longitudinal coordination of care lcp swg thursday, april 18, 2013
TRANSCRIPT
![Page 1: Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013](https://reader036.vdocuments.us/reader036/viewer/2022082917/5514d628550346b0338b5342/html5/thumbnails/1.jpg)
Longitudinal Coordination of Care
LCP SWGThursday, April 18, 2013
![Page 2: Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013](https://reader036.vdocuments.us/reader036/viewer/2022082917/5514d628550346b0338b5342/html5/thumbnails/2.jpg)
• Announcements• Use Case 2.0 Working Session
– Review Community Feedback on the following sections:• Communities of Interest
– Review Base Flows, Alternate Flows, Diagrams
2
Agenda
![Page 3: Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013](https://reader036.vdocuments.us/reader036/viewer/2022082917/5514d628550346b0338b5342/html5/thumbnails/3.jpg)
• LCC HL7 Tiger Team SWG: SWG which will collaborate on LCC-related projects from HL7. Please join our meetings on Wednesdays at 11am ET
– Information about the Tiger Team can be found on the wiki at: http://wiki.siframework.org/LCC+HL7+Tiger+Team+SWG
• Lantana will be providing updates on their Implementation Guide development on the LTPAC calls starting Monday.
• Check out the LCC Use Case 2.0 Wiki Page (http://wiki.siframework.org/LCC+WG+Use+Case+2.0)
– We have a comment form to provide feedback on UC sections (http://wiki.siframework.org/LCC+Use+Case+2.0+Comments)
• Meeting Reminders (next week)– LTPAC SWG meeting – Monday at 11am ET– LCC HL7 Tiger Team SWG meeting – Wednesday at 11am ET– LCP SWG meeting – Thursday at 11am ET
3
Announcements
![Page 4: Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013](https://reader036.vdocuments.us/reader036/viewer/2022082917/5514d628550346b0338b5342/html5/thumbnails/4.jpg)
Date Item Homework (Due Friday COB)
3/11 – 3/18/13
10.0 Scenario (User Stories, Base/Alternate Flow, Functional Requirements, Activity Diagram, Sequence Diagram)
Review: User Stories
3/25 – 3/26/13
3.0 Use Case Scope (Background, In / Out of Scope, Communities of Interest)
Finalize: User Stories, Base Flows, In Scope, Out of ScopeReview: Communities of Interest, Assumption
4/1 – 4/2/13
3.0 Use Case Scope•Communities of Interest
Finalize: Communities of Interest, Assumptions, Pre-Conditions, Post-ConditionsReview: Actors and Roles5.0 Use Case Assumptions
6.0, 7.0 Pre-Conditions, Post Conditions
4/8/13 Finalize: Assumptions, Pre-Conditions, Post-Conditions8.0 Actors and Roles
Review: Actors and Roles
4/11/13 Review Community Feedback : Communities of Interest, Assumptions8.0 Actors and Roles
Finalize: Assumptions, Pre-Conditions, Post-Conditions, Actors and Roles
4/15/13 Finalize: Communities of Interest, Assumptions, Actors and Roles
Review: Base Flows, Use Case Diagrams, Activity Diagrams, Sequence Diagrams
4/18/13 Review Base/Alternate Flows, User StoriesDiagrams: Use Case, Activity, Sequence
Finalize: Base Flows, Use Case Diagrams, Activity Diagrams, Sequence Diagrams
4/22/13 11.0 Risks, Issues, and Obstacles Finalize: Risks, Issues and Obstacles; Dataset Requirements12.0 Dataset Requirements
4/25/13 Appendices (if required) Finalize: Appendices, Use Case Diagram, Value Statement4.0 Value Statement
LCC Use Case 2 Development ScheduleItems in italics will drawn directly from the LCC Project Charter or created offline directly from other sections and will be included in the end-to-end review
![Page 5: Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013](https://reader036.vdocuments.us/reader036/viewer/2022082917/5514d628550346b0338b5342/html5/thumbnails/5.jpg)
• 1.0 Preface and Introduction**
• 2.0 Initiative Overview– 2.1 Initiative Challenge Statement**
• 3.0 Use Case Scope– 3.1 Background**– 3.2 In Scope– 3.3 Out of Scope– 3.4 Communities of Interest
• 4.0 Value Statement**
• 5.0 Use Case Assumptions
• 6.0 Pre-Conditions
• 7.0 Post Conditions
• 8.0 Actors and Roles
• 9.0 Use Case Diagram
Use Case Outline
•10.0 Scenario: Generic Provider Workflow– 10.1 User Stories– 10.2 Activity Diagram
o 10.2.1 Base Flowo 10.2.2 Alternate Flow
– 10.3 Functional Requirementso 10.3.1 Information Interchange Requirementso 10.3.2 System Requirements
– 10.4 Sequence Diagram
•11.0 Dataset Requirements
•12.0 Risks, Issues and Obstacles
•Appendices
– Related Use Cases– Previous Work Efforts– References
5
** Leverage content from Charter
Draft sections complete
Content available for review
![Page 6: Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013](https://reader036.vdocuments.us/reader036/viewer/2022082917/5514d628550346b0338b5342/html5/thumbnails/6.jpg)
• 3.4 Communities of Interest: Review community
feedback
• 10.1, 10.2.1, 10.2.2 User Stories, Base Flow,
Alternate Flow: Available for review this week
• 9.0 Use Case Diagrams: In process
• 10.2 Activity Diagrams: In process
• 10.4 Sequence Diagrams: In process
Status of current Use Case draft sections
6