list of content
DESCRIPTION
List of Content. Vision Company presentations Crane regulations Project organization Project execution Reference projects Success Criteria. Vision. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/1.jpg)
• Vision• Company presentations• Crane regulations• Project organization• Project execution• Reference projects• Success Criteria
List of Content
![Page 2: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/2.jpg)
To establish an Alliance as a leader in smart, customized and cost reducing solutions for safely installation of offshore cranes well within industry risk acceptance criteria (ALARP)
Vision
![Page 3: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/3.jpg)
IKM Kran og Løfteteknikk was founded 2001 by a group of highly specialized, experienced technicians from Bjørge Kran og Løfteteknikk
Our core business is: • Related to all types of Offshore Cranes/lifting appliances, loose lifting equipment, lifeboats and mob-boats• Appurtenant fabrication and installation of structures & piping• Accompanying project management, engineering and work preparation• Rental of equipment
Per 2013 about 70 employees, turnover about 150 MNOK, and preparing for considerable growth.
IKM Kran og Løfteteknikk AS
![Page 4: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/4.jpg)
CRANE, maintenance, modification, refurbishment and certification of all types of offshore cranes/lifting appliances.
LOOSE LIFTING EQUIPMENT, certification, maintenance, sale and rental of all kinds of loose lifting equipment.
LIFEBOAT & MOBBOAT, maintenance, modification and upgrading of all types of lifeboats/mob-boats.
MECHANICAL WORKSHOP, own workshop rigged for crane upgrades, mechanical/hydraulic work, together with fabrication and installation of structures & piping.
PROJECT MANAGEMENT and ENGINEERING, crane technical expert competence, personnel with experience from crane manufacturers and the service industry
HIRING OUT, a wide range of equipment (including lifting equipment)
IKM Kran og Løfteteknikk AS Products & Services
![Page 5: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/5.jpg)
IKM Kran og Løfteteknikk AS FacilitiesOffice/workshops/storage in Tankbåtvegen 1, Tananger.• Approx. 500m2 offices, 3.000m2 outdoor area.• Approx. 2.500m2, workshops, storage.
Horizontal test bench with pull force 200 tons, on actual working length 13,5 m. Break load tests can be done in full length up to 160 tons.
![Page 6: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/6.jpg)
• Ambio Tech Team was founded December 2011 by a group of highly specialized, experienced petroleum industry engineers
• Our core business is in the structure calculations and design, including offshore survey, studies, detail engineering, fabrication follow up and installation supervision
• Our personnel has successfully managed more than 30 crane replacement projects since 1999
Ambio Tech Team
![Page 7: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/7.jpg)
Products and Services:
• Studies & front end services• Structure analyses • Lifting calculations including sea fastening • 3D modeling• Detail engineering• Fabrication follow up• Installation supervision• Subsea operations• Personnel hire within above engineering disciplines
Ambio Tech Team
![Page 8: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/8.jpg)
Analyses• Gap analyses• Capacity and fatigue analyses• In-house developed software for the analyses
of the breakdown sequence• Nonlinear analyses of pedestal flanges including
contact problems and pre-stressed bolts• Extended life / Proprietary program for calculation
of consumed life based on the data log• Evaluation of inspection in combination with
crack growth analysis ("reset life")• Analyses of lifting operations• Analyses of falling loads (Dropped object protect.)
Ambio Tech Team
![Page 9: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/9.jpg)
DNV 2.7-1: Offshore containers including lifting arrangements with MGW ≤ 25 tons
DNV 2.7-3: Portable offshore units including lifting arrangements with MGW ≤ 100 tons
DNV VMO Standard: Marine operations according to DNV-OS-H101, H102, and H201 to H206
DNV 2.22: Lifting appliances and cranes onboard ships and offshore installations
NORSOK R-002: Lifting appliances and accessories for the petroleum industry
Maskindirektivet
Rules and regulations
![Page 10: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/10.jpg)
Project Management
HSE&Q
Dokument Control Project Control
Engineering FabricationModification
Installation
Typical project organization
![Page 11: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/11.jpg)
Project execution
Concept Detail engineering. Fabrication Installation Completion
Offshore surveySOW/procedureDesign basis3D modelSketchesBulk MTOCTRPrincipal works schedule
AdministrationDesign basisOffshore surveyFabrication DrawingMTOInstallation procedureWork packages Design reviewProcurementHAZID/HAZOPDNV follow upMRBAs BuiltDetail PlanningTest and Inspection plan.HSE&Q activities
HSE&Q activitiesFollow upDim. controlFATMRB evaluationPacking for offshore Transport
HSE&Q activitiesFSJA/SJASupervisionOptimizingReportOnshore supportWorkshop/tool container
EvaluationPunch listDebriefMC/TestingCommissioningDemobilization
![Page 12: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/12.jpg)
Extended experiences in crane replacements Focus on safety in all phases More efficient replacement methods Accomplished procedures / design review Close collaboration between engineering and
executing personnel
Ekofisk
Kranalliansen success factors
Kranalliansen personnel have successfully managed more than 30 crane replacement projects (Statfjord A,B & C, Gullfaks A,B & C, Oseberg A &B, Valhall DP & Ula, Draupner , Heimdal, Snorre A)Typical project values in the range of 5-15 MNOK.
Vallhall DP & Ula
Oseberg A and B
GFC, crane 4
![Page 13: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/13.jpg)
Project finalisation – MS 14 release penalties
Including the following phases:• Conceptual• Detail Engineering• Procurement• Fabrication follow-up• Installation• Commissioning• Demobilization
• Temporary foundation for Mobil crane
• Temporary skid beams
• Dropt object protection
• «Temporary boom rest»
• Removal of existing Crane
• New boom rest
• Modification of existing boom rest
• Preparation for installation of new Crane
Oseberg A – M04 Crane
![Page 14: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/14.jpg)
Project finalisation – MS 14 release penalties
• Temporary foundation for Mobil crane
• «Temporary boom rest» included extension adapter
• Removal of existing Crane
• Modification of existing boom rest
• Preparation for installation of new Crane
Oseberg B - M60 Crane
Including the following phases:• Conceptual• Detail Engineering• Procurement• Fabrication follow-up• Installation• Commissioning• Demobilization
![Page 15: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/15.jpg)
BP Norge, Ula BOP Cranes Modification/Overhaul
“Before overhaul” “After modification/overhaul”
2 each Tri Ocean Hydraulic BOP Handling CraneCapacity 2 x 25 ton. Built 1984, Weight approx. 17 ton, l=13m, b=2,5m, h=2m
• Total overhaul/makeover & modification of the 2 each bridge cranes• Length of life after overhaul/ modification to be 20 years• Modifications of cranes control system from hydraulic to PLC/radio controls• Upgrading of documentation package/ user manual/routines for maintenance • FAT in workshop, offshore installation, testing and commissioning
![Page 16: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/16.jpg)
BP Norge, PCP Crane Upgrade (CR-351)Aker Electric/Hydraulic CraneCapacity/Type: 50/15. Built 1980
Total overhaul/makeover & modification of the crane to achieve use 12 more years.• New personnel access to crane to current rules & regulations.• Design & installation of new safety system, (weight in hook, sector control, wind, etc.).• Overhaul of all hydraulic motors, inst. of double brake system, mod. of MOPS & AOPS.• 48mnd PM, exchange all wires including sheaves and Collapse Sequence Analysis.• Design, fabrication and installation of 9,8meter boom extension.
![Page 17: List of Content](https://reader035.vdocuments.us/reader035/viewer/2022062501/56816972550346895de1472d/html5/thumbnails/17.jpg)
Success Criteria• Project Objectives• Project Execution • Project Team
– Education– Skill– Experience
• Dedication– 7/24
• Localization– Integrated team
• Communication (project, customer, installation)– Site rep