Page 1: LETTER FROM THE EDITOR - KaraTau Consultingkaratauconsulting.com/wp-content/uploads/2013/10/RWK.pdf · Letter From The Editor 1 ... AgipKCO EPC 4 (Saipem) ... Dragon Oil Turkmenistan

[email protected]

LETTER FROM THE EDITOR

October, 2013

IN THIS ISSUE:

Letter From The Editor 1

Rig Locator: October 2013 2-7

Upcoming events 2013-2014 8

Active drilling rigs in Kazakhstan as of Oct 1st, 2013 is estimated at: 135 rigs – Kazakhstan Land 105 rigs – Turkmenistan Land 3 rigs – Offshore (ROK sector of the north Caspian Sea) 3 rigs – Offshore (TKM sector of the South Caspian Sea)

A) Offshore AgipKCO EPC 4 (Saipem) have been drilling top hole sections since Dec 2012. EPC -3 (Deutag T-47)was expected to start drilling again in Sept 2013 (start of reservoir section drilling) and EPC – 2 (Saipem) will start drilling again in Oct 2013. NCOC announced the start of oil production from Kashagan on Sept 11th and it is expected that the full Phase 1 production daily target will be reached by mid 2014. Eurasia Drilling (EDC) 3rd jackup rig (Neptune) is almost completed construction in Astrakhan and should be ready to begin operations for Dragon Oil in Turkmenistan in Q1 2014.

Construction of their fourth jack-up drilling rig (Mercury), is proceeding in the Lamprell yard in Sharjah and planned completion is Q4 2014. Teniz Burgylau (TB) commissioned their new drilling barge (Caspian Explorer) in 2012 and completed drilling of the 1st well for Zhambyl Petroleum (ZPL) in the shallow water Zhambyl block in July 2013. The barge will be stationed in Bautino during the winter months then resume operations for ZPL in May 2014.TB new KFELS B Class jackup (Satti) is under construction in Aktau & Kuryk. It is designed to operate in waters up to 80m but upgradeable to 125m. Delivery is expected in Q1 2015. Dragon Oil Turkmenistan are expecting to mobilize their new F&G Super M2 jackup during Q4 2013 from Kuryk to LAM oil field offshore Turkmenistan. The rig (Caspian Driller) was built by CIMC in China and assembled in Astrakhan & Kuryk. Rig Management will be provided by Momentum Engineering (Dubai). B) Land KPO activated Parker Drilling Rig 258L in Jan 2013 and now have 2 deep drilling rigs active in Karachaganak field for the next 3 years. KMG and Nabors Drilling are expected to form a partnership to conduct drilling operations for TCO as part of the Future Growth and Wellhead Pressure Maintenance Project. If these projects are approved and move forward, TCO are expected to have up to 3 new pad land drilling rigs to drill some 100+ new wells in Tengiz and Korolev fields starting in 2015. PKKR Kyzlorda (9 rigs), Emir Oil (4 rigs) & Maersk (3 rigs) Mangistau, & Zhaikmunai West Kazakhstan (6 rigs) continue their high activity during 2013. The Editor

Page 2: LETTER FROM THE EDITOR - KaraTau Consultingkaratauconsulting.com/wp-content/uploads/2013/10/RWK.pdf · Letter From The Editor 1 ... AgipKCO EPC 4 (Saipem) ... Dragon Oil Turkmenistan

[email protected]

Page 2

RIG ACTIVITY IN KAZAKHSTAN - October 2013

Operator Rig Contractor Rig Name Field

Location Status 2013 Activity

AKTUYBINSK ADA Energy (KC Kazakh) None Egizhara Idle No plans for 2013

ADA Oil (KC Kazakh) Sun Drilling LLP

Rig 11 (ZJ20)

Bashenkol

Drilling 34 well Drilling program (29 expected to be completed during 2013 and remaining in early 2014)

Rig 12 (ZJ20) Drilling

Akpan APRS-60/80 Workover/

Completions

Altius Petroleum (KNOC)

Akpan

1xSS-40 + 1 x ZJ 30 and 1 x ZJ-10

Akzhar

Drilling Planning to drill 39 wells during 2013 (< 600m TD) 2xAPRS-40 + 1

Azinmash service rigs

Workover/Completions

Aral Petroleum (Caspian Energy and

MI Energy) GWDC (SKGW) ZJ70L East Zhagabulak Idle 2 wells in 2013

Aman Oil (Formerly KazakhMys)

EXALO (ex-OGEC - Krakow)

N-1625 DE Askar Idle Formally Kazakhmys. Rig being marketed to EmbaVed Oil and others

Caspi Neft Sinopec SIPSK ZJ50D South Alibek Idle Expected to drill 1 well during Q3-Q4 2013

CNPC - Aktobemunaigas

GWDC (SKGW)

20 active drilling rigs (ZJ45, ZJ50,

ZJ70 )

Kenkiyak & Zhanzhol

(Development); Unit Exploration

Drilling CNPC - AMG are planning to drill about 90 wells in 2013. 28 drilling rigs and 10 workover rigs active

XiBu Drilling

SIPSK

Batys Munai

Falcon Oil and Gas Ltd (Condor Petroleum) Ak Pan ZJ30 Zharkamys Drilling 14 wells in 2013.

FIAL JV (Xinjiang Zhongxin Resources

Ltd.)

GWDC (SKGW) ZJ70D East Mortuk

Drilling Turnkey drilling from Great Wall and Vostok neft. VostokNeft ZJ70D Drilling

KazNeftehim-Kopa LLP Operator owned UB60

Kopa, Tagan Yuzkniy

Idle No Information

KazTurkmunai (KTM) TPIC IRI-100

Karatobe Workover 2 wells were planned to be drilled in

2013 F320 Drilling

KMK Munai (CNPC & Yukon Energy Holding) None

Kokzhide, Kumsai and

Mortuk Idle

CNPC assumed controlling interest in Jan 2013

KazakhOil Aktobe (KOA)

Sun Drilling LLP

Rig 1 (ZJ70L) Kozhasai Idle

No drilling activity. SD rigs (3) currently idle pending tender award - expected to start during Sept - Oct in Kozhasai

Rig 2 (ZJ70L) Kozhasai Idle

Rig 7 (ZJ70LD) Kozhasai Idle

GWDC (SKGW)

Rig 1 (ZJ50L) Alibekmola Stacked

Rig 2 (ZJ70L) Kozhasai Idle

Rig 3 (ZJ70L) Kozhasai Idle

Mai-Invest 1 x XJ450 Alibekmola Workovers

TPIC 1 x IRI-100 Kozhasai Stacked

South East Services Group (UVGS)

Rig 3 (UPA-/80), Rig 1 & 2(APR-

100),

Alibekmola / Kozhasai

Workovers

Baty Munai 1 x URB-100 Kozhasai Workovers

KDO Production None West

Zharkamys, Karakemir

Idle Chinese purchased interest into the company

Koblandy Akpan ZJ-30 Kubasai Drilling 2 wells program

Saigak Kazakhstan (Arawak) None Saigak Idle

Page 3: LETTER FROM THE EDITOR - KaraTau Consultingkaratauconsulting.com/wp-content/uploads/2013/10/RWK.pdf · Letter From The Editor 1 ... AgipKCO EPC 4 (Saipem) ... Dragon Oil Turkmenistan

[email protected]

Page 3

Operator Rig Contractor Rig Name Field

Location Status 2013 Activity

AKTUYBINSK

MGK LLP None ZJ70L Sarkramabas

and West Bozoba

Idle

OilTech Group None Koblandy Idle Lost license…selling assets

Oztyurk Munai None Sinelnikovskoe Sinelnikovskoe-

12, Standby No update

Sagiz Petroleum Company (SPC)

SIPSK

SIPSK 133 - ZJ40

Kardashen, Ashkol,

Idle

Expected to drill 25-30 wells this year development wells in Kardashen & Ashkol < 1000m during 2013

SIPSK 142 - ZJ30 Drilling

SIPSK 142 - ZJ30 Drilling

Asia Munai ZJ30 Taskuguk, Kaganai Drilling

Total E&P Nurmunai None Nurmunai Blocks

6 & 7 Idle Drilling expected to start in Q3 2014

Uritkhau Operating Ltd (CNPC / KMG)

GWDC (SKGW) ZJ70L

Uritkhau

Drilling 5 wells expected in 2013 (3000m depth). In 2014, plan to drill U-5 deep well 6000meters

ZJ70L Drilling KMG Burenie LLP (MHI/KPD)

ZJ40L Drilling

ATYRAU

AlgaCaspiGas None Astrakhanskiy Idle Planning to drill 1 well in 2013-2014. Need to find drilling contractor

JSC Anaco None Kyrykmyltyk Idle

AtyrauMunai None Daraimolla Idle

Asker Munai EXALO (ex-OGEC - Krakow)

Midco U1220 Karatobe Burbaital

Spud delayed until Nov

1 x 6700m exploration well.

Astana Oil Company Batys Munai Tortai Idle Turnkey drilling

Aurado Energy Inc. None Liman, Tegen Idle No Information

Bans Munai None South Dossar Idle No Information

Batt Corporation - Central Asian Oil

None

Mezhdurechie Ural-Volga,

Kolzhan-Uyaly, South Torgay

No Information

Gyural LLP None None North Baklaniy Idle No Information

KazEmir Oil None Idle No Information

KaspiiNeft LLP None Airankol Idle No Information

Kokmai LLP None Kokmai -

Zhiloyskoye Idle No Information

Kozhan LLP Sun Drilling LLP Rig 5 (ZJ40) Morskoye, Ogay,

Karatal Drilling to mid 2014

Caspian Holdings - Taraz

AAMG Zhengeldy Workovers Ongoing workover program

Emba South Oil None Zhubanatan Idle No Information

EPC Munai None Block 8 - Sholkara, Akkuduk

Idle No activity

EmbaVedOil None South Komyskul Idle Considering 1 deep well > 6000m in 2013. May use Exalo N-1625 rig currently available in Aktobe region

KMG RD - Embamunaigas

KMG Burenie LLP (MHI/KPD)

3 x ZJ40; 1 x ZJ30; 3 x ZJ20; 1 x ZJ15; 3 x MBY-125; 1 x UM 3D; 1 x Kremco-400; 24 x UPA 50/60

WO rigs

Prova, Naurzhan, & Emba fields

Drilling & W/O 2013 plans included 80 development wells and 15 exploration wells.

including:

Zhaikmunaigas

Provamunaigas

Kainarmunaigas

Dossormunaigas

Makatmunaigas

Kulsarymunaigas

Page 4: LETTER FROM THE EDITOR - KaraTau Consultingkaratauconsulting.com/wp-content/uploads/2013/10/RWK.pdf · Letter From The Editor 1 ... AgipKCO EPC 4 (Saipem) ... Dragon Oil Turkmenistan

[email protected]

Page 4

Operator Rig Contractor Rig Name Field

Location Status 2013 Activity

ATYRAU JV Matin No Information Matin Workovers 50% Embamunaigas & 50% MatOil

Arna Oil - Telf No Information

Emba, Makat, Kara-Arna and

Kok-Arna Vostochnaya

Workovers

Max Petroleum (Samek)

Zhanros ZJ30

Makat Drilling 13 wells planned in 2013 with depth

s900-1800m, tender is ongoing (Block A&E, Atyrau region). Planning NUR-1 rentry well in 2014. TD is 7250m

Zhanros ZJ20 Drilling

North Caspian Oil Development

None Idle Idle

Adai Petroleum (Rosneft / Sinopec)

AtyrauHydroGeologia PAP-50 Adaiski - Bikzhal Idle No Information

Roxy / Ravninnoe Oil LLP

None Ravninnoe Idle No drilling plans in 2013

FIOC - Sazankurak (Sinopec)

SIPS-KAZAKHSTAN 1 x ZJ-20

Sazankurak Idle

Mynteke FIOC - PreCaspian Petroleum (Sinopec)

Idle

TCO

TCO - NDIL operated TCO Rig 4

Tengiz

Drilling

3 new wells planned during 2013 Nabors Drilling Rig 585

Well deepening & Workover

Rigless Contractor

Tower/Crane Well intervention

KARANGANDA, ZHAMBUL & ALMATY

KTG / Amangeldy Gas Akpan ZJ-30 & ZJ-40

Airakty & Sultankuduk

1 rig Drilling, 2nd moving in

1+1 wells 2800-3300 m depth

NAT Tech Service LLP ZJ-30 Amangeldy Drilling 4 wells program

Kuat None Zaysan Idle

North Caspian Oil Petroleum

None Alakol/Oskemen Idle

Erkin Oil None Ussen Idle

Tarbagatay Munai XiBu Drilling ZJ30 Saybulak Drilling 20+ wells

NORTH CASPIAN OFFSHORE

NCOC (Agip, ExxonMobil)

KCA DEUTAG (AKCO) Rig T-47 Kashagan EPC 3 Start Drilling

reservoir section in Sept 2013

PARKER DRILLING Rig 257B Bautino Standby - Ready

stack

Saipem (AKCO)

D-Island Rig 401 Bautino Stacked

D-Island Rig 402

Rig 5946 Kashagan EPC 2 Start Drilling

reservoir section in Oct 2013

Rig 5947 Kashagan EPC 4 Drilling

Rigless Contractor CT jacking frame

A&D well interventions

Idle Light well interventions planned from Sept - Dec using CT jacking frame

Caspi Meruerti Operating Company

B.V. (CMOC) None Zhemchuzhina Idle

Planned 1 exploration well in 2013, but moved it to 2014 because Astra rig is not available.

N-Operating Company (KMG)

None Nursultan Idle ConocoPhilips sold their interest to KMG, no plan to drill in 2013, looking for the rig in 2014

ONGC Videsh None Satpayev Idle 2014-2015 may start exploratory drilling. Depends on rig availability

Zhambyl LLP (KNOC) TengizBurgylau "Caspian Explorer"

Driiling Barge Zhambyl Idle 1 well drilled 2013 during summer drilling window.

Page 5: LETTER FROM THE EDITOR - KaraTau Consultingkaratauconsulting.com/wp-content/uploads/2013/10/RWK.pdf · Letter From The Editor 1 ... AgipKCO EPC 4 (Saipem) ... Dragon Oil Turkmenistan

[email protected]

Page 5

Operator Rig Contractor Rig Name Field

Location Status 2013 Activity

KYZLORDA

Ai-Dan Munai (CNPC)

CNEC ZJ40

Aryskum

Drilling NTS ZJ30

Xibu - 2 x ZJ30 ZJ30

JSC COR / Turan Barlau

OMG ARB-100, PAP-

60 Idle

Equus Petroleum (KTS LLP)

Syrdaria Munai Services (Neftech)

Sarybulak Preparation Plan is to drill 10 appraisal and 8 production wells in current drilling campaign with 4 rigs.

Katco

Volkov Geology 14 x A50

equivalent Tortkuduk and Muynkum (Shymkent

Oblast)

Drilling

KATCO is uranium mining company and JV between Kazakh Kazatomprom (49%) and French Areva (51%). Drilling on average

800 wells per year (<350m)

Synergy 3 rigs

Prakhla 2 rigs

Operator owned 5 rigs

KuatAmlon Munai (KAM - CNPC and

CNIC)

Xibu 5 x ZJ30 Konys and Bektas

Drilling

NTS 2 x ZJ30 Drilling

KazPetrol None Idle

Marsel Petroleum (Condor)

Tamgalytar Idle Condor selling asset

Galaz & Company (LGI)

None North West

Konys Idle

Turgai Petroleum JV

OntustykMunaiGas (OMG)

2 x PAP 60

North Kumkol Drilling and workover

Syrdaria Munai Services (Neftech)

2 x PAP 60

Zhanros 2 PAP 60

KazGermunai

Zhanros 1 x ZJ30

Akshabulak, Nuraly, Aksai

Drilling

17-20 well program in 2013. Drilling program expected to be extended with more rigs involvment

XIBU 1 x ZJ30 Drillng

NefteTechService (NTS)

1 x ZJ30 Drilling

(LNREIS) A-50 Workover

PKKR

PML-OMG ZJ30 NW Kyzylkia Drilling

110 wells planned to be drilled in 2013.

PML Ideco 100 W Tuzkol Drilling

Burene & K ZJ30 Kumkul South Drilling

XiBu/GWDC

XIBU-27 (ZJ30) Kyzylkia Drilling

XIBU-29 (ZJ30) W Tuzkol Drilling

XIBU-30 (ZJ-30) Aryskum Drilling

Zhanros Rig # 1 - ZJ30 Aryskum Drilling

Rig # 2 - ZJ30 Tuzkol Drilling

PKKR - DOS Engineering

5x A50, 2 x A-37 Kumkol Drilling

Zhanros 4 x A50 S Kumkol, Aryskum

Workover Shapagat 3 x A50 Kumkol, Kyzlkiya

South Oil LLP None Kenlyk

Page 6: LETTER FROM THE EDITOR - KaraTau Consultingkaratauconsulting.com/wp-content/uploads/2013/10/RWK.pdf · Letter From The Editor 1 ... AgipKCO EPC 4 (Saipem) ... Dragon Oil Turkmenistan

[email protected]

Page 6

Operator Rig Contractor Rig Name Field

Location Status 2013 Activity

MANGISTAU Arna Petroleum None Zhetybai Idle

KMT - formerlly Ascom - Kazpolmunay & Tolkynneftegas

Mangistau Oil Services Ltd (OSC) & JSC Mangistaugeologiya

ZJ30

Borankol Installing KMT assumed control of Ascom assets in 2012 Tolkyn Idle

BNG LLP (Roxi Petroleum)

Xibu Drilling ZJ50 Aryshagal Drilling

ZJ40 South Yelemes Drilling

KOM-Munai (Petrom) None Komsomolskoye 3 wells by 3200m, deviated planned to start drilling end of 2013. Tender for drilling rig announced in September

Tethys Aral Sea Tethys Services Kazakhstan

ZJ-70L ' Telesto' Doris Drilling Spud AKD08 in Aug. Rig managed by Akpan.

A-37 Kyzyloi, Kulbas Workovers

Emir Oil / BMB Munai (MI Energy)

Xibu Drilling

XDEC 50 (ZJ50D)

Dolinnoe, Aksaz, Emir, Essen,

Karaiman

Drilling

XDEC 25(ZJ70D) Drilling

XDEC 53 (XJ450)

Workovers

XDEC 41 (XJ550)

Workovers

Sinopec (SIPSK) Rig 145 (ZJ50-L) Drilling

Rig 147 (ZJ50-L) Drilling

Caspian Gas Corporation

Caspian Drilling F-100 Shagyrly-

Shomyshty Idle Bankruptcy

Caspian Tristar None Mertvy Kultuk Idle No update

CaspiOilGas

Kaz-Bi A-60/PAP-60 Workovers

No information LLP "AtyrauMunaiGasGeologiya-Burenie"

UM 3D Rakushechnoye Idle

Hazar Munai LLP M-Drilling UM-3D Northern Roadside

Idle No information

Jupiter Energy Ltd Nrth-east Akkar Idle Workovers

KNOC Caspian LLC KenSary

CTK-Geo ZJ40 Arystan Drilling Plan 9 wells in 2013, and 10 wells in 2014

KNOC Caspian LLC Meerbush

Sun Drilling LLP Rig 6 (ZJ40) Kulzhan

Drilling Plan 24 wells in 2013-2014

CTK-Geo ZJ40 Drilling

KBM - Nations Tulpar Services - KBM

IRI5000-MR

Karashanbas

Drilling

Expecting to drill over 160 wells in 2013.

15 x A40/A50/A60

Workover

2 x Cooper 150 Workover

CatKaz Cooper 750 Drilling

KKM OMG ZJ30

Karakaduk Drilling

Plan to dril between 2-4 vertical wells during 2013. South East Service

Group ARB-100 x 6 Workovers

KMG - Uzenmunaigas

Burgylau LLP (MHI/KPD)

7 x ZJ20; 8 x MBY-125; 2 x TXJ-100; 2 x CW-100; 14 x UPA 50/60 WO rigs

Uzen, Tepke Drilling Estimated 165 wells planned to be

drilled during 2013

Astra Star LLP (MHI/KPD)

HRI-700 Uzen Drilling

KMG Teniz MAIKS Ideco 750 Kulandy Idle

Kor-Tazh LLP Akpan ZJ-40 NW Zhetybai Drilling 95% Owned by Caspian International Oil Corporation (CIOC).

Lucent Petroleum(Visor Group)

Beinue-

Exploration Block Idle No drilling plans for 2013

Maersk Kazakhstan Astra Star LLP (MHI/KPD)

IRI-5000 Rig 1

Dunga Drilling Dunga FFD development IRI-5000 Rig 2

IRI-5000 Rig 3 Maksat Munai LLP None Kurgenoi / Konyr Idle

Page 7: LETTER FROM THE EDITOR - KaraTau Consultingkaratauconsulting.com/wp-content/uploads/2013/10/RWK.pdf · Letter From The Editor 1 ... AgipKCO EPC 4 (Saipem) ... Dragon Oil Turkmenistan

[email protected]

Page 7

Operator Rig Contractor Rig Name Field

Location Status 2013 Activity

MANGISTAU

Mangistaumunaigas (MMG)

Mangistau Oil Services Ltd (OSC) & JSC Mangistaugeologiya

7 rigs (3 active) Kalamkas / Zhetibay, 30+

fields

Drilling & Workover

Expect to drill about 50-60 wells in 2013

Xibu Drilling XDEC 43 (ZJ20L)

Drilling

Munai Ontustik Munai Service UM 3D Koltyk Mobilizing Plan to drill 2 wells 3000m depth and 2 re-entry in Q3 2013 - Q2, 2014. Preparing tenders for well services

Munai Services (KSR Resources)

None N. Zhetybai Idle

Buzachi Operating Ltd.

XiBu Drilling

XDEC 31 - MR5000

North Buzachi

Drilling

Planning to drill 150 wells in 2013

XDEC 28 - ZJ30C

Drilling

XDEC 23 -ZJ30C Drilling

OMG ZJ20 Drilling T-100 Drilling ZJ30C Drilling

South East Service Group

4 x APRC 50 Workover

East Oil 1 x XJ-40 Workover

KapremService LLP 1 x UPA 50, 1 x

UPA 60 Workover

Buzachi Neft AMGG

Offshore dr.barge "Lotus"

Karaturun -More Idle No update

UM 3D Northeast Karaturun

Idle

Phystech Firm LLP Polycom ZJ20 North

Karazhanbas Drilling

Drilling on turnkey basis from June. Wells < 600m. 25+ wells in 2013 ZJ20

Tashbulat Oil (Petrom) EXALO (ex-OGEC - Krakow)

ST Brewster TR-800

Tashbulat & Turkmenoi

Drilling Finished 3 wells in Tasbulat and 3 of 7 wells planned in Turkmenoi field. Total 7 wells planned in 2013

Shell LukOil Arman JV None Arman Idle No drilling plans for 2013 Tabynai JV None Tabynai Idle Part of Aksai LLP group Tenge JV None Tenge Idle Workovers

Zhalgiztobe LLP None Zhalgiztobe Idle Workovers

URALSK

Zhaikmunai

Uralskneftegazgeologia ZJ70D

Chinaryovsky

Drilling

Drilling plans for 2013 include 15 to 17 wells (9 appraisal wells, 1 exploration well, and 5 - 7 production wells). 6 rigs in operation

TW-125 Workover

Xibu XDEC-32 (ZJ70D)

Drilling

Xibu ZDEC-24 (ZJ70D)

Drilling

SAIPEM - Kazakhstan Rig 5827 Drilling SAIPEM - Kazakhstan Rig 5843 Drilling Sun Drilling LLP Rig 9 (ZJ70D) Drilling

KPO

Saipar Rig 107L

Moving to Well 232

Saipar Rig 249L

Drilling Well 9816D

Saipar Rig 258L Drilling Well 9834

-1 Saipar Rig 2 Workover KPO - ABE Kazburgas A-50 MB Workover

“Karpovskiy Severniy” JSC (KMG RD)

GWDC (SKGW) ZJ70D South Karpovsky Drilling SK-2 3 more wells planned in 2014

TNC (Eurasia Petroleum Company)

None Kamenkovskiy

Block Idle

Planning a deep exploration well K1 in 2015.

Ural Oil and Gas (MOL/Sinopec/KMG)

SAIPEM - Kazakhstan Rig 5870 Fyodorovski

block Drilling

Plan to drill 8 new wells during 2014-15. New drilling contractor to be selected. AZ 5870 will be released at end of 2013 and move to Turkmenistan (Q1 2014)

Page 8: LETTER FROM THE EDITOR - KaraTau Consultingkaratauconsulting.com/wp-content/uploads/2013/10/RWK.pdf · Letter From The Editor 1 ... AgipKCO EPC 4 (Saipem) ... Dragon Oil Turkmenistan

[email protected]

Page 8

UPCOMING EVENTS— 2013-2014

1 - 4 October 2013 KIOGE 2013 21st Kazakhstan International Oil & Gas Exhibition and Conference Almaty, Kazakhstan

5 - 7 November 2013 Mangystau Oil, Gas & Infrastructure 2013 8th Mangystau Regional Oil, Gas & Infrastructure Exhibition Aktau, Kazakhstan

19 - 21 November 2013 OGT 2013 18th Turkmenistan International Oil & Gas Conference Ashgabat, Turkmenistan

1 - 2 April 2014 OilTech Atyrau 2014 8th Atyrau Regional Petroleum Technology Conference Atyrau, Kazakhstan

1 - 3 April 2014 Atyrau Oil & Gas 2014 13th North Caspian Regional Atyrau Oil & Gas Exhibition Atyrau, Kazakhstan

13 - 15 May 2014 OGU 2014 18th Uzbekistan International Oil & Gas Exhibition and Conference Tashkent, Uzbekistan

20 - 22 May 2014 TGC 2014 5th Turkmenistan Gas Congress Turkmenistan

3 - 6 June 2014 Caspian Oil & Gas 2014 21st Caspian International Oil & Gas Exhibition and Conference Baku, Azerbaijan

Page 9: LETTER FROM THE EDITOR - KaraTau Consultingkaratauconsulting.com/wp-content/uploads/2013/10/RWK.pdf · Letter From The Editor 1 ... AgipKCO EPC 4 (Saipem) ... Dragon Oil Turkmenistan

KomalKomalKomalInternationalBEST PRICE,

BEST PRICE,

BEST PRICE, BEST DELIVERY!BEST DELIVERY!BEST DELIVERY!

BEST EQUIPMENTBEST EQUIPMENTBEST EQUIPMENT

Established in Almaty, Kazakhstan, Komal International supplies Oilfield and Industrial equipments for oil & gas companies. Komal International’s experienced and well trained staff consists of professional petroleum engineers who are passionate about providing the best solution to the client for any of their projects.

With the representative centers in United States of America, China-Beijing, Hong Kongand India, Komal International makes sure that our clients gets the best of quality, price and delivery time to meet their requirements on time.

There has been a long-established associations with manufacturers in Eastern and Western Europe, North America, Southeast Asia, China, Middle East and the former Soviet Union, Komal International works out the best for its clients.

Drawworks

InstrumentationRig-Expendables

Hydraulics

Valves

Mud- Pumps

Blowout-EquipmentHandling-Tools

Solid-Controls

Sprockets

Cassing Accessories

[email protected]@[email protected]@komal-intl.com

Email: Telephone:+7 701 958 8539+7 777 594 1125+7 701 142 0819+1 713 518 1889

Page 10: LETTER FROM THE EDITOR - KaraTau Consultingkaratauconsulting.com/wp-content/uploads/2013/10/RWK.pdf · Letter From The Editor 1 ... AgipKCO EPC 4 (Saipem) ... Dragon Oil Turkmenistan

We cordially invite you to visit our Stand 9-144 in Pavilion 9 at KIOGE 2013 in Almaty on October 1-4, 2013

Your reliable partner for supply of oilfield solutions and services

www.borkitoiltech.com

Borkit Oiltech LLP is a well-resourced and full-service company that delivers best in class products and services to the Oil & Gas Industry of Kazakhstan by providing solutions to our customers in the following fields:

Drilling and Completion Equipment and Services

Engineering Solutions and Processing Equipment

Waste Management and Environmental Solutions

We act as an exclusive agent and distributor for the leading international brand names and manufacturers. We are dedicated to delivering products and services that fully meet quality, performance, safety and environmental requirements of the Industry. Yet, we operate our business for the benefit of our people, customers, partners and the country where we work.

14, Fonvizin Street Almaty 050051 – Republic of Kazakhstan Tel: +7 (727) 222 15 45 Fax: +7 (727) 222 15 48 Email: [email protected]

Page 11: LETTER FROM THE EDITOR - KaraTau Consultingkaratauconsulting.com/wp-content/uploads/2013/10/RWK.pdf · Letter From The Editor 1 ... AgipKCO EPC 4 (Saipem) ... Dragon Oil Turkmenistan

ТОО Казахстанско-китайская буровая компания «Великая стена» - является крупнейшей буровой компанией на территории Казахстана. Предприятие успешно проводит работы с 1999 года. ТОО ККБК «Вели-кая стена» самостоятельно проводит работы по бурению, креплению, ремонту, испытанию и освоению скважин. Предоставляет услуги по бу-рению вертикальных, горизонтальных, наклонно-направленных, много-ствольных скважин, услуги по отбору керна, также по ликвидации аварий в скважине, по обработке бурового раствора, занимается проектирова-нием бурения, подготовкой буровой площадки, монтажом и демонтажом буровых установок, а также проводит другие вспомогательные работы.

ТОО ККБК «Великая стена» представляет собой специализирован-ное буровое предприятие, которое имеет высококвалифицированный персонал, конкурентоспособную технологию и передовое оборудова-ние с мощностью бурения до 7000 м. Персонал Компании составляет более 2500 человек, из них 95% местных кадров. В собственности Ком-пании 27 буровых установок типа ZJ70, ZJ50, ZJ30 с буровыми бригада-ми и полностью укомплектованным вахтовым поселком, также имеется своя собственная производственная база, где на месте производится ремонт оборудования, цех по испытанию ПВО, тампонажный участок, отдел буровых растворов с собственной лабораторией и т.д.

В 2011 году Компания сдала 39 скважин, общая проходка по всем месторождениям составила 176 583 метров. Начиная с 1999 года и к концу 2011 года пробурено и сдано 469 скважин с общей проходкой 1 885 214 метров.

Благодаря многолетнему опыту ТОО ККБК «Великая стена» успешно ведет работы на территории Актюбинской и Западно-Казахстанской областях, работы ведутся сразу на 13 месторождениях. На-шими заказчиками являются крупные нефтегазодобывающие компании Казахстана, такие как: АО «СНПС-Актобемунайгаз», ТОО «Каспий Нефть ТМЕ», ТОО «Урихтау Оперейтинг», ТОО РД КМГ «Раз-ведочные активы», ТОО «КазахойлАктобе», ТОО «Арал Петролеум Кэпитал», ТОО «ОйлТехноГрупп», ТОО «Карповский Северный», ТОО «Урал Ойл энд Газ».

ТОО Казахстанско-китайская буровая компания «Великая стена» является лидером на рынке буровых услуг Актюбинской области, со своей мощной базой, персоналом с многолетним опытом, передовой техно-логией и оборудованием. Единственная Компания в реги-оне, выполняющая работы полностью своими силами – на основе «под ключ». Как показывает практика, ТОО ККБК «Великая стена» - это надежный и выгодный партнер.

ТОО Казахстанско-китайская буровая компания «Великая стена» всегда готово оказать свои услуги на высшем уровне, т.к. знание, труд и опыт – вот три составляющие успеха, необ-ходимые для продуктивной работы нефтегазового сектора.

Sino-Kazakhstan Great Wall drilling company LLP - is the largest drilling company in the territory of Kazakhstan. Company successfully carries out works since 1999. SKGW provides drilling, cementing, work-over services, well testing and development of wells independently. It also carries out drilling services of vertical, horizontal, directed and mul-tilateral wells, coring services, services on accident elimination in a well, drilling mud conditioning, drilling programming, drilling site preparation, rigging-up and rigging-down and other different byworks.

SKGW represents the specialized drilling company with the highly skilled personnel, competitive technology and the advanced equipment with capacity of drilling up to 7000 m. The personnel of the Company constitute more than 2500 people, 95 % among them are locals. Company owns 27 drilling rigs of ZJ70, ZJ50, ZJ30 types

with drilling crew and the fully completed camp, it also has own production base with repair shop, BOP testing section, cementing base, drill mud department with own laboratory and etc.

Company completed 39 wells with 176 583 drilling meters in 2011. Since 1999 till 2011 years 469 wells have been drilled with 1 885 214 drilling meters.

Owing to many years’ experience SKGW successfully works in Aktobe and West-Kazakhstan region, the Com-pany performs an operation in 13 oilfields. Our Clients are large oil and gas production enterprises in Kazakhstan re-gion such as: “CNPC Aktobemunaigas” JSV, “CaspiNeft TME” JSV, “Urikhtau Operating” LLP, “KMG EP Exploration Ventures” LLP, “Kazakhoil Aktobe” LLP, “Aral Petroleum Capital” LLP, “OilTechnoGroup” LLP, “Ural Oil and Gas” LLP, “KarpovskiI Severnyi” LLP.

Sino-Kazakhstan Great Wall drilling com-pany LLP is the leader of drilling service mar-ket in Aktobe region with its extensive capa-bilities, highly qualified personnel, advanced technology and modern equipment. SKGW is the unique company in a region, perform-ing all works by its own efforts on “turnkey” basis. As experience shows, SKGW – is a reliable and advantageous partner.

Sino-Kazakhstan GreatWall drilling com-pany LLP is always ready to offer its services and performs work on high-level, because knowledge, work and experience – that are the three elements of success so essential for efficient work in oil&gas sector.

ТОО Казахстанско-Китайская Буровая Компания

Sino-Kazakhstan Great wall drilling company LLP Генеральный директор Ху Эртай

Hu Ertai general director

030 000, Республика Казахстан г. Актобе, пр.А.Молдагуловой, 43 «А»тел.: +7 7132 947 216, 947 256 факс: +7 7132 947 216 Официальный сайт компании - www.skgw.kz

43A, Aliya Moldagulova avenue, Aktobe, The Republic of Kazakhstantel.: +7 7132 947 216, 947 256 fax: +7 7132 947 216 www.skgw.kz

«Великая стена»

Page 12: LETTER FROM THE EDITOR - KaraTau Consultingkaratauconsulting.com/wp-content/uploads/2013/10/RWK.pdf · Letter From The Editor 1 ... AgipKCO EPC 4 (Saipem) ... Dragon Oil Turkmenistan

Want to be:

#1 and right at the top?the contractor of choice?The company they always call first?

then let us help you with the next steps to get there ……..

KaraTau Consulting We are the 100% Kazakh independent drilling consulting company with adifference. As well as providing front line consulting services to many of theoperating companies and sub-soil license holders in KAZAKHSTAN, we alsoprovide help to the other end of the equation The Drilling Contractor.

If you are ready to raise your standards and strive to be the best in classthen we are ready to help you achieve your goals and protect your valuableassets and equipment. Our highly experienced professional team bring manyyears of experience in the industry and good knowledge of local regulationsthat will help you to implement best industry practices on your drilling &work-over location.

•Self Auditing•Rig Management•BOP & Well Control•Operations Planning•Start Up & Stack Out•Efficient stock control•API & IADC Best Practices•Maintenance of Drill String•Maintenance of Equipment•HSE Management & Systems

Contact us:David Blackmore+7701 715 9732

[email protected] Omirzak

+ 7 727 372 29 29+7 (727) 311 08 93

[email protected]

Almaty, Nurly-Tau business centreBuilding 5A, 15th floor, Office 221