lean consulting proposal
TRANSCRIPT
![Page 1: Lean Consulting Proposal](https://reader038.vdocuments.us/reader038/viewer/2022100501/55c36264bb61eb7e498b464f/html5/thumbnails/1.jpg)
About Consultant:
Karthik Vengatesan, Cognizant Technology Solutions Certified Lean & Six Sigma Professional. During tenure, guided and mentored several Lean Templates and saved time & man power resources for various projects & processes.
During MBA Internship, worked with Fortis Healthcare, for Cathlab Angiogram/Angioplasty Capacity/Utilization Improvement and achieved;
1. 10% Increase in Cath Lab Capacitya. Translates to Approx. Rs. 57,00,000/- Per Annum
2. Verified manpower shortage for operations with Demand/Supply Analysisa. Concluded department was overstaffed.b. Reduced Approx. Rs. 3,00,000/- Per Annum for Projected Additional Man Power
Resource.3. Reduced Total Cycle Time for SRL Laboratories, Subsidiary of Fortis Healthcare.
a. Achieved Approx. 29% Improvement in Turn Around Time.
None of the above required additional investment and all suggestions were implemented with Near Zero Cost.
Attachment:1. Synopsis of Analysis, Solution & Brief Overview.2. Recommendation – Deputy Medical Superintendent.
![Page 2: Lean Consulting Proposal](https://reader038.vdocuments.us/reader038/viewer/2022100501/55c36264bb61eb7e498b464f/html5/thumbnails/2.jpg)
Analysis Phase:Man Power Demand & Supply Analysis
Time SlotMonthly Average
Utilization
Monthly Inverval based
Capacity
Procedure Daily
Average
Man Power Per Procedure
Demand
Designated Supply
Proposed Supply
7 AM to 8 AM
5 ? 0.2 3 1 4 3
8 AM to 9 AM
? 0.72 3 2 4 3
9 AM to 10 AM
? 0.5 3 2 4 3
10 AM to 11 AM
? 0.5 3 2 4 5
11 AM to 12 PM
? 0.4 3 1 4 5
12 AM to 1 PM
26 ? 1.04 3 3 4 5
1 PM to 2 PM
22.5 ? 0.9 3 3 4 5
2 PM to 3 PM
19 ? 0.76 3 2 4 5
3 PM to 4 PM
? 0.58 3 2 3 4
4 PM to 5 PM
? 0.58 3 2 3 4
5 PM to 6 PM
? 0.56 3 2 3 4
6 PM to 7 PM
? 0.36 3 1 3 3
7 PM to 8 PM
4.5 ? 0.18 3 1 3 3
> than 8 PM 1.5 ? 0.06 3 0 3 3
7 AM to 8 AM
8 AM to 9 AM
9 AM to 10 AM
10 AM to 11 AM
11 AM to 12 PM
12 AM to 1 PM
1 PM to 2 PM
2 PM to 3 PM
3 PM to 4 PM
4 PM to 5 PM
5 PM to 6 PM
6 PM to 7 PM
7 PM to 8 PM
> than
8 PM
0
1
2
3
4
5
6
DemandDesignated SupplyProposed Supply
![Page 3: Lean Consulting Proposal](https://reader038.vdocuments.us/reader038/viewer/2022100501/55c36264bb61eb7e498b464f/html5/thumbnails/3.jpg)
Process Flow Analysis
![Page 4: Lean Consulting Proposal](https://reader038.vdocuments.us/reader038/viewer/2022100501/55c36264bb61eb7e498b464f/html5/thumbnails/4.jpg)
Stake Holder & Root Cause Analysis
Under Utilization of Cathlab
Bio Medical & Systems
Billing & AdmissionCathlab
Man Investigations Lab Marketing
![Page 5: Lean Consulting Proposal](https://reader038.vdocuments.us/reader038/viewer/2022100501/55c36264bb61eb7e498b464f/html5/thumbnails/5.jpg)
Control Impact Matrix – Derived from Root Cause Analysis
Solution Phase:
3W-1H Analysis
?? ?? ?? ?? ?
Exceptions Encountered - Admissions
$$$$ dependency & No $$$ of encountered
exceptions.$$$$ Admissions Executives 10-Jun-14
Capacity/Marketing Targets Mismatch
XXXXX targets defined for Marketing executives.
Redfine Marketing targets for executives. Utilize internal conversion database for achieving
targets.
Medical Marketing - Unit Head
20-Jun-14
Benefits Accrued:
1. 10% Increase in Cath Lab Capacitya. Translates to Approx. Rs. 57,00,000/- Per Annum
2. Verified manpower shortage for operations with Demand/Supply Analysisa. Concluded department was overstaffed.b. Reduced Approx. Rs. 3,00,000/- Per Annum for Projected Additional Man Power
Resource.3. Reduced Total Cycle Time for SRL Laboratories, Subsidiary of Fortis Healthcare.
a. Achieved Approx. 29% Improvement in Turn Around Time.
None of the above required additional investment and all suggestions were implemented with Near Zero Cost.