MACS week 2/2011status report

(@ nearly end of CWO-3)Joze Dedic ([email protected]

)… on behalf of CSL MA team

the best people make cosylab

Page 2: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

In this presentation

overview MAPS iLLRF NI performance tests

Cosylab 2011 2

Page 3: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

Overview

acceptance peak load by the end of CWO-3 ¼+ tickets already ACP remaining ~¾

~½ close collaboration of both teams ~½ “granted” (preceding stages of tickets

falling into previous category & mngmnt)

Cosylab 2011 3

MAPS MSE 14REDNET RST 60PCC, FED LSE 81C# SSA 20IS TKU 18iLLRF KVO 24mngmnt JDE 25FECOS MVI 30

272

JGU 61RMO 69CTM 81MMA 46PFR 15

272

Status Status ID PW# of ticketsOpen OPN 206,5 103Implemented IMP 7,5 4Accepted ACP 58 31Postponed PST 0 0Rejected REJ 0 0Canceled CAN 0 8

272 146

Page 4: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

Status reports

Cosylab 2011 4

JozeRokRokRolandRokJozeJozeMiha

MAPS MSE 14REDNET RST 60PCC, FED LSE 81C# SSA 20IS TKU 18iLLRF KVO 24mngmnt JDE 25FECOS MVI 30

272

Page 5: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

CSL_team.count() = 19

19 people are seriously involved (not all full time) in at least one of the MA sub-projects

projects: PCC, REDNET, FECOS, iLLRF, IS, MAPS “technologies”: LabVIEW, VHDL, DSP, C#, MA-CM

training such a pool of MA-educated resources: requires careful planning for next CWO

CSL has ~36 developer/engineering FTEs causes occasional hiccups

IS hiccup Tilen is recovering from surgery Rok stepped in for IS Tillen is supposed to be back (for two weeks) the next week we are doing all we can to help meet MA milestones

Cosylab 2011 5

Page 6: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

MAPSMSE

Cosylab 2011 6

Page 7: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

Work done

quite some bug/support TRAC tickets resolved finalized IPv6 support code SIM and MAPS installer MAPIDD document (just updated after the review) LabVIEW SIM TCP/IP read improved and reconnect implemented Connection handling (alive checks) and SIM message 32-bit

alignment just implemented (C# part only)

MAPS user manual

Work in progress

Page 8: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

Work to be done

MAPS test plan done, but needs a final touch work

connection handling (alive checks) and SIM message 32-bit alignment to be implemented in LabView

small amount of available effort (~days) still available should be defined what to be done ASAP to avoid “last minute

panic”

acceptance of the remaining tickets foreseen for mid-July no big effort foreseen for MA team here

Page 9: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

iLLRFKVO

Cosylab 2011 9

Page 10: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

Cosylab 2007

Completed tasks

Study LLRF requirements and architecture Not very extensive Thomson LLRF documentation – hard to

study and understand, lot of time spent Considering RT LabView but dropped, luckily doesn’t change

much regarding requirements and A&D

Finalized Architecture & Design document Race condition issue took some time, but solved

LLRF trigger PCB design for MRF universal IO adapter – signal convert only 5 adapters received from production, finalized Pulse generation logic inside MTR’s FPGA ITC – trigger FECOS component completed ITC XML document prepared, reviewed by RMO

Page 11: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

Cosylab 2007

Completed tasks – contd.

ILC Configuration of LLRF through TINE based on XML & PVSS Error handling ILC XML document is growing as part of ILC implementation Received D-LLRF TINE simulator, installed and it starts up

At first no simulator was foreseen Used in-house TINE simulator with single field to test connection D-LLRF simulator came late but still on time Valuable for development and initial testing

TINE->LabView TINE.dll implemented Not working on RT LabView => decided to go with WinXP

LabView Simple tests carried out No support for arrays – can be done in CWO-4 No support for asynchronous callbacks – investigation needed

Page 12: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

Cosylab 2007

Yet to be done in CWO-3

ILC – should be completed on time (2011-07-22) Verify that D-LLRF simulator is working as expected Measurements

Maybe measurements not available with simulator Custom commands Finalize ILC XML

Define test cases – should be completed on time (2011-07-22)

Testing with D-LLRF simulator

Around 5 people involved Spent ~60% of estimated effort On time with due dates

PM…

Page 13: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

NI performance testsLSE

Cosylab 2011 13

Page 14: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

Work to be done; measurement scenarios files (sequences)

1, 300 parallelism

concurrent, sequential from -> to variations / how

HDD -> PXI controller RAM PXI controller RAM -> FlexRIO RAM using DMA or not

file sizes variations: worst case (file size 1 MB kB) typical case (file size 40kB / 100kB)

controllers PXI-8110, PXI-8102, PXI-8108

Cosylab 2011 14

Page 15: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people

Other presentations for CSL work… REDNET, PCC & FED, IS, Rok FECOS, Miha C#, Roland

Cosylab 2011 15