Panchayath Raj Engineering Division, Udupi
Sl no. ConstituencyNo of
Tanks Estimated Amount
No of Tanks completed
ExpenditureTotal
1 Udupi 50 906.00 5 249.702 Kundapura 56 623.00 23 210.803 Karkala 17 380.00 6 43.83
4Minor irrigation
dpt. tanks15 589.00 6 174.09
Total 138 2498.00 40 678.36
Rural water supply scheme 2011-12
1Tanks taken up
under Sustainability
58 212.00 35 113.18
3
R W S and P R E Division, Udupi
Sl no. ConstituencyNo of
Tanks Estimated Amount
No of Tanks
tenderd
Tenderd Amount
No of Tanks
completed
Expenditure
Total
1 Udupi 50 906.00 50 803.05 3 249.70
2 Kundapura 56 623.00 56 533.59 8 210.83
3 Karkala 17 380.00 17 347.20 0 43.83
Total 123 1909.00 123 1683.84 11 504.36
4
Sl. No. taluk Total no of tanks
No of tanks survey done
1 Udupi 158 147
2 Kundapura 188 83
3 Karkala 66 45
Total 412 275
Avari Kere Desiltation Rangan Kere Desiltation
5
6
Rangan kere Desiltation Geru Hadi Desiltation Work
1. ¸¹Ñ‘Ð 18-06-2011 ¤Ð·ÐÔ ¹Ð®Ù·Ð ÀЦѹÐô ÄÙÖÓ‘ý � �ƒ·Ñóý¹ÐÅö ÊÐÅöÊÐÄÑ—·Ðì ’õ¦Ð¦Ñ ¦ÙÖÓ¡¹Ù §Ó³Ñô ÀФи� �
A - Action Plan as on 18-06-2011Sl. No.
Depart
ment
Name of Tank
Commond Area
in Hect
Water Spread Area
in Hect.
Encroachment Area in Hect
Eviction of
Encroachment
Improvement required Rs.in lakhs
Area in
Hect.
Cost Rs. In
lakhs
Desilting Waste
Weir Rs. in
lakhs
Sluice/
Canal Rs. in lakhs
Bund Rs. in lakhs
Total Rs. in lakhs
Qty. Amount Rs. in
lakhs
1 2 3 4 5 6 7 8 9 10 11 12 13 141 Mino
r Irrigation
Kandavara Herikere
70.20 12.34 0.69 0.69 1.51 41000.00
29.00
12.00
36.00
37.00
114.00
2 Minor
Irrigation
Yellur Dhalanthara Kere
40.30 3.89 0.30 0.30 0.85 1000.00
1.00 0 0.00 27.00
28.00
3 Minor
Irrigation
Chantaru Madaga Kere
122.72
8.19 0.05 0.05 1.54 11000.00
6.00 0 52.00
55.00
113.00
4 Minor
Irrigation
Anekere 49.75 12.40 0 0 0 12000.00
10.00
22.00
0 33.00
65.00
282.97
36.82 1.04 1.043.90 65000.00
46.00
34.00
88.00
152.00
320.00
887
888
Sl. No.
Name of Work Estimat
e cost (Rs. In
lakhs)
Remarks
1 Improvements to Chantaru Madaga Tank in Chantaru Village, Udupi Taluk
85.00
Desilting, strengthening of tank bund, sluice replacement and allied works.
2 Improvements to Dhalanthra Kere in Yellur Village, Udupi Taluk
28.00
Under Tender process
3 Improvements to Kandavara Herikere in Kandavara Village, Kundapura Taluk
49.00
Under Tender process
889
Improvements to Chantharu Madaga Kere
Before Execution
8810
Improvements to Chantharu Madaga Kere
During Desilting
8811
Improvements to Chantharu Madaga Kere
During Desilting
8812
Improvements to Chantharu Madaga KereDuring Bund Improvements
8813
Improvements to Chantharu Madaga KereContructions of Retaining Wall
8814
• Videos of Chantharu madaga Rejuvenation
• 1
• 2
• 3
• 4
15
16
Compliance on Tree planting, Rejuvenation of water supply catchments etc
Udupi District is one of the Coastal districts of Udupi District is one of the Coastal districts of Karnataka – Geographical area of the district is Karnataka – Geographical area of the district is 356446 Ha.356446 Ha.
The Forests of district forms 28.08% of the area. The Forests of district forms 28.08% of the area.
The Forests are spread mainly in Western The Forests are spread mainly in Western Ghats, which is one of the 25 Mega Bio-diversity Ghats, which is one of the 25 Mega Bio-diversity spots of the world. spots of the world.
TOTAL FOREST AREA OF THE DISTRICT.TOTAL FOREST AREA OF THE DISTRICT. - 1,00,102 Ha.- 1,00,102 Ha.
8817
The Forests are managed as per the prescriptions of the Working Plan / Wildlife Management Plan approved by the Government.
8818
Kundapura Kundapura Forest DivisionForest Division
Kuduremukh Kuduremukh Wildlife Division, Wildlife Division,
KarkalaKarkala
Social Forestry Social Forestry Division, UdupiDivision, Udupi
Kundapura forest division has filed an
affidavit for afforestation in 5000 Ha. Of Government
land, 150 Kms. Roadside plantation
and 100 Ha. Of Mangrove
Plantations for next five years.
Kuduremukh wildlife division, Karkala has filed an affidavit for
275 Ha. of Plantation, 12500 M3 Soil
conservation works, establishing 25 Nos of
Anti –poaching camps, 15 Nos. of check dams and
ponds, desilting of tanks, 2000 Kms of
Fire protection works inside the protected areas for next five
years.
Social Forestry Division, Udupi has filed an affidavit for raising of 5 Laksh seedlings in Govt. Land, Panchayath
lands, Schools, Roadside and
distribution to Farmers and the public for
planting in their lands. Proposed for
afforestation in 506 Ha. Of Govt lands and
roadside plantations for next five years.
8819
Action taken reports- Action taken reports- Kundapura Forest DivisionKundapura Forest Division
SlSl
..
NN
o.o.
ActivityActivity
Progress as on Progress as on
31-03-201231-03-2012Programme for Programme for
the year 2011-12the year 2011-12
Target DateTarget DateArea in
Ha.
Seedlings
planted
Area in Ha.
Seedlings
planted
11Block Block
PlantationPlantation1619.55 1619.55
Ha.Ha.16.07 16.07 LakhsLakhs
533 533 Ha.Ha.
20.87 20.87 LakhsLakhs Balance Balance
works filed works filed in the in the
affidavit, affidavit, will be will be
completed completed in the next in the next five years.five years.
22Roadside Roadside
plantationplantation60.70 60.70 KmsKms
0.1214 0.1214 LakhsLakhs
74 74 KmsKms
0.26 0.26 Lakhs Lakhs
33Mangrove Mangrove PlantationPlantation
15 Ha.15 Ha.0.90 0.90
LakhsLakhs--
1.10 1.10 Lakhs Lakhs
33Coastal Coastal
Green Belt Green Belt plantationplantation
12 Ha.12 Ha.0.30 0.30
LakhsLakhs-- --
8820
Roadside plantationRoadside plantation
21
Mangrove plantationMangrove plantation
22
GqÀĦ ªÀ®AiÀÄzÀ ºÉdªÀiÁr JA§°è UÁ½, GqÀĦ ªÀ®AiÀÄzÀ ºÉdªÀiÁr JA§°è UÁ½, ®ªÀAZÀ ºÁUÀÆ ºÉÆ¼É ºÉÆ£Éß- ¸ÀªÀÄÄzÀæ ®ªÀAZÀ ºÁUÀÆ ºÉÆ¼É ºÉÆ£Éß- ¸ÀªÀÄÄzÀæ §¢ £ÉqÀÄvÉÆÃ¥ÀÄ – 12 ºÉ. s§¢ £ÉqÀÄvÉÆÃ¥ÀÄ – 12 ºÉ. s
Coastal Green Belt plantationCoastal Green Belt plantation
8823
Sl.Sl.
NoNo
..ActivityActivity
Progress as on Progress as on
31-03-201231-03-2012Programme for the Programme for the
year 2011-12year 2011-12
11
Digging of Digging of
trench for trench for
boundary boundary
consolidationconsolidation
18 Kms18 Kms
22
Soil and Soil and
moisture moisture
conservation conservation
works works
(Staggered (Staggered
trenches)trenches)
982 cum982 cum
33Compensation Compensation
paid for wildlife paid for wildlife
damagesdamages
No. of No. of casescases
Amount Amount paid (Rs. paid (Rs. In lakhs)In lakhs)
40040016.43 16.43 LakhsLakhs
44
Revenue share Revenue share
given to Village given to Village
Forest Forest
CommitteesCommittees
No. of No. of VFCsVFCs
Share (Rs., Share (Rs., in lakhs)in lakhs)
404057.739 57.739 LakhsLakhs
Other activities – Other activities – Kundapura Forest DivisionKundapura Forest Division
8824
£À¢ ªÀÄÆ® £À¢ ªÀÄÆ® ¸ÀAgÀPÀëuÁ ¸ÀAgÀPÀëuÁ PÁAiÀÄðPÀæªÀÄ PÁAiÀÄðPÀæªÀÄ
¸Ë¥ÀtÂðPÁ £À¢
¢£ÁAPÀ: 11-01-2011 gÀAzÀÄ ¢£ÁAPÀ: 11-01-2011 gÀAzÀÄ PÉÆ®ÆègÀÄ UÁææªÀÄzÀ PÉÆ®ÆègÀÄ UÁææªÀÄzÀ D£ÉgÀhÄj JA§°è £ÀqÉzÀ “£ÀD£ÉgÀhÄj JA§°è £ÀqÉzÀ “£À¢ ªÀÄÆ® ¸ÀAgÀPÀëuÁ ¢ ªÀÄÆ® ¸ÀAgÀPÀëuÁ C©üAiÀiÁ£À” C©üAiÀiÁ£À” PÁAiÀÄðPÀæªÀÄzÀ°è PÁAiÀÄðPÀæªÀÄzÀ°è ²æÃ. C£ÀAvÀ ºÉUÀqÉ, ²æÃ. C£ÀAvÀ ºÉUÀqÉ, D²Ã¸ÀgÀ, CzsÀåPÀëgÀÄ, D²Ã¸ÀgÀ, CzsÀåPÀëgÀÄ, ¥À²ÑªÀÄ WÀlÖ PÁAiÀÄð¥ÀqÉ ¥À²ÑªÀÄ WÀlÖ PÁAiÀÄð¥ÀqÉ EªÀgÀÄ EªÀgÀÄ ¸À¨sÉAiÀÄ£ÀÄßzÉÝò¹ ¸À¨sÉAiÀÄ£ÀÄßzÉÝò¹ ªÀiÁvÀ£ÁqÀÄwÛgÀĪÀÅzÀÄ. ªÀiÁvÀ£ÁqÀÄwÛgÀĪÀÅzÀÄ.
25
Sowparniak river on the bank of which Kollur Mookambika temple is located .
The river originates at Kodachadri Hill and flows westwards and joins Arabian sea at Gangolli. The main polution of the river is at Kollur , by dumping solid waste to the river and releasing untreated water from all lodges , residential areas
Under the save Sowparnika campaign
1. Jatha was arranged on 11-01-2011 at Kollur.
2. Shramadhan was conducted with all Officials and school children to create awareness of safe disposal of solid waste.
3. A waste disposal vehicle of worth 6.00 lakhs is purchased by peoples contribution ( for each room of the lodge `500-00 was collected .
4. Local committee is formed to monitor the day to day collection of disposal.
5. Cesspool machine is purchased by the Kollur Mookambika Temple for safe disposal of liquid wastes.
The quality of water is substantially improvedThe quality of water is substantially improved. 26
27
28
1. Raising Plantations1. Raising PlantationsA) Block plantation - 100 Ha.B) Fruit Yielding Plantation Along Canal Side - 10 km. C) Planting Agave and Vatevaria slips –16 ha.
4. Soil and moisture conservation worksSoil and moisture conservation worksA) Staggered trenches- 2751 M3
B) Gully checks – 598 M3
5.Community oriented works5.Community oriented works A) LP Gas is being provided to 157 beneficiaries. B) 105 Farmers (65 Men, 40 Women) are taken on a exposure trip to upper Krishna Project area in
Bagalkote (Alamatti).
29
Sl.No.
Activity
Progress as on 18-06-2011
Status as on 31-03-2012
Target Target
DateDateArea in Ha.
Seedlings
planted
Area in Ha.
Seedlings planted
11Raising fruit
bearing trees in forest
75 Ha. of plantation has been raised.
-- --
Balance works filed
in the affidavit, will be
completed in the next five years.
2Compensation paid to farmers
- -
Rs1,34,185 of compensation paid to farmers in 51 cases .
3
Creating awareness
among villagers to reduce man-animal conflict
- -
Three trainings have been conducted to the EDC members – a)Kollur
4Soil
conservation works
- -
Gully checks along the Nalas work completed for 4311.85 Cum. 9 tanks have been Desilted .
5Fire Protection
Works - -
369.20 KMs fire protection works have been carried out .
Action taken reports- Action taken reports- Kuduremukh Wildlife Division, Karkala.Kuduremukh Wildlife Division, Karkala.
30
• A District level committee headed by Deputy Commissioner as Chairman and DCF as member secretary and all the Dist level officers as members is implementing the programme as per govt order Dated 02.02.2010.
• 26 families have given their willingness to come out of the park with the suitable compensation.
• The Govt of Karnataka has released Rs 98.39 lakhs for implementation of rehabilitation, out of which Rs 98.21lakshs has been disbursed to the 12 families and 13.61 acres of land has been included into the National Park.
31
32
Action taken reports- Action taken reports- Social Forestry Division, UdupiSocial Forestry Division, Udupi
33
List of Village Forest Committees- Kundapura Forest List of Village Forest Committees- Kundapura Forest Division Division
34
Sl.Sl.NoNo..
RangeRange JFPM under JFPM under FDA during FDA during
2005-062005-06
JFPM under JFPM under JBIC during JBIC during
2005-062005-06
JFPM under JFPM under JBIC during JBIC during
2006-072006-07
JFPM JFPM under under JBIC JBIC
during during 2007-082007-08
OthersOthers
11KundapuKundapu
rara1)Kodlady, 1)Kodlady,
2)Aluru 2)Aluru 1)Karkunje1)Karkunje
1)Edurkujnadi 1)Edurkujnadi 2)Valthur-2)Valthur-AmparuAmparu
1)Muduru 1)Muduru 2)Jadkal2)Jadkal
1) Thrasi 1) Thrasi
2)Nujadi2)Nujadi 3)Bellala 3)Bellala
22 ByndoorByndoor3)Shiroor, 3)Shiroor,
4)Kalthodu 4)Kalthodu 3)Heroor3)Heroor
4)Yadthare4)Yadthare5)Yalajith 5)Yalajith
3)Golihole 3)Golihole 4)Thaggar4)Thaggarsese
33 UdupiUdupi5)Pirnankila5)Pirnankila, , 6)Heggunje 6)Heggunje
4)Pilaru4)Pilaru -- --
44ShankarShankarnaryananaryana
7)Amasebail7)Amasebail, , 8)Shankarnar8)Shankarnarayna ayna
5)Hosangad5)Hosangadyy
6)Ajri6)Ajri7)Yadamoge7)Yadamoge8)Rattady-8)Rattady-KulanjeKulanje
5)745)74thth Ulloor Ulloor 6)Machch6)Machchattu attu 7)Hengav7)Hengavally ally
55 HebriHebri 9)Hosuru, 9)Hosuru, 10)Perdoor 10)Perdoor
6)Nalkuru-6)Nalkuru-KudiKudi
9)Hebri9)Hebri10)Byrampalli10)Byrampalli-41 (Shiroor--41 (Shiroor-Bellampalli)Bellampalli)
8)Kenjoor 8)Kenjoor
66MoodbidMoodbid
riri
11)Nooralbe11)Nooralbettu, ttu, 12)Nalluru 12)Nalluru
7)Todaru-7)Todaru-HosabettuHosabettu
11)Panapila11)Panapila12)Renjala12)Renjala
9)Idu 9)Idu
2) 2) ValpadyValpady
3)Kadand3)Kadandaleale
77 KarkalaKarkala 13)Durga, 13)Durga, 14)Hirgana 14)Hirgana
8)Durga-8)Durga-MuduruMuduru
13)Shirlalu-13)Shirlalu-JarkalaJarkala
--
9)Marne-9)Marne-HermundeHermunde
14)Kaudoor14)Kaudoor
88 VenoorVenoor15)Sulkerim15)Sulkerimogru, ogru, 16)Nalkuru 16)Nalkuru
10)Savya, 10)Savya, 11)Marodi 11)Marodi
15)Kukkedi15)Kukkedi16)Andinje16)Andinje
10)Karima10)Karimanilu nilu 11)Kuthlo11)Kuthlooror
TOTALTOTAL 16 Nos.16 Nos. 11 Nos.11 Nos. 16 Nos. 16 Nos. 11 Nos.11 Nos. 03 Nos.03 Nos.
TOTAL – 57 VFCs formedTOTAL – 57 VFCs formed 34
Participatory Rural Appraisal Exercise in Village Forest CommitteesParticipatory Rural Appraisal Exercise in Village Forest Committees
35
No. of No. of VFCs VFCs
Formed Formed in the in the
Division Division (2005-06 (2005-06 to 2011-to 2011-
12)12)
Share Distributed (Rs. In Lakhs)Share Distributed (Rs. In Lakhs)
YearYear
No of No of VFCs VFCs Share Share
DistributeDistributedd
ThrougThrough MFPh MFP
No of No of VFCs VFCs Share Share
DistributeDistributedd
Through Through PlantatioPlantatio
n n extractionextraction
Total Total Share Share
DistributeDistributedd
5757
2005-2005-0606
22 0.00360.0036 0.00360.0036
2006-2006-0707
66 0.25970.2597 0.25970.2597
2007-2007-0808
1616 0.686340.68634 0.686340.68634
2008-2008-0909
1616 2.81972.8197 33 5.681045.68104 8.500748.50074
2009-2009-1010
3131 4.249684.24968 66 27.5080427.50804 31.7577231.75772
2010-2010-1111
55 10.1527510.15275 10.1527510.15275
2011-2011-1212
44 6.378526.37852 6.378526.37852
8.019028.01902 49.7203549.72035 57.7393757.73937
VFC SharesVFC Shares
36
School Forest School Forest
37
PÀÄAzÁ¥ÀÄgÀ «¨sÁUÀzÀ°è 2011-12 PÀÄAzÁ¥ÀÄgÀ «¨sÁUÀzÀ°è 2011-12 £Éà ¸Á°£À°è ªÀ£ÀªÀĺÉÆÃvÀìªÀ £Éà ¸Á°£À°è ªÀ£ÀªÀĺÉÆÃvÀìªÀ ªÀÄwÛvÀgÉ PÁAiÀÄðPÀæªÀÄUÀ½UÁV ªÀÄwÛvÀgÉ PÁAiÀÄðPÀæªÀÄUÀ½UÁV 2,30,000 ¸À¹UÀ¼À£ÀÄß ««zsÀ ±Á¯É 2,30,000 ¸À¹UÀ¼À£ÀÄß ««zsÀ ±Á¯É ºÁUÀÆ ¸ÀAWÀ ¸ÀA¸ÉÜUÀ¼À ºÁUÀÆ ¸ÀAWÀ ¸ÀA¸ÉÜUÀ¼À DªÀgÀtUÀ¼À°è VqÀ £ÉqÀÀ¯ÁVzÉ. DªÀgÀtUÀ¼À°è VqÀ £ÉqÀÀ¯ÁVzÉ.
ªÀÄUÀÄ«UÉÆAzÀÄ ªÀÄUÀÄ«UÉÆAzÀÄ ªÀÄgÀ, ±Á¯ÉUÉÆAzÀÄ ªÀÄgÀ, ±Á¯ÉUÉÆAzÀÄ ªÀ£ÀªÀ£À
38
39
Forest Land diverted for non-forestry Forest Land diverted for non-forestry activitiesactivities
Forest land diversion Cases
Extent in Ha.
26 324.51Compensatory Plantation raisedCompensatory Plantation raised
Forest Land(In Ha.)
Non-Forest Land (In Ha.)
369.48 228.43
Satellite Satellite imagery of imagery of
Udupi District - Udupi District - 19991999
Satellite Satellite imagery of imagery of
Udupi District - Udupi District - 20122012
40
• Click here to see video (Forest department )
41
42
PROGRAMMESPHYSICAL
ACH.
FINANCIALEXPENDITUR
E (LAKH Rs.)
AREA EXPANSION OF HORTICULTURE CROPS
425 HA. 64.80
REJUVINATION OF CASHEW 20 HA 3.0
ASSISTANCE TO VERMICOMPOST
AND BIODIGESTER UNITS35 NO. 10.50
INTEGRATED NUTRIENT AND
PEST MANAGEMENT1000 HA 10.00
ASSISTANCE TO BEE KEEPING
250 NO. 3.75
43
YEAR
Area Expansion of Horticulture Crops (Banana, Pineapple, Cocoa, Cashew, Pepper, Nutmeg and udupi Mallige)
Phy. (Ha.) Fin. (Lakh Rs.)2011-12 400 70.502012-13 445 77.502013-14 490 84.502014-15 535 91.502015-16 565 98.0Total 2435 422.0
Fund Flow NHM and MNREGA
• Action has been taken to increase area of horticulture crops using funds of National Horticulture Mission. Till the end of march 2012 an area of 425 Ha of horticulture crop has been increased utilizing Rs. 64.80 lakhs. And 412 Ha of horticulture crop area is maintained utilizing Rs. 22.27 lakhs
• Under MNREGS Rs.16 lakhs have been spent in collaboration with Grama Panchayath for area expansion of Horticulture Crops.
44
• Under Promotion of Organic Farming 100 Ha of Horticulture area has been issued IC-3 Certificate in two clusters each 50 Ha in Udupi and Kundapura Taluk. 8 training programs for organic farming promotion are being completed under National Project on Organic Farming Scheme.
• Till the end of March 2012 Department assisted 5 Vermi Compost Units and 15 Bio-digester Units using Rs.6 lakhs under National Horticulture Mission. So as to enhance the area operated under organic method of cultivation
45
Note = IC-3 Certificate is issued by the organic certifying agency for conversion of land from inorganic to organic cultivation and the cultivation is declared as organic farming after 3 years of conversion period.
• Action taken to distribute bio control agents like trichoderma and Bio-fertilizers like Phosphate Solubilising Bacteria to farmers in order to reduce the use of chemical fertilizers and pesticides in horticulture crops.
• Till the end of March 2012 assistance has been given to promote 250 honey bee colonies under National Horticulture Mission.
46
47
Sl. noSl. no ActivityActivity As on 31-3-2012As on 31-3-201211 Implementation of Implementation of the the
Scheduled Tribes And Scheduled Tribes And other traditional other traditional forest dwellers forest dwellers ( recognition of forest rights ) ( recognition of forest rights ) act 2006 andact 2006 and rules 2008 rules 2008
726 Application from Scheduled 726 Application from Scheduled Tribes received 492 Tittles are Tribes received 492 Tittles are Distributed to eligible claimants.Distributed to eligible claimants.(Total extent of land given is (Total extent of land given is 651.64 acres )651.64 acres )
22 PTG(Primitive Tribal Group ) PTG(Primitive Tribal Group ) Program Program
561 Houses are sanctioned , 561 Houses are sanctioned , 118 completed and 443 are in 118 completed and 443 are in progress.progress.
33 Health Improvement for Koragas Health Improvement for Koragas
Nutritious food distribution Nutritious food distribution
Rs 15.37 has been utilized out Rs 15.37 has been utilized out of Rs 30 lakhs. of Rs 30 lakhs.
Distributed to 2518 Koraga Distributed to 2518 Koraga families .families .
44 Educational schemesEducational schemes Rs 12.07 lakhs have been Rs 12.07 lakhs have been spent out of Rs 40 lakhs. spent out of Rs 40 lakhs.
55 Self employment ProgramSelf employment Program Rs 44.11 lakhs has been spent Rs 44.11 lakhs has been spent out of Rs 92 lakhs . ( 97 out of Rs 92 lakhs . ( 97 beneficiaries. ) beneficiaries. )
48
Developmental Programmes Implemented for
welfare of Scheduled Tribes in Udupi District.
Muduru Tribal colony
Kundapura 33-Shirooru Tribal
colony Udupi49
Livelihood security programme
Ragihaklu Tribal colony Kundapura
50
Infrastructural Facilities
Kenjooru Tribal colony Udupi
51
Infrastructural Facilities
Kukkehalli Tribal colony Udupi52
Haladi and Hosangadi Kundapura-Beneficiaries of SCA
53
Self-employment
Training Karkada
Assitance for Commercial crop at
Haladi 54
55
56