North East Lincolnshire Council's Local Transport Plan 3 Quaterly Review January 2012

TRANSCRIPT

Page 1: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Page 2: Local Transport Plan 3 Quarterly Review
Page 3: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

The LTP3 Quarterly Review – an update for Members

The purpose of this document is to provide all Members with information about the Local Transport Plan (LTP) projects being delivered in each ward area. The Local Transport Plan contains an annual programme of projects. This programme is reviewed on a quarterly basis throughout the course of the year, and changes may be necessary in response to unforeseen events, such as the weather. LTP Quarterly Review will keep all Members fully informed, and will assist with the key decisions made by the Head of Development and the Portfolio Holder for the Environment & Strategic Housing. This report is a snapshot of progress made in delivering North East Lincolnshire Council’s LTP at October 1st 2011.

The review includes:

• how the programme is developed;

• a full list of LTP projects;

• the delivery timescales for each project;

• a breakdown of projects and costs by ward, and;

• a map of schemes by ward.

How the programme is developed There are three types of new project:-

• Those where a statutory duty exists, where the works are unavoidable or already committed to either from a previous year or as part of a wider project. (e.g. Highway Maintenance)

• Major schemes (e.g. A18/A180 Link road)

• Elective schemes, those schemes where there is no statutory duty but works are undertaken to improve conditions on the highway network (e.g. New bus shelters)

The LTP programme is developed using the system described below. Where there is a statutory duty or where the works are either already committed to or unavoidable they are added to the LTP programme, the projects are then assessed against each of the eight LTP Challenges which are to:-

• Enable sustainable growth through effective transport provision.

• Improve journey times and reliability by reducing congestion.

• Support regeneration and employment by connecting people to education, training and jobs.

• Enable disadvantaged groups or people living in disadvantaged areas to connect with employment, healthcare, social and leisure opportunities.

• Improve the health of individuals by encouraging and enabling more physically active travel.

• Provide safe access and reduce the risk of loss, death or injury due to transport accidents or crime.

• Improve the journey experience on the local transport network.

• Ensuring that transport contributes to environmental excellence, including managing air quality and reducing transport related greenhouse gas emissions.

Major schemes are also assessed against these eight LTP Challenges and where the scheme is proven to address these local challenges, an initial feasibility study will be commissioned into how deliverable the scheme will be. Subject to the outcome of this study, and the scheme receiving local support, a full Major Scheme Bid is submitted. Finally, elective schemes are developed by individual programme managers based on a range of programme specific criteria and their impact on the eight LTP Challenges. Programme managers schemes are then combined and prioritised based on available resources and an assessment of their deliverability. In some cases, projects are combined within a geographical area allowing the Council to achieve, at the same time, greater value for money and reduced disruption for local residents. The diagram on the next page summarises these processes.

Page 4: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Members Guidelines for introducing new schemes into the LTP Programme. Ward Councillors are often a valuable source of ideas and suggestions for new schemes. The following guidelines are designed to assist this process.

• In the first instance Ward members should contact the Councils’s Lead Officer for Highways and Transportation, Claire Fitzsimmons on (01472) 324428 to discuss suggestions for new highway and transport schemes. Claire will be able to provide general feedback on the proposal and comment on how it supports wider Council objectives.

• This suggestion will then be discussed by Claire with the Head of Highways & Transportation at Balfour Beatty (Marcus Asquith) who will in turn distribute the request to the relevant Programme Manager for more specialist comment.

• The Programme Manager, will assess the request against the eight LTP3 Challenges, any other relevant programme specific criteria and the already agreed LTP Capital Programme for the year. Ward Members will then be given written feedback as to whether their proposal has been successfully included in future years Capital Programme.

The annual LTP Capital programme is assembled during quarter 4 of the previous financial year (January – March), and whilst proposals from Ward Members can be made at any time it may be that larger, more complex or expensive schemes are not considered for inclusion in the Capital Programme until this time.

Page 5: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

A full list of LTP projects

Maintenance Replacement of defective lighting columns £215,000 Surface Dressing Programme, unclassified class roads £202,460

Laceby Dual Carriageway £200,450 A1173 Riby Road £142,000 Windermere Avenue £129,500 Surface Dressing Programme, unclassified class roads (Micro-asphalt) £127,010 Boulevard Avenue Parapet Fence Replacement £122,235 A46 Weelsby Road £118,000

Market Hall Ramp Re-waterproofing £114,750 A1136 Frederick Ward Way / Ellis Way / Victoria St South / Peaks Parkway £111,570 Improve lighting in high crime areas £105,000 Sutcliffe Avenue £ 95,795 Highgate £ 84,000 A1173 Kings Road Link £ 80,000 Market Street £ 76,540

A46 Laceby Road £ 69,080 Hereford Avenue £ 67,490 Laceby Road (South Side only ) £ 63,045 A1098 Queens Parade / Taylors Ave £ 57,425 Welholme Road footway renewal £ 55,915 A180 Cleethorpe Road £ 54,000

Fairfield Road £ 52,090 A180 Cleethorpe Road (Flyover) (westbound) £ 50,415 A1136 Deansgate / Bargate / Dudley St Junction £ 48,210 A46 Laceby Road £ 47,750 Brereton Avenue £ 47,000 A1098 Taylors Ave £ 45,835

Louth Road (A16) £ 45,200 Surface Dressing Programme, B & C class roads £ 44,570 Ashby Top Roundabout (A18 / B1203) £ 40,000 Tactile crossing programme £ 37,500 B1210 Stallingborough Road £ 37,020 A1173 Kiln Lane Link £ 30,000 Garden Street footway renewal £ 29,995

PROW surface improvements £ 25,000 PROW bridges £ 20,000 B1210 Healing Road £ 14,625 Abbey Road £ 14,050 Ainslie Street £ 9,040 PROW safer road crossings (Feasibility study, A180 / A1173 crossing) £ -

Road Safety Local Safety Schemes - various locations - (SCHEME ASSESSMENT) £150,000 Scartho / Sutcliffe junction improvements £ 93,600 Village Safety Improvements, Laceby and Aylesby £ 41,000 Ward wide 20mph zones £ 40,000 A180 Route Improvements (DESIGN ONLY THIS YEAR) £ 35,000 School safety zones £ 25,000

Road Safety Training (ongoing throughout school year) £ 5,000 Washdyke / Pelham junction £ 1,700 Broadway £ -

Traffic Modernisation of traffic signals at various locations - Ladysmith Rd / Weelsby Rd £165,000 Modernisation of traffic signals at various locations - Dudley St / Littlefield Lane £ 80,000

Facilities for disabled people at pedestrian crossings £ 65,000 Modernisation of traffic signals at various locations Clee Rd / Clee Cres £ 50,000 Modernisation of traffic signals at various locations - Freeman St / Garibaldi St £ 20,000 Modernisation of traffic signals at various locations - Ladysmith Rd / Columbia Rd £ 20,000 UTC 6 & 7 (FEASIBILITY STUDY ONLY - NO SITE WORKS) £ 8,000 Capital works to support car sharing £ 5,000 ATC Hardware updates and new sites £ 5,000

Page 6: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Healing Village £ 5,000

Public Transport Public Transport Information £ 30,000 Cleethorpes Station Approach Already designed and tendered) £ 25,000

Bus stop access improvements (undertaken with highway works) £ 22,000 Bus shelters £ 15,000 Hardware upgrades for Phone'n'Ride £ 5,000 Windermere Avenue £ 4,600

Active Travel Pedalway Signage £ 15,000

Cycle Parking £ 15,000 New Waltham disused railway line off-road cycle path £ 15,000 Capital works to support transport Community Action Plans £ 10,000 Scartho Top - Ferriby Lane footpath improvements £ - Littlefield Lane off-road cycle path £ - Peaks Lane / Peaks Parkway off-road cycleway £ -

Majors A18-A180 Link £60,000

Page 7: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

The delivery timescales for each project

The table on the following page list each LTP scheme along with the ward which it has been assigned to, and estimate of the costs and its status as at the start of Quarter 3 (October 2011). Throughout this table and the subsequent maps and tables the following colouring system has been used: Maintenance Including highway maintenance, surface dressing & street lighting Safety Road safety Traffic Improvements to traffic signals and signage, supporting car sharing and upgrading the monitoring

network Public Transport Improvements to bus and rail facilities, including Phone n Ride

Active Travel Cycling and walking infrastructure and information Majors A18/A180 Link Road.

Page 8: Local Transport Plan 3 Quarterly Review

LTP Highways and Transport Programme 2011-12 Update to end of w/c:

Key to show the status of each scheme: Consultation Design Tender Mobilisation Construction Ongoing delivery ���� Complete ���� Delay

Type Map Ref. Project Ward Cost Status

04/0

4/1

1

11/0

4/1

1

18/0

4/1

1

25/0

4/1

1

02/0

5/1

1

09/0

5/1

1

16/0

5/1

1

23/0

5/1

1

30/0

5/1

1

06/0

6/1

1

13/0

6/1

1

20/0

6/1

1

27/0

6/1

1

04/0

7/1

1

11/0

7/1

1

18/0

7/1

1

25/0

7/1

1

01/0

8/1

1

08/0

8/1

1

15/0

8/1

1

22/0

8/1

1

29/0

8/1

1

05/0

9/1

1

12/0

9/1

1

19/0

9/1

1

26/0

9/1

1

03/1

0/1

1

10/1

0/1

1

17/1

0/1

1

24/1

0/1

1

31/1

0/1

1

07/1

1/1

1

14/1

1/1

1

21/1

1/1

1

28/1

1/1

1

05/1

2/1

1

12/1

2/1

1

19/1

2/1

1

26/1

2/1

1

02/0

1/1

2

09/0

1/1

2

16/0

1/1

2

23/0

1/1

2

30/0

1/1

2

06/0

2/1

2

13/0

2/1

2

20/0

2/1

2

27/0

2/1

2

05/0

3/1

2

12/0

3/1

2

19/0

3/1

2

26/0

3/1

2

02/0

4/1

2

09/0

4/1

2

16/0

4/1

2

Comments

PH PROW safer road crossings (Feasibility study, A180 / A1173 crossing) 0 ���� � � �

PH96 Ainslie Street Park 9,040 ���� � � � � � � � � � � � � �

PH20 Abbey Road Park 14,050 ���� � � � � � � � � � � � � �

PH98 B1210 Healing Road Wolds 14,625 ���� � � � � � � � � � � � � �

PH PROW bridges Various - see Ward maps 20,000

PH PROW surface improvements Various - see Ward maps 25,000

PH94 Garden Street footway renewal Park 29,995 ���� � � � � � � � � � � � � � � � � � � � � �

PH6 A1173 Kiln Lane Link Immingham 30,000 ���� � � � � � � � � � � � �

PH2 B1210 Stallingborough Road Immingham 37,020 ���� �

JD Tactile crossing programme Various - not mapped 37,500 � � � � � � � � � � � � � � � � � � �

PH97 Ashby Top Roundabout (A18 / B1203) Wolds 40,000 � � � � � � � � � � �

PH27-87 Surface Dressing Programme, B & C class roads Various - see Ward maps 44,570 ���� � � � � � � � � � � � � � �

PH4 Louth Road (A16) Humberston & New Waltham 45,200 ���� � � � � � � � � � � �

PH15 A1098 Taylors Ave Haverstoe 45,835 ���� � � � � � � � � � � � � � � � �

PH91 Brereton Avenue Sydney Sussex 47,000 � � � Project brought forward

PH19 A46 Lacbey Road Yarborough 47,750 ���� � � � � � � � � � � � � � �

PH1 A1136 Deansgate / Bargate / Dudley St Junction Park 48,210 ���� � � � � � � � � � � � � �

PH5 A180 Cleethorpe Road (Flyover) (westbound) West Marsh 50,415 ���� � � � � � � � �

PH90 Fairfield Road Scartho 52,090 � � � � � � � � � � � � � � � � � � � � �

PH9 A180 Cleethorpe Road East Marsh 54,000 ���� � � � � � � � � � � �

PH93 Welholme Road footway renewal Heneage 55,915 ���� � � � � � � � � � � � � � � � � � � � � �

PH16 A1098 Queens Parade / Taylors Ave Haverstoe 57,425 ���� � � � � � � � � � � � � � � � �

PH14 Laceby Road (South Side only ) South 63,045 ���� � � � � � � � � � � � �

PH92 Hereford Avene South 67,490 ���� � � � � � � � � � � � � � � �

PH13 A46 Laceby Road South 69,080 ���� � � � � � � � � � � � �

PH88 Market Street Croft Baker 76,540 ���� � � � � � � � �

PH7 A1173 Kings Road Link Immingham 80,000 ���� � � � � � � � � � � � �

PH3 Highgate Croft Baker 84,000

PH11-12 Sutcliffe Avenue South 95,795 ���� � � � � � � � � � � � �

SR16-20 Improve lighting in high crime areas Various - see Ward maps 105,000

PH95 A1136 Frederick Ward Way / Ellis Way / Victoria St South / Peaks Parkway West Marsh 111,570 ���� � � � � � � � � � � � � � �

JD2 Market Hall Ramp Re-waterproofing West Marsh 114,750 ���� � � � � � � � � � � � � � � � � �

PH8 A46 Weelsby Road Park 118,000 � � � � Project brought forward

JD1 Boulevard Avenue Parapet Fence Replacement Yarborough 122,235 ���� � � � � � � � � � � � � � � � � � � � � � � � � �

PH27-87 Surface Dressing Programme, unclassified class roads (Micro-asphalt) Various - see Ward maps 127,010 � � � � � � � � � � � �

PH89 Windermere Avenue Scartho 129,500 � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �

PH17 A1173 Riby Road Immingham 142,000 � � � � � � Project brought forward

PH18 Laceby Dual Carriageway Wolds 200,450 ���� � � � � � � � � � � � � �

PH27-87 Surface Dressing Programme, unclassified class roads Various - see Ward maps 202,460 ���� � � � � � � � � � � � � � �

SR01-15 Replacement of defective lighting columns Various - see Ward maps 215000

MC Village Safety Improvements, Laceby and Aylesby Wolds 0 ���� Project deferred to allow further consultation

MC71 Washdyke / Pelham junction Immingham 1,700 ���� �

MC Road Safety Training (ongoing throughout school year) Various - not mapped 5,000

MC65-66 School safety zones Various - see Ward maps 5,000 £20000 rollover to 2012/13

MC70 Broadway Yarborough 5,000 Project deferred to allow further consultation

MC63 Ward wide 20mph zones East Marsh 10,000 £30000 rollover to 2012/13

MC A180 Route Improvements (DESIGN ONLY THIS YEAR) Various - not mapped 15,000 £20000 rollover to 2012/13

MC69 Scartho / Sutcliffe junction improvements South 93,600 � � � � � � � � � � � � � � � � � �

MC1-62 Local Safety Schemes - various locations - (SCHEME ASSESSMENT) Various - see Ward maps 150,000

DP4 Modernisation of traffic signals at various locations - Freeman St / Garibaldi St East Marsh 0 ���� Deferred pending renaissance plans for Freeman Street

DP UTC 6 & 7 (FEASIBILITY STUDY ONLY - NO SITE WORKS) Various - not mapped 0 ����DP2 Modernisation of traffic signals at various locations Clee Rd / Clee Cres Croft Baker 5,000 � � � � � � � � � £40000 rollover to 2012/13

DP3 Modernisation of traffic signals at various locations - Dudley St / Littlefield Lane Park 5,000 � � � � � � � � � £75000 rollover to 2012/13

DP7 Healing Village Wolds 5,000

DP Capital works to support car sharing Various - not mapped 5,000

MG01-04 ATC Hardware updates and new sites Various - see Ward maps 5,000

DP6 Modernisation of traffic signals at various locations - Ladysmith Rd / Columbia Rd Heneage 20,000

DP8-21 Facilities for disbled people at pedestrian crossings Various - see Ward maps 65,000 � � � � � � � � � �

DP5 Modernisation of traffic signals at various locations - Ladysmith Rd /Weelsby Rd East Marsh 165,000 � � � � � � � � � � � Delay awaiting signal design

MKL4 Windermere Avenue Scartho 4,600 �

MKL Hardware upgrades for Phone'n'Ride Various - not mapped 5,000

MKL Bus shelters Various - not mapped 15,000 � � � � � � � � � �

MKL2-03 & 05 Bus stop access improvements (undertaken with highway works) Various - see Ward maps 22,000

MKL8 Cleethorpes Station Approach Already designed and tendered) Sidney Sussex 25,000

MKL Public Transport Information Various - not mapped 30,000

AS9 Scartho Top - Ferriby Lane footpath improvements Scartho 0 ���� Deferred pending agreement on land acquisition

AS3 Peaks Lane / Peaks Parkway off-road cycleway Heneage 0 ���� Deferred pending agreement on land acquisition

AS Capital works to support transport Community Action Plans Various - not mapped 10,000

AS2 New Waltham disused railway line off-road cyclepath Humberston & New Waltham 15,000 � � � � � � � �

AS4-6 Pedalway Signage Various - not mapped 15,000

AS7-8 Cycle Parking Various - not mapped 15,000

AS1 Littlefield Lane off-road cyclepath Park 30,000 � � � � � � � �

Major

SchemesSR A18-A180 Link Immingham 60000 Subject to DfT funding approval

Current Programme

Total Budget

(Overprogramming) -4%

Acti

ve

Tra

vel

£3,736,465

£3,888,000

Ro

ad

Safe

tyT

raff

icM

ain

ten

an

ce

Pu

blic

Tra

nsp

ort

28/11/11

Q1 Q2 Q3 Q4

Page 9: Local Transport Plan 3 Quarterly Review

SR1

SR2

SR3SR4

SR8

SR5

SR16

SR19

SR18

SR12

SR20

SR13SR14

SR9

SR10

SR11

SR17

SR6

SR7

SR15

AS5

AS2

AS3

AS4

AS4

AS4

AS4AS4

AS4

AS9

AS6

AS1

AS4

PH38

PH36PH82

PH35

PH41PH42

PH40

PH23

PH44

PH47

PH48

PH45PH46

PH71

PH24

PH68

PH66

PH65

PH25PH26

PH67PH69

PH53PH54

PH55PH84

PH81

PH58

PH63PH62

PH32

PH33

PH34

PH56PH60

PH59PH57

PH70PH85

PH72 PH73

PH79PH86

PH76PH74

PH78

PH30

PH43

PH39

PH22

PH51PH52

PH50

PH49

PH31

PH37

PH75

PH75

PH80

PH61

PH83

PH28

PH29

PH27PH87

MG1

MG3

MG4

MG2

PH1

PH3

PH13PH14

PH5

PH8

PH88

PH16

PH15

PH9

PH91

PH10

PH92

PH11PH12

PH18

PH19

PH20PH93

PH94

PH4

PH89 PH90

PH7

PH6

PH2

PH98

PH17

MKL5

MKL4

MKL4

MKL8

MKL3

MC71

MC70

MC69

MC63

MC63

MC63

MC66

MC65

JD1

JD2

DP10

DP10DP10

DP10

DP10

DP12

DP13

DP14

DP15

DP16

DP17

DP18

DP19

DP10

DP3

DP4

DP5

DP6

DP7

DP20

DP1

DP8

DP21

DP2

DP9

DP11

DP22

SR21

MC9

MC2

MC3

MC4

MC48

MC29

MC19MC22

MC39

MC56MC10

MC8

MC11MC27

MC6

MC17

MC24

MC58

MC31

MC32

MC42

MC44

MC49

MC47

MC14

MC57

MC61

MC1

MC20

MC36

MC45

MC28 MC41

MC40

MC30

MC50 MC38MC21

MC54

MC62

MC25

MC26

MC16MC55MC37

MC23

MC46

MC7

MC34

MC33

MC52

MC53MC51

MC43

MC59

MC5

MC15

MC12

MC60

MC13MC18

MC35

SR1

SR2

SR3SR4

SR8

SR5

SR16

SR19

SR18

SR12

SR20

SR13SR14

SR9

SR10

SR11

SR17

SR6

SR7

SR15

AS5

AS2

AS3

AS4

AS4

AS4

AS4AS4

AS4

AS9

AS6

AS1

AS4

PH38

PH36PH82

PH35

PH41PH42

PH40

PH23

PH44

PH47

PH48

PH45PH46

PH71

PH24

PH68

PH66

PH65

PH25PH26

PH67PH69

PH53PH54

PH55PH84

PH81

PH58

PH63PH62

PH32

PH33

PH34

PH56PH60

PH59PH57

PH70PH85

PH72 PH73

PH79PH86

PH76PH74

PH78

PH30

PH43

PH39

PH22

PH51PH52

PH50

PH49

PH31

PH37

PH75

PH75

PH80

PH61

PH83

PH28

PH29

PH27PH87

MG1

MG3

MG4

MG2

PH1

PH3

PH13PH14

PH5

PH8

PH88

PH16

PH15

PH9

PH91

PH10

PH92

PH11PH12

PH18

PH19

PH20PH93

PH94

PH4

PH89 PH90

PH7

PH6

PH2

PH98

PH17

MKL5

MKL4

MKL4

MKL8

MKL3

MC71

MC70

MC69

MC63

MC63

MC63

MC66

MC65

JD1

JD2

DP10

DP10DP10

DP10

DP10

DP12

DP13

DP14

DP15

DP16

DP17

DP18

DP19

DP10

DP3

DP4

DP5

DP6

DP7

DP20

DP1

DP8

DP21

DP2

DP9

DP11

DP22

SR21

MC9

MC2

MC3

MC4

MC48

MC29

MC19MC22

MC39

MC56MC10

MC8

MC11MC27

MC6

MC17

MC24

MC58

MC31

MC32

MC42

MC44

MC49

MC47

MC14

MC57

MC61

MC1

MC20

MC36

MC45

MC28 MC41

MC40

MC30

MC50 MC38MC21

MC54

MC62

MC25

MC26

MC16MC55MC37

MC23

MC46

MC7

MC34

MC33

MC52

MC53MC51

MC43

MC59

MC5

MC15

MC12

MC60

MC13MC18

MC35

This Product includes mapping data licensed from Ordnance Surveywith the permission of the controller of HMSO. © Crown Copyright 2011.

All rights reserved 10020759

LTP3 Highway and Transport Programme 2011-12 North East Lincolnshire

KEY

� � � � � � � � � � �� � � � � � � � � � � �� � � � � �� � � � � � �� � � � � � � � � � � � � � �� � � � � � � �� � � � � � � � � � � �

Page 10: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

A breakdown of projects and costs by ward

In the following tables, projects within single ward areas, include those where they cross over the neighbouring ward boundaries. Cost breakdowns are therefore indicative, please see map for the full detail in each ward. There are also a number of schemes listed at the end of each section that take place across several wards.

Croft Baker

Map Ref Project Cost (£s) Status

PH15 A1098 Taylors Avenue 45,835 Complete PH03 Highgate 84,000 Design

PH88 Market Street 76,540 Complete DP02 Modernisation of traffic signals at various locations Clee Rd / Clee Crescent 5,000 Design

Other cross ward schemes:

• Surface dressing of B&C class roads.

• Replacement of defective lighting columns.

• Local safety schemes.

• Pedalway cycle route signage.

• Facilities for disabled people at pedestrian crossings

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 11: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

East Marsh

Map Ref Project Cost (£s) Status

PH09-10 A180 Cleethorpe Road 54,000 Construction MC63 Ward wide 20mph zones 40,000 Delayed DP04 Modernisation of traffic signals Freeman St / Garibaldi St 20,000 Not Started DP05 Modernisation of traffic signals Ladysmith Rd / Columbia Rd 20,000 Not Started

Other cross ward schemes:

• Surface dressing of B&C class roads.

• Local safety schemes.

• Pedalway cycle route signage.

• Facilities for disabled people at pedestrian crossings

• Surface dressing of unclassified roads

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 12: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Freshney

There are no schemes specifically allocated to this ward during 2011/12

Other cross ward schemes:

• Local safety schemes.

• Facilities for disabled people at pedestrian crossings

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 13: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Haverstoe

Map Ref Project Cost (£s) Status

PH16 A1098 Queens Parade 57,425 Complete PH15 A1098 Taylors Avenue 45,835 Complete

Other cross ward schemes:

• Surface dressing of unclassified roads

• Local safety schemes.

• Pedalway cycle route signage.

• Automatic traffic count site upgrades

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 14: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Heneage

Map Ref Project Cost (£s) Status PH93 Welholme Rd footway 55,915 Construction DP06 Modernisation of traffic signals at Ladysmith Rd x Weelsby Rd 165,000 Design

AS03 Peaks Lane – Peaks Parkway off road cycle lane. - Deferred to future year

Other cross ward schemes:

• Surface dressing of unclassified roads

• Replacement of defective lighting columns.

• Local safety schemes.

• Pedalway cycle route signage.

• Facilities for disabled people at pedestrian crossings

• Automatic traffic count site upgrades

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 15: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Humberston & New Waltham

Map Ref Project Cost (£s) Status PH04 Louth Rd (A16) 45,200 Complete AS02 New Waltham Disused Rail Track 15,000 Design

Other cross ward schemes:

• Replacement of defective lighting columns.

• Local safety schemes.

• Pedalway cycle route signage.

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 16: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Immingham

Map Ref Project Cost (£s) Status PH06 A1173 Kiln Lane 30,000 Tender PH07 A1173 Kings Road Link 80,000 Tender PH17 A1173 Riby Road 142,000 Tender PH02 B1210 Stallingborough Road 37,020 Complete MC71 Washdyke / Pelham Junction 1,700 Complete SR21 A18-A180 Link Road 440,000 Design

MC66 School Safety Zone 5,000 Not Started

Other cross ward schemes:

• Local safety schemes.

• Pedalway cycle route signage.

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 17: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Park

Map Ref Project Cost (£s) Status PH01 A1136 Deansgate/Bargate/Dudley St Junction 48,210 Complete PH08 A46 Weelsby Road 118,000 Complete PH96 Ainslie Street 9,040 Complete PH94 Garden Street footway 29,995 Construction

PH20 Abbey Road 14,050 Complete DP03 Modernisation of traffic signals at Dudley St x Littlefield Lane 80,000 Design AS01 Littlefield Lane – Westward Ho 0 Cancelled

Other cross ward schemes:

• Replacement of defective lighting columns.

• Local safety schemes.

• Pedalway cycle route signage.

• Facilities for disabled people at pedestrian crossings

• Cycle parking

• Bus stop improvements

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 18: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Scartho

Map Ref Project Cost (£s) Status PH89 Windermere Avenue 129,500 Mobilisation PH90 Fairfield Rd 52,090 Mobilisation MKL04 Windermere Avenue Bus Stops 4,600 Mobilisation

AS09 Scartho Top 0 Deferred to future year

Other cross ward schemes:

• Replacement of defective lighting columns.

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 19: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Sidney Sussex

Map Ref Project Cost (£s) Status PH91 Brereton Avenue 47,000 Design

MKL08 Cleethorpes Station Approach 25,000 On site

Other cross ward schemes:

• Surface dressing of unclassified roads

• Local safety schemes.

• Pedalway cycle route signage.

• Facilities for disabled people at pedestrian crossings

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 20: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

South

Map Ref Project Cost (£s) Status PH13 A46 Laceby Road 69,080 Complete PH14 A46 Louth Rd (South Side Only) 63,045 Complete PH92 Hereford Avenue 67,490 Complete PH11/12 Sutcliffe Ave 95,795 Complete MC69 Scartho/Sutcliffe Junction 93,600 Mobilisation

Other cross ward schemes:

• Local safety schemes.

• Facilities for disabled people at pedestrian crossings

• Bus stop improvements

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 21: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Waltham

There are no schemes specifically allocated to this ward during 2011/12

Other cross ward schemes:

• Replacement of defective lighting columns.

• Automatic traffic count site upgrades

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 22: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

West Marsh

Map Ref Project Cost(£s) Status PH95 A1136 FWW/Ellis Way/Victoria St South/PPW 111,570 Complete PH05 A180 Cleethorpe rd Flyover 50,415 Complete JD01 Boulevard Avenue Parapet Fence 122,235 Construction JD02 Market Hall Ramp Re-waterproofing 114,750 Construction

Other cross ward schemes:

• Local safety schemes.

• Replacement of defective lighting columns.

• Pedalway cycle route signage.

• Facilities for disabled people at pedestrian crossings

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 23: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Wolds

Map Ref Project Cost(£s) Status PH99 Ashby Top Roundabout (A18/B1203) 40,000 Design

PH18 Laceby Dual Carriageway 200,450 Complete PH98 B1210 Healing Road 14,625 Complete DO01 / MC08 Village Safety Improvements – Laceby & Aylesby 41,000 Consultation DP07 Healing Village Signage 5,000 Design MC65 School Safety Zone 5,000 Not Started

Other cross ward schemes:

• Local safety schemes.

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 24: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Yarborough

Map Ref Project Cost(£s) Status PH19 A46 Laceby Road 47,750 Complete

MC70 Broadway 0 Deferred to future year

Other cross ward schemes:

• Local safety schemes.

• Replacement of defective lighting columns.

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

Page 25: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Cross ward projects – see ward maps

These are projects that are not specifically attached to one particular ward or area but are spread across several.

Map Ref Project Cost(£s) Status PH27-87 Surface Dressing Programme (B&C) 44,750 Complete PH27-87 Surface Dressing Programme (UNC) 202,460 On going PH27-87 Surface Dressing Programme (Micro-asphalt) 127,010 Mobilisation PH-- PROW surface improvements 25,000 On going PH-- PROW bridges 20,000 On going SR01-15 Replacement of Defective Light Columns 215,000 On going SR16-20 Improve lighting in higher crime areas 105,000 On going n/a Tactile Crossing Programme 37,500 Mobilisation MC01-62 Local safety schemes assessment 150,000 Design n/a UTC Areas 6&7 8,000 Design DP08-21 Facilities for disabled people at pedestrian crossings 65,000 On going MC65-66 School Safety Zones 25,000 Design

MG01-04 ATC upgrades and new sites 5,000 Complete AS04-06 Pedalway signage 15,000 On going AS07-08 Cycle Parking 15,000 On going n/a Bus shelters 15,000 On going n/a Bus stop access improvements 22,000 On going

Projects in various locations – not mapped

These are projects that don’t have a geographic element and are delivered across North East Lincolnshire.

Project Cost(£s) Status

PROW safer road crossings studies - Deferred to future year

Road safety training 5,000 On going A180 Route safety improvements (design stage only) 35,000 Design Capital Works supporting Car Sharing 10,000 On going Public transport information 30,000 On going

Hardware updates for Phone n Ride 5,000 Design Capital Works to support TCAPs 10,000 On going

Page 26: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

Index of LTP projects 2011-12

Ref Scheme Value

SR1-15 Replacement of defective lighting columns £215,000

PH27-87 Surface Dressing Programme, unclassified class roads £202,460

PH18 Laceby Dual Carriageway £200,450

DP5 Modernisation of traffic signals at various locations - Ladysmith Rd / Weelsby Rd £165,000

MC1-62 Local Safety Schemes - various locations £150,000

PH17 A1173 Riby Road £142,000

PH89 Windermere Avenue £129,500

PH27-87 Surface Dressing Programme, unclassified class roads (Micro-asphalt) £127,010

JD1 Boulevard Avenue Parapet Fence Replacement £122,235

PH8 A46 Weelsby Road £118,000

JD2 Market Hall Ramp Re-waterproofing £114,750

PH95 A1136 Frederick Ward Way / Ellis Way / Victoria St South / Peaks Parkway £111,570

SR16-20 Improve lighting in high crime areas £105,000

PH11-12 Sutcliffe Avenue £95,795

MC69 Scartho / Sutcliffe junction improvements £93,600

PH3 Highgate £84,000

PH7 A1173 Kings Road Link £80,000

PH88 Market Street £76,540

PH13 A46 Laceby Road £69,080

PH92 Hereford Avenue £67,490

DP8-21 Facilities for disabled people at pedestrian crossings £65,000

PH14 Laceby Road (South Side only ) £63,045

SR21 A18/A180 Link Road £60,000

PH16 A1098 Queens Parade / Taylors Ave £57,425

PH93 Welholme Road footway renewal £55,915

PH9 A180 Cleethorpe Road £54,000

PH90 Fairfield Road £52,090

PH5 A180 Cleethorpe Road (Flyover) (westbound) £50,415

PH1 A1136 Deansgate / Bargate / Dudley St Junction £48,210

PH19 A46 Laceby Road £47,750

PH91 Brereton Avenue £47,000

PH15 A1098 Taylors Ave £45,835

PH4 Louth Road (A16) £45,200

PH27-87 Surface Dressing Programme, B & C class roads £44,570

PH97 Ashby Top Roundabout (A18 / B1203) £40,000

MC63 Ward wide 20mph zones £40,000

n/a Tactile crossing programme £37,500

PH2 B1210 Stallingborough Road £37,020

n/a A180 Route Improvements (Design only) £35,000

PH6 A1173 Kiln Lane Link £30,000

n/a Public Transport Information £30,000

PH94 Garden Street footway renewal £29,995

n/a PROW surface improvements £25,000

MC65-66 School safety zones £25,000

MKL8 Cleethorpes Station Approach £25,000

MKL2-5 Bus stop access improvements £22,000

n/a PROW bridges £20,000

DP6 Modernisation of traffic signals at various locations - Ladysmith Rd / Columbia Rd £20,000

n/a Bus shelters £15,000

AS4-6 Pedalway Signage £15,000

AS7-8 Cycle Parking £15,000

AS2 New Waltham disused railway line off-road cycle path £15,000

PH98 B1210 Healing Road £14,625

PH20 Abbey Road £14,050

n/a Capital works to support transport Community Action Plans £10,000

PH96 Ainslie Street £9,040

n/a Road Safety Training (ongoing throughout school year) £5,000

n/a Capital works to support car sharing £5,000

MG1-4 ATC Hardware updates and new sites £5,000

DP7 Healing Village £5,000

n/a Hardware upgrades for Phone'n'Ride £5,000

MKL4 Windermere Avenue £4,600

DP3 Modernisation of traffic signals – Dudley St x Littlefield Lane £5,000

Page 27: Local Transport Plan 3 Quarterly Review

LTP3 Quarterly Review – October 2011

DP2 Modernisation of traffic signals at various locations Clee Rd / Clee Cres £5,000

MC71 Washdyke / Pelham junction £1,700

n/a PROW safer road crossings (Feasibility study, A180 / A1173 crossing) £ -

MC70 Broadway £ -

AS9 Scartho Top - Ferriby Lane footpath improvements £ -

AS1 Littlefield Lane off-road cycle path £ -

AS3 Peaks Lane / Peaks Parkway off-road cycleway £ -

DP1 Village Safety Improvements, Laceby and Aylesby £ -

DP4 Modernisation of traffic signals at various locations - Freeman St / Garibaldi St £ -

n/a UTC 6 & 7 (Feasibility only) £ -