LOS OSOS WASTEWATER LOS OSOS WASTEWATER PROJECT PROJECT UPDATE UPDATE February 5, 2008 February 5, 2008

Upload: etana

Post on 20-Feb-2016

35 views

Category:

Documents


0 download

DESCRIPTION

LOS OSOS WASTEWATER PROJECT. UPDATE February 5, 2008. WORK EFFORTS. FISCAL ENGINEERING ENVIRONMENTAL. FISCAL Integrated Regional Water Management Plan. $10 million request Submitted to State January 25, 2008 County application included: Los Osos Wastewater Project Flood Zone 1/1A - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: LOS OSOS WASTEWATER PROJECT

LOS OSOS WASTEWATER LOS OSOS WASTEWATER PROJECTPROJECT

UPDATEUPDATEFebruary 5, 2008February 5, 2008

Page 2: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

WORK EFFORTSWORK EFFORTS

FISCALFISCALENGINEERINGENGINEERINGENVIRONMENTALENVIRONMENTAL

Page 3: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

FISCALFISCALIntegrated Regional Water Management PlanIntegrated Regional Water Management Plan

$10 million request$10 million request

Submitted to State January 25, 2008Submitted to State January 25, 2008

County application included:County application included:

Los Osos Wastewater ProjectLos Osos Wastewater Project Flood Zone 1/1AFlood Zone 1/1A Morro Bay Desalination PlantMorro Bay Desalination Plant

Final grant awards announced June 2008Final grant awards announced June 2008

Page 4: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

FISCALFISCALDisadvantaged Persons Assistance PlanDisadvantaged Persons Assistance Plan

Analysis included:Analysis included:

Demographics, Census Data, Household Income, Demographics, Census Data, Household Income, EPA Affordability GuidelinesEPA Affordability Guidelines

Proposed framework:Proposed framework:

Qualification based on income Qualification based on income ANDAND other assets. other assets. Repayment upon title transfer.Repayment upon title transfer. Subject property is only eligible once.Subject property is only eligible once. Available for those who cannot qualify for other Available for those who cannot qualify for other

assistance programs.assistance programs.

Page 5: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

FISCALFISCALFuture StepsFuture Steps

Final Program Development:Final Program Development:

Grant funding commitmentsGrant funding commitmentsPublic outreach and meetingsPublic outreach and meetingsCommunity surveyCommunity surveyFinal Board approvalFinal Board approval

Page 6: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

DESIGN-BUILD OVERVIEW DESIGN-BUILD OVERVIEW Design-Build RequirementsDesign-Build Requirements

DBIA & SRF Design-Build RequirementsDBIA & SRF Design-Build RequirementsPre-Qualify Design-Build TeamsPre-Qualify Design-Build Teams20% Design and Selection Criteria20% Design and Selection Criteria Independent Peer Review Panel Independent Peer Review Panel Select “Best Value” ProposalSelect “Best Value” Proposal

Page 7: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

DESIGN-BUILD OVERVIEWDESIGN-BUILD OVERVIEWDesign-Build / Environmental Process IntegrationDesign-Build / Environmental Process Integration

Draft EIRDraft EIR

Final EIR Final EIR

RFQ: Design-Build TeamsRFQ: Design-Build Teams

Final Contract DocumentsFinal Contract Documents Release RFPRelease RFP Proposals/Contractor BidsProposals/Contractor Bids

Consider Cost, Community Consider Cost, Community Survey & Environmental Survey & Environmental ImpactsImpacts

Page 8: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

DESIGN-BUILD OVERVIEW DESIGN-BUILD OVERVIEW Next StepsNext Steps

Meeting with State Water BoardMeeting with State Water BoardEngineering Consulting ServicesEngineering Consulting ServicesPeer Review RFPPeer Review RFPRelease of RFQRelease of RFQDevelop Contract Specifications for Develop Contract Specifications for

Design-Build RFPDesign-Build RFP

Page 9: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

ENVIRONMENTALENVIRONMENTALEIR Scope, Schedule and BudgetEIR Scope, Schedule and Budget

Scope:Scope: Co-equal analysis of alternativesCo-equal analysis of alternatives Maximize existing informationMaximize existing information Good faith effort at full disclosureGood faith effort at full disclosure

Schedule:Schedule: Public Review Draft EIR September 2, 2008Public Review Draft EIR September 2, 2008

Budget:Budget: $ 50,000 Initial Purchase Order$ 50,000 Initial Purchase Order $ 81,572 Environmental Process Development $ 81,572 Environmental Process Development $1,924,820 Environmental Impact Report$1,924,820 Environmental Impact Report $$2,056,3922,056,392 Total Total

Page 10: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

ENVIRONMENTALENVIRONMENTALCriteria For Alternatives AnalysisCriteria For Alternatives Analysis

Key Local Coastal Plan Standards:Key Local Coastal Plan Standards: Environmentally Sensitive HabitatEnvironmentally Sensitive Habitat Prime Agricultural SoilsPrime Agricultural Soils Public Utility FacilitiesPublic Utility Facilities

Alternatives analysis must show that a feasible Alternatives analysis must show that a feasible and less-environmentally damaging alternative and less-environmentally damaging alternative does not exist.does not exist.

Page 11: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

ENVIRONMENTALENVIRONMENTALConsultant TeamConsultant Team

Michael Brandman Associates, Irvine CAMichael Brandman Associates, Irvine CA Michael Brandman, Principal-in-chargeMichael Brandman, Principal-in-charge Gene Talmadge, EIR Project ManagerGene Talmadge, EIR Project Manager

Page 12: LOS OSOS WASTEWATER PROJECT

Los Osos Wastewater ProjectLos Osos Wastewater Project Environmental Services for the Environmental Services for the

Draft/Final EIR Draft/Final EIR

Michael Brandman AssociatesMichael Brandman Associatesin partnership with…in partnership with…

Kennedy/Jenks, Bauer Environmental Kennedy/Jenks, Bauer Environmental Services, Hopkins Groundwater Services, Hopkins Groundwater Consultants, Inc., Far Western Consultants, Inc., Far Western

Anthropological Resource Group, Inc., and Anthropological Resource Group, Inc., and Associated Transportation EngineersAssociated Transportation Engineers

Presentation to the Board of SupervisorsCounty of San Luis Obispo

February 5, 2008

Page 13: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

Our Project PhilosophyOur Project Philosophy

Highly experienced team with exceptional technical Highly experienced team with exceptional technical support staffsupport staff

Partnership Approach with the County and stakeholdersPartnership Approach with the County and stakeholders Precise scheduling during all phases of the workPrecise scheduling during all phases of the work Availability of staff throughout the project lifecycleAvailability of staff throughout the project lifecycle Innovative technical approach, concisely presented for Innovative technical approach, concisely presented for

multiple end usersmultiple end users Seamless interface with other project development effortsSeamless interface with other project development efforts User-friendly electronic interface linked to websiteUser-friendly electronic interface linked to website Three-pronged QA/QC Process designed to ensure Three-pronged QA/QC Process designed to ensure

successsuccess

Page 14: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

A Team of Experts…A Team of Experts…

Michael Brandman, PhD……………Principal-in-ChargeMichael Brandman, PhD……………Principal-in-Charge Gene Talmadge, MUP……………………Project ManagerGene Talmadge, MUP……………………Project Manager

Mike Houlihan, AICP…………………….………….CEQA/NEPA LeadMike Houlihan, AICP…………………….………….CEQA/NEPA Lead Bob Owens, PE……………….…Water Engineering and Health/ Safety Bob Owens, PE……………….…Water Engineering and Health/ Safety

LeadLead Kenneth J. Lord, PhD……………………………Cultural Resources, Kenneth J. Lord, PhD……………………………Cultural Resources,

Regulatory Services, Construction & Mitigation MonitoringRegulatory Services, Construction & Mitigation Monitoring Thomas J. McGill, PhD………………....Natural Resources LeadThomas J. McGill, PhD………………....Natural Resources Lead Curtis Hopkins, PG, CEG, CH.………………Geohydrology LeadCurtis Hopkins, PG, CEG, CH.………………Geohydrology Lead Mike Joyce, PE……….……Bio-Solids Process Evaluation LeadMike Joyce, PE……….……Bio-Solids Process Evaluation Lead Michael Schindler…………………………………………….GIS/WebsiteMichael Schindler…………………………………………….GIS/Website Sandra Bauer…………………….Quality Assurance/Peer ReviewSandra Bauer…………………….Quality Assurance/Peer Review

Page 15: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

……With Expert SupportWith Expert Support Michael Brandman AssociatesMichael Brandman Associates

CEQA/NEPA SupportCEQA/NEPA Support Thomas Holm, AICPThomas Holm, AICP Emilie Johnson, AICP, REAEmilie Johnson, AICP, REA Clint MeyerClint Meyer Grant GruberGrant Gruber Kathryn Lee, MSKathryn Lee, MS

Air Quality and Noise AnalysisAir Quality and Noise Analysis Cori WilsonCori Wilson Chelsea AyalaChelsea Ayala Greg Tonkovich, AICP, INCEGreg Tonkovich, AICP, INCE Vince Mirabella, MSVince Mirabella, MS Joe O’BannonJoe O’Bannon

Environmental JusticeEnvironmental Justice Kara Palm, MPAKara Palm, MPA

Cultural ResourcesCultural Resources Carrie Wills, RPA, MACarrie Wills, RPA, MA Michael Dice, RPA, MAMichael Dice, RPA, MA Marnie Aislin-KayMarnie Aislin-Kay

Biological and Regulatory ServicesBiological and Regulatory Services John Baas, PhDJohn Baas, PhD Bruce WilcoxBruce Wilcox Scott Crawford, MSScott Crawford, MS Linda ArcherLinda Archer T’Shaka Toure, MST’Shaka Toure, MS Scott HolbrookScott Holbrook Kelly RiosKelly Rios Tom Mullen, PETom Mullen, PE Paul Mead, JDPaul Mead, JD

GIS/WebsiteGIS/Website Mike SerranoMike Serrano Ricardo MarquezRicardo Marquez Karlee McCrackenKarlee McCracken

PublicationsPublications EditorsEditors Word ProcessorsWord Processors In-House Reprographics TeamIn-House Reprographics Team

Health/SafetyHealth/Safety Kristen GarciaKristen Garcia

Page 16: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

……With Expert SupportWith Expert Support

Kennedy/JenksKennedy/Jenks Alternatives AnalysisAlternatives Analysis

Justyna TeperJustyna Teper Mark MinkowskiMark Minkowski Lily ZsuLily Zsu Val FrenkelVal Frenkel Kapil VermaKapil Verma Additional technical support as requiredAdditional technical support as required

Far Western Anthropological Resource Far Western Anthropological Resource GroupGroup

Archaeology/Cultural AnalysesArchaeology/Cultural Analyses Deborah Jones, MADeborah Jones, MA Patricia Mikkelsen, MAPatricia Mikkelsen, MA Clinton M. Blount, MSClinton M. Blount, MS Steven Wee, MASteven Wee, MA Additional technical support as requiredAdditional technical support as required

Hopkins Groundwater ConsultantsHopkins Groundwater Consultants Groundwater AnalysisGroundwater Analysis

Curtis Hopkins, PG, CEG, CHCurtis Hopkins, PG, CEG, CH Additional technical support as requiredAdditional technical support as required

Bauer Environmental ServicesBauer Environmental Services Data ManagementData Management

Linda RogersLinda Rogers

Associated Transportation EngineersAssociated Transportation Engineers Transportation AnalysesTransportation Analyses

Scott Schell, AICPScott Schell, AICP Additional technical support as requiredAdditional technical support as required

Page 17: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

Major Work EmphasisMajor Work Emphasis

Eliminate Groundwater Degradation Eliminate Groundwater Degradation Alternatives Analysis for CEQA/NEPAAlternatives Analysis for CEQA/NEPA 150-page Draft EIR with Executive Summary – 150-page Draft EIR with Executive Summary –

Final EIRFinal EIR Community Involvement with Website and GISCommunity Involvement with Website and GIS Partnering with CountyPartnering with County

Page 18: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

Major MilestonesMajor Milestones

Completed DEIR by September 1Completed DEIR by September 1st st

Pre-Contracts provided to start Pre-Contracts provided to start research/cataloging/engineering review/team research/cataloging/engineering review/team buildingbuilding

Award of full contract by early February 2008Award of full contract by early February 2008Detailed Scope of Work with DeliverablesDetailed Scope of Work with Deliverables

Community Survey/DB RFP – Fall ‘08Community Survey/DB RFP – Fall ‘08 Final EIR by year endFinal EIR by year end

Page 19: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

Abstract of the Web Map Portal Process

Page 20: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

Your Core Values are Our Core Your Core Values are Our Core ValuesValues

AffordabilityAffordabilityEnvironmental StewardshipEnvironmental StewardshipFlexibilityFlexibilitySustainabilitySustainabilityCommunityCommunityControllabilityControllability……and we would add Teamwork based on and we would add Teamwork based on Commitment, Knowledge, and Commitment, Knowledge, and CommunicationCommunication

Page 21: LOS OSOS WASTEWATER PROJECT

LOWWP UPDATE 02-05-08LOWWP UPDATE 02-05-08

Thank You!Thank You!

Questions?Questions?

Contact:Contact:Gene Talmadge at Gene Talmadge at 805.427.4123 or 805.791.7200805.427.4123 or [email protected]@brandman.com