OVERVIEW OF CONTENTSMeasure U Implementation Plan
Lodi Unified School District
1
Measure U Implementation Plan
Utilizing a collaborative consensus building planning process with school site and community
stakeholders, LPA developed a Facilities Master Plan for the Lodi Unified School District which
was completed in June 2016. Following engagement with the District’s Board of Education
to prioritize scopes-of-work to match potential dollars available, the master plan document
was then utilized to develop a proposed project list for the successful Measure U local bond
campaign that November. Eligible projects were grouped into Level One, Level Two and Level
Three categories of work. Of which Level One represents approximately $162.5 million available
from Measure U for future construction.
In July 2017, in order to facilitate an efficient and coordinated roll out of the program, LPA was
contracted by Lodi Unified School District for development of an Implementation Plan for each
of the school sites within the Measure U program. The process to develop the site-specific plans
included the following activities:
• Facilities, Maintenance & Operations Meeting – Reviewed Level One work proposed
against current improvements completed or in-progress.
• School Site Committee Meeting 01 – Explanation of Board approved priorities and
confirmation of scope in context with eligible site needs.
• Detailed Site Surveys – Completed by the LPA architectural, LP Engineering and
Cumming cost estimating team to verify existing on the ground conditions.
• Cost Estimating – Update of FMP cost estimates with new information and escalation of
Level One costs to projected mid-points of construction.
• School Site Committee Meeting 02 – Ranking of scopes through comparison of escalated
estimates to approved Measure U budget allocations.
• District Leadership Review and Board of Education Approval
TH
E P
RO
CE
SS
1.1
OVERVIEW OF CONTENTS
TH
E P
UR
PO
SE
Measure U Implementation Plan Lodi Unified School District
2
Measure U Implementation Plan
The primary goal of the Lodi Unified School District, for the development of site-specific
Implementation Plans, was to facilitate implementation clarity and parity across the campuses
involved in the Measure U facilities improvement program. The intent of this document is to
provide a conceptual design for each school site with scopes-of-work and confirmed design-to
budgets specified. Supporting standards in addition to the school site Implementation Plans
developed by LPA include Learning Spaces Design Standards establishing spatial characteristics
and Technical Design Specifications for products/materials in CSI format. Together these three
Board approved documents provide each architect with the tools necessary to develop the
project design and documentation without the need for extensive meetings with District and/or
school site staff to program, budget or scope the work.
TH
E P
UR
PO
SE
1.2
OVERVIEW OF CONTENTSMeasure U Implementation Plan
Lodi Unified School District
3
Measure U Implementation Plan
The individual school site Implementation Plan proposals have been organized into an easy to
use format. The document for each campus in the Measure U program contains the following
items:
• Planning Process Overview Description
• Purpose of the Document
• Detailed Scope of Work Description
• Budget Allocation/Cost Estimate (Escalated to Mid-Point of Construction)
• FMP Diagram (Overlay with Proposed Level One Scopes of Work Highlighted)
The purpose of the information contained in the school site plans is to guide the future
development of the design solution. As each project is executed, with more detailed information
becoming available as the documentation progresses, questions that arise regarding the work
or budgets specified in the Implementation Plan should be brought to the attention of the Lodi
Unified School District facilities leadership for review, evaluation and ultimately direction in
context with the overall District and Measure U program parameters.
HO
W T
O U
SE
1.3
APPROVED SCOPE-OF-WORK
1. Safety Locks at Classroom Doors
2. Shade Structure
9275 Glacier Point Drive, Stockton, CA 95212
2.1ANSEL ADAMS ELEMENTARY
SCOPE-OF-WORKMeasure U Implementation Plan
Lodi Unified School District
4
3.1ANSEL ADAMS ELEMENTARY
COST ESTIMATE SUMMARY
SCOPE OF WORK CATEGORIES COST
The following items are
excluded from this budget:
• Utility hook-up fees & City connection fees
• Off-site work and traffic signals
• Land acquisition costs
• Hazardous material surveys
• Abatement and disposal
1. Modernization
2. New Construction
3. Site Work
4. District Support Facilities
Total Construction Cost Subtotal in 2016 dollars
$ 18,000
$ 0
$ 216,000
$ 0
$ 234,000
$ 311,454Total Construction Cost Escalated to MOC - Phase 3
Measure U Implementation Plan Lodi Unified School District
5
���������������� ������������ �������� �����������
���� ������������ ��������� �������������
�������������� � ����� !"�#���!$
���� ����%��
&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0
������������� ����������������������� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
������������������������������� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
� �����!����� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�"������������#�$���������� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�%���&����'�������������(�)� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�*������+�� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�,�-�������������.�'��+����� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�4�-5��������������.�'��+����� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�����������������������''��� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
���()����������������''�������+��� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
���������6��������������'��������� !$23331���������������� )423331���������������������
� ��������������� ������� �������� �������������������� �� ������������������� ��������������������
� �3��������''����2������ �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
���%��������(������,)3!510������ �������� �����������
������(������������
�������������� ����������������
3.2ANSEL ADAMS ELEMENTARY
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
6
���������������� ������������ �������� �����������
���� ������������ ��������� �������������
�������������� � ����� !"�#���!$
���� ����%��
&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0
���%��������(������,)3!510������ �������� �����������
������(������������
�"�7�������(������+���������8���� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�%���������-�����'����6�-�����������9��������� ��������������������� )!523331������������� )$623331�������������������
�!"�#$�#����%���&�'������ ���������������������
�!"��������������� ������������������ � �������������������� ��(����������������
�*�#����:�����������������2���)����;2������< �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�,����5������.������������ �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
���������������1-��=���������;���*>< )/423331������������� 1/!!2333
�������������������������������� /!!24*41������������� 14!/2"4!
�5�������$��������������������������5��)�����?
)����������� *���� �&�+������������������ �
,�� ����-��������������� �.��� ��
/�����0� �������� � �
'�1��� ���������� �2�� ���"������������� *� ���
$ ���������3+� � �����������(��������������������������������4�
�������������� ����������������
3.2ANSEL ADAMS ELEMENTARY
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
7
4.1ANSEL ADAMS ELEMENTARY
SCOPE-OF-WORK SITE DIAGRAM
Approved Scope
Not in Scope of Work
Learning Court | Quad
Play Apparatus Hardcourts
Kinder Play
Portable Classroom
Main Entry Fence/Gate
Modernization
Reconfigure
New Construction
Electives | LabsSL - Science Lab
PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten
Classrooms, CR
S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.
Support Spaces
Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office
IL - Innovation Lab, LC - Learning Center
Shared Spaces
Not to Scale
APPROVED SCOPE NOT
DEPICTED ON PLAN:
• Safety Locks at Classroom Doors
Note: The exact location of the shade
structure will be determined during
the design process.
Measure U Implementation Plan Lodi Unified School District
8
2.1BECKMAN ELEMENTARY
SCOPE-OF-WORK
2201 Scarborough Drive, Lodi, CA 95240
APPROVED SCOPE-OF-WORK
1. Fire Alarm System + Emergency Lighting
2. New Public Address/Emergency Communication System
3. Reseal Brick, campus-wide
4. New Drop-off and Repair Existing Parking Lot, including:• New Concrete Walkways
5. New Parking Lot, including:• New Concrete Walkways
6. Safety Locks at Classroom Doors
7. Air Conditioning at MDF/IDF
Measure U Implementation Plan Lodi Unified School District
9
3.1BECKMAN ELEMENTARY
COST ESTIMATE SUMMARY
SCOPE OF WORK CATEGORIES COST
The following items are
excluded from this budget:
• Utility hook-up fees & City connection fees
• Off-site work and traffic signals
• Land acquisition costs
• Hazardous material surveys
• Abatement and disposal
1. Modernization
2. New Construction
3. Site Work
4. District Support Facilities
Total Construction Cost Subtotal in 2016 dollars
$ 700,000
$ 297,000
$ 767,000
$ 0
$ 1,764,000
$ 2,347,884Total Construction Cost Escalated to MOC - Phase 3
Measure U Implementation Plan Lodi Unified School District
10
���������������� ����������������� �����������
���� ������������ ��������� �������������
� ������������!�! ����� "#�$���"%
���� ����&��
'�� ()������ ���� ��������� )!���� ���� �����*+,�-.�"/001
������������� ����������������������� 0%234445������������� +""34445�������������������
������������� ��������� �������
� ����������������� ���������������� �� �������������������� �������������������
������������������������������� �5���������������������� �5����������������������������
� �������������� ���!���������������"��������
� �����!����� �5���������������������� �5����������������������������
� �������������� ���!���������������"��������
�"������������#�$���������� �5���������������������� �5����������������������������
� �������������� ���!���������������"��������
�%���&����'�������������(�)� �5���������������������� �5����������������������������
� �������������� ���!���������������"��������
�*������+�� �5���������������������� �5����������������������������
� �������������� ���!���������������"��������
�,�-�������������.�'��+����� �5���������������������� �5����������������������������
� �������������� ���!���������������"��������
�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �5���������������������� �5����������������������������
� �������������� ���!���������������"��������
�4�-5��������������.�'��+����� �5���������������������� �5����������������������������
� �������������� ���!���������������"��������
�����������������������''��� �5���������������������� �5����������������������������
� �������������� ���!���������������"��������
���()����������������''�������+��� �5���������������������� �5����������������������������
� �������������� ���!���������������"��������
���&��������)������-*4"651����������� �����������
������)������������
�������������� ����������������
3.2BECKMAN ELEMENTARY
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
11
���������������� ����������������� �����������
���� ������������ ��������� �������������
� ������������!�! ����� "#�$���"%
���� ����&��
'�� ()������ ���� ��������� )!���� ���� �����*+,�-.�"/001
���&��������)������-*4"651����������� �����������
������)������������
���������6��������������'��������� "302%34445���������� "37#034445����������������
����#����$���� %������� ����& ������������&������ �' ����������������(��)
����������*��(��)�+ � ���������������� �� �������������������� �������������������
����������,� �' ���"��� ���������������� �� �������������������� �������������������
����-���������.�����)�*��(��)�+ � �-�/������������ �� ��������������������� ��/����������������
����������� ���������(��$� ������������������ �� �������������������� ��������������������
� ����#����$�� (���������� �� �� �������������������� �� ��-���������������� ��������������������
����!���������$��0��������������������������)��$���) ���)
� ������!����"����#$��� �-��-����������� �� ��������������������� �������������������
� ������1��)��$�+�) ���) �-��-����������� �� ��������������������� ��������������������
�
��2������������������&���)��$� ������ ��
�$����� �-��-����������� �� /�������������������� �-/����������������
� �3��������''����2������ �5���������������������� �5����������������������������
� �������������� ���!���������������"��������
�"�7�������(������+���������8���� �5���������������������� �5����������������������������
� �������������� ���!���������������"��������
�%���������-�����'����6�-�����������9��������� �5���������������������� �5����������������������������
�� �������������� ���!���������������"���������
�*�#����:�����������������2���)����;2������< �5���������������������� �5����������������������������
� �������������� ���!���������������"��������
�,����5������.������������ 0*34445���������������� 0*34445���������������������
�
��/�3,!�����4,!������� ����� ���%�� ������� ��� ��
5������ ��� ��$6� ���������������������� �� ���������������� ��������������������
���������������1-��=���������;���*>< "376234445���������� 5*30063444
�������������������������������� *30273%%25���������� 503"4#3*"6
�5�������$��������������������������5��)�����?
7�����$� ('��������8�9��$� ����� �������
:�������� �(��������������)������
+�����0������ �� ����
;�<��� ��������������%�$��������������������� ����
1������ ��59 ��������������������������� �� ������ ��� ��$���6�
�������������� ����������������
3.2BECKMAN ELEMENTARY
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
12
4.1BECKMAN ELEMENTARY
SCOPE-OF-WORK SITE DIAGRAM
Approved Scope
Not in Scope of Work
Learning Court | Quad
Play Apparatus Hardcourts
Kinder Play
Portable Classroom
Main Entry Fence/Gate
Modernization
Reconfigure
New Construction
Electives | LabsSL - Science Lab
PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten
Classrooms, CR
S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.
Support Spaces
Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office
IL - Innovation Lab, LC - Learning Center
Shared Spaces
Not to Scale
APPROVED SCOPE NOT
DEPICTED ON PLAN:
• Fire Alarm System + Emergency Lighting
• New Public Address/Emergency Communication System
• Reseal Brick, campus-wide
• Safety Locks at Classroom Doors
• Air Conditioning at MDF/IDF
Measure U Implementation Plan Lodi Unified School District
13
2.1LOIS E. BORCHARDT ELEMENTARY
SCOPE-OF-WORK
375 Culbertson Drive, Lodi, CA 95242
APPROVED SCOPE-OF-WORK
1. Safety Locks at Classroom Doors
2. Signage for Emergency Response & Wayfinding
3. Exterior Lighting to Ensure Student Safety
4. Shade Structure
Measure U Implementation Plan Lodi Unified School District
14
3.1LOIS E. BORCHARDT ELEMENTARY
COST ESTIMATE SUMMARY
SCOPE OF WORK CATEGORIES COST
The following items are
excluded from this budget:
• Utility hook-up fees & City connection fees
• Off-site work and traffic signals
• Land acquisition costs
• Hazardous material surveys
• Abatement and disposal
1. Modernization
2. New Construction
3. Site Work
4. District Support Facilities
Total Construction Cost Subtotal in 2016 dollars
$ 90,000
$ 0
$ 216,000
$ 0
$ 306,000
$ 407,286Total Construction Cost Escalated to MOC - Phase 3
Measure U Implementation Plan Lodi Unified School District
15
���������������� ���������������������������� �����������
���� ������������ ��������� �������������
� ������������!�! ����� "#�$���"%
���� ����&��
'�� ()������ ���� ��������� )!���� ���� �����*+,�-.�"�//0
������������� ����������������������� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
������������������������������� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
� �����!����� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�"������������#�$���������� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�%���&����'�������������(�)� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�*������+�� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�,�-�������������.�'��+����� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�4�-5��������������.�'��+����� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�����������������������''��� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
���()����������������''�������+��� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�
���������6��������������'��������� #232221���������������� "*232221�������������������
� �������������������������� ��� ����� ����� ���������������������� � ���������������� ��������������������
� �������������� ������� �������� �������������������� �� ��!���������������� �"������������������
� ���������������������������� #�� �����$�������� ���������������������� � %��������������� %�������������������
� �3��������''����2������ �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
���&��������)������-*2"410���������������������� �����������
������)������������
�������������� ����������������
3.2LOIS E. BORCHARDT ELEMENTARY
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
16
���������������� ���������������������������� �����������
���� ������������ ��������� �������������
� ������������!�! ����� "#�$���"%
���� ����&��
'�� ()������ ���� ��������� )!���� ���� �����*+,�-.�"�//0
���&��������)������-*2"410���������������������� �����������
������)������������
�"�7�������(������+���������8���� �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�%���������-�����'����6�-�����������9��������� *"432221������������� *%532221�������������������
�&'�(��(����)���*�+������
�&'��������������� ������������������ � !������������������� ��,����������������
�*�#����:�����������������2���)����;2������< �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
�,����5������.������������ �1���������������������� �1����������������������������
���������������� ���������� ���� �� � ����
���������������1-��=���������;���*>< /2432221������������� 16253222
�������������������������������� 6253*%41������������� 1+6"35"5
�5�������$��������������������������5��)�����?
-���������� .#���� �*�/������������������ �
0�� ����$�� ������������ ����� ��
1�����2� �������� � �
+�3��� ���������� �4�� ���'������������� #� ���
� ���������5/� � �����������,��������������������������������6�
�������������� ����������������
3.2LOIS E. BORCHARDT ELEMENTARY
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
17
4.1LOIS E. BORCHARDT ELEMENTARY
SCOPE-OF-WORK SITE DIAGRAM
Approved Scope
Not in Scope of Work
Learning Court | Quad
Play Apparatus Hardcourts
Kinder Play
Portable Classroom
Main Entry Fence/Gate
Modernization
Reconfigure
New Construction
Electives | LabsSL - Science Lab
PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten
Classrooms, CR
S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.
Support Spaces
Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office
IL - Innovation Lab, LC - Learning Center
Shared Spaces
Not to Scale
APPROVED SCOPE NOT
DEPICTED ON PLAN:
• Safety Locks at Classroom Doors
• Signage for Emergency Response & Wayfinding
• Exterior Lighting to Ensure Student Safety
Note: The exact location of the shade
structure will be determined during
the design process.
Measure U Implementation Plan Lodi Unified School District
18
2.1CLAIRMONT ELEMENTARY
SCOPE-OF-WORK
8282 Le Mans Avenue, Stockton, CA 95210
APPROVED SCOPE-OF-WORK
1. Safety Locks at Classroom Doors
2. Shade Structure
3. Reseal Brick, campus-wide
Measure U Implementation Plan Lodi Unified School District
19
3.1CLAIRMONT ELEMENTARY
COST ESTIMATE SUMMARY
SCOPE OF WORK CATEGORIES COST
The following items are
excluded from this budget:
• Utility hook-up fees & City connection fees
• Off-site work and traffic signals
• Land acquisition costs
• Hazardous material surveys
• Abatement and disposal
1. Modernization
2. New Construction
3. Site Work
4. District Support Facilities
Total Construction Cost Subtotal in 2016 dollars
$ 311,000
$ 0
$ 216,000
$ 0
$ 527,000
$ 701,437Total Construction Cost Escalated to MOC - Phase 3
Measure U Implementation Plan Lodi Unified School District
20
���������������� ���������� ��������� �����������
���� ������������ ��������� �������������
����������������� ����� !�"��� #
���� ����$��
%�� &'������ ���� ��������� '����� ���� �����()*�+,� -../
������������� ����������������������� (!)01112������������� .!(01112�������������������
������������� ��������� �������
� ����������������� ���������������� �� �������������������� �������������������
������������������������������� �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
� �����!����� �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
�"������������#�$���������� �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
�%���&����'�������������(�)� �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
�*������+�� �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
�,�-�������������.�'��+����� �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
�4�-5��������������.�'��+����� �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
�����������������������''��� �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
���()����������������''�������+��� �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
���������6��������������'��������� 301112���������������� ( 01112���������������������
� ����#����$�� %���������� �� �� �������������������� �� ������������������� ��������������������
� �3��������''����2������ �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
���$��������'������+(1 32/���� ��������� �����������
������'������������
�������������� ����������������
3.2CLAIRMONT ELEMENTARY
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
21
���������������� ���������� ��������� �����������
���� ������������ ��������� �������������
����������������� ����� !�"��� #
���� ����$��
%�� &'������ ���� ��������� '����� ���� �����()*�+,� -../
���$��������'������+(1 32/���� ��������� �����������
������'������������
�"�7�������(������+���������8���� �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
�%���������-�����'����6�-�����������9��������� ( 301112������������� (#401112�������������������
����&'�&��$�(����)�*��� ����
������# ����#������� ������������������ �� �������������������� �������������������
�*�#����:�����������������2���)����;2������< �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
�,����5������.������������ �2���������������������� �2����������������������������
� �������������� ���!���������������"��������
���������������1-��=���������;���*>< )(401112������������� 24110111
�������������������������������� 41 05.42������������� 2!. 0411
�5�������$��������������������������5��)�����?
+�����$� %,��������)�-��$� ����� �������
.�������� �%��������������/������
0�����1������ �� ����
*�2��� ��������������3�$��������������������� ����
'������ ��4- ��������������������������� �� ������ ��� ��$���5�
�������������� ����������������
3.2CLAIRMONT ELEMENTARY
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
22
4.1CLAIRMONT ELEMENTARY
SCOPE-OF-WORK SITE DIAGRAM
Approved Scope
Not in Scope of Work
Learning Court | Quad
Play Apparatus Hardcourts
Kinder Play
Portable Classroom
Main Entry Fence/Gate
Modernization
Reconfigure
New Construction
Electives | LabsSL - Science Lab
PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten
Classrooms, CR
S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.
Support Spaces
Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office
IL - Innovation Lab, LC - Learning Center
Shared Spaces
Not to Scale
APPROVED SCOPE NOT
DEPICTED ON PLAN:
• Safety Locks at Classroom Doors
• Reseal Brick, campus-wide
Note: The exact location of the shade
structure will be determined during
the design process.
Measure U Implementation Plan Lodi Unified School District
23
2.1CREEKSIDE ELEMENTARY
SCOPE-OF-WORK
2515 Estate Drive, Stockton, CA 95209
APPROVED SCOPE-OF-WORK
1. New Public Address/Emergency Communication System
2. Safety Locks at Classroom Doors
3. Resurface & Repair Hardcourts (western portion only - from the basketball courts to the west)
4. Reseal Brick, campus-wide
Measure U Implementation Plan Lodi Unified School District
24
3.1CREEKSIDE ELEMENTARY
COST ESTIMATE SUMMARY
SCOPE OF WORK CATEGORIES COST
The following items are
excluded from this budget:
• Utility hook-up fees & City connection fees
• Off-site work and traffic signals
• Land acquisition costs
• Hazardous material surveys
• Abatement and disposal
1. Modernization
2. New Construction
3. Site Work
4. District Support Facilities
Total Construction Cost Subtotal in 2016 dollars
$ 120,000
$ 167,000
$ 171,000
$ 0
$ 458,000
$ 609,598Total Construction Cost Escalated to MOC - Phase 3
Measure U Implementation Plan Lodi Unified School District
25
���������������� ����������������� �����������
���� ������������ ��������� �������������
�������������� � ����� !"�#���!$
���� ����%��
&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0
������������� ����������������������� !1231114������������� !5)31114�������������������
������������� ��������� �������
� ������������������������������ ������������������ �� �������������������� �������������������
������������������������������� �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
� �����!����� �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
�"������������#�$���������� �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
�%���&����'�������������(�)� �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
�*������+�� �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
�,�-�������������.�'��+����� �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
�4�-5��������������.�'��+����� �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
�����������������������''��� �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
���()����������������''�������+��� �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
���������6��������������'��������� !$131114������������� )/"31114�������������������
� ����#����$�� ����������� �� �� %������������������� �� ��&���������������� �%������������������
�
��'������������������(���)��$� ������ ��
�$����� ���&������������ �� ��������������������� �������������������
� �3��������''����2������ �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
���%��������(������,)1!640����������� �����������
������(������������
�������������� ����������������
3.2CREEKSIDE ELEMENTARY
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
26
���������������� ����������������� �����������
���� ������������ ��������� �������������
�������������� � ����� !"�#���!$
���� ����%��
&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0
���%��������(������,)1!640����������� �����������
������(������������
�"�7�������(������+���������8���� �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
�%���������-�����'����6�-�����������9��������� !2!31114������������� ))231114�������������������
�*��+,�+��$�-����.�/��� ����
�*��*����������.��������/��� ���� %���*����������� �� *�������������������� �������������������
�*�#����:�����������������2���)����;2������< �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
�,����5������.������������ �4���������������������� �4����������������������������
� �������������� ���!���������������"��������
���������������1-��=���������;���*>< 5*$31114������������� 461$3111
�������������������������������� 61"3*"$4������������� 4$1"3)5$
�5�������$��������������������������5��)�����?
0�����$� �1��������.�2��$� ����� �������
3�������� ����������������)������
4�����5������ �� ����
/�6��� ��������������7�$��������������������� ����
,������ ��82 ��������������������������� �� ������ ��� ��$���9�
�������������� ����������������
3.2CREEKSIDE ELEMENTARY
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
27
4.1CREEKSIDE ELEMENTARY
SCOPE-OF-WORK SITE DIAGRAM
Approved Scope
Not in Scope of Work
Learning Court | Quad
Play Apparatus Hardcourts
Kinder Play
Portable Classroom
Main Entry Fence/Gate
Modernization
Reconfigure
New Construction
Electives | LabsSL - Science Lab
PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten
Classrooms, CR
S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.
Support Spaces
Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office
IL - Innovation Lab, LC - Learning Center
Shared Spaces
Not to Scale
APPROVED SCOPE NOT
DEPICTED ON PLAN:
• New Public Address/Emergency Communication System
• Safety Locks at Classroom Doors
• Reseal Brick, campus-wide
Measure U Implementation Plan Lodi Unified School District
28
2.1DAVIS ELEMENTARY
SCOPE-OF-WORK
5224 E. Morada Lane, Stockton, CA 95212
APPROVED SCOPE-OF-WORK
1. Classroom (18 typical & 2 kinder) and Restroom Modernization, including:• Wall Strengthening at the (4) Classrooms experiencing a musty smell• Replace Windows• Replace Doors & Hardware• Replace Ceilings• Patch & Paint the Interior & Exterior• Patch Existing Roofing• Repair Existing Covered Walkways/Hallways• New Interior Lighting & Controls• Upgrade Electrical Wiring & Increase Electrical Outlets• Plumbing System Upgrades• Reconfigure Existing Restrooms• Asbestos Removal
2. Electrical Capacity Upgrade
3. Updated Electrical Mains & Distribution
4. New Public Address/Emergency Communication System
5. New Parking Lot, including:• New Concrete Walkways
6. Exterior Lighting to Ensure Student Safety
7. Signage for Emergency Response & Wayfinding
Measure U Implementation Plan Lodi Unified School District
29
2.1DAVIS ELEMENTARY
SCOPE-OF-WORK
8. Safety Locks at Classroom Doors
9. Fire Alarm System + Emergency Lighting
Measure U Implementation Plan Lodi Unified School District
30
3.1DAVIS ELEMENTARY
COST ESTIMATE SUMMARY
SCOPE OF WORK CATEGORIES COST
The following items are
excluded from this budget:
• Utility hook-up fees & City connection fees
• Off-site work and traffic signals
• Land acquisition costs
• Hazardous material surveys
• Abatement and disposal
1. Modernization
2. New Construction
3. Site Work
4. District Support Facilities
Total Construction Cost Subtotal in 2016 dollars
$ 3,088,000
$ 231,000
$ 867,000
$ 0
$ 4,186,000
$ 5,571,566Total Construction Cost Escalated to MOC - Phase 3
Measure U Implementation Plan Lodi Unified School District
31
���������������� ���������������� �����������
���� ������������ ��������� �������������
�������������� � ����� !"�#���!$
���� ����%��
&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0
������������� ����������������������� !123!13334���������� )1)5)13334����������������
������������������� ����
� �������������� ���� ������������������ �� �������������������� ��������������������
�������������������������� ���
� ������������� ��� �!�!������������ �� �������������������� �"�����������������
� ��������������������� �����#�� ��� �������$���%��
&���������� ����'
� � �������� �����(� �� ��� �!�!������������ �� �������������������� �)�����������������
�����������������������������
� ���������������� �!�!������������ �� �)������������������ ��!����������������
���*��� �(�*�����+������,-.�����
� �����*��� �(�������������� �!�!������������ �� ��������������������� "�������������������
� �����*��� �(�������.����� �!�!������������ �� ��������������������� !�������������������
� ���*��� �-.�������������� ���������������� �� "�������������������� �������������������
� ���������-.�������/�0� ���%��$��,�1���$� ���������������� �� �������������������� �������������������
������������������������������� !13*313334���������� !1/"213334����������������
� �2�3�� ���������� ��4�������������� �����(�������� �!�!������������ �� �������������������� �������������������
� ���-������������ �
�
�����5���� ���������������(���������������
����� �!�!������������ �� !�������������������� �������������������
� � �*��2�����$��������� � �!�!������������ �� �������������������� �������������������
�
����������������2���������� ��� ,���.��� �
����������������
� ��������������-.�������������� ���)�������������� �� ������������������� �������������������
� �����!����� 5"$13334������������� ")$13334�������������������
#6����������������� ����'
� �5� �� ���������������� � �����2����� ����)���������� �� ��!������������������ �������������������
���-�������/������$�5���� � ���������������������� � �)������������� �)�����������������
�"������������#�$���������� �4���������������������� �4����������������������������
7������� ����� ���6��������7 ��8�������
�%���&����'�������������(�)� �4���������������������� �4����������������������������
7������� ����� ���6��������7 ��8�������
�*������+�� �4���������������������� �4����������������������������
7������� ����� ���6��������7 ��8�������
�,�-�������������.�'��+����� �4���������������������� �4����������������������������
7������� ����� ���6��������7 ��8�������
�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �4���������������������� �4����������������������������
7������� ����� ���6��������7 ��8�������
���%��������(������,)3!540���������� �����������
������(������������
�������������� ����������������
3.2DAVIS ELEMENTARY
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
32
���������������� ���������������� �����������
���� ������������ ��������� �������������
�������������� � ����� !"�#���!$
���� ����%��
&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0
���%��������(������,)3!540���������� �����������
������(������������
�4�-5��������������.�'��+����� �4���������������������� �4����������������������������
7������� ����� ���6��������7 ��8�������
�����������������������''��� �4���������������������� �4����������������������������
7������� ����� ���6��������7 ��8�������
���()����������������''�������+��� �4���������������������� �4����������������������������
7������� ����� ���6��������7 ��8�������
���������6��������������'��������� 2/213334������������� "$313334�������������������
� ����������������2��������0� ���������������� �� ��������������������� �"������������������
��2�����$������0���������� ,�����������,2��� ���4����������� ����%���
��2���7��*��%����3�� "����������������� �� �"������������������ !"������������������
��2����7�����������%��$� ������������������ �� �������������������� ��������������������
�� �-.�������� ���������������� �������$ ���������������������� � ���������������� ��������������������
� �������$���%�������������� ���� �)������������������ � ��!���������������� ��������������������
� ��������������������$���������� ���$��� ��� ���������������������� � ���������������� ��������������������
����6�������$�9�������������������� ������$��� ����
� ������6���8�����$��� ���������������� �� ��������������������� �"�����������������
� ������-�����$�3�� ���� ���������������� �� ��������������������� ��������������������
�
��:�7����2���� ���,�����$���������������
�$����� ���������������� �� )�"������������������ �������������������
� �3��������''����2������ �4���������������������� �4����������������������������
7������� ����� ���6��������7 ��8�������
�"�7�������(������+���������8���� �4���������������������� �4����������������������������
7������� ����� ���6��������7 ��8�������
�%���������-�����'����6�-�����������9��������� �4���������������������� �4����������������������������
�7������� ����� ���6��������7 ��8��������
�*�#����:�����������������2���)����;2������< �4���������������������� �4����������������������������
7������� ����� ���6��������7 ��8�������
�,����5������.������������ �4���������������������� �4����������������������������
7������� ����� ���6��������7 ��8�������
���������������1-��=���������;���*>< 61!$513334���������� 4*1*521333
�������������������������������� *1*2!1*554���������� 42163"1522
�������������� ����������������
3.2DAVIS ELEMENTARY
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
33
���������������� ���������������� �����������
���� ������������ ��������� �������������
�������������� � ����� !"�#���!$
���� ����%��
&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0
���%��������(������,)3!540���������� �����������
������(������������
�5�������$��������������������������5��)�����?
5����$� ��%4������(�/��$��������������
;���������%��� �����������������
3�� ���9���������������
1�<�� ��������������0$����2��������� � �������
-���������#/��������������"�������� ����� �� ����� �$��'�
�������������� ����������������
3.2DAVIS ELEMENTARY
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
34
4.1DAVIS ELEMENTARY
SCOPE-OF-WORK SITE DIAGRAM
Approved Scope
Not in Scope of Work
Learning Court | Quad
Play Apparatus Hardcourts
Kinder Play
Portable Classroom
Main Entry Fence/Gate
Modernization
Reconfigure
New Construction
Electives | LabsSL - Science Lab
PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten
Classrooms, CR
S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.
Support Spaces
Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office
IL - Innovation Lab, LC - Learning Center
Shared Spaces
Not to Scale
APPROVED SCOPE NOT
DEPICTED ON PLAN:
• Electrical Capacity Upgrade
• Updated Electrical Mains & Distribution
• New Public Address/Emergency Communication System
• Exterior Lighting to Ensure Student Safety
• Signage for Emergency Response & Wayfinding
• Safety Locks at Classroom Doors
• Fire Alarm System + Emergency Lighting
Measure U Implementation Plan Lodi Unified School District
35
2.1ELKHORN SCHOOL
SCOPE-OF-WORK
10505 N. Davis Road, Stockton, CA 95209
APPROVED SCOPE-OF-WORK
1. New Classroom/Science/Library Building, including:• (6) Typical Classrooms• (2) Science/Elective Labs + Shared Prep Room• Collaboration Spaces• Library/Innovation Lab (footprint equal to the (2) Science/Elective Labs + Shared Prep Room• Sitework
2. Reconfigure (3) Existing Classrooms to New Administration Office, Faculty Work and Faculty Lounge, including:
• Remaining Asbestos Removal
3. Modernize Staff Restrooms, including:• Remaining Asbestos Removal
4. Demolish Existing Administration/Classroom Building, (1) 7/8 Classroom, Existing Music and Library Building, and District Storage Building
5. Update Electrical Mains
6. Electrical Capacity Upgrades 7. Fire Alarm System + Emergency Lighting
8. New Public Address/Emergency Communications System
9. Relocate Existing MDF/IDF
Measure U Implementation Plan Lodi Unified School District
36
2.1ELKHORN SCHOOL
SCOPE-OF-WORK
10. New EMS System
11. Exterior Lighting to Ensure Student Safety
12. Safety Locks at Classroom Doors
13. Signage for Emergency Response & Wayfinding
14. Modernization of (4 typical) Classrooms (north building), including:• Repair Walls• Replace Windows• Replace Doors & Hardware• Repair Floors• Repair Ceilings• Patch & Paint Interior and Exterior• Replace Roofing• New Interior Lighting & Controls• Upgrade Electrical Wiring & Increase Electrical Outlets• Plumbing System Upgrades• Remaining Asbestos Removal
15. Shade Structure
16. Repair Existing Parking Lot, Slurry Coat and Stripe Existing Paving, Add ‘Right-Turn Only’
17. Resurface and Repair Access Road
Measure U Implementation Plan Lodi Unified School District
37
3.1ELKHORN SCHOOL
COST ESTIMATE SUMMARY
SCOPE OF WORK CATEGORIES COST
The following items are
excluded from this budget:
• Utility hook-up fees & City connection fees
• Off-site work and traffic signals
• Land acquisition costs
• Hazardous material surveys
• Abatement and disposal
1. Modernization
2. New Construction
3. Site Work
4. District Support Facilities
Total Construction Cost Subtotal in 2016 dollars
$ 1,906,000
$ 7,515,000
$ 1,246,000
$ 0
$ 10,667,000
$ 11,883,038Total Construction Cost Escalated to MOC - Phase 1
Measure U Implementation Plan Lodi Unified School District
38
���������������� ���������� ���������� �
���� ������������ ��������� �������������
����������������� ����� !�"��� #
���� ����$��
%�� &'�����( ���� ��������� '����� ���� �����)*+�,-� .//0
������������� ����������������������� 12)32224������������� */*32224�������������������
������������� ��������� �������
� ����������������� ������������������ �� �������������������� ��������������������
������������ ��������� ������ ��
� ��������������� �� ������������������ �� �������������������� ��������������������
������������� ��������� ��� ���� ��������������� �� !��
"������ �� ��#
� ������������� ���$��������� ������������������ �� ���%���������������� %�������������������
������������� ��������� ���� ��
� �������������� �� ������������������ �� �������������������� ��������������������
������������� ��������� �������&�
� �����������������&� ������������������ �� ��������������������� ��������������������
�&�'����$�'�����(����� �)*+���� �
� �&���'����$������������� � ������������������ �� ��������������������� ��������������������
� �&���'����$��������+���� � ������������������ �� ��%������������������ �,������������������
� � ��������*+�����&�� ���& ������������������ �� �������������������� �������������������
������������������������������� */!32224������������� 5 532224�������������������
� ���-./0�� ����1�&����� ��,�%������������� �� �������������������� �%�����������������
� ���2�&����&�1�&������3����������� ����&����&�$� ��� �� ������������������ �� �%������������������ %�������������������
��*��������1�&�����
�
����4�&�������������������&�$������������������
1����� ������������������ �� ��������������������� �%������������������
� ���'�1���&�� ����1�&����� ������������������ �� �������������������� ��������������������
�����������&��&���1���&��1�&��������) ���+�����
����� ����������
� ������� ���&1���*+�����&������ ������������������� �� ������������������� �,������������������
�
���*���& 3����������1�����&�� ��������� ��� ����*56�
� ������������ ��7��&# ���,�%���������� �� ,�������������������� �%������������������
� �����!����� 1#)32224������������� 61 32224�������������������
�8 �����������1����������#
���4��������������������������������1�� � �����%��������� �� ��������������������� �������������������
���*��������0����� �4�&����� ���������������������� �� �,��%���������� �,�����������������
�"������������#�$���������� 13/*632224���������� *35!/32224����������������
���9���0 ����1�� ��3�0����� � ��#�0�:� '�
� �����;� �����*+�����&�71�����&� ,���%������������� �� �������������������� �,�����������������
� ���,�9���5������6� ��0����� �71�����&���3�� � # ,����������������� �� ������������������� ������������������
������6���� �!�$�6����(�� <����� ������������������ �� �������������������� �������������������
���6�1�����0 ���� ���� ��2��
� �����9���6�1�����0 ���� ���� ��2�����3�6� � ���,,������������� �� ������������������� %,�����������������
�����6���� �!�$�6����(�� <����� ������������������� �� �������������������� ��������������������
�%���&����'�������������(�)� �4���������������������� �4����������������������������
9 �����1������������8���������9�����/��������
���$��������'����(�,)2 640���� ���������� �
������'������������
�������������� ����������������
3.2ELKHORN SCHOOL
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
39
���������������� ���������� ���������� �
���� ������������ ��������� �������������
����������������� ����� !�"��� #
���� ����$��
%�� &'�����( ���� ��������� '����� ���� �����)*+�,-� .//0
���$��������'����(�,)2 640���� ���������� �
������'������������
�*������+�� 35/)32224���������� )3/2132224����������������
���56)-6�*����<��
� �����9���56)-6�*����<���71�����&� ��,��������������� �� ������������������� ������������������ �3�� � ��1�����&
���,�6���� �!�$�6����(�� <����� ������������������ �� �������������������� ,�������������������
�,�-�������������.�'��+����� �4���������������������� �4����������������������������
9 �����1������������8���������9�����/��������
�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �4���������������������� �4����������������������������
9 �����1������������8���������9�����/��������
�4�-5��������������.�'��+����� �4���������������������� �4����������������������������
9 �����1������������8���������9�����/��������
�����������������������''��� 32#132224���������� 311)32224����������������
����*+���������� �&���=��� ����� ���������������� ��
�����
� �������� ���&1���/���������� � ������������������ �� ��%���������������� �%�����������������
����6�����0 ���� ���� �)> �!�� �
� �������� ���&1���6�����0 ���� ���� �)> �!�� � ������������������ �� ��%���������������� �������������������
� ������9���6�����0 ���� ���� �)> �!�� � ��%���������������� �� ������������������� �������������������
����%�6���� �!�$�6����(�� <����� ������������������� �� �������������������� ��������������������
���()����������������''�������+��� 31 532224���������� 3##*32224����������������
����5������6� �)-�&��6� ��2����� )(�� <��� ��2�� '���)�5'��6 ��
� ������9���2����� )(�� <��� ��2�� ������������������ �� ������������������� ������������������
����%�6���� �!�$�6����(�� <����� ������������������ �� �������������������� �������������������
���������6��������������'��������� 12532224������������� *1 32224�������������������
� ������������&������� ���� <�� ,�%��������������� �� ��������������������� ��������������������
����6���� ���� <������� ����) ������������)�1���� �3 ����������������!��&
���������1����������������/����� �� ���%�������������� �� ��������������������� ��������������������
��������������+�����&�'��!��&�2 � ,����������������� �� ��������������������� ��������������������
�������6�1�� �0 ���$�6������*+�����&�'�<��& �,��%����������� �� ��������������������� %�������������������
����*+���� ����&����&�� ����1�����1���������� ���������������������� �� ���������������� ��������������������
� ����6���� �� !���������� �� �� ���������������������� �� ������������������� ����������������������
� ����6�&��&��� �����&�� ����� ���������� ������& ���������������������� �� ���������������� ��������������������
����8��������� ��?1�������������������������&�� ���&����&
� ������8����/����6 ��� ���,�%���������� �� %�������������������� ��������������������
� ������*��&�� �2�&����& ���,�%���������� �� ��������������������� ��������������������
�
��@�9����1�����������)���&�� � 1����� ��
� ����� ���,�%���������� �� ,�������������������� ��������������������
�������������� ����������������
3.2ELKHORN SCHOOL
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
40
���������������� ���������� ���������� �
���� ������������ ��������� �������������
����������������� ����� !�"��� #
���� ����$��
%�� &'�����( ���� ��������� '����� ���� �����)*+�,-� .//0
���$��������'����(�,)2 640���� ���������� �
������'������������
� �3��������''����2������ �4���������������������� �4����������������������������
9 �����1������������8���������9�����/��������
�"�7�������(������+���������8���� �4���������������������� �4����������������������������
9 �����1������������8���������9�����/��������
�%���������-�����'����6�-�����������9��������� ) 632224������������� )#532224�������������������
�%��'*�'�� �A����$�-��� 1���
�%����6�����6��1�1�� ������������������ �� �������������������� �������������������
�*�#����:�����������������2���)����;2������< �4���������������������� �4����������������������������
9 �����1������������8���������9�����/��������
�,����5������.������������ /)32224���������������� /)32224���������������������
�
��,�5;8�����(;8������� ���������<�� ������� ��� ��
������� ��� �� #� ���������������������� �� ���������������� ��������������������
���������������1-��=���������;���*>< 2366532224�������� 4 13 553222
�������������������������������� 3##/32/#4�������� 4 *35!/3 5#
�5�������$��������������������������5��)�����?
4����� �� !31�������$�0�� � ����� �������
B�������� �!��������������&������
2�����?1����� �� ����
-�=��� 1�����������1�<� ��������������������� ����
*������ ���0 �������������������1������� ��������� ������ ���#�
�������������� ����������������
3.2ELKHORN SCHOOL
COST ESTIMATE DETAILMeasure U Implementation Plan
Lodi Unified School District
41
4.1ELKHORN SCHOOL
SCOPE-OF-WORK SITE DIAGRAM
Approved Scope
Not in Scope of Work
Learning Court | Quad
Play Apparatus Hardcourts
Kinder Play
Portable Classroom
Main Entry Fence/Gate
Modernization
Reconfigure
New Construction
Electives | LabsSL - Science Lab
PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten
Classrooms, CR
S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.
Support Spaces
Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office
IL - Innovation Lab, LC - Learning Center
Shared Spaces
Not to Scale
APPROVED SCOPE NOT
DEPICTED ON PLAN:
• Update Electrical Mains
• Electrical Capacity Upgrades • Fire Alarm System + Emergency
Lighting
• New Public Address/Emergency Communications System
• Relocate Existing MDF/IDF
• New EMS System
• Exterior Lighting to Ensure Student Safety
• Safety Locks at Classroom Doors
• Signage for Emergency Response & Wayfinding
Note: The exact location of the shade
structure will be determined during
the design process.
Measure U Implementation Plan Lodi Unified School District