Liverpool Waters

Parameter Plan Report November 2011

www.liverpoolwaters.com

Page 2: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

1.1 Structure of this Report

1.1.1 This Parameter Plan Report provides the Parameter Plan descriptions and Parameter Plans for the

Liverpool Waters proposal, as updated October 2011. This report is structured as follows:

• Description of Parameter Plan 001 – Liverpool Waters Site Location Plan;

• Description of Parameter Plan 002 – Liverpool Waters Neighbourhood Plan;

• Description of Parameter Plan 003 – Liverpool Waters Phasing Plan;

• Description of Parameter Plan 004 – Liverpool Waters Development Parcels;

• Description of Parameter Plan 005 – Liverpool Waters Development Plots;

• Description of Parameter Plan 006 – Liverpool Waters Building Heights;

• Description of Parameter Plan 007 – Liverpool Waters Access and Movement Plan;

• Description of Parameter Plan 008 – Liverpool Waters Car Parking Plan;

• Description of Parameter Plan 009 – Liverpool Waters Buildings to be Demolished;

• Description of Parameter Plan 010 – Liverpool Waters Areas of High Potential for Underground

Archaeology

1.1.2 In addition to providing the descriptions and the parameter plans, this report also includes copies of

the Indicative Liverpool Waters Masterplan, October 2011, together with an Axonometric of the

Indicative Masterplan Layout.

Page 3: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

1.2 Parameter Plan 001 – Liverpool Waters Site Location Plan

1.2.1 This parameter plan identifies the extent of the Liverpool Waters outline planning application site

boundary outlined in red. The site extends to some sixty hectares and is located immediately north

of Liverpool’s Pier Head. It is over two kilometres in length from Princes Dock in the south to

Bramley Moore Dock in the north. The site is relatively narrow - about 450m across in the north and

200m in the south.

1.2.2 The site is bounded by the River Mersey to the west. To the east, the docks boundary wall lies

within the site and defines it edge strongly except in two places. First, in the vicinity of Waterloo

Warehouse, the eastern boundary of West Waterloo Dock and Prince’s Half Tide Dock defines the

site. Second, in the south-east of the site King Edward Industrial Estate is included in the

application site but located east of the docks boundary wall. The northern site boundary is not

marked clearly on the ground at present but runs at the mid-point between Bramley Moore Dock

(within the site) and Wellington Dock (to the north of the site). In the south, St Nicholas Place runs

immediately beyond the site.

1.2.3 Virtually the entire Liverpool Waters site comprises reclaimed land which was created to form docks

commencing in the late 18th Century. Over a third of the Liverpool Waters site consists of docks

with open water. These are (from north to south):

• Bramley Moore Dock;

• Nelson Dock;

• Salisbury Dock; with Collingwood Dock to its east.

• Trafalgar Dock (remnants) with Clarence Graving Docks to its east;

• West Waterloo Dock (remnants);

• Prince’s Half Tide Dock;

• Princes Dock

1.2.4 The southern part of site in the area around Princes Dock has benefited from significant investment

in commercial offices, hotels and residential development since the 1990s. However, substantial

development plots remain and hence it has been included within Parameter Plan 001. King Edward

industrial estate in the south-east corner of the site comprises relatively modern warehouse-type

business units. This has been included within Parameter Plan 001 as the locality is one of

Page 4: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

substantial land use change where redevelopment is anticipated during the thirty year timeframe of

the Liverpool Waters proposal as it has the potential to form a natural extension of the commercial

core of Liverpool City Centre down to its waterfront.

Page 5: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

Parameter Plan 001 – Liverpool Waters Site Location Plan

Page 6: Liverpool Waters - Parameter plan report

BankBank

BOUNDARY STREET

LIGHTBODY STREET

Leeds and LiverpoolCanal

Liverpool Locks

GR

EA

T HO

WA

RD

STR

EE

T

BIR

CH

STR

EE

T

DENBIGH STREET

BENTINCK STREET

BE

AC

ON

STR

EE

T

BLACKSTONE STREET

FULTO

N STR

EET

BATH STREET

LEEDS STREET

GR

EE

NO

CK

STR

EE

T

LANYO

RK R

OAD

WA

TER

LOO

RO

AD

GR

EAT

HO

WAR

D S

TREE

T

KINGSWAY (Tunnel)

VANDRIES STREET

OIL STREET

CHADWICK STREET

HOWARD STREET

WATER

LOO

RO

AD

PORTER STREET

VULCAN STREET

LOV

E L

AN

E

SPRAINGER STREET

CARLTON STREET

REGENT STREET

GR

EA

T HO

WA

RD

STR

EE

T

WHITLEY STREET

DICKSON STREET

COTTON STREET

STONE STREET

UPPER WILLIAM STREET

MADDRELL STREET

GLEGG STREET

SHERWOOD STREET

LOV

E LA

NE

LOV

E L

AN

E

WEST W

ATERLO

O D

OC

K

EAST WATER

LOO

DO

CK

COLLINGWOOD DOCKSALISBURY DOCK

WELLINGTON DOCK

BRAMLEY MOORE DOCK

NELSON DOCK

STANLEY DOCK

REG

ENT

RO

AD

RE

GE

NT R

OA

D

RE

GE

NT R

OA

D

LIGHTBODY STREET

LockLeeds and Liverpool

CanalLiverpool Locks

GR

EA

T HO

WA

RD

STR

EE

T

BIR

CH

STR

EE

T

BENTINCK STREET

BE

AC

ON

STR

EE

T

SALTNEY STREET

DUBLIN STREET

ROBERTS STREET

PAISLEY STREET

GALTON STREET

GLA

SG

OW

STR

EE

T

VentilatingStation

KINGSWAY (Tunnel)

KINGSWAY (Tunnel)

CLARENCE GRAVING DOCKS

PRINCESHALF TIDE DOCK

RIVER MERSEY

CLARENCE GRAVING DOCKS

TRAFALGARDOCK

PRINCESDOCK

OLD HALL STREET

NEW Q

UAY

KIN

G E

DW

ARD

STR

EET

PRIN

CES PAR

ADE

WILLIAM

JESSOP W

AY

GEORGE'S DOCK GATES

ST. NIC

HO

LAS PLACE

WATER STREET

BRUNSWICK STREET

GOREE

JAMES STREET

WATER STREET

CHAPEL STREET RUMSFORD ST

CASTLE STREET

STRAND STREET

STRAND STREET

BRUNSWICK STREET

ST. NICHOLAS PL.

MANN ISLAND

OLD HALL STREET

LORD STREET

FENWICK ST

PALL MALL

PALL MALL

DALE STREET

DALE STREET

TITHEBARN S

TREET

MOORFIELDS

FULT

ON

ST

WALTER STREETTHE STRAND

Other land in the ownership of the Applicant

KEY:Liverpool Waters Outline Application Redline Boundary

0 100m 500m

October 20111:7500 @A3

Parameter Plan 001 - Liverpool Waters Site PlanDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 7: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

1.3 Parameter Plan 002 – Liverpool Waters Neighbourhood Plan

1.3.1 The Liverpool Waters site has been divided into five neighbourhoods, within which building, public

realm and supporting infrastructure will be constructed. The neighbourhoods are defined by historic

uses of the site and draw on the historic dock layouts for reference. There are also identified by the

key structural components that define the site as set out in Parameter Plan 001, in terms of the

River Mersey Wall, the Dock Boundary Wall and ownership.

1.3.2 The total development floorspace stated in Table 2.1 of this SKDP has been divided between the five

neighbourhoods in accordance with the figures contained in Table 2.2 ‘Liverpool Waters: Overall

Land Use and Amount (Parameters)’ as shown in this SKDP. It should be noted that some degree of

overlap is to be provided across the defined edges of each of the five neighbourhoods in order to

enable a degree of flexibility between the distribution of compatible uses and phasing. The total

floorspace for each use within each neighbourhood would not, however, be exceeded.

1.3.3 For the purposes of this application the five neighbourhoods comprise:

• Neighbourhood A – Princes Dock

• Neighbourhood B – King Edward Triangle

• Neighbourhood C – Central Docks

• Neighbourhood D – Clarence Docks

• Neighbourhood E – Northern Docks.

Page 8: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

Parameter Plan 002 – Liverpool Waters Neighbourhood Plan

Page 9: Liverpool Waters - Parameter plan report

A

B

C

D

E

PRINCES DOCK (neighbourhood A)

KING EDWARD TRIANGLE (neighbourhood B)

CENTRAL DOCKS (neighbourhood C)

CLARENCE DOCKS (neighbourhood D)

NORTHERN DOCKS (neighbourhood E)

KEY:Liverpool Waters Outline Application Redline Boundary

0 100m 500m

October 20111:7500 @A3

Parameter Plan 002 - Liverpool Waters Neighbourhood PlanDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 10: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

1.4 Parameter Plan 003 – Liverpool Waters Phasing Plan

1.4.1 The Liverpool Waters proposal will be delivered in general accordance with Parameter Plan 004 –

Phasing Plan. As indicated, the Liverpool Waters proposal will be developed from the city centre

northwards towards the Northern Docks over a three decade period. The purpose of the Phasing

Plan is to ensure orderly and satisfactory development of the Liverpool Waters site, in the interests

of delivering a balanced sustainable development that is supported by the necessary infrastructure

and facilities to ensure the development remains connected to existing business and residential

communities.

1.4.2 Given the length of time it will take to deliver the Liverpool Waters proposal in its entirety, a degree

of flexibility will need to be retained to ensure that the proposal can respond to inevitable market

and demand changes. It is envisaged that subject to obtaining the prior written approval of LCC,

amendments to the phasing of the Liverpool Waters may take place to reflect changes to the

phasing of the proposal that are not feasible at the date of planning permission.

1.4.3 The following written principles provide an indication of the phasing of the Liverpool Waters in

accordance with Peel’s understanding of how the Liverpool Waters proposal will be delivered over a

three decade period. As outlined above, the final delivery of the development may alter from the

phasing indicated by ‘Parameter Plan 004 – Liverpool Waters Phasing Plan’ .

Page 11: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

Parameter Plan 003 – Liverpool Waters Phasing Plan

Page 12: Liverpool Waters - Parameter plan report

Phase TWO13 years (2016-2029)

KING EDWARD TRIANGLE(neighbourhood B)

Phase ONE5 years (2012-2016)

Phase THREE15 years (2021-2036)

Phase FOUR5 years (2031-2036)

Phase FIVE5 years (2036-2041)

PRINCES DOCK(neighbourhood A)

CENTRAL DOCKS(neighbourhood C)

NORTHERN DOCKS(neighbourhood E)

CLARENCE DOCKS(neighbourhood D)

PRINCES DOCK (neighbourhood A)

KING EDWARD TRIANGLE (neighbourhood B)

CENTRAL DOCKS (neighbourhood C)

CLARENCE DOCKS (neighbourhood D)

NORTHERN DOCKS (neighbourhood E)

KEY:Liverpool Waters Outline Application Redline Boundary

0 100m 500m

October 20111:7500 @A3

Parameter Plan 003 - Liverpool Waters Phasing PlanDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 13: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

1.5 Parameter Plan 004 – Development Parcels

1.5.1 As outlined under ‘Parameter Plan 002 – Neighbourhood Plan’ The Liverpool Waters proposal is

divided in five neighbourhoods. These neighbourhoods are further broken down into thirty

development parcels within which building plots, public realm and infrastructure to support the

Liverpool Waters proposal will be accommodated. The development parcels are defined by the key

structural components of the Liverpool Waters proposal in the form of existing structures that define

the site including for instance the water bodies, the Dock Boundary Wall, the River Mersey Wall and

the Leeds to Liverpool Canal.

1.5.2 The total development floorspace stated in Table 2.1 has been divided between the development

parcels in accordance with the Development Parcels Floorspace Schedule contained in accompanying

‘Liverpool Waters Environmental Statement’ (November 2011). It should be noted that some

degree of overlap is provided across the development parcels in terms of the provision of public

realm and infrastructure in order to ensure a coordinated approach to the delivery of these elements

of the Liverpool Waters proposal.

1.5.3 The following written key development principles seek to provide clarification as to how the

information provided on Parameter Plan 004 should be interpreted, together with additional

principles against which future application for approval of reserved matters and other approvals

under the planning permission will be required to demonstrate conformity, unless otherwise agreed

in writing with LCC.

Page 14: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

Parameter Plan 004 – Liverpool Waters Development Parcels

Page 15: Liverpool Waters - Parameter plan report

Development Parcel 1h

Development Parcel 1d

Development Parcel 1b

Development Parcel 1a

Development Parcel 5e

Development Parcel 4d

Development Parcel 3h

Development Parcel 3e

Development Parcel 3f

Development Parcel 3d

Development Parcel 4c

Development Parcel 4b

Development Parcel 4a

Development Parcel 5d

Development Parcel 5c

Development Parcel 5a

Development Parcel 5b

Development Parcel 5g

Development Parcel 2c

Development Parcel 2b

Development Parcel 2a

Development Parcel 5f

Development Parcel 1g

Development Parcel 1c

Development Parcel 1e

Development Parcel 1f

Development Parcel 3a

Development Parcel 3b

Development Parcel 3c

Development Parcel 3g

PRINCES DOCK (neighbourhood A)

KING EDWARD TRIANGLE (neighbourhood B)

CENTRAL DOCKS (neighbourhood C)

CLARENCE DOCKS (neighbourhood D)

NORTHERN DOCKS (neighbourhood E)

KEY:Liverpool Waters Outline Application Redline Boundary

Development Parcel Boundary

0 100m 500m

October 20111:7500 @A3

Parameter Plan 004 - Liverpool Waters Development ParcelsDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 16: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

1.6 Parameter Plan 005 – Development Plots

1.6.1 Parameter Plan 005 identifies broad areas within the site within which proposed buildings will be

located. The development plots in themselves can contain a number of potential buildings.

Page 17: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

Parameter Plan 005 – Liverpool Waters Development Plots

Page 18: Liverpool Waters - Parameter plan report

BankBank

BOUNDARY STREET

LIGHTBODY STREET

Leeds and LiverpoolCanal

Liverpool Locks

GR

EA

T HO

WA

RD

STR

EE

T

BIR

CH

STR

EE

T

DENBIGH STREET

BENTINCK STREET

BE

AC

ON

STR

EE

T

BLACKSTONE STREET

FULTO

N STR

EET

BATH STREET

LEEDS STREET

GR

EE

NO

CK

STR

EE

T

LANYO

RK R

OAD

WA

TER

LOO

RO

AD

GR

EAT

HO

WAR

D S

TREE

T

KINGSWAY (Tunnel)

VANDRIES STREET

OIL STREET

CHADWICK STREET

HOWARD STREET

WATER

LOO

RO

AD

PORTER STREET

VULCAN STREET

LOV

E L

AN

E

SPRAINGER STREET

CARLTON STREET

REGENT STREET

GR

EA

T HO

WA

RD

STR

EE

T

WHITLEY STREET

DICKSON STREET

COTTON STREET

STONE STREET

UPPER WILLIAM STREET

MADDRELL STREET

GLEGG STREET

SHERWOOD STREET

LOV

E LA

NE

LOV

E L

AN

E

WEST W

ATERLO

O D

OC

K

EAST WATER

LOO

DO

CK

COLLINGWOOD DOCKSALISBURY DOCK

WELLINGTON DOCK

BRAMLEY MOORE DOCK

NELSON DOCK

STANLEY DOCK

REG

ENT

RO

AD

RE

GE

NT R

OA

D

RE

GE

NT R

OA

D

LIGHTBODY STREET

LockLeeds and Liverpool

CanalLiverpool Locks

GR

EA

T HO

WA

RD

STR

EE

T

BIR

CH

STR

EE

T

BENTINCK STREET

BE

AC

ON

STR

EE

T

SALTNEY STREET

DUBLIN STREET

ROBERTS STREET

PAISLEY STREET

GALTON STREET

GLA

SG

OW

STR

EE

T

VentilatingStation

KINGSWAY (Tunnel)

KINGSWAY (Tunnel)

CLARENCE GRAVING DOCKS

PRINCESHALF TIDE DOCK

RIVER MERSEY

CLARENCE GRAVING DOCKS

TRAFALGARDOCK

PRINCESDOCK

OLD HALL STREET

NEW Q

UAY

KIN

G E

DW

ARD

STR

EET

PRIN

CES PAR

ADE

WILLIAM

JESSOP W

AY

GEORGE'S DOCK GATES

ST. NIC

HO

LAS PLACE

WATER STREET

BRUNSWICK STREET

GOREE

JAMES STREET

WATER STREET

CHAPEL STREET RUMSFORD ST

CASTLE STREET

STRAND STREET

STRAND STREET

BRUNSWICK STREET

ST. NICHOLAS PL.

MANN ISLAND

OLD HALL STREET

LORD STREET

FENWICK ST

PALL MALL

PALL MALL

DALE STREET

DALE STREET

TITHEBARN S

TREET

MOORFIELDS

FULT

ON

ST

WALTER STREETTHE STRAND

A-02

A-07

B-01

B-02

B-03

C-01

C-03

C-04

C-02

E-04 E-05 E-01

E-03E-06

E-07

E-08

E-09

E-11 E-12

E-10

E-13

E-15 E-16

E-14

D-01

D-02 D-03

D-04 D-05 D-06

D-11D-10D-09

D-12

D-13

D-14

D-15D-16

D-19D-18

D-21

D-22

D-23

D-08

C-06

C-08

C-11

C-12

C-13

C-15

C-16C-09

C-10

C-26

C-18

C-17

C-25

C-19

C-22

C-20C-21

E-17

E-18

E-19 E-20

E-02

D-17

A-01

A-06

A-03

C-21

C-23C-24

B-04

B-05B-06

A-08

E-02b

A-04

A-05

C-14

D-07

D-20

PRINCES DOCK (neighbourhood A)

KING EDWARD TRIANGLE (neighbourhood B)

CENTRAL DOCKS (neighbourhood C)

CLARENCE DOCKS (neighbourhood D)

NORTHERN DOCKS (neighbourhood E)

KEY:Liverpool Waters Outline Application Redline Boundary

KEY:KEY:KEY:

Development plots

0 100m 500m0 100m 500m0 100m 500m0 100m 500m

October 20111:7500 @A3

Parameter Plan 005 - Liverpool Waters Development PlotsDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 19: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

1.7 Parameter Plan 006 – Building Heights

1.7.1 Parameter Plan 006 shows the maximum heights of the proposed buildings within the areas of built

development. All heights are shown as above ordnance datum (AOD). The maximum building

height is measured to the top of a parapet for flat roofs and the top of the ridge for pitched roofs,

therefore any roof plant will not exceed the maximum roof height identified on Parameter Plan 006.

1.7.2 The following written key development principles provide maximum building heights on a

development plot basis. Reference is given to development parcels and development plots from

Parameter Plans 004 and 005 for reference.

Page 20: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

Parameter Plan 006 – Liverpool Waters Building Heights

Page 21: Liverpool Waters - Parameter plan report

90m

86m

64m

134m

88m 68m 90m

63m

73m

76m

38.7

38.742.7

59.5

27.6

27.6

34.0

126.8

34.0

195.65

44.5 147.8

49.15

45.5174.05

38.2170.2

30.7

41.044.8

41.0

41.0

134.85

41.85

117.742.6

141.9543.2

30.9148.5

41.85

109.565.0 27.3

119.35 27.6

30.7

33.8

41.0

43.1

33.8 30.7 27.6

30.7 21.4

27.6 21.4 27.6

21.427.621.424.5

24.5

30.7

16.316.3

24.5 21.4

21.4 29.7 29.719.95

9.0

19.0 19.95 27.6 24.5

36.933.8

38.5

6.6 7.8

27.6 33.8 33.8 27.6 31.7

28.9

14.4

38.5

27.6 33.8 33.8 30.7

28.8

26.724.527.6 27.6

29.2

8.5

44.5

12.0

44.5

19.95

19.95

8.5

34.0

24.5 24.5

30.7

30.9

30.0

PRINCES DOCK (neighbourhood A)

KING EDWARD TRIANGLE (neighbourhood B)

CENTRAL DOCKS (neighbourhood C)

CLARENCE DOCKS (neighbourhood D)

NORTHERN DOCKS (neighbourhood E)

KEY:Liverpool Waters Outline Application Redline Boundary

Low -rise Building - any building below 21m

Medium-rise Building - any building over 21m and under 45m

High-rise Building - any building over 45m

0 100m 500m

October 20111:7500 @A3

Parameter Plan 006 - Liverpool Waters Building HeightsDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 22: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

1.8 Parameter Plan 007 – Access and Movement Plan

1.8.1 Parameter Plan 007 identifies the proposed access points to the Liverpool Waters proposal,

differentiating between vehicle and pedestrian access/egress points as appropriate. Plan 007 also

provides indicative pedestrian and cycle routes within the site. The Plan also indentifies indicative

water body crossing points, focussed primarily on historic crossing points between the various docks

and thereby utilising existing infrastructure where it remains.

1.8.2 In addition to identifying the key access points and routes Parameter Plan 007 also identifies

strategic areas of open space indicating the role and purpose of that space.

Page 23: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

Parameter Plan 007 – Liverpool Waters Access and Movement Plan

Page 24: Liverpool Waters - Parameter plan report

ALEXANDERTOWER

CROSSING

St. NICHOLAS GATE

PRINCES GATE

VICTORIA GATE

TRAFALGAR GATE

CLARENCE GATE

DUBLIN GATE

COLLINGWOOD GATE

NELSON GATE

BRAMLEY MOORE GATE

BRAMLEY NORTH GATE

COLLINGWOOD NORTH GATE

GRAVING NORTH GATE

GRAVING SOUTH GATE

CLARENCE SOUTH GATE

TRAFALGAR SOUTH GATE

BATH GATE

NELSON NORTH GATE

TRAFALGARBRIDGE

BRAMLEYMOOREBRIDGE

SHANGHAIPLAZA

MALMAISON GATE

Isolation

Structure

SALISBURYDOCK SWING

BRIDGE

ALEXANDERTOWER

CROSSING

INLAND PROMENADE

MERSEY VIEW ESPLANADE

MERSEY VIEW ESPLANADE

CANAL WAY PROMENADE

CANAL WAY PROMENADE

CENTRALPARK

PROSPECTPARK

CULTURESQUARE

MERSEY VIEW ESPLANADE

DOCK BOUNDARY WALL PROMENADE

Crossing

Point

Crossing

Point

Crossing

Point

Crossing

Point

Crossing

Point

Crossing

PointVICTORIA CLOCK TOWER

DOCK MASTERS SQUARE

CLARENCEGRAVING

DOCK

THEPONTOON

PRINCES JETTY

PRINCES DOCK (neighbourhood A)

KING EDWARD TRIANGLE (neighbourhood B)

CENTRAL DOCKS (neighbourhood C)

CLARENCE DOCKS (neighbourhood D)

NORTHERN DOCKS (neighbourhood E)

KEY:Liverpool Waters Outline Application Redline Boundary

OPENINGS IN BOUNDARY WALL:

Vehicular Access/Egress

Pedestrian Access/Egress

CROSSING POINT

MAIN GREEN SPACES

MAIN PUBLIC SPACES

WALKWAYS

0 100m 500m

October 20111:7500 @A3

Parameter Plan 007 - Liverpool Waters Access and Movement PlanDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 25: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

1.9 Parameter Plan 008 – Car Parking Plan

1.9.1 Parameter Plan 008 provides an indication of the location of car parking to support the Liverpool

Waters proposal.

Page 26: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

Parameter Plan 008 – Liverpool Waters Car Parking Plan

Page 27: Liverpool Waters - Parameter plan report

2 levels

2 levels2 levels

2 levels

2 levels

1 level

2 levels

3 levels

2 levels

2 levels

2 levels

1 level

3 levels

2 levels

2 levels

2 levels

3 levels

3 levels

8 levels

9 levels

1 levels

1 levels

2 levels

2 levels

6 levels

2 levels

4 levels

9 levels

4 levels 2 levels

6 levels

E: 1.0

C: 2.0

C: 3.0

E: 4.0

E: 7.0

D: 1.0

C: 11.0

C: 10.0

D: 2.0

E: 5.0

E: 8.0

E: 6.0

E: 3.0

E: 2.0

D: 5.0

A: 3.0A: 2.0

B: 1.0

B: 3.0

B: 2.0

A: 4.0

A: 1.0

D: 4.0

C: 4.0C: 5.0

C: 8.0C: 7.0

E: 9.0

E: 10.0

C: 12.0

C: 13.0

PRINCES DOCK (neighbourhood A)

KING EDWARD TRIANGLE (neighbourhood B)

CENTRAL DOCKS (neighbourhood C)

CLARENCE DOCKS (neighbourhood D)

NORTHERN DOCKS (neighbourhood E)

KEY:Liverpool Waters Outline Application Redline Boundary

Underground Car Parking

Podium Car Parking

Multi Storey Car Parking

0 100m 500m

October 20111:7500 @A3

Parameter Plan 008 - Liverpool Waters Parking PlanDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 28: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

1.10 Parameter Plan 009 – Buildings to be Demolished

1.10.1 Parameter Plan 009 identifies the buildings that are required to be demolished in order to deliver the

Liverpool Waters proposal. The timing for demolition will be tied to future reserved matters

applications tied to the delivery of certain phases and development parcels.

Page 29: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

Parameter Plan 009 – Liverpool Waters

Buildings to be Demolished Plan

Page 30: Liverpool Waters - Parameter plan report

BankBank

STL Transport warehouse

King Edward Estate (Industrial)

Gatehouse (hut)

19m wide vehicular opening in Dock Boundary Wallat the end of Dublin Street.

Substation

Transit Shed

Brick shed

Brick shed

6m wide pedestrian opening in Dock Boundary WallWidening of the existing opening

PRINCES DOCK (neighbourhood A)

KING EDWARD TRIANGLE (neighbourhood B)

CENTRAL DOCKS (neighbourhood C)

CLARENCE DOCKS (neighbourhood D)

NORTHERN DOCKS (neighbourhood E)

KEY:Liverpool Waters Outline Application Redline Boundary

BUILDINGS TO BE DEMOLISHED

0 100m 500m0 100m 500m

October 20111:7500 @A3

Parameter Plan 009 - Liverpool Waters - Buildings to be demolishedDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 31: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

1.11 Parameter Plan 010 – Areas of High Potential for Underground

Archaeology

1.11.1 All the current and historic dock walls (where they survive), sea lock structures, half-tide lock

structures and associated sluices, hydraulics and swing bridges are identified as having ‘high

potential’ for the physical evidence they contain about the technological innovation with the World

Heritage Site.

Page 32: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

Parameter Plan 010 – Liverpool Waters Areas of High Potential for

Underground Archaeology

Page 33: Liverpool Waters - Parameter plan report

PRINCES DOCK

KEY:Liverpool Waters Outline Application Redline Boundary

Liverpool Waters Areas of High Potential forUnderground Archaeology

0 100m 500m

October 20111:7500 @A3

Parameter Plan 010 – Liverpool Waters Areas of High Potential for Underground ArchaeologyDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 34: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

Liverpool Water Indicative Masterplan

Page 35: Liverpool Waters - Parameter plan report

October 20111:2000 @A3

Liverpool Waters Indicative Masterplan - Northern Docks ExtractDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 36: Liverpool Waters - Parameter plan report

0 10m 50m

October 20111:2000 @A3

Liverpool Waters Indicative Masterplan - Clarence Docks ExtractDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 37: Liverpool Waters - Parameter plan report

0 10m 50m

October 20111:2500 @A3

Liverpool Waters Indicative Masterplan - Central Docks ExtractDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 38: Liverpool Waters - Parameter plan report

0 100m 500m

October 20111:7500 @A3

Liverpool Waters Indicative MasterplanDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 39: Liverpool Waters - Parameter plan report

0 10m 50m

October 20111:2000 @A3

Liverpool Waters Indicative Masterplan - Princes Dock and King Edward Triangle ExtractDate:Scale:

Title:Chapman TaylorChapman Taylor LLPArchitects Masterplanners Designers

Page 40: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011

Axonometric of the Indicative Liverpool Waters Masterplan

Page 41: Liverpool Waters - Parameter plan report

0m 50m

100m 200m

Liverpool Waters - Axonometric of Indicative Masterplan Layout

Page 42: Liverpool Waters - Parameter plan report

Liverpool Waters

Parameter Plan Report – November 2011