lessons learned from florida’s profiler certification track · 2019. 10. 9. · construction...
TRANSCRIPT
![Page 1: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/1.jpg)
PE 2019
Lessons Learned from Florida’s Profiler Certification Track
By
James Greene
Noah Borelli
Florida Department of Transportation
![Page 2: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/2.jpg)
PE 2019
Outline
• Background
• Construction
• 2018 Smoothness Rodeo
• Accuracy/repeatability requirements
• Testing requirements
• Summary
![Page 3: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/3.jpg)
PE 2019
FDOT Profiler Certification Track
• Establish a standardized process to verify profilers are reliable and accurate
• Williston Municipal Airport, Levy County
![Page 4: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/4.jpg)
PE 2019
FDOT Profiler Certification Track
• 3700 ft. long x 14 ft. wide
• Open & dense-graded surfaces
• IRI ranges from 34 in/mile to 105 in/mile
![Page 5: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/5.jpg)
PE 2019
FDOT Profiler Certification Track
•All FDOT profilers certified prior to start of annual network survey
•New profilers must pass certification
•Troubleshooting & research
![Page 6: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/6.jpg)
PE 2019
Controlling Roughness in Paving
1. Altered base elevation based on profile simulation.
2. Adjusted paver tow arm based on profile simulation.
3. Measured smoothness.
4. Repeat 2 & 3 for each AC lift.
Elev
atio
n (
inch
)
Station (ft)Original Design Profile Final Design Profile
![Page 7: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/7.jpg)
PE 2019
Stabilized Subgrade
![Page 8: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/8.jpg)
PE 2019
Base & 1st Asphalt Lift
![Page 9: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/9.jpg)
PE 2019
2nd Asphalt Lift & Friction Course
![Page 10: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/10.jpg)
PE 2019
Construction Issues
• Cold joint in open-graded friction course due to contractor running out of material.
• FC-5 & FC-12.5 smooth sections were both rougher than desired.
• Decision made to mill & resurface both smooth sections.
![Page 11: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/11.jpg)
PE 2019
Construction Lessons Learned
• There are many ways to target roughness
• Treat as a research project
• Coordination is critical
![Page 12: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/12.jpg)
PE 2019
2018 Smoothness Rodeo
• 13 profilers from four manufactures representing eight organizations participated
• Testing done on four 0.1 mile sections:
• Dense Smooth (IRI=39 in/mile)
• Dense Medium-Smooth (IRI=83 in/mile)
• Open Smooth (IRI=41 in/mile)
• Open Medium-Smooth (IRI=96 in/mile)
• Test speeds of 30 & 45 mph
![Page 13: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/13.jpg)
PE 2019
AASHTO R-56 Performance
Test Section
Fraction of Tested Profilers Meeting
AASHTO R 56 Criteria
Repeatability Accuracy Both
Dense smooth 12 / 13 12 / 13 11 / 13
Dense medium-smooth 13 / 13 13 / 13 13 / 13
Open smooth 8 /13 0 / 13 0 / 13
Open medium-smooth 13 / 13 12 / 13 12 /13
Accuracy cross-correlation conducted using ProVAL with SurPRO as reference device
![Page 14: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/14.jpg)
PE 2019
Accuracy Cross-Correlation vs. IRI %Error
Dense-grade SmoothDense-grade Medium-smooth
Open-grade SmoothOpen-grade Medium-smooth
-10
-8
-6
-4
-2
0
2
4
6
8
10
70 75 80 85 90 95 100
IRI
Pe
rce
nt E
rro
r (%
)
Accuracy Cross-correlation-10
-8
-6
-4
-2
0
2
4
6
8
10
70 75 80 85 90 95 100
IRI
Pe
rce
nt E
rro
r (%
)
Accuracy Cross-correlation
-10
-8
-6
-4
-2
0
2
4
6
8
10
70 75 80 85 90 95 100
IRI
Pe
rce
nt E
rro
r (%
)Accuracy Cross-correlation
-10
-8
-6
-4
-2
0
2
4
6
8
10
70 75 80 85 90 95 100
IRI
Pe
rce
nt E
rro
r (%
)
Accuracy Cross-correlation
![Page 15: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/15.jpg)
PE 2019
IRI Statistic Based Criteria
Test Section
Fraction of Tested Profilers Meeting
AASHTO R 56 Criteria
Repeatability Accuracy Both
Dense smooth 12 / 13 12 / 13 11 / 13
Dense medium-smooth 13 / 13 13 / 13 13 / 13
Open smooth 13 /13 9 / 13 9 / 13
Open medium-smooth 13 / 13 13 / 13 13 /13
Nine of thirteen tested profilers would pass certification under the proposed
criteria
![Page 16: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/16.jpg)
PE 2019
Choosing Certification Criteria
• Accuracy cross-correlation struggles on smooth open-grade surfaces
• Proposed criteria for smooth open-grade accuracy requirement
The candidate profiler must produce ten-run average profiler IRI within 5 percent of the SurPRO for each wheel path
• Proposed criteria for smooth open-grade repeatability requirement
The candidate profiler must have a ten-run coefficient of variation less than 5 percent for each wheel path
![Page 17: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/17.jpg)
PE 2019
Surface Type Example
• Gocator line laser on the open-graded surface showed several low errors.
• These errors were not evident on the dense-graded surface.
• Upgraded laser firmware eliminated low errors on the open-graded surface.
![Page 18: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/18.jpg)
PE 2019
Test Speed Example
• Profiler with slightly out-of-round tire was shown to increase IRI by 7%. This was only apparent when the vehicle was tested at higher speeds (55 to 60 mph).
• Diagnosed using ProVAL spectral density.
Spike at 7.2 ft./cycle caused by out-of-round tire
![Page 19: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/19.jpg)
PE 2019
Florida Smoothness Stats
0
10
20
30
40
50
60
70
80
90
100
0 100 200 300
Cu
mu
lati
ve P
erce
nt
Freq
uen
cy
IRI (in/mile)
New Construction Network
PercentileNew
Construction IRI
Network IRI
25% 38 54
50% 44 66
75% 52 85
• New Construction Avg. IRI = 44 in/mile
• Network Avg. IRI = 66 in/mile
• Approximately 70% of miles tested at 50 mph or greater
![Page 20: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of](https://reader036.vdocuments.us/reader036/viewer/2022071006/5fc3edd45046ee2ee84e30b3/html5/thumbnails/20.jpg)
PE 2019
Summary of Lessons Learned
• Construction • Targeted pavement roughness can be achieved by adjusting
paver toe arm & measuring profile between lifts.• Good communication with paving contractor is critical. Treat track
as a research project.
• Test surfaces & speed should reflect actual conditions. Make sure test track is long enough to test at highest speeds.
• Accuracy cross-correlation is difficult for smooth open-graded surfaces.
• Test track is a valuable part of the overall data quality management, profiler diagnostic tool, and research.