lost lake marsh creation and hydrologic restoration (te-72) russ joffrion, p.e. engineering division...

11
Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast committed to our coast

Upload: austen-thomas

Post on 17-Dec-2015

217 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast

Lost Lake Marsh Creation and Hydrologic Restoration (TE-72)

Russ Joffrion, P.E.Engineering Division

May 6, 2014

committed to our coastcommitted to our coast

Page 2: Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast

• CWPPRA PPL 19 • Create/Restore over 400 acres of intertidal marsh• Create approximately 30,000 LF of earthen terraces• Replace 4 fixed crest weirs and 1 earthen plug with

variable crest weirs• Engineering and Design: November 2012• Phase 2 Funding: January 2013• Anticipated Bid Advertisement: Fall 2014

Coastal Protection and Restoration Authority of Louisiana

PROJECT BACKGROUND

Page 3: Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast

PROJECT VICINITY MAP

Coastal Protection and Restoration Authority of Louisiana

Page 4: Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast

PROJECT LAYOUT

Coastal Protection and Restoration Authority of Louisiana

Page 5: Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast

PROJECT LAYOUT

Coastal Protection and Restoration Authority of Louisiana

Page 6: Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast

MARSH CREATION FILL AREAS AND TYPICAL

SECTION

Coastal Protection and Restoration Authority of Louisiana

Page 7: Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast

MARSH NOURISHMENT FILL AREA AND TYPICAL

SECTION

Coastal Protection and Restoration Authority of Louisiana

Page 8: Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast

EARTHEN TERRACE LAYOUT AND TYPICAL

SECTION

Coastal Protection and Restoration Authority of Louisiana

Page 9: Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast

VARIABLE CREST WEIR TYPICAL SECTION

Coastal Protection and Restoration Authority of Louisiana

Page 10: Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast

SUMMARY OF ESTIMATED QUANTITIES

• Marsh Fill: 3.3M CY (Cut)• Marsh Nourishment: 120K CY (Cut)• Shoreline Restoration: 4,000 LF• Containment Dikes: 50,700 LF• Earthen Terraces: 30,000 LF• 5 Water Control Structures

– Channel Excavation: 1,500 CY – Treated Timber Piles: 9,000 LF– Steel Sheet Pile: 17,000 SF– Rip Rap (55 lb): 1,400 CY

Coastal Protection and Restoration Authority of Louisiana

Page 11: Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Russ Joffrion, P.E. Engineering Division May 6, 2014 committed to our coast

Coastal Protection and Restoration Authority of Louisiana

QUESTIONS