· lbg-guyton prepared the progress report for november services. task 3 lbg-guyton reviewed and...

2

Upload: others

Post on 15-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · LBG-Guyton prepared the progress report for November services. TASK 3 LBG-Guyton reviewed and revised stratigraphic picks for consistency (elevations and thickness). TASK 6 LBG-Guyton
Page 2:  · LBG-Guyton prepared the progress report for November services. TASK 3 LBG-Guyton reviewed and revised stratigraphic picks for consistency (elevations and thickness). TASK 6 LBG-Guyton