Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013

Upload: ashton-gibbs

Post on 27-Mar-2015

216 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013

Longitudinal Coordination of Care

LCP SWGThursday, April 18, 2013

Page 2: Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013

• Announcements• Use Case 2.0 Working Session

– Review Community Feedback on the following sections:• Communities of Interest

– Review Base Flows, Alternate Flows, Diagrams

2

Agenda

Page 3: Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013

• LCC HL7 Tiger Team SWG: SWG which will collaborate on LCC-related projects from HL7. Please join our meetings on Wednesdays at 11am ET

– Information about the Tiger Team can be found on the wiki at: http://wiki.siframework.org/LCC+HL7+Tiger+Team+SWG

• Lantana will be providing updates on their Implementation Guide development on the LTPAC calls starting Monday.

• Check out the LCC Use Case 2.0 Wiki Page (http://wiki.siframework.org/LCC+WG+Use+Case+2.0)

– We have a comment form to provide feedback on UC sections (http://wiki.siframework.org/LCC+Use+Case+2.0+Comments)

• Meeting Reminders (next week)– LTPAC SWG meeting – Monday at 11am ET– LCC HL7 Tiger Team SWG meeting – Wednesday at 11am ET– LCP SWG meeting – Thursday at 11am ET

3

Announcements

Page 4: Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013

Date Item Homework (Due Friday COB)

3/11 – 3/18/13

10.0 Scenario (User Stories, Base/Alternate Flow, Functional Requirements, Activity Diagram, Sequence Diagram)

Review: User Stories

3/25 – 3/26/13

3.0 Use Case Scope (Background, In / Out of Scope, Communities of Interest)

Finalize: User Stories, Base Flows, In Scope, Out of ScopeReview: Communities of Interest, Assumption

4/1 – 4/2/13

3.0 Use Case Scope•Communities of Interest

Finalize: Communities of Interest, Assumptions, Pre-Conditions, Post-ConditionsReview: Actors and Roles5.0 Use Case Assumptions

6.0, 7.0 Pre-Conditions, Post Conditions

4/8/13 Finalize: Assumptions, Pre-Conditions, Post-Conditions8.0 Actors and Roles

Review: Actors and Roles

4/11/13 Review Community Feedback : Communities of Interest, Assumptions8.0 Actors and Roles

Finalize: Assumptions, Pre-Conditions, Post-Conditions, Actors and Roles

4/15/13 Finalize: Communities of Interest, Assumptions, Actors and Roles

Review: Base Flows, Use Case Diagrams, Activity Diagrams, Sequence Diagrams

4/18/13 Review Base/Alternate Flows, User StoriesDiagrams: Use Case, Activity, Sequence

Finalize: Base Flows, Use Case Diagrams, Activity Diagrams, Sequence Diagrams

4/22/13 11.0 Risks, Issues, and Obstacles Finalize: Risks, Issues and Obstacles; Dataset Requirements12.0 Dataset Requirements

4/25/13 Appendices (if required) Finalize: Appendices, Use Case Diagram, Value Statement4.0 Value Statement

LCC Use Case 2 Development ScheduleItems in italics will drawn directly from the LCC Project Charter or created offline directly from other sections and will be included in the end-to-end review

Page 5: Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013

• 1.0 Preface and Introduction**

• 2.0 Initiative Overview– 2.1 Initiative Challenge Statement**

• 3.0 Use Case Scope– 3.1 Background**– 3.2 In Scope– 3.3 Out of Scope– 3.4 Communities of Interest

• 4.0 Value Statement**

• 5.0 Use Case Assumptions

• 6.0 Pre-Conditions

• 7.0 Post Conditions

• 8.0 Actors and Roles

• 9.0 Use Case Diagram

Use Case Outline

•10.0 Scenario: Generic Provider Workflow– 10.1 User Stories– 10.2 Activity Diagram

o 10.2.1 Base Flowo 10.2.2 Alternate Flow

– 10.3 Functional Requirementso 10.3.1 Information Interchange Requirementso 10.3.2 System Requirements

– 10.4 Sequence Diagram

•11.0 Dataset Requirements

•12.0 Risks, Issues and Obstacles

•Appendices

– Related Use Cases– Previous Work Efforts– References

5

** Leverage content from Charter

Draft sections complete

Content available for review

Page 6: Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013

• 3.4 Communities of Interest: Review community

feedback

• 10.1, 10.2.1, 10.2.2 User Stories, Base Flow,

Alternate Flow: Available for review this week

• 9.0 Use Case Diagrams: In process

• 10.2 Activity Diagrams: In process

• 10.4 Sequence Diagrams: In process

Status of current Use Case draft sections

6