERENCE ELECTRICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL POWER OUTLETS AND CONNECTIONS.
25. PROVIDE SOLID BLOCKING IN ALL WALLS WHEREFIXTURES AND EQUIPMENT WILL BE WALL MOUNTED.
26. REFER TO FINISH SCHEDULE/LEGEND ON DRAWINGSHEET A-251 FOR ADDITIONAL INFORMATION ONFLOOR/WALL/CEILING FINISHES.
27. REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FORADDITIONAL INFORMATION.
E = EXCHANGEV = VENDORC = CONTRACTOR
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SHEET:SHEET:SHEET:SHEET:
2 3 4 5 61
A
B
C
D
E
1 2 3 4 5 6
As indicated
DHB
GSH
100% SOLICITATION SET
MARCH 06, 2014
G-003
PHASING PLAN
Madigan Gate Express -Image Upgrade
Madigan Gate Express Bldg 9052JBLM Ft. Lewis
4915-12-008
SCALE : 1/4" = 1'-0"A1CONSTRUCTION PHASING PLAN
Revision Schedule
Revision #
Revision
Description Revision Date
A B
2
4
C D
E F1
3
1
2
1
1
4
2
PHASE 1 PHASE 2 PHASE 3
2 3
7
7
7
8
9
10
10
11
12
12
1
KEY NOTES
1 REMOVE EXISTING VCT FLOOR FINISH & WALL BASE. PREPSURFACE TO RECEIVE NEW DIAMOND POLISHEDCONCRETE FLOOR FINISH AND WALL BASE.
REMOVE EXISTING VCT FLOOR FINISH & WALL BASE. PREPSURFACE TO RECEIVE NEW PORCELAIN TILE FLOOR FINISHAND WALL BASE.
REMOVE EXISTING VCT FLOOR FINISH & WALL BASE. PREPSURFACE TO RECEIVE NEW CARPET TILE AND RUBBERBASE.
REMOVE EXISTING VCT FLOOR FINISH, ENTRY MAT & WALLBASE. WASH AND PREP SURFACE TO RECEIVE NEWDIAMOND POLISHED CONCRETE FLOOR FINISH, ENTRY MATAND WALL BASE.
NOT USED
NOT USED
FACILITIES MAINTENANCE OPERATIONS (FMO) TO REMOVEALL EXISTING FIXTURES, EQUIPMENT & DECOR. SALVAGEBACK TO THE EXCHANGE. COORDINATE REMOVAL WITHGENERAL MANAGER TO DETERMINE WHAT FIXTURES NEEDTO REMAIN TO SUPPORT ON-GOING SALES UNTIL FINALPHASE IS COMPLETED.
REMOVE AND RE-LOCATE EXISTING FIRE EXTINGUISHERCABINET.
EXISTING FLOOR SINK TO REMAIN.
EXISTING ICE MACHINE AND SHELVING IN MPA TO REMAIN.
BAG 'N BOX FOR DRINK STATION TO BE REMOVED
EXISTING TOILET AND LAVATORY TO REMAIN. REMOVE ALLEXISTING FLOOR, BASE, WALL FINISHES ANDACCESSORIES. REMOVE AND RE-HANG IN EXISTINGLOCATION. IN AREAS OF CERAMIC WALL TILE REMOVEEXISTING FINISHES TO STUD. PREP SURFACES FOR NEWFINISHES.
2
3
4
5
6
7
8
9
10
11
12
GENERAL NOTES
1. CONTRACTOR RESPONSIBILITIES: THE CONTRACTOR ISRESPONSIBLE FOR THE MEANS AND METHODS OFCONSTRUCTION AND ALL JOB RELATED SAFETY STANDARDS(i.e. OSHA AND UFC). CONTRACTOR IS RESPONSIBLE FOR THESTRENGTH AND STABILITY OF THE STRUCTURE DURINGCONSTRUCTION. CONTRACTOR SHALL PROVIDE TEMPORARYSHORING, BRACING AND OTHER ELEMENTS REQUIRED TOMAINTAIN STABILITY UNTIL THE STRUCTURE IS COMPLETE. ITIS THE CONTRACTOR'S RESPONSIBILITY FOR EXECUTING ITPROPERLY. CONTRACTOR SHALL AT HIS DISCRETION EMPLOYA REGISTERED STRUCTURAL ENGINEER FOR DESIGN OFTEMPORARY BRACING AND SHORING.
2. EXPRESS SALES SERVICE WILL CONTINUE OPERATIONTHROUGHOUT CONSTRUCTION PERIOD. COORDINATE WITHEXPRESS MANAGER REGARDING HOURS OF OPERATION, ANDMAINTAIN PUBLIC ACCESS TO STORE AT ALL TIMES.
3. CONTRACTOR TO CONSTRUCT FULLY SEALEDTEMPORARY CONSTRUCTION BARRIER BETWEEN PHASEDCONSTRUCTION AND SALES OPERATIONS. PROVIDESUPPLEMENTAL UTILITIES AND HVAC VENTILATION ASREQUIRED TO ACCOMMODATE BUSINESS OPERATIONS DURINGCONSTRUCTION. REFERENCE DETAIL E1/A-151.
4. CONTRACTOR TO TRANSPORT DEMOLISHED MATERIALSOFF BASE AND LEGALLY DISPOSE OF THEM.
5. PROTECT ALL EXISTING CONSTRUCTION, ITEMS TOREMAIN AND ITEMS TO BE SALVAGED.
6. CONTRACTOR SHALL FIELD VERIFY EXISTINGCONDITIONS TO VERIFY THE EXTENT OF DEMOLITION, TYPESOF CONSTRUCTION & MATERIALS USED AND CRITICALDIMENSIONS PRIOR TO BID.
7. CONTRACTOR TO MAINTAIN CONTINUOUS ACCESS TOALL SIGNED EXITS WHEN THE STORE IS OPEN.
8. MAINTAIN CONTINUOUS EMPLOYEE ACCESS TOADMINISTRATION AREA AND MERCHANDISE PROCESSINGAREAS (MPA) AT ALL TIMES.
9. CONTRACTOR TO COORDINATE WITH EXCHANGEMANAGER AND FACILITIES MAINTENANCE OPERATIONS (FMO),REGARDING PHASING SCHEDULE. ALL EQUIPMENT ANDFIXTURES TO BE REMOVED/DEMOLISHED ARE TO BESALVAGED BACK TO THE EXCHANGE. EXISTING EQUIPMENTTO REMAIN WILL BE MOVED AND RELOCATED BY THEEXCHANGE.
10. FMO REQUIRES 3 DAYS NOTICE PRIOR TO THE START OFEACH PHASE TO RELOCATE FIXTURES.
11. ALLOW 72 HOURS FOR NEW FLOORING TO CURE PRIORTO THE END OF EACH PHASE. DURING THIS TIME, PROTECTNEW FLOORING PRIOR TO TURN OVER TO OWNER.
12. REFER TO ALL OTHER DISCIPLINES TO COORDINATEADDITIONAL DEMOLITION REQUIREMENTS THAT MAY NOT BESHOWN ON ARCHITECTURAL SHEETS.
13. PATCH ALL WALLS AND FLOORS ADJACENT TODEMOLITION OR EQUIPMENT REMOVAL TO MATCH EXISTINGADJACENT SURFACES, OR PREP FOR NEW FINISHES AS NOTEDIN DRAWINGS.
14. VERIFY STRUCTURAL SHORING OF BEARING MEMBERSPRIOR TO DEMOLITION.
15. DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS.
16. DIMENSIONS ARE TO FACE OF FINISH, GRID LINES, ANDCENTERLINE OF COLUMNS U.N.O.
17. FIXTURES & EQUIPMENT SHOWN ARE EF/EI UNLESSNOTED OTHERWISE, AND ARE FOR REFERENCE ONLY.REFERENCE FLOOR PLANS AND EQUIPMENT SCHEDULES FORINSTALLATION RESPONSIBILITY.
18. CONTRACTOR TO PROVIDE ALL NECESSARY ELECTRICAL& MECHANICAL CONNECTIONS AND FINAL HOOK-UPS FOREXCHANGE FURNISHED/EXCHANGE INSTALLED FIXTURES ANDEQUIPMENT. REFERENCE ELECTRICAL AND MECHANICALDRAWINGS FOR ADDITIONAL INFORMATION.
19. ALL CASEWORK TO BE NON-LOCKING UNLESS NOTEDOTHERWISE.
20. ALL WALL FINISH TRANSITIONS TO OCCUR AT NEARESTINSIDE CORNER OR REVEAL JOINT U.N.O.
21. VERIFY ALL EQUIPMENT MEASUREMENTS ANDPLACEMENT WITH EXCHANGE.
22. VERIFY ALL CASEWORK OPENINGS AS PER EQUIPMENTMEASUREMENTS.
23. REFERENCE MECHANICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL FLOOR DRAINS, SINKS AND PLUMBINGCONNECTIONS.
24. REFERENCE ELECTRICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL POWER OUTLETS AND CONNECTIONS.
25. PROVIDE SOLID BLOCKING IN ALL WALLS WHEREFIXTURES AND EQUIPMENT WILL BE WALL MOUNTED.
26. REFER TO FINISH SCHEDULE/LEGEND ON DRAWINGSHEET A-251 FOR ADDITIONAL INFORMATION ONFLOOR/WALL/CEILING FINISHES.
27. REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FORADDITIONAL INFORMATION.
E = EXCHANGEV = VENDORC = CONTRACTOR
SCOPE & SEQUENCE OVERVIEW
RETAIL SALES: REMOVE EXISTING VCT FLOOR FINISH, WALLBASE, WALL FINISH, FIXTURES, EQUIPMENT, & DECOR ANDFIRE EXTINGUISHER CABINET. PROVIDE NEW WALL BASE,WALL FINISH, CEILING PANELS, FIXTURES AND EQUIPMENT.EXISTING CONCRETE SLAB TO BE DIAMOND POLISHED FINISH.
RESTROOM: REMOVE EXISTING FLOOR & WALL FINISHES,ACCESSORIES, TOILET AND LAVATORY. PROVIDE NEWPORCELAIN FLOOR TILE, TILE BASE, WALL & CEILING FINISH,AND ACCESSORIES. TOILET & LAVATORY TO BE INSTALLED INEXISTING LOCATION.
COOLER/FREEZER: UPGRADES IN LIGHTING, ELECTRICAL &DOOR SEALS TO EXISTING WALK-INS.
PHASE 1
RETAIL SALES: REMOVE EXISTING VCT FLOOR FINISH, WALLBASE, WALL FINISH, FIXTURES, EQUIPMENT, & DECOR ANDFIRE EXTINGUISHER CABINET. PROVIDE NEW WALL BASE,WALL FINISH AND CEILING PANELS. EXISTING CONCRETESLAB TO BE DIAMOND POLISHED FINISH.
SNACK AVE: EXISTING CASEWORK AND EQUIPMENT TO BEREUSED, COORDINATE RELOCATION AND STORAGE WITHTHE EXCHANGE NEW PAINT ON WALLS. PROVIDE NEW WALLBASE, WALL & CEILING FINISH . EXISTING CONCRETE SLAB TOBE DIAMOND POLISHED FINISH.
SNACK AVE PREP: NEW PAINT ON WALLS. EXISTING SINK ANDCABINETRY TO BE REMOVED. BAG-N-BOX TO REMAIN IN THISROOM. INSTALL THREE BASIN SINK. PROVIDE NEW WALLBASE, WALL FINISH, CEILING PANELS AND EQUIPMENT.EXISTING CONCRETE SLAB TO BE DIAMOND POLISHED FINISH.
PHASE 2
MPA: UPGRADES IN LIGHTING, WALL BASE WHERE MISSINGOR DAMAGED AND WALL FINISH.
JANITOR: REMOVE RFP AND WALL EQUIPMENT RACKS.PROVIDE NEW RFP WALL FINISH AND FIXTURES.
RESTROOM: REMOVE EXISTING FLOOR & WALL FINISHES,ACCESSORIES, TOILET AND LAVATORY. PROVIDE NEWPORCELAIN FLOOR TILE, TILE BASE, WALL & CEILING FINISH,AND ACCESSORIES. TOILET & LAVATORY TO BE INSTALLED INEXISTING LOCATION.
OFFICE: REMOVE EXISTING CARPET. PROVIDE NEW PAINT ONWALLS AND CARPET TILES.
BREAK ROOM: NEW PAINT ON WALLS. EXISTING SINK ANDCABINETRY TO BE REMOVED. PROVIDE NEW PORCELAINFLOOR TILE, CASEWORK AND SINK.
PHASE 3
CLG
CONST.SIDE
FL
WIRE TO GRID/SUPPORTPROTECT FINISH
VERT. 4'-0" O.C. MAX
6 MIL. POLY
MTL. STUD
TAPE
DIAGONAL/VERTICALBRACE. USE SANDBAGSAT FLOOR TO KEEP INPOSITION. NO ANCHORSINTO FLOOR ALLOWED
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SHEET:SHEET:SHEET:SHEET:
2 3 4 5 61
A
B
C
D
E
1 2 3 4 5 6
As indicated
DHB
GSH
100% SOLICITATION SET
MARCH 06, 2014
A-100
DEMO PLAN
Madigan Gate Express -Image Upgrade
Madigan Gate Express Bldg 9052JBLM Ft. Lewis
4915-12-008
SCALE : 1/4" = 1'-0"A1DEMO PLAN
SCALE : 3" = 1'-0"E1TEMPORARY DUST BARRIER
PLANNORTH
Revision Schedule
Revision #
Revision
Description Revision Date
A B
2
4
A-2514
A-251
A-251
13
A-251
5
15
1416
9
7
8 6
1
2
3
6' -
1"
C D E F
1
104A
105A
101A
EX
IST
ING
111A
EXISTING
EX
IST
ING
110A
109A
EX
IST
ING
3
13' - 9" 31' - 10" 30' - 6" 17' - 0" 8' - 8"
101' - 9"
4' - 0" 6' - 4" 19' - 8"
8' -
1"
27' -
0"
27' -
0"
6' -
3"
62' -
1"
5' -
4"
11' -
11"
3' - 4" 34' - 0"
7' - 2 1/4" 14' - 3 3/4"
20' - 2 1/2"
6' -
8 3
/4"
10' - 1" 7' - 4"
8' -
1"
8' -
4"
2' -
5"
EXISTING STL COL. PAINTED EXISTING STLCOLUMNS
14' -
4"
2' -
4"
3' -
2"
26' - 8" 1' - 8" 9' - 8" 2' - 4" 8' - 0" 3' - 0"
4' -
0"
1111
A-101A-101A-101A-101 A-401A-401A-401A-401
6666
A-101A-101A-101A-101 A-401A-401A-401A-401
P-4
/ P
-5
P-4 / P-5P-2
P-3
P-3
P-2
P-2
PAINT COLUMN P-2
PAINT COLUMN P-3
P-2
EXISTING COOLER WALL
RESTROOM
104
RESTROOM
110
RETAIL SALES
101
WALK-INCOOLER
102
WALK-INFREEZER
102A
BULK SALES
103
BREAK ROOM
105
MANAGEROFFICE
106
MPA
107
SNACK AVEPREP
109
10' -
1"
2' -
3 3
/4"
ELECTRICALCLOSET
108
EXISTING GLAZINGTO REMAIN
EXISTING AUTOMATIC DOORTO REMAIN
GENERAL NOTES
1. DIMENSIONS ARE TO CENTER LINE OF STUD PARTITIONS,GRID LINES, FACE OF CMU, AND CENTERLINE OF COLUMNSUNO
2. CLR DIMENSIONS INDICATE CLEAR DIMENSIONS FROM FACEOF WALL FINISH
3. MASONRY DIMENSIONS ARE NOMINAL, VERIFY ACTUALDIMENSIONS
4. FOR EXTERIOR WALL CONSTRUCTION VERIFY IN FIELD
5. SEE DOOR SCHEDULE FOR DOOR AND RELITE FRAMETYPES AND DETAIL REFERENCES
6. REPLACE CONC SLAB THAT HAS BEEN REMOVED ORDAMAGED
7. REFERENCE INTERIOR ELEVATIONS, ROOM FINISHSCHEDULE AND FINISH LEGEND FOR LOCATIONS ANDEXTENTS OF FINISHES.
8. EXTERIOR DOORS TO BE PRIMED AND PAINTED. COLORTO BE FED STD 595 COLOR FS 30450 (TAN)
9. PROVIDE PRICE FOR OPTION 1 FLOORING SEE FINISHLEGEND AND SCHEDULE FOR EXTENT OF ALTERNATE 1
STUD SPACING at 16" O.C.UNLESS NOTEDOTHERWISE.
GRAB BAR / RAILING with3 SCREWS at EACHCONNECTION
STEEL STUDS - REFERTO WALL TYPE DETAILS
6"x 18 GA STEEL BACKINGSTUD. NOTCH BACKINGSTUD AROUND WALLSTUDS.3 STUD MINIMUM SPAN.
(2) #8 SCREWS PERWALL STUD
NOTE: MAXIMUMWEIGHT SHALL BE 250LBS
1/2"
1/2"
LOCATION OF CLEAT orHANGER
STEEL STUDS - REFERTO WALL TYPE DETAILS
(2) #8 SCREWS PERWALL STUD
STUD SPACING at 16" O.C.UNLESS NOTEDOTHERWISE.
6"x 18 GA STEEL METAL BACKING FOR ALLWALL MOUNTED ITEMS. 2 STUD MINIMUMSPAN. IF LENGTH OF CLEAT OR HANGERENDS BETWEEN STUDS, THE BACKING ISTO EXTEND TO THE NEXT STUD.
NOTE: MAXIMUMWEIGHT SHALL BE 150LBS
VE
RIF
Y H
EIG
HT
with
SU
PP
LIE
R
1/2"
1/2"
CENTERLINE OF CLEATor HANGER
STUD SPACING at 16" O.C.UNLESS NOTEDOTHERWISE. 3 STUDMINIMUM SPAN.
BACKING PLATE: 12"WIDE X 18 GA. STEELPLATE FASTENEDFLUSH TO STUD WITH (2)#10 SHEET METALSCREWS PER STUD
STEEL STUDS - REFER TO WALLTYPE DETAILS
FOR STUD SPACING LARGER THAN16" O.C., USE 7/8" HAT CHANNEL FORINTERMEDIATE SUPPORT
NOTE: THIS DETAIL OCCURS AT WALL LOCATIONS THAT REQUIRE METAL BACKING.REFER TO SPECIFICATIONS.
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SHEET:SHEET:SHEET:SHEET:
2 3 4 5 61
A
B
C
D
E
1 2 3 4 5 6
As indicated
DHB
GSH
100% SOLICITATION SET
MARCH 06, 2014
A-101
FLOOR PLAN
Madigan Gate Express -Image Upgrade
Madigan Gate Express Bldg 9052JBLM Ft. Lewis
4915-12-008
1/4" = 1'-0"A-101
1 OVERALL FLOOR PLAN
DOOR SCHEDULE
ROOM NAME MARK
DOOR FRAME
HDW NOTESNO OF LEAFSSIZE (NOM)
PANEL 1 TYPE PANEL 2 TYPE MATL TYPE MATL HEAD HEIGHTWIDTH HEIGHT THKRETAIL SALES 101A 1 3' - 0" 7' - 0" 2" P01 HM F01 HM - EXISTING 2" 01BULK SALES 104A 2 6' - 0" 7' - 0" 2" P01 P01 HM F01 HM - EXISTING 2" 02RESTROOM 105A 1 3' - 0" 7' - 0" 2" P01 Wood - Birch F01 HM - EXISTING 2" 03MPA 109A 2 5' - 0" 7' - 0" 2" P01 P01 HM F01 HM - EXISTING 2" 04RESTROOM 110A 1 3' - 0" 7' - 0" 2" P01 Wood - Birch F01 HM - EXISTING 2" 03SNACK AVE PREP 111A 1 3' - 0" 7' - 0" 2" P01 Wood - Birch F01 HM - EXISTING 2" EXISTING
PLANNORTH
Revision Schedule
Revision #
Revision
Description Revision Date
A B
2
4
OPEN TO STRUCTURE
EXISTINGINSULATED METAL
C D E F
1
3
NEW 2'X4' SUSP. ACOUSTICALPANEL CEILING REUSE EXISTING T-BAR SYSTEM
GYP BD CEILING
EXPOSED ROOF STRUCTURE
EXISTING PRE-FINISHEDMETAL SOFFIT PANEL
EXISTINGINSULATED METAL
OPEN TOSTRUCTURE
8' - 0"
10' - 0"
8' - 0"
8' - 0"
9' - 4"
8' - 0"
8' - 0"
OPEN TO STRUCTURE
RETAIL SALES
101
MPA
107
MANAGEROFFICE
106
BREAK ROOM
105
RESTROOM
110
SNACK AVEPREP
109
WALK-INFREEZER
102A
WALK-INCOOLER
102
BULK SALES
103
RESTROOM
104
EXISTING 2'X4' PARABOLIC TROFFER TO REMAIN
EXISTING LINEAR PENDENT LIGHT TO REMAIN
EXISTING EXTERIOR DOWNLIGHT TO REMAIN
EXISTING RECESSED CAN LIGHT TO REMAIN
EXISTING WALL MOUNTED FIXTURE TO REMAIN
FIXTURE LEGEND
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SHEET:SHEET:SHEET:SHEET:
2 3 4 5 61
A
B
C
D
E
1 2 3 4 5 6
1/4" = 1'-0"
DHB
GSH
100% SOLICITATION SET
MARCH 06, 2014
A-111
REFLECTED CEILINGPLAN
Madigan Gate Express -Image Upgrade
Madigan Gate Express Bldg 9052JBLM Ft. Lewis
4915-12-008
SCALE : 1/4" = 1'-0"1OVERALL RCP
GENERAL NOTES
1. ALL HEIGHTS LISTED ARE AFF UNO
2. ALL EXISTING SURFACES TO BE PAINTED SHALL BECLEANED AND FREE OF DUST, OILS AND DEBRES.
3. PAINT ALL VISIBLE CEILING ELEMENTS INCLUDING BUTNOT LIMITED TO HVAC DUCTS, CONDUIT, PIPES ANDSTRUCTURAL ELEMENTS UNO
4. ALL GYP BD WALLS & SOFFITS EXPOSED TO VIEW AND/ORADJACENT TO CEILING CLOUDS SHALL BE PAINTED TOUNDERSIDE OF STRUCTURE. MATCH COLOR OF GYP BDHORIZ SURFACE TO VERT SURFACE.
5. G.C. IS RESPONSIBLE FOR THE REMOVAL, REPLACEMENTAND REINSTALLATION OF ALL CEILING SPEAKERS.
6. ALL SECURITY CAMERAS AND EQUIPMENT TO BE REMOVEDAND REINSTALLED BY THE EXCHANGE.
7. ALL LIGHT FIXTURES TO REMAIN, THE G.C. IS RESPONSIBLEFOR THE PROTECTION OF THE FIXTURES DURINGDEMOLITION AND CONSTRUCTION.
CEILING TYPES LEGEND
Revision Schedule
Revision #
Revision
Description Revision Date
PO
ST
MIX
DIS
PE
NS
ER
BIN
AD
AP
TE
R
ICE
MA
KE
R
iMIX-14BEVERAGEDISPENSER
CHILIDISPENSER
CHEESEDISPENSER
MIC
RO
WA
VE
MIC
RO
WA
VE
(DE
LI EX
PR
ES
S)
HO
T T
O G
O
RU
IZB
UR
RIT
OS
HO
T T
O G
O
DE
LIE
XP
RE
SS
NA
PK
INS
FR
ITO
LAY
RO
LLER
GR
ILL RA
CK
FR
ITO
LAY
RO
LLER
GR
ILL RA
CK
FR
ITO
LAY
RO
LLER
GR
ILL RA
CK
HO
T D
OG
RO
LLER
GR
ILLH
OT
DO
GR
OLLE
R G
RILL
BU
N W
AR
ME
R
HO
T D
OG
RO
LLER
GR
ILLO
DW
ALLA
CO
UN
TE
RS
TA
ND
BIS
CO
FF
PO
WE
RW
ING
920112
ICE
MA
KE
R&
BIN
NAPKINS
COFFEEAIRPOTS& STANDS
BIGELOWTEA
CR
EA
ME
RM
AC
HIN
E
FLA
VO
RS
HO
T
COFFEESERVER& STAND
COFFEESERVER& STAND
MULTI-ICETEA
TWIN COFFEEBREWER
MU
LTI-F
LAV
OR
DIS
PE
NS
ER
ATM
3 BOXES WIDE
MP 92098
MP
920
129
920140
MP 920104
9109
5
TO
BA
CC
OA
CC
ES
. 2'
MINI
SPI
RIT
VERS
A GR
ID U
NIT
SMOKELESSTOBACCOCIGARILLOS
CON-AGRA TWO FTSPINNER RACK
OP
T. P
RG
RM
DE
TE
RM
INE
DB
Y S
TR
/VN
DR
TO
BA
CC
OC
AR
TO
N
TO
BA
CC
OS
ING
LE
TO
BA
CC
OS
ING
LE
TO
BA
CC
OC
AR
TO
N
KELLOGG'S CEREALCUP TREE
SA
TH
ER
SS
PIN
NE
R T
RE
E 5
4"
JUS
T B
OR
NS
IDE
KIC
K 9
2013
3SNAKCLUBPOW
ER WING
HERSHEY END CAPDISPLAYER
MASS DISPLAYPALLET
MASS DISPLAYPALLET
MASS DISPLAYPALLET
MASS DISPLAYPALLET
MASS DISPLAYPALLET
TO
BA
CC
O C
ON
TR
OL
CO
UN
TE
R
TO
BA
CC
O C
ON
TR
OL
CO
UN
TE
R IMPU
LSE
RACK
w/
BEVE
RAGE
COOL
ER
IMPU
LSE
RACK
w/
BEVE
RAGE
COOL
ER
1S
FR
ON
T
1S
FR
ON
T
AS
SO
ICA
TE
AC
CE
SS
TO
BA
CK
OF
FIX
TU
RE
EMPLO
YEES'
LOCKERS
RE
MO
TE
FILL
W/ G
AU
GE
FO
R C
O2
CO
2
54" HIGH FIXTURE
2S
1S
2S
VIDEORENTAL
HAND BASKET W/STAND AND SIGN
72"
HIG
H F
IXT
UR
E
72"
HIG
H F
IXT
UR
E
72"
HIG
H F
IXT
UR
E
72"
HIG
H F
IXT
UR
E
3SP
1S
Use EitherBeverage Air#MT12-C orTrue #GDM12
Use EitherBeverage Air#MT12-C orTrue #GDM12
4S
1S
HAND BASKET W/STAND AND SIGN
72"
HIG
H F
IXT
UR
E
A B
2
4
A-2514
A-251
A-251
13
A-251
5
15
1416
9
7
8 6
1
2
3
C D E F
1
3
EXISTING STL COL. PAINTED EXISTING STL COL. PAINTEDEXISTING STLCOLUMN
36
A-401
12
11
GENERAL NOTES
FIXTURE PLANS ARE FOR REFERENCE ONLY, AND AREINTENDED TO SHOW THE LAYOUT OF FURNITURE ANDEXISTING FIXTURES THAT ARE EXCHANGEFURNISHED/EXCHANGE INSTALLED (EF/EI).
ALL FURNITURE AND FIXTURES SHOWN ARE EF/EI UNLESSOTHERWISE NOTED. REFER TO FLOOR PLANS ANDEQUIPMENT SCHEDULES FOR INSTALLATION RESPONSIBILITY.
CONTRACTOR TO PROVIDE ALL NECESSARY ELECTRICAL &MECHANICAL CONNECTIONS AND FINAL HOOK-UPS FOREXCHANGE FURNISHED/EXCHANGE INSTALLED FIXTURES ANDEQUIPMENT. REFERENCE ELECTRICAL AND MECHANICALDRAWINGS FOR ADDITIONAL INFORMATION.
ALL CASEWORK TO BE NON-LOCKING UNLESS NOTEDOTHERWISE.
ALL WALL FINISH TRANSITIONS TO OCCUR AT NEARESTINSIDE CORNER OR REVEAL JOINT U.N.O.
VERIFY ALL EQUIPMENT MEASUREMENTS AND PLACEMENTWITH EXCHANGE.
VERIFY ALL CASEWORK OPENINGS AS PER EQUIPMENTMEASUREMENTS.
REFERENCE MECHANICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL FLOOR DRAINS, SINKS AND PLUMBINGCONNECTIONS.
REFERENCE ELECTRICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL POWER OUTLETS AND CONNECTIONS.
PROVIDE SOLID BLOCKING IN ALL WALLS WHERE FIXTURESAND EQUIPMENT WILL BE WALL MOUNTED.
REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FORADDITIONAL INFORMATION.
DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS.
DIMENSIONS ARE TO FACE OF FINISH, GRID LINES, ANDCENTERLINE OF COLUMNS U.N.O.
CLEAN AND PAINT ALL EXISTING CEILING STRUCTURE ANDEXPOSED ELECTRICAL & MECHANICAL EQUIPMENT AS PERNEW FINISH LEGEND/SCHEDULE ON DRAWING SHEET A-601.
EXISTING WALK-IN COOLER & FREEZER TO REMAIN.CONTRACTOR TO UPGRADE LIGHTING AND ELECTRICALELEMENTS, AS SPECIFIED IN ELECTRICAL DRAWINGS. NEWDOOR SEALS TO BE REPLACED BY COOLER/FREEZER VENDOR.
REFERENCE DRAWING SHEET A-001 FOR INFORMATION ONNEW WALL CONSTRUCTION TYPES.
ALL OUTSIDE CORNERS IN EXPRESS SALES TO RECEIVECORNER GUARDS CG-1. REFERENCE FINISH LEGEND ONSHEET A-251 FOR INFORMATION.
REFERENCE ROOM FINISH SCHEDULE, FINISH LEGEND ONSHEET A-251, AND INTERIOR ELEVATIONS ON SHEET A-154FOR LOCATIONS AND PLACEMENT OF ALL FINISHES.
E = EXCHANGEV = VENDORC = CONTRACTOR
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SHEET:SHEET:SHEET:SHEET:
2 3 4 5 61
A
B
C
D
E
1 2 3 4 5 6
As indicated
LAW
GSH
100% SOLICITATION SET
MARCH 06, 2014
A-150
OVERALL FIXTUREPLAN
Madigan Gate Express -Image Upgrade
Madigan Gate Express Bldg 9052JBLM Ft. Lewis
4915-12-008
SCALE : 1/4" = 1'-0"1OVERALL FIXTURE PLAN
PLANNORTH
Revision Schedule
Revision #
Revision
Description Revision Date
7' -
6"
OPENING TOBULK SALES
PAINT FRAME P-3PAINT FRAME P-3
10' -
0"
P-4
6' -
6"
P-5
END P-4/P-5 AT EDGE OF DOOR FRAME
P-3
RB-1, TYP EXISTING SNACK AVENUECASEWORK AND
EQUIPMENT TO REMAIN
10' -
0"
10' -
0"
P-4
6' -
6"
P-5
RB-1EXISTING SNACKAVENUE CASEWORK &
EQUIPMENT TO REMAIN
PAINT DOOR FRAME P-2
EXISTING SNACKAVENUE CASEWORK &EQUIPMENT TO REMAIN
P-4
P-5
P-4
P-5
AUTOMATIC DOOR
10' -
0"
OPEN
P-2
RB-1
P-4
6' -
6"
P-5
END P-4 / P-5 AT EDGEOF WINDOW FRAME
EXISTING SNACK AVENUE CASEWORK& EQUIPMENT TO REMAIN
P-2
8' -
0"
7' -
6"OPENING TO
BULK SALES
10' -
0"
STEEL COLUMN PAINT P-3END P-2 AT THIS EDGE
P-2
P-3 P-3
RB-1
DO NOT PAINT COOLER WALLS
8' -
0"
P-1
RB-2
EXISTINGBAG-IN-BOXTO REMAIN FRP-1
3' - 6"
P-1
RB-2
8' -
0"
RB-2
FRP-1
36
8' -
0"
RB-2
END FRP-1 AT EDGEOF DOOR FRAME
FRP-1
P-1
PAINT DOORFRAME P-2
8' -
0"
RB-1, TYP
P-2
OPEN TOSALES
P-2WALL BEYOND
P-2
EXISTING COOLERWALL DO NOT PAINT
WRAP P-3 TO THISINSIDE CORNER
P-2
2' -
10"
1' -
8"
2' -
6"
3' - 6"
REF.NIC
P-1
RB-2
BASE CABSPLAM-2
COUNTERTOP& BACKSPLASHPLAM-1
UPPER CABSPLAM-2
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SHEET:SHEET:SHEET:SHEET:
2 3 4 5 61
A
B
C
D
E
1 2 3 4 5 6
1/4" = 1'-0"
LAW
GSH
100% SOLICITATION SET
MARCH 06, 2014
A-251
INTERIOR ELEVATIONS- FINISH & EQUIPMENTSCHEDULES
Madigan Gate Express -Image Upgrade
Madigan Gate Express Bldg 9052JBLM Ft. Lewis
4915-12-008
1/4" = 1'-0"A-101 A-251
1 101 RETAIL SALES - NORTH 1/4" = 1'-0"A-101 A-251
2 101 RETAIL SALES - EAST
1/4" = 1'-0"A-101 A-251
3 101 RETAIL SALES - SOUTH 1/4" = 1'-0"A-101 A-251
4 101 RETAIL SALES - WEST
1/4" = 1'-0"A-101 A-251
13 BEVERAGE PREP - NORTH 1/4" = 1'-0"A-101 A-251
14 BEVERAGE PREP - EAST 1/4" = 1'-0"A-101 A-251
15 BEVERAGE PREP -SOUTH 1/4" = 1'-0"A-101 A-251
16 BEVERAGE PREP - WEST
1/4" = 1'-0"A-101 A-251
5 103 BULK SALES - NORTH 1/4" = 1'-0"A-101 A-251
6 103 BULK SALES - EAST
1/4" = 1'-0"A-101 A-251
7 103 BULK SALES - SOUTH 1/4" = 1'-0"A-101 A-251
8 103 BULK SALES - WEST 1/4" = 1'-0"A-101 A-251
9 105 BREAK ROOM - NORTH
ROOM FINISH SCHEDULE
ROOMNO NAME FLOOR BASE
WALL FINISH CEILINGFINISH
CEILINGHEIGHT COMMENTSNORTH EAST SOUTH WEST
101 RETAIL SALES PC-1 * RB-1 P-3 / P-4 / P-5 P-4 / P-5 P-2 / P-4 / P-5 P-2 / P-3 ACT-1 10'-0" POLISHED CONCRETE BASE BID FLOORING - PT-2 IS ALTERNATE 1 FLOORING WITH PTB-1 BASE
102 WALK-IN COOLER EXIST EXIST EXIST EXIST EXIST EXIST EXIST -
102 A WALK-IN FREEZER EXIST EXIST EXIST EXIST EXIST EXIST EXIST -
103 BULK SALES PC-1 * RB-1 P-2 P-2 EXIST / P-2 P-2 ACT-1 8'-0" POLISHED CONCRETE BASE BID FLOORING - PT-2 IS ALTERNATE 1 FLOORING WITH PTB-1 BASE
104 RESTROOM PT-1 / GT-1 CTB-1 / GT-1 CT-1 / GT-2 / P-6 CT-1 / GT-2 / P-6 CT-1 / GT-2 / P-6 CT-1 / GT-2 / P-6 P-7 8'-0" REFERENCE ELEVATIONS FOR WALL FINISH PATTERN & LOCATIONS
105 BREAK ROOM SC-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 10'-0" CLEAN / PAINT EXISTING CEILING GRID TO LIKE NEW CONDITION
106 MANAGER CPT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 10'-0" CLEAN / PAINT EXISTING CEILING GRID TO LIKE NEW CONDITION
107 MPA EXIST EXIST P-1 P-1 P-1 P-1 OPEN -
108 ELECTRICAL EXIST EXIST EXIST EXIST EXIST EXIST EXIST -
109 SNACK AVE PREP PC-1 * RB-2 FRP-1 / P-1 FRP-1 FRP-1 / P-1 P-1 ACT-1 8'-0" CLEAN / PAINT EXISTING CEILING GRID TO LIKE NEW, CONDITION POLISHED CONCRETE BASE BIDFLOORING - PT-2 IS ALTERNATE 1 FLOORING WITH PTB-1 BASE
110 RESTROOM PT-1 / GT-1 CTB-1 / GT-1 CT-1 / GT-2 / P-6 CT-1 / GT-2 / P-6 CT-1 / GT-2 / P-6 CT-1 / GT-2 / P-6 P-7 8'-0" REFERENCE ELEVATIONS FOR WALL FINISH PATTERN & LOCATIONS
MATERIAL FINISH LEGEND
SPEC MATERIAL CODEMANUFACTURER /
PRODUCT COLOR FINISH / DESCRIPTION03 30 00 SEALED CONCRETE SC-1 - NATURAL -
03 35 10 POLISHED CONCRETE PC-1 - NATURAL DIAMOND POLISHED - BASE BID FLOORING
06 40 23 PLASTIC LAMINATE PLAM-1 WILSONART 4811-60 SILICON EV BREAK ROOM COUNTERTOPS
06 40 23 PLASTIC LAMINATE PLAM-2 WILSONART 4878-38 PEWTER MESH BREAK ROOM BASE & UPPER CABINETS
06 40 23 SOLID SURFACE SSF-1 DUPONT - CORIAN TERRA COLLECTION SAHARA WINDOW SILLS
06 64 00 FIBER REINFORCED PANELS FRP-1 MARLITE - STANDARD FRP S100-S25 WHITE BEVERAGE PREP - SEE ELEVATIONS FOR EXTENTS
09 30 00 CERAMIC TILE CT-1 DAL TILE - SEMI GLOSS K175 BISCUIT TOILET ROOMS - 3" x 6" - INSTALLED IN RUNNING BOND PATTERN TO 7'-0" AFF
09 30 00 CERAMIC TILE BASE CTB-1 DAL TILE - SEMI GLOSS K175 BISCUIT TOILET ROOMS - S-3601 - 6" X 6" COVE BASE
09 30 00 GROUT GT-1 LATICRETE - EPOXY GROUT 78 STERLING SILVER TOILET ROOM FLOOR TILE GROUT & ALTERNATE 1 FLOOR TILE AND BASE GROUT
09 30 00 GROUT GT-2 LATICRETE - SANDED GROUT 78 STERLING SILVER TOILET ROOM WALL TILE GROUT
09 30 00 PORCELAIN TILE PT-1 DAL TILE - FABRIQUE P690 GRIS LINEN TOILET ROOMS - 12" x 12" FLOOR TILE - REFERENCE TOILET ROOM TILE PATTERN ON SHEET A-401
09 30 00 PORCELAIN TILE PT-2 DAL TILE - LODGE P303 PICO BONITO UNPLOISHED - NON TEXTURED, 12" X 12", ALTERNATE 1 FLOORING
09 30 00 PORCELAIN TILE BASE PTB-1 DAL TILE - LODGE P303 PICO BONITO 5-36C9T 6" X12" COVE BASE, ALTERNATE 1 BASE
09 51 23 ACOUSTICAL CEILING TILE ACT-1 USG - 562 FISSURED WHITE 2' x 4', CLASS A
09 65 13 RUBBER BASE RB-1 JOHNSONITE - 4" W/ TOE 179 STEEL -
09 65 13 RUBBER BASE RB-2 JOHNSONITE - 4" W/ TOE 48 GRAY -
09 65 13 TRANSITION STRIP TS-1 JOHNSONITE - CTA-29-J 29 MOONROCK CARPET TO CONCRETE TRANSITION
09 68 13 CARPET TILE CPT-1 J&J INVISION - BROKEN SLATE 7950M 338 PYRITE 24" x 24" MODULAR TILE
09 91 00 PAINT P-1 SHERWIN WILLIAMS - HARMONY SW7006 EXTRA WHITE SEMI-GLOSS FINISH
09 91 00 PAINT P-2 SHERWIN WILLIAMS - HARMONY SW6127 IVORIE SATIN FINISH
09 91 00 PAINT P-3 SHERWIN WILLIAMS - HARMONY SW6531 INDIGO SATIN FINISH
09 91 00 PAINT P-4 SHERWIN WILLIAMS - HARMONY SW6314 LUXURIOUS RED SATIN FINISH - SNACK AVENUE TO 7'-0" AFF
09 91 00 PAINT P-5 SHERWIN WILLIAMS - HARMONY SW6601 TANAGER SATIN FINISH - SNACK AVENUE 7'-0" AFF TO CEILING
09 91 00 PAINT P-6 SHERWIN WILLIAMS - HARMONY SW7043 WORLDLY GRAY SEMI-GLOSS FINISH - TOILET ROOMS ABOVE TILE WAINSCOT
09 91 00 PAINT P-7 SHERWIN WILLIAMS - HARMONY SW7042 SHOJI WHITE SEMI-GLOSS FINISH - TOILET ROOM CEILINGS
10 26 00 CORNER GUARDS CG-1 POLYCARBONATE CLEAR 1 1/2" x 1 1/2" INSTALL AT TOP OF WALL BASE TO 4'-0" AFF
SNACK AVENUE EQUIPMENT SCHEDULE
ITE
M #
QU
AN
TIT
Y
EQUIPMENT MANUFACTURER MODEL
SIZE ELECTRICAL PLUMBING
FU
RN
ISH
ED
INS
TA
LL
ED
REMARKSWid
th
Dep
th
Heig
ht
Vo
lts
Ph
ase
Am
ps
Co
ld W
ate
r
Ho
t W
ate
r
Waste
36 1 3 COMPARTMENT SINK W/ RH DRAINBOARD ADVANCE TABCO FC-3-2424-18R 62.5" 20.5" 37" 0.5" 0.5" 1.5" E C
Revision Schedule
Revision #
Revision
Description Revision Date
8'-0
" T
YP
3
P-6, TYP
CT-1/GT-2, TYP
CTB-1/GT-1, TYP
7'-0
" T
YP
2' -
10"
4
2
11
8
91 7
6
8
EXISTING EMPLOYEELOCKERS
8'-0
" T
YP
7'-0
" T
YP
CTB-1/GT-1, TYP
CT-1/GT-2, TYP
P-6, TYP
8
6
7
2' -
10"
1' -
3"
11
8
9
3
4
1
2' - 0"
CL
4
5
1' - 10"
CL
10
2
A-401
4
2
35
1
RESTROOM
104
V.I.
F.
1' -
10"
4
A-401 8
7
9
10
E
RESTROOM
110
V.I.
F.
1' -
3"
A-401
12
11
2' -
10"
3' -
4"
3' -
4"
2' -
10"
1' -
6"
3' -
4"
6" 3' - 0" 4' - 0" 6"
3' - 4"
3'-6
"
2' -
1"
2' -
2"
TO
LE
DG
E
2' -
7"
SIDEBACK ADA
1' -
6"
2' -
3"
3' -
7"
1 2 3 4 5 6 7 8 8 9 10 11
RESTROOM FIXTURES
WALL MOUNT SINK
MIRROR 2'-0" x 3'-0"
SOAP DISPENSER
AUTOMATIC TOUCHLESS PAPER TOWEL DISPENSER
SEMI-RECESSED WASTE RECEPTACLE
TOILET PAPER DISPENSER
SANITARY NAPKIN DISPOSAL
GRAB BARS
WALL MOUNT TOILET
BABY CHANGING STATION
SEAT COVER DISPENSER
1
2
3
4
5
6
7
8
9
10
11
RB-2
FRP-1
P-1
4' -
0"
EXISTINGMOP SINK
RB-2EXISTING MOPSINK
4' -
0"
3' -
0"
FRP-1
P-1NEW S.S. MOPHOLDER & SHELF
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SHEET:SHEET:SHEET:SHEET:
2 3 4 5 61
A
B
C
D
E
1 2 3 4 5 6
As indicated
LAW
GSH
100% SOLICITATION SET
MARCH 06, 2014
A-401
ENLARGED TOILETROOM PLANS &ELEVATIONS
Madigan Gate Express -Image Upgrade
Madigan Gate Express Bldg 9052JBLM Ft. Lewis
4915-12-008
1/4" = 1'-0"A-401 A-401
7 110 EMPLOYEE RESTROOM - NORTH 1/4" = 1'-0"A-401 A-401
8 110 EMPLOYEE RESTROOM - EAST 1/4" = 1'-0"A-401 A-401
9 110 EMPLOYEE RESTROOM - SOUTH 1/4" = 1'-0"A-401 A-401
10 110 EMPLOYEE RESTROOM - WEST
1/4" = 1'-0"A-401 A-401
2 104 RESTROOM - NORTH 1/4" = 1'-0"A-401 A-401
3 104 RESTROOM - EAST 1/4" = 1'-0"A-401 A-401
4 104 RESTROOM - SOUTH 1/4" = 1'-0"A-401 A-401
5 104 RESTROOM - WEST
1/2" = 1'-0"A-101 A-401
1 ENLARGED TOILET ROOM 104
1/2" = 1'-0"A-101 A-401
6 ENLARGED TOILET ROOM 110
PLANNORTH
PLANNORTH
1/4" = 1'-0"TYPICAL FIXTURE MOUNTING HEIGHTS
1/4" = 1'-0"A-150 A-401
11 JANITOR EAST 1/4" = 1'-0"A-150 A-401
12 JANITOR SOUTH
Revision Schedule
Revision #
Revision
Description Revision Date