Services : Possible Sources Maintain services in the requisition Assign source Specs. Contract ___ ___ ___ ____ ___ ___ Hour % Conditions $ Service master record conditions Vendor

Upload: vviini

Post on 24-Dec-2015

223 views

Category:

Documents


6 download

DESCRIPTION

LO540 Gerenciamento de Servicos Externos5.pdf

TRANSCRIPT

Page 1: LO540 Gerenciamento de Servicos Externos5

Services : Possible Sources

Maintain services in therequisition

Assign source

Specs.

Contract___ ______ _______ ___

Hour %

Conditions$

Service master record conditions

Vendor

Page 2: LO540 Gerenciamento de Servicos Externos5

Suggested Sources

Purchaserequisition

- M gr. SoftwareConsulting

- Service 1580Senior consultant

Vendor ?

Possible sources

- Master conditions- Contracts for material group

-Contracts forservice

Existing

NO YES

X

X

X

Vendor Miller Co.

Service 1580

Price $250

Contract4711Mat. Gr.Softwareconsulting

ContractService1580

$260

RFQ

Rel. order

Rel. order

Page 3: LO540 Gerenciamento de Servicos Externos5

Sourcing Suggestion ( Customizing)

Purchaserequisition

-Mat gr.-Software consultg.-- 1580-- 15xx

Contract158015xx15yy

Contract158015xx

Customizing

-At least 1 service- All service

Master conditionsVendor Miller Co.1580 price in $15xx price in $15yy15zz

Master conditionsVendor Smith Co.15xx15zz

Page 4: LO540 Gerenciamento de Servicos Externos5

Chapter 6 Value Limits

1 Cost control in the procurement of unplanned servicesusing value limits.

1 Differences betwwen the procurement of planned andunplanned services at the time of planning (ordering)and at the time of performance (service entry)

Page 5: LO540 Gerenciamento de Servicos Externos5

Chapter 6 Objectives

1 Course participants are shown how to work withvalue limits as na instrument of cost control in the procurement of services.

1 They are familiarized with the different proceduresapplied in the procurement of planned andunplanned services.

Page 6: LO540 Gerenciamento de Servicos Externos5

Limits in the Planning/Entry of ServicesService entry sheets

01 Selection of software components

01 Definition of requirements

Consultant K4 10 days à $2,100.00

02 Adjustment of components

01 Component A

Consultant K3 5 days à $1,900.00

02 Testing configuration/settings

Consultant K3 4 days à $1,900.00

ModificationConsultant k4 10 days à $ 2,100.00

01 Selection of software components

01 Definition of requirements

Consultant K4 10 days à $2,100.00

02 Adjustment of components

01 Component A

Consultant K3 5 days à $1,900.00

02 Testing configuration/settings

Consultant K3 4 days à $1,900.00

Unplanned services up toMax. $60,000.00

Page 7: LO540 Gerenciamento de Servicos Externos5

Value Limits for Unplanned Services

PO # 12345 Jan. 27

Item 10 Repair printing press

-Exact service decription

-Order quantity

-Account assignment

???

Cost contral -Contractsvia -Limits !

Service entry sheet Feb. 3

Item 10

L1 Oil filter replaced

1 hr à 75.00

CC 123

???

Limit adhered to

Release procedure Acceptance

Page 8: LO540 Gerenciamento de Servicos Externos5

Contract 1200

Overall Limit, Contract Limit, Limit w/o Ref. to Contr.

Contract 1000

ABC Software Co.

Software consulting

Junior consultant K2Senior consultant K3

managing consult.K4

Purchase order

ABC Software Co.

Software

implementation K4Limit

$100,000.00

Contract

Limit definition

Overrall limit$100,000.00

Limits on conctratsNo. 1000 $60,000.00No. 1200 $50,000.00

Limit w/o conctract$10,000.00

Service entry sheet

<- $60,000.00from conctract

no. 1000

Planned

Via limit

Page 9: LO540 Gerenciamento de Servicos Externos5

Limits: Service Entry

Purchase order

Quantity checkAdoption of price

Service entry sheet

Planned service10 days $12,000.00

Unplanned service8 days $16,000.00

Target quantity checkAdoption of price

Contract

Contract

- Target qty. 100 days

- Price $ 2,000.00/day

Value checkOverall limit

Contract limit

Limits

1010 days à $1,200.00

Page 10: LO540 Gerenciamento de Servicos Externos5

Planned Procurement of Services

Service entry sheet

- Service 1580

- Service 1540

Purchase order

- Service 1580

- Service 1540

No limit

Only planned services

Page 11: LO540 Gerenciamento de Servicos Externos5

Partially Planned Procurement of Services(Unplanned Procurement via Contracts)

Service entry sheet

- Service 1580

- Service 10

from contract 1

-Service 24

from contract 2

- Service 57

from contract 2

Purchase order

No servicespecifications

Limit Contract 1 $20,000.00Contract 2 $ 15,000.00

No planned services,but reference tocontract

Page 12: LO540 Gerenciamento de Servicos Externos5

Unplanned Procurement of Services

Service entry sheet

-

Service 1

- Service 2

:

:

:

:

Purchase order

No servicespecifications

LimitUnlimited

Only unplannedservices

Not created untilentry of services

performed

Spcs.

Page 13: LO540 Gerenciamento de Servicos Externos5

Chapter 7 Entry and Acceptance of ServicesPerformed

1 Recording services actually performed on the serviceentry sheet.

1 Manual acceptance of service entry sheets (one-step,multi-step).

1 Automatic acceptance of services using the release(approval) procedure for entry sheets.

Page 14: LO540 Gerenciamento de Servicos Externos5

Chapter 7 Obectives

1 Course participants learn to record services that have actually been performed, using the service entry sheet.

1 They become familiar with the different proceduresfor accepting service entry sheets.

Page 15: LO540 Gerenciamento de Servicos Externos5

Creation of na Entry Sheet for Services Performed

Service entry sheets

01 Selection of software components

01 Definition of requirements

Consultant K4 10 days à $2,100.00

02 Adjustment of components

01 Component A

Consultant K3 5 days à $1,900.00

02 Testing configuration/settings

Consultant K3 4 days à $1,900.00

ModificationConsultant k4 10 days à $ 2,100.00

01 Selection of software components

01 Definition of requirements

Consultant K4 10 days à $2,100.00

02 Adjustment of components

01 Component A

Consultant K3 5 days à $1,900.00

02 Testing configuration/settings

Consultant K3 4 days à $1,900.00

Unplanned services up toMax. $60,000.00