In this presentation
overview MAPS iLLRF NI performance tests
Cosylab 2011 2
![Page 3: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people](https://reader036.vdocuments.us/reader036/viewer/2022082713/5697bfc11a28abf838ca469a/html5/thumbnails/3.jpg)
Overview
acceptance peak load by the end of CWO-3 ¼+ tickets already ACP remaining ~¾
~½ close collaboration of both teams ~½ “granted” (preceding stages of tickets
falling into previous category & mngmnt)
Cosylab 2011 3
MAPS MSE 14REDNET RST 60PCC, FED LSE 81C# SSA 20IS TKU 18iLLRF KVO 24mngmnt JDE 25FECOS MVI 30
272
JGU 61RMO 69CTM 81MMA 46PFR 15
272
Status Status ID PW# of ticketsOpen OPN 206,5 103Implemented IMP 7,5 4Accepted ACP 58 31Postponed PST 0 0Rejected REJ 0 0Canceled CAN 0 8
272 146
![Page 4: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people](https://reader036.vdocuments.us/reader036/viewer/2022082713/5697bfc11a28abf838ca469a/html5/thumbnails/4.jpg)
Status reports
Cosylab 2011 4
JozeRokRokRolandRokJozeJozeMiha
MAPS MSE 14REDNET RST 60PCC, FED LSE 81C# SSA 20IS TKU 18iLLRF KVO 24mngmnt JDE 25FECOS MVI 30
272
![Page 5: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people](https://reader036.vdocuments.us/reader036/viewer/2022082713/5697bfc11a28abf838ca469a/html5/thumbnails/5.jpg)
CSL_team.count() = 19
19 people are seriously involved (not all full time) in at least one of the MA sub-projects
projects: PCC, REDNET, FECOS, iLLRF, IS, MAPS “technologies”: LabVIEW, VHDL, DSP, C#, MA-CM
training such a pool of MA-educated resources: requires careful planning for next CWO
CSL has ~36 developer/engineering FTEs causes occasional hiccups
IS hiccup Tilen is recovering from surgery Rok stepped in for IS Tillen is supposed to be back (for two weeks) the next week we are doing all we can to help meet MA milestones
Cosylab 2011 5
![Page 6: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people](https://reader036.vdocuments.us/reader036/viewer/2022082713/5697bfc11a28abf838ca469a/html5/thumbnails/6.jpg)
MAPSMSE
Cosylab 2011 6
![Page 7: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people](https://reader036.vdocuments.us/reader036/viewer/2022082713/5697bfc11a28abf838ca469a/html5/thumbnails/7.jpg)
Work done
quite some bug/support TRAC tickets resolved finalized IPv6 support code SIM and MAPS installer MAPIDD document (just updated after the review) LabVIEW SIM TCP/IP read improved and reconnect implemented Connection handling (alive checks) and SIM message 32-bit
alignment just implemented (C# part only)
MAPS user manual
Work in progress
![Page 8: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people](https://reader036.vdocuments.us/reader036/viewer/2022082713/5697bfc11a28abf838ca469a/html5/thumbnails/8.jpg)
Work to be done
MAPS test plan done, but needs a final touch work
connection handling (alive checks) and SIM message 32-bit alignment to be implemented in LabView
small amount of available effort (~days) still available should be defined what to be done ASAP to avoid “last minute
panic”
acceptance of the remaining tickets foreseen for mid-July no big effort foreseen for MA team here
![Page 9: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people](https://reader036.vdocuments.us/reader036/viewer/2022082713/5697bfc11a28abf838ca469a/html5/thumbnails/9.jpg)
iLLRFKVO
Cosylab 2011 9
![Page 10: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people](https://reader036.vdocuments.us/reader036/viewer/2022082713/5697bfc11a28abf838ca469a/html5/thumbnails/10.jpg)
Cosylab 2007
Completed tasks
Study LLRF requirements and architecture Not very extensive Thomson LLRF documentation – hard to
study and understand, lot of time spent Considering RT LabView but dropped, luckily doesn’t change
much regarding requirements and A&D
Finalized Architecture & Design document Race condition issue took some time, but solved
LLRF trigger PCB design for MRF universal IO adapter – signal convert only 5 adapters received from production, finalized Pulse generation logic inside MTR’s FPGA ITC – trigger FECOS component completed ITC XML document prepared, reviewed by RMO
![Page 11: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people](https://reader036.vdocuments.us/reader036/viewer/2022082713/5697bfc11a28abf838ca469a/html5/thumbnails/11.jpg)
Cosylab 2007
Completed tasks – contd.
ILC Configuration of LLRF through TINE based on XML & PVSS Error handling ILC XML document is growing as part of ILC implementation Received D-LLRF TINE simulator, installed and it starts up
At first no simulator was foreseen Used in-house TINE simulator with single field to test connection D-LLRF simulator came late but still on time Valuable for development and initial testing
TINE->LabView TINE.dll implemented Not working on RT LabView => decided to go with WinXP
LabView Simple tests carried out No support for arrays – can be done in CWO-4 No support for asynchronous callbacks – investigation needed
![Page 12: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people](https://reader036.vdocuments.us/reader036/viewer/2022082713/5697bfc11a28abf838ca469a/html5/thumbnails/12.jpg)
Cosylab 2007
Yet to be done in CWO-3
ILC – should be completed on time (2011-07-22) Verify that D-LLRF simulator is working as expected Measurements
Maybe measurements not available with simulator Custom commands Finalize ILC XML
Define test cases – should be completed on time (2011-07-22)
Testing with D-LLRF simulator
Around 5 people involved Spent ~60% of estimated effort On time with due dates
PM…
![Page 13: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people](https://reader036.vdocuments.us/reader036/viewer/2022082713/5697bfc11a28abf838ca469a/html5/thumbnails/13.jpg)
NI performance testsLSE
Cosylab 2011 13
![Page 14: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people](https://reader036.vdocuments.us/reader036/viewer/2022082713/5697bfc11a28abf838ca469a/html5/thumbnails/14.jpg)
Work to be done; measurement scenarios files (sequences)
1, 300 parallelism
concurrent, sequential from -> to variations / how
HDD -> PXI controller RAM PXI controller RAM -> FlexRIO RAM using DMA or not
file sizes variations: worst case (file size 1 MB kB) typical case (file size 40kB / 100kB)
controllers PXI-8110, PXI-8102, PXI-8108
Cosylab 2011 14
![Page 15: MACS week 2/2011 status report (@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com)joze.dedic@cosylab.com … on behalf of CSL MA team the best people](https://reader036.vdocuments.us/reader036/viewer/2022082713/5697bfc11a28abf838ca469a/html5/thumbnails/15.jpg)
Other presentations for CSL work… REDNET, PCC & FED, IS, Rok FECOS, Miha C#, Roland