logistical management presentation - breakbulk.com semi-submersible heavy-lift vessels carrying...
TRANSCRIPT
SLIDE NAME IN TEMPLATE:
\
1
02 TITLE - BLUE NAME
BOSKALIS COLORS:
RGB values:
R 255, G 255, B 255
R 0, G 0, B 0
R 255, G 247, B 25
R 0, G 38, B 99
R 0, G 81, B 158
R 127, G 127, B 127
R 191, G 191, B 191
R 49, G 128, B 255
SET UP GRIDS AND GUIDES:
Grids and guides make it easier to align shapes and objects
(index, chart, table etc.). Grids and guides can be shown or
hidden.
Right-click on an empty area of the slide and then click Grid
and Guides.
Check under Guide settings → the button Display drawing
guides on screen.
If you want the current settings in the Grid and Guide dialog box
to be the default settings for all presentations, rather than just
this one, click Set as Default.
Drawing guides are not visible during a slide show and do not
show on prints or handouts.
SLIDE EXAMPLE:
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and double-
click on it
3. Right-click on the picture and Send to Back to place
it in the background behind your text
BREAKBULK MIDDLE EAST
ABU DHABI, UAE
HEIN HEYSTER
OCTOBER 28, 2015
LOGISTICAL MANAGEMENT
SLIDE NAME IN TEMPLATE:
\
4
07 PICTURE FULL SCREEN
SLIDE EXAMPLE:
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and double-
click on it
3. Right-click on the picture and Send to Back to place
it in the background behind your text
BOSKALIS
COMPANY INTRO
SLIDE NAME IN TEMPLATE:
\
5
07 PICTURE FULL SCREEN
SLIDE EXAMPLE:
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and double-
click on it
3. Right-click on the picture and Send to Back to place
it in the background behind your text
BOSKALIS OVERVIEW
SLIDE NAME IN TEMPLATE:
\
6
18 EMPTY
SLIDE EXAMPLE:
OUR FLEET
3 Multi Purpose / cable lay vessel
23 Semi-submersible heavy-lift vessels
Carrying capacity up to 117,000 MT
Free deck space ≤ 70 m x 275 MT
2 Fall Pipe Vessels
Capacity from 18,000 to 24,000 MT
10 Floating sheerlegs
Capacity from 400 to 5,000 MT
165 Barges
Hopper barges, capacity 50 to 3,800 MT
Oceangoing semi, capacity 21,000 MT
Oceangoing flat top, capacity from 1,000 to 14,000 MT
Inland barges, capacity from 100 to 2,000 MT
424 Tugs
Anchor handling , capacity > 2,239 kW
Coastal / Harbor, capacity from 358 to 5,224 kW
Harbor / River (pusher), capacity from 75 to 2,089 kW
151 Support Vessels
Diving support vessels
Launches
Work / Supply vessels
107 Dredgers
Trailing suction hopper dredgers
Cutter suction dredgers
Backhoes
Floating grab cranes
SLIDE NAME IN TEMPLATE:
\
7
Logistical Management Solutions
Turnkey logistical
services for onshore
industrial projects.
SLIDE NAME IN TEMPLATE:
\
8
08 TEXT & PICTURE 80/20
SLIDE EXAMPLE:
BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and
double-click on it
3. The picture is centered automatically. If the
main focus of the picture is not visible, please
use another picture
4. Right-click on the picture and Send to Back to
place it in the background behind your text
LOGISTICAL MANAGEMENT:
THE ‘ONE-STOP SHOP’ SOLUTION
• Single interface management partner • Heavy transportation vessels
• Tug and barge
• Dock type ships
• Self geared ships
• Complete project management solution • Grillage & sea-fastening design, fabrication and installation
• Engineering studies
• Management of risk
• Partnering with SPMT providers, freight forwarding, civil
engineering
• Scope outside of transportation • MOF design and construction
• Land reclamation
• Dredging
• Environmental monitoring
• Offshore installation
SLIDE NAME IN TEMPLATE:
\
9
18 EMPTY
SLIDE EXAMPLE:
LOGISTICAL MANAGEMENT SOLUTIONS:
HYBRID SOLUTION
• Complete and robust logistics solutions
• Supplementing our vessels with 3rd party
tonnage
• Source most suitable vessel for the solution
• One contract – one interface
• Flexible contracting approach
• Ability to offer services outside of core
business
SLIDE NAME IN TEMPLATE:
\
11
09 TEXT & PICTURE 60/40
SLIDE EXAMPLE:
BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and
double-click on it
3. The picture is centered automatically. If the
main focus of the picture is not visible, please
use another picture
4. Right-click on the picture and Send to Back to
place it in the background behind your text
LOGISTICAL MANAGEMENT PROJECT:
KONIAMBO
CLIENT: Hatch / Technip
PERIOD: 2010
LOCATION: Qingdao, China to New Caledonia
SCOPE:
− Transport 18 nickel plant modules in 4
voyages.
− Scope of work included detailed engineering of
grillage and sea fastening to ensure safe
transport of the modules across the swells of
the Pacific Ocean.
KEY ASSETS INVOLVED:
− m/v Trustee
SLIDE NAME IN TEMPLATE:
\
14
STERN OR SIDE LOAD-OUT / IN
STERN LOAD-OUT
• More compact on the quay, single trailer
path
• Less compact in harbor area
• Long distance to final positon
• More ballast / weight capacity
SIDE LOAD-OUT
• Large quay length / space required
• Cargo length limitation due to parallel trailer
paths
• Short distance to final position
• Less ballast / weight capacity
SLIDE NAME IN TEMPLATE:
\
15
TYPICAL LOAD-OUT / IN PROCEDURES
1. Mooring alongside
2. Outfitting – grillage installation
3. Mooring stern to quay
4. Ballasting
5. Ramp installation
6. Module roll-on
7. Sea-fastening
8. Voyage
SLIDE NAME IN TEMPLATE:
\
24
LOGISTICAL MANAGEMENT SOLUTIONS:
Piggy-back concept
SLIDE NAME IN TEMPLATE:
\
25
18 EMPTY
SLIDE EXAMPLE:
INTRODUCTION – PIGGY-BACK
1. Mobilization 2. Module loading 3. Float-on
4. Voyage 5. Float-off 6. Module discharge
SLIDE NAME IN TEMPLATE:
\
28
ADVANTAGES OF PIGGY BACK SOLUTION
• Shallow draft coastal and estuarial sites accessible without major modifications
• Can be used as floating storage at the loading and discharge locations
• Increased vessel utilization with approx. 40% leading to cost efficiency and lower overall cost
• Reduces the dependency on constricted ‘open-stern’ market
• Provides a solution for environmental / regulatory challenges
• Increase stowage / voyage performance by adding deck space
Roll-on module Float-on barge Voyage Float-off barge Roll-off module
- Vessel Utilization - Barge Utilization
SLIDE NAME IN TEMPLATE:
\
29
09 TEXT & PICTURE 60/40
SLIDE EXAMPLE:
BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and
double-click on it
3. The picture is centered automatically. If the
main focus of the picture is not visible, please
use another picture
4. Right-click on the picture and Send to Back to
place it in the background behind your text
• CLIENT: Bechtel / Chevron
• PERIOD: 2014 - 2015
• LOCATION: Lumut, Malaysia / Tianjin,
China to Onlsow, Australia
• SCOPE:
− Transportation of 119 modules for the
fabrication of the onshore LNG facilities at
Onslow in Australia.
− Transport methods:
− Direct on-deck of the HTV
− Piggy-back
− Tug & Barge
LOGISTICAL MANAGEMENT PROJECT:
WHEATSTONE LNG
• KEY ASSETS:
− Semi-submersible heavy lift vessels
(Fjord, Fjell, T-class vessels and Super
Servant 3).
− Giant 5, Giant 6 and other barges (3rd
party)
SLIDE NAME IN TEMPLATE:
\
30
09 TEXT & PICTURE 60/40
SLIDE EXAMPLE:
BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and
double-click on it
3. The picture is centered automatically. If the
main focus of the picture is not visible, please
use another picture
4. Right-click on the picture and Send to Back to
place it in the background behind your text
• CLIENT: Mammoet / Methanex Corp.
• PERIOD: 2013
• LOCATION: Punta Arenas, Chile to
Geismar, LA U.S.
• SCOPE:
− Transportation of 19 modules in 2
consecutive voyages.
− Modules were transported via piggy-back
method, utilizing a S-class type vessel
and two barges (FSPs).
LOGISTICAL MANAGEMENT PROJECT:
METHANOL PLANT RELOCATION
• KEY ASSETS:
− m/v Swan
− (2) Barges / Floating Super Pallets
SLIDE NAME IN TEMPLATE:
\
32
09 TEXT & PICTURE 60/40
SLIDE EXAMPLE:
BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and
double-click on it
3. The picture is centered automatically. If the
main focus of the picture is not visible, please
use another picture
4. Right-click on the picture and Send to Back to
place it in the background behind your text
ENGINEERING PHASE
• Voyage plan – optimal route will be determined
• Environmental conditions determined by global wave statistics
database
• Motions will be calculated in cog of cargo and system input for
grillage design
• Extreme design forces will be calculated input for sea-fastening
design.
ACTUAL VOYAGE
• Continuous route monitoring – changes upon Captain’s discretion
• Receive weather forecast via SPOS (ship performance optimization
system) continuously
• Acceleration monitoring system: Octopus
VOYAGE
32
2. Voyage
SLIDE NAME IN TEMPLATE:
\
33
09 TEXT & PICTURE 60/40
SLIDE EXAMPLE:
BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and
double-click on it
3. The picture is centered automatically. If the
main focus of the picture is not visible, please
use another picture
4. Right-click on the picture and Send to Back to
place it in the background behind your text
DELIVERABLES INCLUDE
• Maximum cargo dimensions for transportation
• Vessel and barge capacity needed for the project
• Transhipment needs and locations
• Temporary intermediate storage
• SPMT operations/arrangements
• Provisional schedule for deliveries from fabrication yard
to construction site
• Risk assessment
• Local content requirements
• Seafastening and grillage design
• Budgetary price information
• Partnerships with SPMT and geared vessel owners
TRANSPORTATION STUDY
SLIDE NAME IN TEMPLATE:
\
34
09 TEXT & PICTURE 60/40
SLIDE EXAMPLE:
BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and
double-click on it
3. The picture is centered automatically. If the
main focus of the picture is not visible, please
use another picture
4. Right-click on the picture and Send to Back to
place it in the background behind your text
IDEA BEHIND THE SIMULATION TOOL
• Reduce the time required to develop a
logistical planning
• Enhance possibility to evaluate multiple
scenarios, including competitors
• Improve insight into bottle necks
• Monitor asset utilization
• Include disturbances: weather, module
delivery, MOF availability, restricted
voyages, seasonal leg availability
• Evaluate scenario reliability
SIMULATION FLEET PLANNING TOOL
SLIDE NAME IN TEMPLATE:
\
35
09 TEXT & PICTURE 60/40
SLIDE EXAMPLE:
BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and
double-click on it
3. The picture is centered automatically. If the
main focus of the picture is not visible, please
use another picture
4. Right-click on the picture and Send to Back to
place it in the background behind your text
CLIENT: KJV / Chevron
PERIOD: 2012 – 2014
LOCATION: Korea / Indonesia / China
to Barrow Island, Australia
SCOPE:
− Transportation of 50+ modules from various
fabrication yards in a long term time charter
contract.
− Prior to voyage, all vessels were prepared to
meet Australia’s stringent environmental and
quarantine requirements.
LOGISTICAL MANAGEMENT PROJECT:
GORGON LNG
KEY ASSETS INVOLVED:
− m/v Mighty Servant 3
− m/v Forte
− m/v Fjell
− m/v Fjord
SLIDE NAME IN TEMPLATE:
\
44
08 TEXT & PICTURE 80/20
SLIDE EXAMPLE:
BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and
double-click on it
3. The picture is centered automatically. If the
main focus of the picture is not visible, please
use another picture
4. Right-click on the picture and Send to Back to
place it in the background behind your text
CONCLUSIONS LOGISTICAL MANAGEMENT
• Single interface management partner • Heavy transportation vessels
• Tug and barge
• Dock type ships
• Self geared ships
• Complete project management solution • Grillage & sea-fastening design, fabrication and installation
• Engineering studies
• Management of risk
• Partnering with SPMT providers, freight forwarding, civil
engineering
• Scope outside of transportation • MOF design and construction
• Land reclamation
• Dredging
• Environmental monitoring
• Offshore installation
SLIDE NAME IN TEMPLATE:
\
45
08 PICTURE & PICTURE 70/30
SLIDE EXAMPLE:
BULLET LEVELS
(INCREASE OR DECREASE)
By using List Levels, you can organize bullets and numbering
into categories. Complete the following steps to adjust the
List Level:
To promote the text line UP one list level, go to the Home
command tab and click in the Paragraph box on:
INCREASE LIST LEVEL
To bring the text line DOWN one list level, go to the Home
command tab and click in the Paragraph box on :
DECREASE LIST LEVEL
INSERT A PICTURE:
1. Click icon to add a picture:
2. Locate the picture you wish to insert and
double-click on it
3. The picture is centered automatically. If the
main focus of the picture is not visible, please
use another picture
4. Right-click on the picture and Send to Back to
place it in the background behind your text
NEW HORIZONS
THANK YOU FOR YOUR ATTENTION!