Ludlow STP DECK (39)Alternatives Presentation MeetingVT 100 – Bridge #99 over Branch Brook

April 4, 2016

Page 2: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Introductions

Jennifer Fitch, P.E.VTrans Scoping Project Manager

Todd Sumner, P.E.VTrans Design Project Manager

Shannon Beaumont, P.E.CLD Design Consultant

Page 3: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Purpose of Meeting

Provide an understanding of our approach to the project Provide an overview of project constraints Discuss alternatives that were considered Discuss our recommended alternative Provide an opportunity to ask questions and voice

concerns

Page 4: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Location Map

Page 5: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Project Location

Page 6: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Meeting Overview

VTrans Project Development Process Project Overview

– Existing Conditions– Alternatives Considered– Recommended Alternative

Maintenance of Traffic Schedule Summary Questions

Page 7: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

VTrans Project Development Process

Project Definition

Project Design Construction

ProjectFunded

ProjectDefined

ContractAward

Quantify areas of impact

Environmental permits

Develop plans, estimate and specifications

Initiated

Identify resources & constraints

Evaluate alternatives Public participation Build Consensus

Initiated

Page 8: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Who are you representing?

A. Municipal OfficialB. ResidentC. Local BusinessD. Independent

OrganizationE. Emergency ServicesF. Other

A. B. C. D. E. F.

50%

29%

7%7%

0%

7%

Page 9: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

How often do you use this segment of VT 100?

A. DailyB. WeeklyC. MonthlyD. RarelyE. Never

Daily

Weekly

MonthlyRare

lyNev

er

33%

47%

0%0%

20%

Page 10: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

How often do you walk over the bridge?

A. DailyB. WeeklyC. MonthlyD. RarelyE. Never

Daily

Weekly

MonthlyRare

lyNev

er

7% 7%

50%

21%

14%

Page 11: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

How often do you bike over the bridge?

A. DailyB. WeeklyC. MonthlyD. RarelyE. Never

Daily

Weekly

MonthlyRare

lyNev

er

47%

27%

20%

7%

0%

Page 12: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

What is your reason for attending this meeting?

A. Specific concernB. General InterestC. Live in close vicinityD. Other

Specif

ic co

ncern

Genera

l Inter

est

Live in

close

vicin

ityOther

7%

47%

7%

40%

Page 13: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Project Overview

Existing Conditions

Alternatives Considered

Recommended Alternative

Page 14: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Description of Terms Used

Page 15: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Existing Conditions – Bridge #99 Roadway Classification – Minor Arterial Bridge Type – 82’ Rolled Beam Constructed in 1966 Ownership – State of Vermont

Looking Along VT 100

Page 16: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Existing Conditions – Bridge #99

Concrete deck has begun to delaminate

Page 17: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Existing Conditions - Bridge #99 Deck Rating 5 (Fair) Superstructure Rating 7 (Good) Substructure Rating 7 (Good)

Cracks, Spalls, and Delamination

Page 18: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Existing Conditions

Page 19: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Truck Turning Movements/Limitations Design Speed of 40 mph (Stop Condition) Access to local businesses throughout construction

Design Criteria and Considerations

Page 20: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

No Action̶ Additional maintenance required within 10 years

Deck Patching– Least-up front cost

Full Deck Replacement– Longest service life

Alternatives Considered – Bridge #99

Page 21: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Proposed Typical Section (Looking Toward VT-103) Proposed Curb to Curb = 35’-8” (Existing is 34’) Proposed Fascia to Fascia = 39’-8” (Existing is 38’-10”)

Page 22: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Recommended Alternative - Bridge #99 Deck Replacement

– Replace Deck with precast concrete deck panels– Increase bridge width (10 inches)

Page 23: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Maintenance of Traffic Options Considered

Short Term Road Closure w/ Offsite Detour– Signed by State – Passenger car/pedestrian route: 2.5 miles end-to-end– Regional truck detour route: 53.5 miles end-to-end– Truck through traffic:

Phased Construction– 1-Way alternating Traffic maintained by phasing with no pedestrian access

Temporary Bridge– Not considered since it isn’t economical for maintenance projects

Page 24: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Road Closure Approx. 10 day bridge closure Detour route signed by State Shortest passenger car route available: 2.5 miles end-to-end

Page 25: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Regional Detour Route for Trucks VT 103, to US Route 7,to US Route 4, to VT 100

End-to-End: 53.5 MilesThrough: 33.7 Miles

Page 26: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Local Detour Route for Cars and Pedestrians

VT 100, Rod and Gun Club Rd, to Buttermilk Falls Rd, to VT 103

End-to-End: 2.5 Miles

Page 27: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Phased Construction Alternating 1-way traffic Possible Truck Turn Around Bridge closed to pedestrians 12 weeks of construction Cycle length is approximately 2 min

Page 28: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Phased Construction – Typical (Looking toward VT-103)

Page 29: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Phased Construction - Phase 1

Page 30: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Phased Construction - Phase 2

Page 31: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Project Location

Truck Turn Around

Page 32: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Which maintenance of traffic option do you prefer?

A. Phased ConstructionB. Closure

A. B.

63%

38%

Page 33: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

What would be the maximum acceptable length of closure for Bridge #99?

A. 5 DaysB. 10 DaysC. 2 weeksD. Not Acceptable

A. B. C. D.

0%7%

0%

93%

Page 34: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Which time of year would be most acceptable for Bridge #99 to be constructed?

A. MayB. JuneC. JulyD. AugustE. SeptemberF. Other

A. B. C. D. E. F.

100%

0% 0%0%0%0%

Page 35: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Recommended Scope

Deck replacement with new precast panels with traffic maintained onsite with phased construction– Increase width 10”– Summer 2017 or 2018

Page 36: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Alternatives MatrixRecommended

Montgomery STP DECK (40)

Alt 1 Alt 2 Alt 3

Do Nothing Deck Patching Deck Replacement

N/A Phased Construction Phased Construction

Total Project Costs (Including Engineering and Contingencies)

$0 N/A $948,900

Town Share N/A N/A N/A

Project Development Duration

0 N/A 2 year

Construction Duration 0 N/A 4 months

Closure Duration (If Applicable)

N/A N/A N/A

Geometric Design Criteria

No Change No Change No Change

Alignment Change No No No

Utilities No Change No Change No Change

ROW Acquisition No No No

Design Life Less than 10 Years N/A 30-40 Years

Page 37: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Additional Considerations

Coordinate with intersection and downtown closure projects Intersection scope Intersection Duration Intersection traffic impacts Mike Lacroix for contact info

Page 38: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Which would you be most concerned about?

A. Construction DurationB. Bridge AestheticsC. Environmental ImpactsD. Recreational ImpactsE. Emergency ServicesF. Business ImpactsG. OtherH. Not really concerned

A. B. C. D. E. F. G. H.

50%

0%

7% 7%

0%

14%14%

7%

Page 39: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Did you find this presentation to be?

A. Too technical in natureB. Too simplified C. Just about rightD. Not much use at all

Too tec

hnical

in nature

Too sim

plified

Just

about

right

Not much

use at

all

0% 7%

93%

0%

Page 40: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Do you find the recommended scope of work satisfactory?

A. YesB. No

Yes No

0%

100%

Page 41: Ludlow STP DECK (39) Alternatives Presentation Meeting · 2017. 2. 24. · Alternatives Presentation Meeting VT 100 – Bridge #99 over Branch Brook. April 4, 2016. Introductions

Ludlow STP DECK (39)Questions & CommentsVT 100 – Bridge #99 over Branch Brook

April 4, 2016

For more information: https://outside.vermont.gov/agency/vtrans/external/Projects/Structures/15b109