12 August 2009 D.Lacarrère & E.Thomas 1 LHCb - UX85 EXPT AREA RESTRUCTURING SAFETY DEVICES SUMMARY (wks 30-35/09) • AUGs : Repositioning (4) & additional AUGs (13) – 9 AUG chains instead of 2. • Evacuation Switches (ES) : Repositioning (5) + additional ES (6) – (wk35) • Red Telephones (RT) : Repositioning (4 on panel) + 4 additional RT on panel (wk35) • Regrouping AUG + ES + RT : 9 panels

Upload: turner

Post on 19-Jan-2016

28 views

Category:

Documents


0 download

DESCRIPTION

LHCb - UX85 EXPT AREA RESTRUCTURING SAFETY DEVICES. SUMMARY (wks 30-35/09) AUGs : Repositioning (4) & additional AUGs (13) – 9 AUG chains instead of 2. Evacuation Switches (ES) : Repositioning (5) + additional ES (6) – (wk35) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: LHCb - UX85 EXPT AREA  RESTRUCTURING SAFETY DEVICES

12 August 2009 D.Lacarrère & E.Thomas 1

LHCb - UX85 EXPT AREA RESTRUCTURING SAFETY DEVICES

SUMMARY (wks 30-35/09)

• AUGs : Repositioning (4) & additional AUGs (13) – 9 AUG chains instead of 2.

• Evacuation Switches (ES) : Repositioning (5) + additional ES (6) – (wk35)

• Red Telephones (RT) : Repositioning (4 on panel) + 4 additional RT on panel (wk35)

• Regrouping AUG + ES + RT : 9 panels

Page 2: LHCb - UX85 EXPT AREA  RESTRUCTURING SAFETY DEVICES

12 August 2009 D.Lacarrère & E.Thomas 2

LHCb SAFETY PANEL(example)

Photo D.LACARRERE 10 August 2009

Safety Panel

Page 3: LHCb - UX85 EXPT AREA  RESTRUCTURING SAFETY DEVICES

12 August 2009 D.Lacarrère & E.Thomas 3

CONCLUDING REMARK

• CURRENT STATUS : ~ 80 % ACHIEVED

• END EXPECTED FOR 31 August 2009

• GLOBAL TEST TO BE SCHEDULED

(Sept. – Oct.09)

Page 4: LHCb - UX85 EXPT AREA  RESTRUCTURING SAFETY DEVICES

12 August 2009 D.Lacarrère & E.Thomas 4

APPENDIX

• UX85A – Safety Devices (sheets 1,2,3 & 4)

• UX85B – Safety Devices (sheets1,2,3)

• UX85 CAVERN – Top view

Page 5: LHCb - UX85 EXPT AREA  RESTRUCTURING SAFETY DEVICES

12 August 2009 D.Lacarrère & E.Thomas 5

UX85-A – Safety devices (1)

Location AUG Evacuation

(E)

Extinguishers Phones Comments

Access Point

YCA01=UX85

EUB611-80 SEBG-18510 CO2 (5kg)

CO2 (9kg)

77886

CTER-00665

E to be displaced

RB84 (level 0)

Behind Barrel

EUB910/80

(85) ?

- CO2 (5 kg) CTER-00664 E to be

displaced

RB84 (level 0)

Ventil. door

EUB907/80 SEBGL-18511 - 77891 In place, E to be displaced

RB84 (2400)

TDM platform

- - CO2 (5 kg) x2 - AUG to

be installed

RB84-PZ area

Level 1

EUB617/85 - CO2 (5kg) 77883 In place

RB86-PZ area

Level 1

EUB615/85 SEBGL-18508

(visit platform)

CO2 (2 kg) 77883 In place

RB86-PZ area

Level 2

EUB614/85 SEBGL-18507 - 77884 In place

RB84-PZ area

Level 2

EUB618/85 SEBGL-18506 CO2 (5 kg) 77884 In place

1

2

3

4

5

6

7

8

Page 6: LHCb - UX85 EXPT AREA  RESTRUCTURING SAFETY DEVICES

12 August 2009 D.Lacarrère & E.Thomas 6

UX85-A – Safety devices (2)

Location AUG Evacuation

(E)

Extinguishers Phones Comments

RB84-PZ area

Level 3

EUB619/85 - - 77885

In place

RB86-PZ area

Level 3

EUB913/85 - - 77885 In place

RB86-PZ area

Level 4

EUB912/85 - - - In place

RB84-PZ area

Level 4

EUB620/85 - - - In place

RB86 - PZ

Level 5200

EUB610/80 - - - In place

RB86-UXA-A2

Level 5200

EUB608/80 - CO2 (2 kg) - In place

RB86-UXA-A3 Level 8200

EUB609/80 SEBGL-18509 CO2 (2 kg) - In place

RB84 - PZ

Level 0

EUB616/85 - - - E to be

installed

9

10

11

12

13

14

15

16

Page 7: LHCb - UX85 EXPT AREA  RESTRUCTURING SAFETY DEVICES

12 August 2009 D.Lacarrère & E.Thomas 7

UX85-A – Safety devices (3)

Location AUG Evacuation

(E)

Extinguishers Phones Comments

RB84 - D3

Count. house

EUB811/80 - CO2 (2 kg) -

In place

RB84 – D2

Count. house

EUB812/80 HIGH FOG

(blue box)

CO2 (2 kg) - In place

RB84 – D1

Count. house

EUB813/80 HIGH FOG

(blue box)

CO2 (2 kg) - In place

UXA-B1

Shield. Wall

- - - CO2 (5 kg) x2 AUG to be

installed

UXA-C3

VELO Racks

EUB909/80/80 SEBGL-18505 - - In place

UXA-C2

Cool. Units

EUB908/80 - - - In place

RB84- gangw.

Level 5200

EUB911/80 - - - In place

RB86-chicane

to UXB area

EUB607/80 - CO2 (5 kg) - In place

17

18

19

20

21

22

23

24

Page 8: LHCb - UX85 EXPT AREA  RESTRUCTURING SAFETY DEVICES

12 August 2009 D.Lacarrère & E.Thomas 8

UX85-A – Safety devices (4)

Location AUG Evacuation

(E)

Extinguishers Phones Comments

RB86 side

2828/41-A06

- - - - AUG to be installed

D1 (outdoor)

RB86 Side

EUB815/80 - - - In place

D2 (outdoor)

RB86 Side

EUB814/80 - - - In place

25

26

27

28

29

Page 9: LHCb - UX85 EXPT AREA  RESTRUCTURING SAFETY DEVICES

12 August 2009 D.Lacarrère & E.Thomas 9

UX85-B – Safety devices (1)

Location AUG Evacuation

(E)

Extinguishers Phones Comments

RB84- level 0

TX door

EUB906/80 -

- -

To be displaced (1m)

RB84 – level 0

TX (UP side)

- SEBGL-18504 .

CO2 (5 kg) 77894

CTER-00667

In place

RB86-level 0

Chicane

- -

CO2 (5 kg)

CO2 (9 kg)

77894

CTER-00667

AUG & E to be

installed

Bunker-level 0

middle

- - - - AUG & E to be

Installed

RB84 -5200

C-side VELO

EUB209/85 - CO2 (5 kg) - E to be

installed

RB86 – 2500

Muon-A side

EUB605/80 SEBGL-18500 CO2 (5 kg) - In place

RB86-5200

Muon-A side.

EUB604/85 - - 77892 (x2) In place

RB86-8200

Muon-A side

- - CO2 (5 kg) - AUG & E to be

installed

30

31

32

33

34

35

36

37

Page 10: LHCb - UX85 EXPT AREA  RESTRUCTURING SAFETY DEVICES

12 August 2009 D.Lacarrère & E.Thomas 10

UX85-B – Safety devices (2)

Location AUG Evacuation

(E)

Extinguishers Phones Comments

RB86-8200

Muon-C side

- - CO2 (5 kg) -

AUG to be

installed

RB86-5200

Muon C side

EUB601/85 SEBGL-18502 CO2 (5 kg) 77893 In place

RB86-5200

Muon- C side

- - - - AUG & E to be

Installed

RB86-1500

Muon-C side

EUB601/85 SEBGL-18501 - 77892 In place

Balcony -4200

VELO A side

- - - - AUG & E to be

installed

Balcony-5200

Racks – A side

- - CO2 (5 kg) - AUG to be

installed

Calos -12000

C side (pillar)

- - - - AUG to be

installed

Calos-12000

A side (pillar)

- - - - AUG to be

installed

38

39

40

41

42

43

44

45

Page 11: LHCb - UX85 EXPT AREA  RESTRUCTURING SAFETY DEVICES

12 August 2009 D.Lacarrère & E.Thomas 11

UX85-B – Safety devices (3)

Location Emergency

Stop

Evacuation

(E)

Extinguishers Phones Comments

Bunker level 0

A side

Magnet - - - In place

VELO- 5200

C-side

Magnet - - - In place

D1

Count. house

D2

Count. house

D3

Count. house

RB84 Side

Balcony top

New - - - Gangway

Cable trays

50

51

52

53

54

31b

Page 12: LHCb - UX85 EXPT AREA  RESTRUCTURING SAFETY DEVICES

12 August 2009 D.Lacarrère & E.Thomas 12

ADDITIONAL AUGs & E Switches in UX85Summary

1

2 3

45

6

8

7

9

10

11

12

13

14

15

1617

18

19

20

21

2223

2425

3031

32

33

34

35

36

37 38

3940

41

4243

4445

Additional AUGs &/or E

Emergency Panel

27

26

31b