Page 1: Lucrezia Patruno

U. S. G E N E R A L S E R V I C E S A D M I N I S T R A T I O N

GSA and the Recovery Act

January 19, 2011

Page 2: Lucrezia Patruno

G S A ’ S P U B L I C B U I L D I N G S S E R V I C E (P B S)

Landlord for over 400 federal agencies, bureaus & commissions

Portfolio of 353.9 M rentable square feet Space for over 1,000,000 tenants 8,603 owned and leased assets 30 LEED certified properties

Page 3: Lucrezia Patruno

P R E S I D E N T O B A M A

O N T H E R E C O V E R Y M A N D A T E

“What I will need from all of you is unprecedented responsibility

and accountability…the American people are watching. They need

this plan to work. They expect to see the money they’ve earned,

that they’ve worked so hard to earn, spent in its intended

purposes without waste, without inefficiency, without fraud.”

Page 4: Lucrezia Patruno

P U R P O S E S :

T H E A M E R I C A N R E C O V E R Y &

R E I N V E S T M E N T A C T OF 2 0 0 9 (Recovery Act)

Creating and saving jobs

Increasing domestic renewable energy capacity

Investing in infrastructure with long-term economic benefits

Stabilizing state and local government budgets

Assisting those most impacted by the recession

Page 5: Lucrezia Patruno

P B S & T H E R E C O V E R Y A C T

$5.55 B spending plan for

U.S. Courthouses, land ports of entry, and federal buildings

Existing facilities to convert to high-performance green buildings

Projects in all 50 states, the District of Columbia and two territories

Page 6: Lucrezia Patruno

R E C O V E R Y A C T: G R E E N B U I L D I N G

M O D E R N I Z A T I O N S

$4.50 B focused on high-performance green building (HPGB) projects

Large full building modernization projects

Limited scope projects that include such improvements as: Renewable energy – photovoltaic and windRoofing, including green roofsWindowsLighting replacements High performance building systemsAdvanced meteringWater conservation projectsRe-commissioning

Small projects

Page 7: Lucrezia Patruno

R E C O V E R Y A C T: M A J O R P R O J E C T S

$750 M

Federal Courthouses, Federal Buildings and Modernizations ($450 M for DHS Headquarters)

$300 M

Land Ports of Entry (Border Stations)

Page 8: Lucrezia Patruno

R E C O V E R Y A C T: GREAT LAKES PROJECTS

• 11 Full and Partial Modernization Projects– $677.731 M

• A Total of $739.473 M as of January 14, 2011

• 23 Limited Scope HPGB Projects

– $37.631 M

• 25 Small HPGB Projects– $24.111 M

Page 9: Lucrezia Patruno

R E C O V E R Y A C T: GREAT LAKES PROJECTS

• IL: $157.84 M• IN: $153.86 M• MI: $ 58.86 M• MN:$155.49 M• OH:$186.88 M• WI: $ 2.47 M

Figures are rounded

Page 10: Lucrezia Patruno

Great Lakes RegionHigh Performance Green Building

Full and Partial Modernization Projects

ILLINOISChicago Federal Center $ 25,639,000Chicago JCK Federal Building & USPS Loop Station $ 93,828,000Chicago State Street South – 10 W Jackson $ 24,973,000

INDIANAIndianapolis Minton-Capehart Federal Building $ 48,217,000Indianapolis Birch Bayh US Courthouse $ 69,559,000Indianapolis Emmett J. Bean $ 33,957,000

MINNESOTAFt. Snelling Whipple Federal Building $151,519,000

OHIOCincinnati John W. Peck Federal Building $ 41,004,000Cleveland Celebrezze Federal Building $112,055,000Columbus Kinneary US Courthouse $ 25,487,000

MICHIGANDetroit McNamara Federal Building Complex $ 51,761,000

Page 11: Lucrezia Patruno

Great Lakes Region High Performance Green Building

Limited Scope ProjectsILLINOISCarbondale Senator Paul Simon Federal Building $1,677,000Chicago 536 S. Clark Street Federal Building $5,713,000Chicago Customhouse $ 927,000Chicago Metcalfe Building $2,228,000Chicago Federal Center Loop Station $1,380,000Springfield Federal Building $ 199,000Urbana US Courthouse $1,301,000INDIANAHammond US Courthouse $2,153,000MICHIGANDetroit Theodore Levin US Courthouse $1,142,000Lansing Charles Chamberlain $ 263,000Ann Arbor Federal Building $2,231,000Grand Rapids G R Ford Federal Courthouse $ 370,000Detroit Rosa Parks Federal Building $ 410,000Sault Ste Marie US Border Station $2,607,000MINNESOTAMinneapolis US Courthouse $3,974,000OHIODayton Federal Building US Courthouse $4,563,000Cleveland Metzenbaum US Courthouse $ 366,000Youngstown Thomas D Lambros Federal Office Building $1,176,000Cleveland Carl B. Stokes US Courthouse $1,138,000Youngstown Nathaniel R Jones Federal Building $ 577,000Cincinnati Potter Steward US Courthouse $ 750,000WISCONSINMilwaukee Federal Building US Courthouse $1,563,000Madison US Courthouse $ 903,000

Page 12: Lucrezia Patruno

Great Lakes Region High Performance Green Building

ILLINOISChicago 450 Federal Parking Facility $ 494,000Chicago Dirksen US Courthouse $1,868,000Chicago Federal Archives Record Center $1,399,000Chicago Lipinski Federal Building (RRB) $2,457,000Danville Federal Building & US Courthouse $ 324,000East St. Louis US Courthouse $ 47,000Mt. Vernon Federal Building $ 362,000Peoria Federal Building & US Courthouse $1,008,000Quincy Social Security Administration District Office Building $ 386,000INDIANAFt. Wayne Adair Federal Building $1,358,000Jeffersonville Federal Center $ 880,000Lafayette Halleck Federal Building & US Courthouse $ 780,000South Bend Grant Federal Building & US Courthouse $2,686,000MICHIGANBattle Creek Hart-Dole-Inouye Federal Center $ 438,000Flint Federal Building $ 723,000Kalamazoo Federal Building & US Courthouse $ 558,000MINNESOTABemidji Federal Building $ 262,000Duluth Heaney US Courthouse & Customhouse $1,733,000Fergus Falls US Courthouse & Post Office $ 143,000Ft. Snelling Motor Pool Building $ 524,000Minneapolis Federal Office Building $2,666,000St. Paul Burger Federal Building & US Courthouse $ 52,000OHIOAkron Seiberling Federal Building & US Courthouse $1,501,000Columbus Bricker Federal Building $ 110,000Dayton Warehouse 4 $ 105,000

Page 13: Lucrezia Patruno

Chicago Federal Center

– HVAC Upgrades, restroom renovation, plaza water proofing

E X A M P L E: RECOVERY ACT P R O J E C T

Page 14: Lucrezia Patruno

Major General Emmett J. Bean Federal Center

– Installation of an energy efficient photovoltaic roofing system

E X A M P L E: RECOVERY ACT P R O J E C T

Page 15: Lucrezia Patruno

E X A M P L E: RECOVERY ACT P R O J E C T

Joseph P. Kinneary US Courthouse

-Lighting and Building System Upgrades and Façade Restoration

Page 16: Lucrezia Patruno

H O W P R O J E C T S W E R E S E L E C T E D

Energy savings and speed of delivery

Projects that have been designed or are in design with

a focus on energy

Projects that can be developed and awarded quickly,

getting people back to work

Page 17: Lucrezia Patruno

S P E E D C O U N T S

Take advantage of full funding

Compress our processes

Eliminate wasteful/unnecessary steps

Carefully track all deliverables

Standardize advertisements and contract requirements

to align with industry standards

Page 18: Lucrezia Patruno

C O N T R A C T I N G

Existing procurement process provisions remain in place for Recovery Act contracts

Existing security requirements remain applicable to RecoveryAct contracts

Contracting options include:

Full and open competitionMAS schedulesIndefinite Delivery, Indefinite Quantity (IDIQ) contractsNew or existing Blanket Purchase Agreements (BPAs)Small business set asides

Page 19: Lucrezia Patruno

A C O M M I T M E N T T O S M A L L B U S I N E S S E S

Recovery Act mandates the maximum number of practicable

small business opportunities

In 2010, GSA awarded $2.6 billion (33%) of all eligible contract

dollars to small businesses

According to OSBU, “The nearly $2.6 billion GSA awarded to small business in a given year represents the largest amount GSA made possible in large part due to Recovery Act funds.

To maximize opportunities, small businesses not already part of

the GSA contracting system are encouraged to partner with

firms that are

Page 20: Lucrezia Patruno

A C O M M I T M E N T T O S M A L L B U S I N E S S E S

For projects awarded to large businesses, a substantial portion

of the work went to small business subcontractors

To maximize opportunities, small businesses not already part of

the GSA contracting system are encouraged to partner with

firms that are

Page 21: Lucrezia Patruno

GSA FY 2011 AGENCY GOALS

Overall Small Business 27%

Small Disadvantaged Business (SDB), includes Section 8(a) 5%

Women-owned Small Business (WOD) 5%

Historically Underutilized Business Zones (HUBZone)Small Business

3%

Service-disabled Veteran-owned Small Business (SDVOSB) 3%

Page 22: Lucrezia Patruno

FedBizOpps. Gov

22

Page 23: Lucrezia Patruno

GSA Schedules

23

Page 24: Lucrezia Patruno

CONTACT INFORMATION

• Susan Lynch, GSA, Vendor Alliance Program Manager, 312-886-0539, for information on doing business with the GSA

• www.wbdg.org to find the GSA Design Excellence Policies and Procedures document that gives detail about how GSA conducts AE selections on all Design Excellence

Page 25: Lucrezia Patruno

QUESTIONS?