localization plan in russia - handelskammer hamburg · pdf filepage 3 rc ru siemens in russia,...
TRANSCRIPT
Restricted © Siemens AG 2016 All rights reserved. www.siemens.ru/gas-turbines
Localization plan in Russia SGTT – Siemens Gas Turbine Technologies
Restricted © Siemens AG 2016 All rights reserved.
Page 2 PG GT MLGT RU
Siemens history in Russia:
more than 160 years of tradition and progress
Page 3 RC RU
Siemens in Russia, Belarus & Central Asia in a
nutshell
Key Facts
2.800 experts
>40 locations and 10 local production sites
R&D, Sales, Production, Service, Finance
Wide network of local partners
3”3 bill € Orders and 1”5 bill € Sales in FY15
Siemens invested ~ 1 bill € since 2010
Restricted © Siemens AG 2016 All rights reserved.
Restricted © Siemens AG 2016 All rights reserved.
Page 4 PG GT MLGT RU
Main Facts and Figures
December 2012 July 2013 December 2014 June 2015
Start of
construction
Ground
breaking
Office building construction
completion
• June 18th, 2015
Ceremony of the opening a
new manufacturing plant in
Gorelovo (Leningrad region)
• December 1th, 2011
Establishment of JV Siemens
Gas Turbine Technologies
• Siemens AG - 65%
OAO Power Machines - 35%
• 1991-2011 OOO Interturbo
• 38.000 m² (manufacturing
building 12.700 m²,
office building 6.500 m²)
• Investments more than 100
Million €
• > 350 employees
Restricted © Siemens AG 2016 All rights reserved.
Siemens Gas Turbine Production in Russia:
more than 25 years experience
PG GT MLGT RU
Restricted © Siemens AG 2016 All rights reserved.
Page 6 PG GT MLGT RU
SGTT provides all competencies to be a local partner
in Russia
Service
Industrial gas turbines
Compressor
Research and Development
(R&D)
Heavy-duty gas turbines
Manufacturing and Assembly
Components Manufacturing
for Network
Project Execution &
Engineering
Sales
Restricted © Siemens AG 2016 All rights reserved.
Page 8 PG GT MLGT RU
SGTT Factory designed to heavy duty SGTs but also enables
manufacturing of products for Oil & Gas applications
SGT5-2000E
(up to 187 MW)
Reliable, robust,
fuel flexible
SGT5-4000F
(up to 307 MW)
Trusted operational
excellence
SGT-800
(up to 50 MW)
Flexible maintenance,
high availability
Centrifugal
Compressor
machine Reliability and durability
under
severe operating
conditions
Restricted © Siemens AG 2016 All rights reserved.
Page 9 PG GT MLGT RU
Close cooperation within network
ensures high quality
Human
Resources
Equipment
Engineering
Manufacturing
Processes
Order
Management
Process
Quality
Management
Processes
Competence
Development
Network
Support
St.
Petersburg
Operations
Finance
EHS
SGTT Plant Saint-
Petersburg
Gas Turbine Plant
Berlin
Restricted © Siemens AG 2016
Page 10 PG GT MLGT RU
SGTT @ Russian Universities
• 12 Leading Russian Universities into the Loop
• Determination the possible joint R&D project
• Negotiations ongoing
• Providing lectures
• Practice and internship of students in SGTT EN.
• Training of student through involvement into research works
on test rigs.
Education program @ Saint-Petersburg State Polytechnic University
• Experimental aerodynamic research of flow paths for
various Siemens Large Gas Turbine (100 – 340 MW) on
unique University Test Rig. Siemens has been using this
test rig for research since 1997.
• Kinematic and long time wear testing of full scale Actuation
System for large gas turbine compressor. 2014 - 2015
R&D cooperation @ Saint-Petersburg State Polytechnic University
Cooperation expanding with Leading
Russian Universities
Restricted © Siemens AG 2014 All rights reserved.
Page 11
Total Reward at SGTT is fully competitive on the
Russian Market
Development and Environment
Training and Development opportunities:
•Professional, management, soft skills (local, regional and international programs)
•Outbound delegations – worldwide development
•Opportunities for development of regional/worldwide networks
•Professional development for shop floor employees
•Teambuilding and employee events
•Performance appraisal
•Career Development
Environment
•Flexible working hours
•Summer working schedule
•Comfortable working conditions
•Full compliance with the Russian Labor
• Law
Benefits Total Compensation
Medical and life
insurance
Meal compensation
Sick leave
compensation
Car/petrol
compensation
Transportation to/from
metro stations
Medical center
Sports compensation
Base pay: competitive salary.
Salary review on annual basis
Variable pay: bonus systems
based on target/KPIs,
outstanding achievements
PG GT MLGT RU Restricted © Siemens AG 2016 All rights
Page 12 PG GT MLGT RU Restricted © Siemens AG 2016 All rights reserved.
Tax Concessions in Leningrad Region
Restricted © Siemens AG 2016 All rights reserved.
Page 13
Import Substitution program
30.10.2014
Letter to the President of RF from the Minister of
Industry and Trade and the Minister of Energy,
Academy of Sciences’ President
Development of “Import substitution program” for the
300-350 MW gas turbines range.
Approving resolution of Mr. V. Putin was received.
The Interagency working group was created.
Its four meetings were held from March to October
2015.
• Subsidizing R&D GTD-110M (Saturn);
• Developing of HGP components (ROTEC/Renova);
• the considered basic platform for Gas Turbine
production – UTW;
• Providing support for REP Holding to create GT 16,
25, 32 MW.
The RF Government issued a decree dated 17th
July 2015 on the criteria for including of industrial
products, which have no analogues in Russia».
The product is Russian if foreign Share of GT price in
less than
01.01.2016 01.01.2018 01.01.2020
70% 50% 30%
PG GT MLGT RU
Page 14 PG GT MLGT RU Restricted © Siemens AG 2016 All rights reserved.
SGTT: Opportunities & Challenges
Opportunities Challenges
Tax benefits available from the government
The independency of Russian central bank remains
Financing of international banks available
Strong labor law and high EHS requirements remains
Access to the pool of local suppliers available but
Know How and cost efficiency still to be developed
Extension of business to CIS for capturing new
markets
Russia remains the world biggest Energy exporter
Localization is part of a new emerging Russian
economy due to sanctions
Growing need for modernization and efficiency
increase
Special Economic Zones, Industrial Parks
Political relation with the “west” remains difficult
Localization pressure increases to 2020 to meet
government requirements
Gaps in educational system exists for narrow technical
specializations
Devaluation of ruble and high interest rates
Political lobbying of the competitors occurs including
strong competition from Asia
Bureaucracy
Restricted © Siemens AG 2016 All rights reserved.
Page 15
Ul. Siemensa 1, Yuzhnaya chast
proizvodstvennoy zony Gorelovo,
Villozskoye selskoye poseleniye,
Lomonosovsky rayon, Leningradskaya
oblast, 198323
Phone.: +7 (812) 643-73-00
Fax: +7 (812) 643-59-57
E-mail: [email protected]
www.siemens.ru/gas-turbines
Welcome at SGTT Factory
PG GT MLGT RU