Drawing No Rev Title Scale
Architectural
NTWA14.A001 B Cover Sheet
NTWA14.A002 A Overall Site Plan 1:1000
NTWA14.A101 B Floor Plan: New Building 1:100
NTWA14.A102 B Roof Plan: New Building 1:100
NTWA14.A200 C 1:100
NTWA14.A400
A
1:50
NTWA14.A401A
1:50
Elevations: New Building
Sections: New Building - Sheet 1
Sections: New Building - Sheet 2
NTWA14.A900 A 1:100Floor Plan: Existing Winery
variesNTWA14.A901 A Section + Elevations: Existing Winery
ANTWA14.A402 1:50Sections: New Building - Sheet 3
NTWA14.A003 B Site Plan 1:500
PLANNING
Luisini Winery RedevelopmentNew Building + Landscape Works
National Trust of Australia (WA)April 2009
THE SCOTT SMALLEYPARTNERSHIP
EXISTING BUILDING
NEW BUILDINGS
L A K E W A
Y
P L O V E R W A Y
P L O V E R W A Y
OVERALL SITE PLANScale: 1:1000 @ A1
H O C K I N G R O A D
L A K E G O O L L E L A L
K I N G F I S H E R
PROPOSED DEC APPROVED BOARDWALK(Refer to Landscape Drawings)
APPROXIMATE LINE OF LAKE WATER BODY
EXISTING JUNCTIONMODIFIED TO INCORPORATEROUNDABOUT
LOT 801
BUS ACCESS ONLY
D R I V E
W A Y
PROPOSED CARPARK(Refer to Landscape Drawings for proposed plantations)
VEHICLE ACCESS
PROPOSED DUAL USE PATH
APPROXIMATE LINE OF 50 M WETLAND BUFFER
issue
Approv.
Copyright © Mulloway Studio
Drawing No.
Project No
scale date
Revision
Coord.
drawing title
project
client
revisionsdate description
check and verify levels and dimensions on site prior to commencing work
confirm any discrepancies
do not scale off drawings
notes
mulloway studio level 1 16 peel street adelaide sa 5000 australiaT +61 8 8231 3131 F +61 8231 3113 E [email protected] ABN 86 617 619 412
National Trust of Australia (WA)
Luisini Winery Redevelopment New Building + Landscape Works
16-24 Lakeway DriveKingsley WA 6026
NTWA14
architecture interpretation urban design conservation interiors
Dec 2009
Overall Site Plan
A 002 A
Planning Approval Issue16.12.09A
1:1000 @ A1
issue
Approv.
Copyright © Mulloway Studio
Drawing No.
Project No
scale date
Revision
Coord.
drawing title
project
client
revisionsdate description
check and verify levels and dimensions on site prior to commencing work
confirm any discrepancies
do not scale off drawings
notes
mulloway studio level 1 16 peel street adelaide sa 5000 australiaT +61 8 8231 3131 F +61 8231 3113 E [email protected] ABN 86 617 619 412
National Trust of Australia (WA)
Luisini Winery Redevelopment New Building + Landscape Works
16-24 Lakeway DriveKingsley WA 6026
NTWA14
architecture interpretation urban design conservation interiors
Dec 2009
Site Plan
A 003
EXISTING WINERY BUILDING
NEW COURTYARD
NEW BUILDING
NEW BUILDING
OBSERVATION DECK
SERVICE YARD-2
L A K
E W A
Y
P L O V E R W A Y
P L O V E R W A Y
LOT BOUNDARY
LOT BOUNDARY
LOT BOUNDARY
EXISTING FENCETO BE REMOVED
WORKS BOUNDARY
CIVIL WORKS BOUNDARY
ARCHITECTURAL WORKS BOUNDARY
WORKS BOUNDARY
CIVIL
WORKS
BOUNDAR
YWORKS BOUNDARY
CIVI
L W
ORK
S BO
UNDA
RY
WORKS BOUNDARY
DECK
MAIN ENTRY
SERVICE ENTRY
REFURBISHED AREA
REFURBISHED AREA REFURBISHED
AREA
SERVICE YARD-1
SITE PLANScale: 1:500 @ A1
APROXIMATE LINE OFLAKE WATER BODY
BOARDWALK(Refer to Landscape Drawings)
DUAL USE PATH
WORKS BOUNDARY
D R I V E
B
Building Licence Issue01.04.09A
Planning Approval Issue16.12.09B
1:500 @ A1
SITE AREAS:
FULLY ENCLOSED AREAS:
TOTAL FULLY ENCLOSED BUILDING AREA:
WALKWAY AREA:
DECKS AREA :
SERVICE YARD AREA :
ENTRIES AREA :
TOTAL SEMI - ENCLOSED AREA:
312 sq m
348 sq m
660 sq m
75 sq m
78 sq m
31 sq m
22 sq m
371 sq m
NORTHERN SECTION BUILDING AREA:
SOUTHERN SECTION BUILDING AREA:
SEMI - ENCLOSED AREAS:
PERGOLA AND OUTDOOR DINING AREA: 165 sq m
NUMBER OF CARSPACES 85
NUMBER OF DISABLE CARSPACES INCLUDED 2
30.71
30.70
30.71
30.70
pit
BOILER ROOM
STILL ROOMSTILL
FIRST CELLAR
BOND STORERL +30.49
RL +31.14
RL +30.70
Existing FL: 29.82(approx - COS)
top ofthreshold RL+30.84 (cos)
WINEEDUCATION
ROOMX.01 FFL 30.84
WX.01a
WX.01b
128
301B
128
000X
top of thresholdRL +30.84 (cos)
DX.01a
VERANDAHX.02 -
-
BOILER ROOM
STILL ROOM
BOND STORE
EXIT
EXIT
DX.03a
FHR
7000
CLNR
WR.01oWE.02n
RISING WALKWAY 1:20FFL 29.95
1400R 1400R
RISING WALKWAY 1:20 FFL 30.8
1400R
steel framed door
STOR
E + KITCH
EN
E.01 TFFL 30.3
FFL 30.5
E.15 MATFFL 30.3
E.16 CO-AVARIES
R.03 COFFL 30.3
R.01 CO-PFFL 30.8
C.01
C.02
R.04 CO-AVARIES
E.08 CPFFL 30.8
E.07 CPFFL 30.8
E.03 CPFFL 30.3
E.11CT
FFL 30.5
E.09 VARIESVARIES
ENVIRONMENT & EXHIBITION CENTRE
CONFERENCEROOM
MALE OFFICE
RECEPTION
FEMALE
STAFF
STORE
DECKFOYER
AIR LOCK
WALKWAY
SERVICE YARD
DINING
COURTYARD
MAIN ENTRY
PERGOLA
WE.05 WE.06 WE.07a
WE.07b
WE.08
WE.03a
WE.02c WE.02b WE.02a
WE.02m
DE.02a
DE.03
DE.14
DE.08
DE.06DE.05
DE.04
DE.10
DE.11
DE.12
DR.01a
DR.01d
WR.01a
WR.01b
WR.01cWR.01d
WR.01eWR.01fWR.01g
WR.01hWR.01iWR.01j
WR.01k
WR.01m
WR.01p
DR.04 WC.01a WC.01b
DC.01c
DC.01a
high level windows above
WE.08b
DE.02b
DR.03
RISING WALKWAY 1:20
WE.07c
EXIT
EXIT
EXIT
C.03 C0-AVARIES
OUTDOOR DINING
R.01 CO-PFFL 30.8
DINING
R.02
OBSERVATIONDECK
FFL 30.8CO-P
1209
new access gate
line of wall parallel to existing building
high level windows aboveextent of roof overhang extent of roof overhang
high level windows above
TB
TB
DR.01b
DR.01c
EXIT
WR.01q
R.05 COFFL 30.8
E.02 CO-PFFL 30.3
E.10CTE.12 CT
FFL 30.5
E.04CT
E.14 COFFL 30.3
E.13MAT
FFL 30.5
DE.16
KITCHEN
internal fitout by others
WR.01l
extent of roof overhang
826
3600
1800
DC.01b
4500
RISING WALKWAY 1:20
DB
high level windows above
high level windows above
edge of floor finish
batten & board TB
WR.01n
future kiosk opening by others
EXIT
6001.2
6045.2
6045.3/4
6023.3
timber screen
cjfb fb
cj
cj
cj
6056.3
6056.4
6023.2
6001.2
DC+FIP
DB
JE.06-AJE.05-A
E.05 CTFFL 30.5
E.06 CTFFL 30.5
JE.07-A
JE.08-A
JE.08-B
JE.03-B
JE.03-A
JE.02-A
2000
cle
ar
EXIT
EXIT
2000 clear
dp1
dp2
dp3
dp6
dp8
dp10
dp9
dp7
dp11
FFL 30.45
dp4
dp5
dp12
JE.03-BA810
JE.03-BA810
DE.07
removable panels
DR.01e
FHR
402F
402E
6'
1
2
3
4
5
6
3'
6900
6900
6900
6900
BA69
00
400
B 400
A401
D
400
B 401
D
400
A
401C
401C
402
G
402E
402F
402
G
Approv.
Copyright © Mulloway Studio
Drawing No.
Project No
scale date
Revision
Coord.
drawing title
project
client
issue
revisionsdate description
check and verify levels and dimensions on site prior to commencing work
confirm any discrepancies
do not scale off drawings
notes
mulloway studio level 1 16 peel street adelaide sa 5000 australiaT +61 8 8231 3131 F +61 8231 3113 E [email protected] ABN 86 617 619 412
National Trust of Australia (WA)
Luisini Winery Redevelopment New Building + Landscape Works
16-24 Lakeway DriveKingsley WA 6026
NTWA14
architecture interpretation urban design conservation interiors
A 01.04.09 Building Lisence Issue
07.05.09B Revised exits for BCA compliance
Apr 2009
Floor Plan: New Building
1:100 @ A1
A 101
COURTYARD
C.01 CO-PFFL 30.80
room name
floor finish
finish floor level
room number
LI-S
LI
CO
CR
TB
FC
WR.01d window and door number
solid limestone wall
cavity limestone wall
formed concrete
rendered concrete
batten and board timber cladding
fibre cement sheet
dp downpipe
CGI
11.5 fall
roof material
fall
REFER A900
REFER A900
B
cj control joint
fb floor box
JE.01-A Joinery Unit - Reference as indicated
CO-P polished concrete
CO-A concrete - exposed aggregate
CP carpet
CT ceramic tiles
CO concrete
MAT floor mat
T timber
DC+FIP data cabinet and fire indicator panel
DB distribution board
extent of tactile indicator
REFER TOLANDSCAPE DRAWINGS
of overflow
CGI corrugated steel roof sheet
RD selected profile steel roof deck
POL corrugated polycarbonate roof sheet
Planning Approval Issue16.12.09B
Approv.
Copyright © Mulloway Studio
Drawing No.
Project No
scale date
Revision
Coord.
drawing title
project
client
issue
revisionsdate description
check and verify levels and dimensions on site prior to commencing work
confirm any discrepancies
do not scale off drawings
notes
mulloway studio level 1 16 peel street adelaide sa 5000 australiaT +61 8 8231 3131 F +61 8231 3113 E [email protected] ABN 86 617 619 412
National Trust of Australia (WA)
Luisini Winery Redevelopment New Building + Landscape Works
16-24 Lakeway DriveKingsley WA 6026
NTWA14
architecture interpretation urban design conservation interiors
A 01.04.09 Building Lisence Issue
07.05.09B Revised exits for BCA compliance
Apr 2009
Roof Plan: New Building
1:100 @ A1
timber rafters
WC.01c
RD2º
RD2º
CGI11.5ºCGI
11.5ºfall
fall
fall
fall
line of building beneath
edge gutter
existing building outline
dp1
dp2
dp6
dp3
PLANT DECK
RD2º
dp10
dp8
CGI11.5º
fall
dp11
CGI11.5ºfall
fall
fall
POL2º
dp7
dp9
fall
timber rafters
3450 3450 3450
3450
3450
3450
3450
3450
3450
fall
rc
building outline / limestone wall beneath
POL2º
dp5
corrugated polycarbonate roof sheet over timber rafters
eaves gutter
cavity limestone wall
access platform /maintenance walkway
continuous anchor wire for full width of roof access platform
timber rafters over walkwaytimber rafters over service yard access platform
/maintenance walkway
continuous anchor wire for full width of roof access platform
extent of roof overhang
line of building beneath
access platform /maintenance walkway
continuous anchor wire for full width of roof access platform
timber rafters
access platform /maintenance walkway
continuous anchor wire for full width of roof access platform
CGI11.5º
fall
CGI11.5º
fall
rafters continues beneath roof overhang
gutter beneath roof overhang extents length of polycarbonate roof
timber rafters
steel structure
extent of roof overhang
extent of roof overhang
fall
POL2º
parapet capping
edge capping
edge capping
parapet capping
edge capping
edge capping
edge capping
barge capping
edge capping
edge capping
dp12
of
of
dp4
ridge cappingrc rc
rc
rcrc
rc
dp14
sp sp
rh
rh
rh
rh
rhrh
rh
of
of
of
of
of
ofbelow
eg
bg
bg
bg below
bg
bg below
bg below
1:180
1:180
1:180
of
of
side flashingbelow
side flashing
rc
rh of
dp13eg
402F
402E
6'
1
2
3
4
5
6
3'
6900
6900
6900
6900
BA69
00
400
B 400
A401
D
400
B 401
D
400
A
401C
401C
402
G
402E
402F
402
G
COURTYARD
C.01 CO-PFFL 30.80
room name
floor finish
finish floor level
room number
LI-S
LI
CO
CR
TB
FC
WR.01d window and door number
solid limestone wall
cavity limestone wall
formed concrete
rendered concrete
batten and board timber cladding
fibre cement sheet
dp downpipe
CGI
11.5 fall
roof material
fall
cj control joint
fb floor box
JE.01-A Joinery Unit - Reference as indicated
CO-P polished concrete
CO-A concrete - exposed aggregate
CP carpet
CT ceramic tiles
MAT floor mat
T timber
DC+FIP data cabinet and fire indicator panel
DB distribution board
extent of tactile indicator
of overflow
CGI corrugated steel roof sheet
RD selected profile steel roof deck
POL corrugated polycarbonate roof sheet
rh rainwater head
bg box gutter
eg eaves gutter
sp spreader
A 102 B
Planning Approval Issue16.12.09B
TB
B A
WE.06 WE.05 WE.02cWE.02bWE.02a
TB
FC
NORTH ELEVATIONScale: 1:100 @ A1
sliding steel gate
timber deck
DC.01a
LI-S LI-S WE.07a
CO
RL +30.80
RL +30.30
RL +33.20
[U] WE.07a[U] WE.07b [U] WE.07c [U] WE.06b [U] WE.06a [U] WE.05c [U] WE.05b
[U] WE.05a [U] WE.02i [U] WE.02a
[U] WE.02h [U] WE.02g [U] WE.02f [U] WE.02e [U] WE.02d [U] WE.02c [U] WE.02b
RL +36.00RL +36.37
LI-S
RL +34.30
high level steel framed windows
timber batten & board cladding
painted fibre cement sheet cladding
FC
WE.03a
timber batten & board cladding
painted fibre cement sheet cladding
high level steel framed windows
dp
FC
timber screen
CO
LI
FC
CO
LI
fibre cement sheet cladding
fibre cement sheet cladding
solid limestone wall
steel framed windows
steel framedpergola
BA
RL +30.80RL +30.45
RL +36.00
RL +33.80
SOUTH ELEVATIONScale: 1:100 @ A1
FC
CR
steel framed windows
CGI
formed concretebalustrade
rendered concrete blockwork
WR.01cWR.01dWR.01eWR.01fWR.01gWR.01hWR.01iWR.01j
bi fold steel framed windows
solid limestone wall
paintedfibre cement fins
CO
WC.01a WC.01b
DR.05
CR
steel panel steel gatessteel gates
LI-S
timber fasciatimber fascia
CO
[U]WR.01x[U]WR.01y[U]WR.01z[U]WR.01aa[U]WR.01cc [U]WR.01bbFC
steel framed pergola
timber rafters
corrugated steelroof sheeting
fibre cementsheet cladding
LI
CO
sliding steel gate
WE.02n
timber deck
SOUTH ELEVATION THROUGH WALKWAYScale: 1:100 @ A1
painted fibre cement sheet cladding
concrete skirting
steel framed windows
LI-S
LI-S
RL +30.80
RL +30.30
RL +36.00
RL +34.30
RL +33.06
RL +36.37
RL +33.60
concrete skirting
DC.01a
steel access gatescorrugated polycarbonate roof sheeting over timber rafters
timber board ceiling
dp
LI
CO
DE.03
FC
LI
CO
LI
FC
DE.12dp
DE.08 CO
LI-SLI
FC
fibre cement sheet cladding
corrugated steel roof sheeting
CGI CGI
solid limestone wall
corrugated polycarbonate roof sheeting over timber purlins
steel framed pergola
corrugated steel roof sheeting
louvres
steel framed pergola
6 4 2 1355
EAST ELEVATIONScale: 1:100 @ A1
TB
TBpainted fibre cement fins
steel framed windows
CR
WR.01aWE.08 WE.07c WE.07b
DR.01aDR.01bDR.01cWR.01b
RL +30.80
RL +36.00
RL +33.50RL +33.80
rendered concrete blockworkpainted fibre cement sheet cladding
TB
timber batten & board cladding
bi-fold steel framed doors
painted fibre cementsheet cladding
louvres timber framedpergola
cavity limestoneand formed concrete wall
timber batten & board cladding
louvres
dp dp
DR.01e
dpFC
FC FC
fibre cementsheet cladding
kiosk opening painted fibre cementsheet cladding
steel framedwindows
corrugated polycarbonate roof sheeting over timber rafters
6
RL +33.80
RL +30.80
RL +36.00
RL +34.30
421 3 5
WEST ELEVATIONScale: 1:100 @ A1
LI
CO
TB
TB
CR
FC
WR.01k
fibre cement fins
steel framed windows
rendered concrete blockwork
bi fold steel framed door
formed concretebalustrade
timber batten and board cladding
timber screen
corrugated polycarbonate roof sheetingover timber purlins
timber deck
DR.01d WR.01l
RL +36.37
FC
RL +30.30
RL +33.06
steel gate
painted fibre cement sheet cladding
CR
steel framed windows
CO
louvres louvrestimber framed pergola
cj
dp dp dp
DE.02bWE.02m
WR.01m WR.01j
CR
WR.01n
painted timber batten and board cladding
steel framedpergola
fibre cementsheet cladding
Ahigh level steel framed windows
fibre cement sheet cladding
Elevations: New Building
1:100 @ A1
A200 C
COURTYARD
C.01 CO-PFFL 30.80
room name
floor finish
finish floor level
room number
LI-S
LI
CR
FC
WR.01d window and door number
solid limestone wall
cavity limestone wall
rendered concrete
fibre cement sheet
dp downpipe
CGI
11.5 fall
roof material
fall
cj control joint
JE.01-A Joinery Unit - Reference as indicated
CGI corrugated steelroof sheet
B A
NORTH ELEVATION THROUGH WALKWAYScale: 1:100 @ A1
high level steel framed windows
painted timber batten & board cladding
painted fibre cement sheet cladding
steel framedpergola
fibre cement sheet cladding
timber board ceiling
[U] WR.01b [U] WR.01a[U] WR.01c[U] WR.01d[U] WR.01e[U] WR.01f[U] WR.01g[U] WR.01h
TB
RL +30.80
RL +33.88
RL +36.00
WR.01q WR.01p WR.01o
DR.03
corrugated polycarbonate roof sheeting over timber purlins
corrugated polycarbonate roof sheeting over timber rafters
steel framed windows
Approv.
Copyright © Mulloway Studio
Drawing No.
Project No
scale date
Revision
Coord.
drawing title
project
client
issue
revisionsdate description
check and verify levels and dimensions on site prior to commencing work
confirm any discrepancies
do not scale off drawings
notes
mulloway studio level 1 16 peel street adelaide sa 5000 australiaT +61 8 8231 3131 F +61 8231 3113 E [email protected] ABN 86 617 619 412
National Trust of Australia (WA)
Luisini Winery Redevelopment New Building + Landscape Works
16-24 Lakeway DriveKingsley WA 6026
NTWA14
architecture interpretation urban design conservation interiors
A 01.04.09 Building Lisence Issue
07.05.09B Revised exits for BCA compliance
Apr 2009
Planning Approval Issue16.12.09C
TB batten and board timber cladding
CO formed concrete
FC painted fibre cement sheet(Dulux P04H8 EYE OF NEWT)
RL +36.00
RL +33.50
suspended flush plasterboard ceiling
RL +30.80
SECTION - SPLITScale: 1:50AA
fibre cement fins
69006
KITCHEN R.05
WALKWAY E.16
fibre cement panels
steel framed awning window on selected actuator
steel framed windowswith structurals mullions
selected steel deck roof2 fall
2700
ac ac
compacted fill as lost formwork
6900 6900 6900
DINING R.01DINING R.01
exposed timber rafters to engineer's details
double leaf stone wall
3.1A602
steel roof deck
3.1A602
4.1A603
4.2A603
4.2A603
4.3A603
fan and light as per selection
(internal fitout by others)
corrugated polycarbonate roof sheet over timber purlins
steel beamto engineer's detail
formed box gutter
batten and board timber cladding
steel framed windowfixed glazing
motorized blindexposed steel beam to engineer's details
polished concrete floor
timber rafter to engineer's details
RL +31.54
RL +32.90
paintedmdf skirting
WR.01k WR.01l DR.01d
WR.01m WR.01n
WR.01h
[u]WR.01bb
WR.01o
[u]WR.01c[u]WR.01k[u]WR.01s
top of roof
ceiling / window head
window head
window sill
floor
window sillRL +33.65
RL +35.43 window head
RL +34.70 window sill
RL +33.76 underside of beam
5 4 3
RL +33.30 ceiling
RL +30.80 top of concrete upstand
RL +34.30 top of parapet
SECTION Scale: 1:50BB
acoustic fibre cement cladding
RL +30.30 floor
EXHIBITION & ENVIRONMENT CENTRE E.02
ac
exposed timber rafter to engineer's details
RL +36.37 top of roof
2.3A601
2.2A601
6900 6900
steel framed fixed window
double leaf stone wall
suspended light as per selection
double leaf stone wall
concealed steel column
upstand concrete
selected steel roof deck 2 fall
formed box gutter
timber framedplasterboardhanging wall
corrugated polycarbonate roof sheet over timber rafters
RL +33.88 top of parapet
batten and board timber cladding
batten and board timber screen
timber rafters
steel roof deck
exposed steel beam to engineer's details
polished concrete floor
suspended flushplasterboard ceiling
280
2760
steel framed awning windowon selected actuator
RL +31.80 window sill
RL +32.31 window head
[u]WE.02g
WE.02aWE.02m
SERVICE YARD 2 R.03 polished concrete
upstand and reveal
700
RL +34.30 top of stone wall
RL +33.60 underside of rafter
RL +34.12 underside of beam
WALKWAY E.16
3 2 1
Approv.
Copyright © Mulloway Studio
Drawing No.
Project No
scale date
Revision
Coord.
drawing title
project
client
issue
revisionsdate description
check and verify levels and dimensions on site prior to commencing work
confirm any discrepancies
do not scale off drawings
notes
mulloway studio level 1 16 peel street adelaide sa 5000 australiaT +61 8 8231 3131 F +61 8231 3113 E [email protected] ABN 86 617 619 412
National Trust of Australia (WA)
Luisini Winery Redevelopment New Building + Landscape Works
16-24 Lakeway DriveKingsley WA 6026
NTWA14
architecture interpretation urban design conservation interiors
Building Licence Issue01.04.09A
16.12.09A Planning Approval Issue
Mar 20091:50 @ A1
Sections: New Building - Sheet 1
A 400
2.1A601
AIR LOCK E.12 FEMALE TOILET E.05
WALKWAY E.16 2560
SECTION - SPLITScale: 1:50AA
6900 69005.1
A604
RL +30.80
RL +34.30
RL +30.50
double leaf stone wall
selected steel deck roof 2 fall
4.3A603
corrugated polycarbonate roof sheet over timber purlins
batten and board timber cladding
steel framed windowfixed glazing
formed box gutter
steel framed windowfixed glazing
steel beamto engineer's detail
exposed timber rafter to engineer's details
steel roof deck
suspended flushplasterboard ceiling
exposed steel beam to engineer's details
ceramic tiled floor
RL +33.30
RL +31.80
batten and boardtimber clad wall
selected toilet partitions
steel framed awning windows
timber rafter to engineer's details
RL +32.31
ceramic tiles
DE.04DE.12 DE.05
WE.05
[u]WE.05c
ac
suspended light as per selection
RL +36.00 top of roof
ceiling
window head
window sill
floor
top of parapet / window sill
timber cladding
E.13
RL +35.43 window head
2100
RL +33.76 underside of beam
ceramic tiled skirting
fibre cementlining
2 1
981
A
SECTION - SPLITScale: 1:50CC
RL +30.80 top of concrete upstand
RL +30.30 floor
RL +33.30 ceiling
RL +34.30 top of stone wall
RL +36.37 top of roof
1.1A600
steel roof deck
polycarbonate roof sheeting
double leaf stone wall
steel framed pergola
timber deck
suspended flushplasterboard ceiling
timber framedplasterboard hanging wall
steel beamto engineer's detailtimber strut
to engineer's detailsunder purlinto engineer's details
timber rafterto engineer's details
9 mm fibre cement panels
polished concrete floor
concrete upstand
3000
ENVIRONMENT AND EXHIBITION CENTRE E.02
CONFERENCE ROOM E.03
9 mm fibre cement panels
RL +31.80 window sill
RL +32.31 window head
JE.02-A
steel purlin toengineer's detail
timber framedplasterboard hanging wallWE.02c WE.02b WE.02a
DECK E.01
RL +33.45 underside of beam
Approv.
Copyright © Mulloway Studio
Drawing No.
Project No
scale date
Revision
Coord.
drawing title
project
client
issue
revisionsdate description
check and verify levels and dimensions on site prior to commencing work
confirm any discrepancies
do not scale off drawings
notes
mulloway studio level 1 16 peel street adelaide sa 5000 australiaT +61 8 8231 3131 F +61 8231 3113 E [email protected] ABN 86 617 619 412
National Trust of Australia (WA)
Luisini Winery Redevelopment New Building + Landscape Works
16-24 Lakeway DriveKingsley WA 6026
NTWA14
architecture interpretation urban design conservation interiors
Building Licence Issue01.04.09A
16.12.09A Planning Approval Issue
Mar 20091:50 @ A1
Sections: New Building - Sheet 2
A 401
SECTION - SPLITScale: 1:50CC
RL +30.80 floor
RL +36.00 top of roof
RL +30.50 floor
RL +33.30 ceiling / window head
12000
1800600
9 mm fibre cement panels
steel framed window
batten and board timber clad wall
steel roof deck
sound insulated steel stud wall suspended flush
plasterboard ceiling
timber strutto engineer's details
ceramic tiled floor
concrete upstand
selected steel deck roof2 fall
2800 25
00
CONFERENCE ROOM E.03 FEMALETOILET E.05
MALETOILET E.06 OFFICE E.07ACCESS
TOILET E.04
RL +31.80 window head
RL +32.31 window sill
RL +31.20 window sill
JE.02-A
JE.06-AJE.05-A
carpet floor
carpet floor
ceramic tiles
JE.07-AJE.03-B
steel portal frame behindto engineer's details
steel portal frame columnto engineer's details
steel purlin toengineer's detail
timber rafterto engineer's details
under purlinto engineer's details
steel beamto engineer's detail
WE.05 WE.07a WE.07c
RL +33.95 top of beam
A B
544
RL +30.30 floor
RL +33.30 ceiling
RL +34.30 top of parapet
SECTION Scale: 1:50DD
double leaf stone wall
radial sawn batten and board timber clad wall
steel framed window
selected steel deck roof2 fall
CONFERENCE ROOM E.03
suspended flushplasterboard ceiling
carpet floor
steel beamto engineer's detail
formed box gutter
SERVICE YARD 2 R.02WALKWAY E.16
corrugated polycarbonate roof sheet over timber rafters
timber rafters
RL +33.88 top of parapet
2760
radial sawn batten and board timber clad wall
fibre cement cladding
steel raftersto engineer's detail
formed box gutter
RL +31.80 window sill
RL +32.31 window head bulkhead
JE.03-B
JE.03-A
WE.03a
DE.03
batten and board timber screen
5.4A604
mdf lining
16900
2 36900
A
Approv.
Copyright © Mulloway Studio
Drawing No.
Project No
scale date
Revision
Coord.
drawing title
project
client
issue
revisionsdate description
check and verify levels and dimensions on site prior to commencing work
confirm any discrepancies
do not scale off drawings
notes
mulloway studio level 1 16 peel street adelaide sa 5000 australiaT +61 8 8231 3131 F +61 8231 3113 E [email protected] ABN 86 617 619 412
National Trust of Australia (WA)
Luisini Winery Redevelopment New Building + Landscape Works
16-24 Lakeway DriveKingsley WA 6026
NTWA14
architecture interpretation urban design conservation interiors
Building Licence Issue01.04.09A
16.12.09A Planning Approval Issue
Mar 20091:50 @ A1
Sections: New Building - Sheet 3
A 402
PERGOLA R.04
RL +36.00 top of roof
RL +30.80 floor
RL +33.50 ceiling
RL +32.90 window head
RL +31.50 window sill
SECTION Scale: 1:50EE
batten and board timber clad wall
steel framed window
suspended flushplasterboard ceiling
steel beamto engineer's detail
9 mm fibre cement panels
steel framed pergola
polycarbonate roof sheetingon timber rafters
polished concrete floor
12000
1800600
KITCHEN R.05(internal fitout by others)
selected steel deck roof2 fall
steel purlinto engineer's detail
steel roof deck
steel columnto engineer's detail
fibre cement fins and canopy
timber purlinsto engineer's detail
527
6.5A605
WR.01m
RL +30.80 floor
RL +33.50
RL +31.55
SECTION Scale: 1:50GG
steel framed bifold window
steel framed pergola
timber rafters
OUTDOOR DINING C.03
6900
RL +33.50underside of beam underside of beam /
window head
window sill
steel portal frame behindto engineer's details
timber strutto engineer's details
aluminium louvre
A B
6 5
SECTION - SPLITScale: 1:50FF
12000
1800600
SECTION - SPLITScale: 1:50FF
RL +30.80 floor
RL +33.50 ceiling / underside of beam
RL +36.00 top of roof
steel framed pergola
timber raftersbatten and board timber clad wall
steel roof deck
suspended flushplasterboard ceiling
steel beamto engineer's detail
polished concrete floor
timber rafterto engineer's details
DINING R.01
OBSERVATION DECK R.02
polycarbonate roof sheetingon timber rafters
under purlinto engineer's details
steel beamto engineer's detail
544
6.1A605
6.1A605
steel framedfolding door
timber purlinsto engineer's detail
timber strutto engineer's details
steel portal frame behindto engineer's details
steel portal frame column to engineer's details
DR.01d PERGOLA R.04
A B
RL +30.80 floor
RL +33.50 underside of beam
SECTION - SPLITScale: 1:50FF
steel framed pergola
timber rafters
steel roof deck
suspended flushplasterboard ceiling
OUTDOOR DINING C.03
polycarbonate roof sheetingon timber rafters
under purlinto engineer's details
timber strutto engineer's details
steel portal frame column to engineer's details
PERGOLA R.04
B
A
REFER A101 Approv.
Copyright © Mulloway Studio
Drawing No.
Project No
scale date
Revision
Coord.
drawing title
project
client
issue
revisionsdate description
check and verify levels and dimensions on site prior to commencing work
confirm any discrepancies
do not scale off drawings
notes
mulloway studio level 1 16 peel street adelaide sa 5000 australiaT +61 8 8231 3131 F +61 8231 3113 E [email protected] ABN 86 617 619 412
National Trust of Australia (WA)
Luisini Winery Redevelopment New Building + Landscape Works
16-24 Lakeway DriveKingsley WA 6026
NTWA14
architecture interpretation urban design conservation interiors
A 01.04.09 Building licence issue
Mar 2009
remove all concretetanks in first cellar only
remove stair
remove stair
remove section ofexisting concrete
paving slab
retain existing concretepaving slabs
retain existing concretepaving slab
existing meter box
create new opening inmasonry wall
1200750
pit
BOTTLING AND PACKING STORE
STILL
SECOND CELLARFIRST CELLAR
CELLAR SALES
Existing FL: 29.82(approx - COS)
Existing FL: 29.82(approx - COS)
Existing FL: 29.78(approx - COS)
EXISTING AND DEMOLITION PLANScale: 1:100 @ A1
1
MAIN CELLAR AREA
BOILER ROOM
STILL ROOM
BOND STORE
Floor Plan: Existing Winery
A 900
9021.1
MAIN CELLAR AREA
BOILER ROOM
STILL ROOMSTILL
BOND STORERL +30.49
RL +31.14
RL +29.91
RL +30.70
top ofthreshold RL+30.84 (cos)
WINEEDUCATION
ROOMX.01 PLY
FFL 30.84WX.01a
WX.01b
WX.01c
WX.01d
top of thresholdRL +30.84 (cos)
DX.01
dwfridge under
VERANDAH
EXHIBITIONSPACE
X.02 --
EXHIBITIONSPACE
X.03 --
DX.04
1:14
1:14
Ram
p 1:14
Ram
p 1:14
new timber framedaccess ramp - typical
ramp detail
WINERY PLAN Scale: 1:100 @ A1
3
EXIT
EXIT
DX.03
NEW STOREX.04 -
-
12345
steel platform floorlevel to match boiler room
901A
901A
DX.05
2930
new steel studframe wall
FHR
300mm wide steel grate. Refer detail
painted floor marking indicating position of removed tanks
make good wall around new glazing
threshold ramp. complywith AS1428
new timber framed stair and access ramp
tactile indicators
pinboards and whiteboard
make good opening
threshold ramp. complywith AS1428
REFER A101
exposed aggregate concreteCO-ACO concrete
CO-P polished concretexCT ceramic tileMAT wipe off matPLY plywood
C.01 CFFL30.80
COURTYARD finished floor levelfloor finishroom name
room number
WE.07f window & door numbers
1:100 @ A1
A
Planning Approval Issue16.12.09A
Sections + Elevations:Existing Winery
A 901Approv.
Copyright © Mulloway Studio
Drawing No.
Project No
scale date
Revision
Coord.
drawing title
project
client
issue
revisionsdate description
check and verify levels and dimensions on site prior to commencing work
confirm any discrepancies
do not scale off drawings
notes
mulloway studio level 1 16 peel street adelaide sa 5000 australiaT +61 8 8231 3131 F +61 8231 3113 E [email protected] ABN 86 617 619 412
National Trust of Australia (WA)
Luisini Winery Redevelopment New Building + Landscape Works
16-24 Lakeway DriveKingsley WA 6026
NTWA14
architecture interpretation urban design conservation interiors
A 01.04.09 Building licence issue
Mar 2009
WX.01b
WEST ELEVATIONScale: 1:100 @ A1
NORTH ELEVATIONScale: 1:100 @ A1
line of verandahshown dashed
RL +30.84RL +31.14
DX.04a
new openingexisting metal sliding doorto be reused as partly openable
EXIT
existing openingnew door to existing openingexisting sliding door to be retainedand fixed open inside
new door to existing openingexisting sliding door to be retainedand fixed open inside
new operable window to existing opening with new timber frame
existing opening
new operable window to existing opening with new timber frame
existing opening
RL +30.84RL +31.14
NEW FL TO EDUCATION ROOM
new threshold ramp new threshold ramp
missing concrete blocks
missing concrete block
NEW FL TO EDUCATION ROOM
DX.01 DX.03
WX.01a
EXITEXIT
WINE EDUCATION ROOM
VERANDAH
X.01
joinery to details
existing roof & structure retained
make good & paint existing walls
new uplight to roof
new uplight to floor
new steel grate
new suspended timber frame floor plywood floor
SECTION AAScale: 1:50
WX.01d
1:50 / 1:100 @ A1
A
Planning Approval Issue16.12.09A