ee ee' south - nuclear regulatory commission · geologic cross section ee-ee' wls col 2.5-6 wls col...

1
Explanation ? ? ? ? ? ? Intersection of UU - UU' Intersection of ZZ - ZZ' Intersection of CC - CC' Fill – granular Fill – Group I (soil) CNS concrete WLS fill concrete 1.5 1 1 1 1.5 1 EE North EE' South Turbine Building (non-seismic) Radwaste Building (non-seismic) Unit 1 (SC-1) First Bay (SC-II) Yard Grade B-83AP B-152P (proj. 32 ft.) B-218 (proj. 32 ft.) B-224 (proj. 32 ft.) B-90P (proj. 32 ft.) B-1007 (proj. 28 ft.) B-239 (proj. 35 ft.) B-1010 (proj. 32 ft.) B-246 (proj. 55 ft.) B-1004 (proj. 32 ft.) Intersection of BB - BB' ? ? Residual soil/saprolite Residual soil/ saprolite Partially weathered rock B-1001 (proj. 32 ft.) 0 50 feet 0 25 feet Scale Vertical exaggeration 2X N12°W Continuous rock Continuous rock Continuous rock Existing ground surface Existing ground surface Original ground surface Original ground surface 4 1 ? ? ? B-1004A (proj. 10 ft. trend N20°W, 34° from vertical) B-2001 B-2003 Elevation (feet) 620 640 660 600 580 560 520 540 500 480 460 440 420 400 380 360 340 320 300 280 Elevation (feet) 620 640 660 600 580 560 520 540 500 480 460 440 420 400 380 360 340 FIGURE 2.5.4-262 NUCLEAR STATION UNITS 1 & 2 WILLIAM STATES LEE III Planned Excavation Profile, Geologic Cross Section EE-EE' WLS COL 2.5-6 WLS COL 2.5-7 Rev 7

Upload: others

Post on 20-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Explanation

    ?

    ?

    ? ?

    ? ?

    Intersectionof UU - UU'

    Intersectionof ZZ - ZZ'

    Intersectionof CC - CC'

    Fill – granular

    Fill – Group I (soil)

    CNS concrete

    WLS fill concrete

    1.5 1 1

    1

    1.5 1

    EENorth

    EE'South

    Turbine Building(non-seismic)

    RadwasteBuilding

    (non-seismic)

    Unit 1(SC-1)

    First Bay (SC-II)

    Yard Grade

    B-83AP

    B-152P(proj. 32 ft.)

    B-218(proj. 32 ft.)

    B-224(proj. 32 ft.)

    B-90P(proj. 32 ft.)

    B-1007(proj. 28 ft.)

    B-239(proj. 35 ft.)

    B-1010(proj. 32 ft.)

    B-246(proj. 55 ft.)

    B-1004(proj. 32 ft.)

    Intersectionof BB - BB'

    ??

    Residual soil/saprolite

    Residual soil/saprolitePartially weathered rock

    B-1001(proj. 32 ft.)

    0 50 feet0

    25 feet

    ScaleVertical exaggeration 2X

    N12°W

    Continuous rock

    Continuous rock Continuous rock

    Existinggroundsurface

    Existinggroundsurface

    Originalgroundsurface

    Originalgroundsurface

    4

    1?? ?

    B-1004A(proj. 10 ft.

    trend N20°W, 34°from vertical)

    B-2001

    B-2003

    Elev

    atio

    n (fe

    et)

    620

    640

    660

    600

    580

    560

    520

    540

    500

    480

    460

    440

    420

    400

    380

    360

    340

    320

    300

    280

    Elev

    atio

    n (fe

    et)

    620

    640

    660

    600

    580

    560

    520

    540

    500

    480

    460

    440

    420

    400

    380

    360

    340

    320

    300

    280FIGURE 2.5.4-262

    NUCLEAR STATION UNITS 1 & 2WILLIAM STATES LEE III

    Planned Excavation Profile,Geologic Cross Section EE-EE'

    WLS COL 2.5-6WLS COL 2.5-7

    Rev 7