Lincolnshire Low Carbon Hub. Steven Burns. Presentation Outline. Background to the Hub Progress Learning Next Steps. mVA Harmonics Voltage. Foot print Site Layout. Project Background. Lincolnshire Low Carbon Hub. Year 1 Tier 2 Project Total Budget£3.4m LCNF £3m Objectives - PowerPoint PPT PresentationTRANSCRIPT
Lincolnshire Low Carbon HubSteven Burns
• Background to the Hub• Progress• Learning • Next Steps
Presentation Outline
mVAHarmonicsVoltageFoot print
Site Layout
Project Background
Year 1 Tier 2 ProjectTotal Budget £3.4mLCNF £3m
ObjectivesDemonstrate 6 innovative techniques
Make it easier for generation to connect
Develop an investment ahead of need concept
Lincolnshire Low Carbon Hub
Existing 33kV Network Layout
Dynamic Line Rating
Network Enhancement
s
Commercial Agreements FACTs
Dynamic Voltage Control
33kV Active Ring
Low Carbon Hub Network
Elements of the Hub
Proposed Layout
Progress To Date
• FACTS Specification complete• FACTS ITT Issued and being scored• Wayleaves for OHL rebuild well underway• Harmonisation with works at Trusthorpe
Progress to Date
Trusthorpe
New 4.5km Overhead Line
• Local opposition
• Unintended Consequences
• Investment ahead of need Vs business need
• Compulsory wayleaves a last resort
• Not appropriate in this scenario
Proposed Revised Layout
TRUSTHORPE
ALFORD
CHAPEL ST LEONARDS
INGOLDMELLS
SKEGNESS 33kV
NO
NO
NO
NO
Tee
SPILSBY
s
Current LayoutBAMBERS
FARM
TRUSTHORPE
ALFORD
CHAPEL ST LEONARDS
INGOLDMELLS
SKEGNESS 33kV
NO
NO
NO
NO
Tee
SPILSBY
s
Current Layout - 2 Radial FeedersBAMBERS
FARM
TRUSTHORPE
ALFORD
CHAPEL ST LEONARDS
INGOLDMELLS
SKEGNESS 33kV
NO
NO
NO
Tee
SPILSBY
s
Outline Ring DesignBAMBERS
FARM
FACTS
TRUSTHORPE
ALFORD
CHAPEL ST LEONARDS
INGOLDMELLS
SKEGNESS 33kV
NO
NO
Tee
SPILSBY
s
Design 1: Full Unit Protection SchemeBAMBERS
FARM
FACTS
Proposed 9MW
Wind Farm
s
NO
7 Panel Board
7 Panel Board
6 Panel Board
3 Panel Board
Unit Protection
Design 1: Full Unit Protection Scheme
Time – Offline Build, but stretching
Cost - £1.3m over budget
Quality - Significant Network Improvement
Project - Full rebuild not in ethos of scheme
ALFORD
CHAPEL ST LEONARDS
INGOLDMELLS
SKEGNESS 33kV
NO
NO
NO
Tee
SPILSBY
s
Design 2 : Minimal Unit SchemeBAMBERS
FARM
TRUSTHORPE
FACTS
s
7 Panel Board
CTs and Breaker
CTs and Breaker
CTs and Breaker
Unit Protection
Chapel St Leonards
Ingoldmells
Time – Online build with complex works
Cost - On budget
Quality - Significant site reworks, little benefit
Project - High risk, complex
Design 2 : Minimal Unit Scheme
ALFORD
CHAPEL ST LEONARDS
INGOLDMELLS
SKEGNESS 33kV
NO
NO
NO
Tee
SPILSBY
s
Design 3 : Minimal SchemeBAMBERS
FARM
TRUSTHORPE
FACTS
s
7 Panel Board
Change Protection
Distance Protection
Change Protection
Change Protection
Change Protection
Time – Site works realistic
Cost - On budget
Quality - Increased protection risk
Project - Delivers all 6 elementsUtilises existing assets
Design 3 : Minimal Scheme
Learning
Ingoldmells
Unintended Consequences
Investment ahead of need
• Change Process• Space to Innovate• Project Continuity• Re-design Time
Cultural change & technical change
Working with the business
• Space to Innovate• Project Continuity• Re-design Time• Change Process
www.westernpowerinnovation.co.uk
Thank you for listening