lnp col 2.5-1, lnp col 2.5-5gse 42.3 ft 0 nav-3 n, rec, rqd (%) nuclear island is approximately...
TRANSCRIPT
LEGEND
/
Progress Energy Florida
Rev 0
Subsurface Fence Diagram with Vs Results atLNP 2: Plant East to West
Part 2, Final Safety Analysis Report
FIGURE 2.5.4.2-205B
Levy Nuclear PlantUnits 1 and 2
50
-50
-100
-150
-200
-250
-300
-350
-400
-450
0
-50
-100
-150
-200
-250
-300
-350
-400
-450
0
50
Elev
atio
n (ft
)
Boring A-07GSE 42.3 ft
3
Boring I-03GSE 42.1 ft
25
Vs(ft/s x 1000)
3 54 4265
Vs(ft/s x 1000)
6
Boring A-07GSE 42.3 ft
50
Boring AD-01GSE 42.0 ft
0
Boring E-02GSE 39.8 ft
-97'
-148'
7525
NAV-4
S-1S-2
S-3
NAV-1
-303'
NAV-2
1 654
Vs(ft/s x 1000)
100
Boring I-02GSE 42.3 ft
0
NAV-3
N, REC, RQD(%)
Nuclear Island is approximately located between bor ings A-07 and I-03 in this section.Note: Horizontal is not to scale.
N, REC, RQD(%)
10075502 100251
Boring B-12GSE 43.3 ft
0 25 50
N, REC, RQD(%)
75 100100100 50
Boring A-08GSE 42.1 ft
1007550250 0
Boring B-02GSE 41.8 ft
Boring A-08GSE 42.1 ft
N, REC, RQD(%)
N, REC, RQD(%)
75
Boring B-11GSE 42.7 ft
4
Vs(ft/s x 1000)
Boring I-01GSE 42.5 ft
321
N, REC, RQD(%)
10075502 035 6 1 2 654
Vs(ft/s x 1000)
3 6 25
Boring E-04GSE 43.1 ft
Boring D-02GSE 41.3 ft
Boring AD-01GSE 42.0 ft
25
N, REC, RQD(%)
7550
N, REC, RQD(%)
00 50 75
N, REC, RQD(%)
4 1 255100
Vs(ft/s x 1000)
3210 25 50 75
SPT N-Values
Rock Core Recovery Percentage
Rock Quality Designation
Shear Wave Velocity
Interpreted Layering fromSuspension Logging
Interpreted Layering fromDownhole Logging
Soil Layer 1
North Reactor Avon ParkRock Layer 1
Top of Rock
S-1
NAV-1
E-06
VERTICAL SCALE: 1" = 30.0'HORIZONTAL NOT TO SCALE
B-02
AD-01 A-08
I-03B-11
B-12
E-04
D-02
E-02
I-02
I-01 A-07
LINE IS ONE INCH WHENPRINTED TO SCALE
1"0
LNP COL 2.5-1, LNP COL 2.5-5