lng as marine fuel - poseidonmed · 1 poseidon med ii - 2016 - wartsila greece . ... • 2015...
TRANSCRIPT
© Wärtsilä PUBLIC
LNG as marine fuelSteadily becoming a realityPoseidon Med II Conference 2016 - Thursday 8th December 2016
Dionysios Antonopoulos General Manager, Marine Solutions SalesWärtsilä Greece S.A.
Poseidon Med II - 2016 - Wartsila Greece 1
© Wärtsilä PUBLIC2
OUR EXPERTISE IN THE GAS VALUE CHAIN
Poseidon Med II - 2016 - Wartsila Greece
Exploration &development
ProductionFPSOFlare recoveryOil separation
LNG carrier
LNG liquefaction& terminal
LNG terminal & Regasification(FSRU/JRU) Distribution & transport
Power generation
LNG bunkering& barges
LPG/LEG/LNG tanker
LNG fuelled vessels
Small-scaleLNG plants
LNG fuelledvessels
Oil tankerwith VOC
Exploration & Drilling
Production & liquefaction
Transport & storage
Receiving terminals &
regasification
Distribution & transport to the
users• LNG fuel gas systems for OSVs
• LNG fuel gas systems• LPG, LEG & LNG cargo handling
• On- & Offshore small scale liquefaction
• Antiflaring/VOC• Oil separation• Gas FPSO
• Jetty & Floating regasification
• Bunkering & barges• Receiving terminals
• Gas/LNG distribution/logistics
• Feed gas to Power plants
LNG receivingterminal
Poseidon Med II - 2016 - Wartsila Greece
© Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece 3
• During last conference in Zappeio (held November 2015), LNG conversions have been discussed.
LAST POSEIDON MED
© Wärtsilä PUBLIC
BACKGROUND
• 2009 LNGPac™ fuel gas handling development begins
• 2010 First LNGPac™ order
• 2011 Bit Viking conversion to gas
• 2012 Harvey Gulf orders more LNG fueled PSVs
• 2013 Viking Grace – first cruise ferry on gas with LNGPac™
• 2014 The new upgraded LNGPac™ is revealed• 2015 Wärtsilä Svanehøj ECA Fuel Pump launched• 2016 Market and innovation leader with 80 LNGPac™ orders
Poseidon Med II - 2016 - Wartsila Greece 4
WÄRTSILÄ LNGPAC ON BOARD
© Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece 5
LNGPAC - REFERENCES – OVERVIEW / STATISTICS
NOTE: Includes also LNG fuel gas tank deliveries of Hamworthy
Dredger 3Fish Feeder 1Offshore special 1Passenger 1Product Tanker 5PSV 12RoPax 20RoRo 4Tug 4Special vessels 15
Belgium 4Canada 14Germany 2Norway 15Sweden 3UAE 1USA 8UK 17Finland 1Spain 1
Total number of vessels equipped with Wartsila LNGPac™: 66
Total number of LNGPac™: 80
Total volume: 20580 m³
Number of vessels in operation: 18Number of vessels confirmed and/or under construction: 48
Owner country Application
05
101520253035
2011 2012 2013 2014 2015 2016 2017+
15
2 25
18
33
Delivery year
Distribution trend of LNG fuel gas vessels fitted with Wärtsilä LNG Fuel gas system
010203040506070
2011 2012 2013 2014 2015 20162017 +
Year
Cumulative distribution of LNG fuel gas vessels fitted with Wärtsilä LNG Fuel gas system
66
© Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece 6
ORIGINAL LNGPAC™ & GVU CONFIGURATION
© Wärtsilä PUBLIC7 © Wärtsilä
Upgraded LNGPac - Efficient space utilisationEasy installation - Enclosed GVU
Poseidon Med II - 2016 - Wartsila Greece
© Wärtsilä PUBLIC8 © Wärtsilä
Upgraded LNGPac - Reduced installation costFewer interfaces - Integrated GVU
Poseidon Med II - 2016 - Wartsila Greece
© Wärtsilä PUBLIC9
Upgraded LNGPacMaximised LNG storage volumeEfficient space utilisationFewer interfacesReduced installation and Operating costIncreased reliability
Poseidon Med II - 2016 - Wartsila Greece
© Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece 10
TYPE C - MULTILOBE
Membrane
Type A & B
Type C - single lobe
Type C – bilobe
Type C - multilobe
Wärtsilä Type C - multilobe
• For certain applications with strict volume restrictions, a Type C, multilobe tank can be a better solution
© Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece 11
WÄRTSILÄ 31 – EFFICIENT, FLEXIBLE AND ENVIRONMENTAL FRIENDLY
Top efficiency (over 50% thermal efficiency)
Low pressure gas admission (<12bar)
Multi fuel engine offering flexibility
IMO Tier III on gas (no need for after treatment devices)
Optimized maintenance costs
Wärtsilä 31DF Ready to Sail!
10V31 SG
8V31 20V31 SG
10V31 DF
© Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece 12
WÄRTSILÄ 31 – LNGPAC ON BOARD
Engine load dependent flow control
LNG NG
FUEL GAS TREATMENT SKID
EFP Variable Frequency Drive
LNGPac Process Automation & Safety System
Engine control system
Gas Valve Unit
© Wärtsilä PUBLIC
NEW REFERENCE
Wärtsilä scope of supply:
2x LNGPac™ 440m³Horizontal, double-shell tank with vacuum-perlite insulation + Tank Connection Space with integrated Air Lock2x Bunkering Station, 430m³/hr each, with local monitoringpanelProcess Control Automation & Safety System Nitrogen generator
4x 8L50DF (4S, 7800 kW)3x 9L20DF (4S, 1440 kW) 4x DN100 + 3x DN50 GVUs2x gearboxes2x transverse thrusters2x CPP propellers
Vessel: RoPax Ferry
Owner: Balearia (Spain)
Yard: Construcciones Navales del Norte SL (LaNaval)
Number of vessels: 1 (new building)
Classification: BV
Delivery: 2019
Main vessel characteristics:
Length: 232 m
Speed: 22 kts
Passengers / Cars 1700 / 331
Poseidon Med II - 2016 - Wartsila Greece 13
© Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece 14
REFERENCES – VAST NUMBER OF DUAL REFERENCES
MERCHANTLNG Carrier 204 vesselsLPG Carrier 11 vesselsTankers 14 vesselsContainers 4 vesselsBulk Carrier 3 vesselsCar Carrier 2 vessels
OFFSHOREPlatform 2 vesselsFSO 2 vesselsFPSO 6 vesselsJack-up Rig 1 vesselOSV 24 vessels
SPECIALSHopper Dredger 1 vesselTugs 6 vesselsNavy 1 vesselIcebreaker 1 vesselIWW 16 vesselsGuide ship 1 vesselCable Layer 1 vessel
CRUISE & FERRYCruiseFerry 1 vesselROPAX 3 vesselsFerries 12 vessels
DF CONVERSIONFPSO 4 vesselsChemical tanker 1 vesselRORO 2 vesselsFerries 3 vesselsIWW 1 vessel
DF POWER PLANTPlants 82Output 5031 MWOnline since 1997
>1,500 engines >16,000,000 running hours
881 engines
132 engines
46 engines
66 engines
36 engines
376 engines
© Wärtsilä PUBLIC Poseidon Med II - 2016 - Wartsila Greece 15
Thank you!