1st LTEX 22 June 2009 D.LACARRERE 1
Protection of UX85
EDMS No 1005700
IP8
Current Status & Plans
UX85 Expt Area
RB84 (8-7 sector)
RB86 (8-1 sector)
Works to be done
Remarks 15 June 2009
1st LTEX 22 June 2009 D.LACARRERE 2
Pit 8 – LHCb - UX85 Area
ACCESSPERSONNEL
PM SHAFTUXA
IP8
ACCESSEQUIPMENTPX SHAFT
RADIATION SHIELD
UXCUXB
Access - CheckingPersonnel & Materials
UXA – LHCb Protected AreaUXB – LHCb Detector AreaUXC – LHC Cryogenics
Accessible Area when LHC operates
BEAM 2
BEAM 1
POINT 1(ATLAS)
ACCESSPERSONNEL
PZ SHAFT
UX85 CAVERN
RB86
RB84
SHIELDING PLUGS
FIG. 1
UJX Gallery
1st LTEX 22 June 2009 D.LACARRERE 3
Shielding Plug – RB84 Area
2200
REF. : Document edms no 38083FIG. 2
Beam Axis
IP8
10400Fe Concrete
Concrete
8001200800
Air flux
holes
1st LTEX 22 June 2009 D.LACARRERE 4
RB84 - Segmentation (reminder)
January 2008
Mobile door
Concrete blocks
Aperturefor survey
View from LHC tunnel FIG. 3
1st LTEX 22 June 2009 D.LACARRERE 5
August 2008
Air tightness – First Improvements (August 08)
Metallicjoints
View from LHC tunnel FIG. 4
1st LTEX 22 June 2009 D.LACARRERE 6
18 June 2009FIG. 5
RB84 side - Current Status (June 09)
- Joints filled with PUR- Joints sealed with concrete- Painting
1st LTEX 22 June 2009 D.LACARRERE 7
Aluminium Cover Sheets
Al sheet removable
FIG. 6
Al sheetsremovable
View from LHC tunnel
Al sheetsfixed to tunnel
Additional Improvements (?) (not yet decided)
Installation of Al cover sheets
1st LTEX 22 June 2009 D.LACARRERE 8
19900 from IP8
FIG. 7
Beam Axis
24622 from IP8
FeConcrete
REF. : Document edms no 38083
1200 800
RB86 Area - Improvement Tightness
MF4
MF
4
1st LTEX 22 June 2009 D.LACARRERE 9
Hole 800 x 800 mm2
MF4 – Central Part
NO ACTION
FIG. 8
1st LTEX 22 June 2009 D.LACARRERE 10
Joint PUR + concreteMetallic sheets (Al 8 mm thick)
Joints & Metallic sheets
FIG. 9
1st LTEX 22 June 2009 D.LACARRERE 11
Holes in the chicane
PROPOSED ACTIONS 1 - STRENTHEN SECTOR DOOR2 – FILL HOLE DEDICATED TO SURVEY PIPE
1st LTEX 22 June 2009 D.LACARRERE 12
False floor in the chicane
ADDITIONAL CONCRETE BRICKSIN THE FALSE FLOOR
1st LTEX 22 June 2009 D.LACARRERE 13
RB84 Side- Mechanical stability of the 1st concrete shield (front of VELO) to be checked with a pressure of 40 mbar. Calculations has been performed by J.C. Batista Lopes DG-SC edms 1005362/1 19 June 2009) – Conclusion : Good stability up to pressure 75 mbar – sliding of upper part - Installation of aluminium cover sheets (LHC tunnel side)- Work scheduled fro week 26
RB86 Side- All main joints (MF4) will be filled with PUR or plastic seal (in particular small gaps) + special concrete (repair cement) + cover sheets.- Strengthen of the sector door (?) . But how. - Cover the cryo-line with aluminium sheets (8-10 mm thick)- Work scheduled for wks 30 – 31
Summary – Main Works on going
1st LTEX 22 June 2009 D.LACARRERE 14
Remarks UJX Tunnel (from UJ87 up to PX shaft)
- Mechanical stability of the wall between tunnel & UJX to be checked with a pressure of 40 mbar. Contact with GS-CE Group
US85/UX85- Wall between US85 & UX85 is made of “SIPOREX” concrete (20 cm thick) Mechanical stability to be check (?)
BUDGET & COORDINATION
- Budget code to be used ? Machine side ?- How to proceed ? - Coordination on site – Who ?
1st LTEX 22 June 2009 D.LACARRERE 15