layher - scaffold usa · 2018. 2. 9. · layher ® more possibilities. the scaffolding system....

40
Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction Made of hot-dip-galvanised steel or aluminium General construction approvals Z-8.1-16.2, Z-8.1-840 and Z-8.1-844 Certification according to DIN ISO 9001/EN 29 001 by TÜV-CERT Fast. Safe. Complete. SpeedyScaf®

Upload: others

Post on 06-Mar-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

Layher®

M o r e P o s s i b i l i t i e s . T h e S c a f f o l d i n g S y s t e m .

Layher SpeedyScaf® SystemTechnical Brochure

The standard system for scaffolding construction

Made of hot-dip-galvanised steel or aluminium

General construction approvalsZ-8.1-16.2, Z-8.1-840 and

Z-8.1-844

Certification according toDIN ISO 9001/EN 29 001

by TÜV-CERT

Fa

st

.

Sa

fe

.

Co

mp

le

te

.

Spe

edyS

caf®

0840_01_10_GB 30.03.2005 13:44 Uhr Seite 1

Page 2: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

2

More possibi l i t ies. With the original .

Simple technology with a convincing

mix of perfected and detailed solutions:

� uncomplicated insertion system

for fast and effortless assembly,

� just a few basic elements,

� logical expansion possibilities

and rapid extendability,

� complete safety including during

assembly,

� ergonomically advantageous

and easy to handle,

� minimum maintenance.

With just 6 basic elements and a

few manual operations, this classic

Layher equipment will “speedily”

provide a secure platform for all

work. Established on the market

for several decades as the frame

scaffolding equipment that leads the

field, you can cater for almost every

requirement with this unbeatably

lightweight yet sturdy and stable

system:

With the maximum safety that comes

from building authority approvals for

SpeedyScaf 0.73 m wide in steel,

SpeedyScaf 0.73 m wide in aluminium,

SpeedyScaf 1.09 m wide in steel, in

Germany and many other countries

all over the world.

In addition to the comprehensive

engineering concept, perfected down

to the last detail, and the proven

precision production methods used

by Layher, a delivery availability,

stock capacity and after-sales

service that are second to none will

provide you with further support.

the guard rail

the toe board

the scaffolding deck

the diagonal brace

the assembly frame

the adjustable base plate

The sum of all advantages cleverly

combined: that’s the secret behind

the success of Layher SpeedyScaf® –

and hence the secret behind the

success of every single user – every

single day.

Layher SpeedyScaf®: So simple.

0840_01_10_GB 30.03.2005 13:44 Uhr Seite 2

Page 3: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

The firmly wedged diagonal provides

the scaffolding with the necessary

safety thanks to dependable bracing:

simply insert it at the top and fix it at

the bottom using the wedge coupler.

Verticality is always quick to fix,

though the inclination of the frame

can be adjusted according to the

building tolerances.

All Layher scaffolding decks – which

double as a work surface and as a

dependable self-reinforcement –

always provide a safe working area

even at highest heights and in

difficult weather conditions.

3

0840_01_10_GB 30.03.2005 13:44 Uhr Seite 3

Page 4: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

4

Layher SpeedyScaf, a perfected and

complete system for all building

requirements. That means safety and

speed in any application, at any site

and in any conditions.

The assembly frames determine the

scaffolding width, with the other

system parts being suitable for all

scaffolding widths and forming the

basis for maximum versatility:

Scaffolding, 0.73 m wide,steel, hot-dip-galvanised:As facade scaffolding for both

scaffolding contractors and for

craftsmen, for any jobs, outdoors or

indoors.

Scaffolding, 0.73 m wide,durable aluminium:As facade scaffolding for all

professionals who like to have it

easy. Lightweight scaffolding means

fast and non-fatiguing assembly and

dismantling, and transport using

lighter vehicles.

Scaffolding, 1.09 m wide,steel, hot-dip-galvanised:As facade scaffolding – with frame

1.09 m wide – for all jobs calling for

wide scaffolding and high load-

bearing capacities.

The optimised-for use and sturdy

scaffolding decks can be selected to

suit your particular requirements

from a wide range, to fit scaffolding

bay lengths of 1.57 m, 2.07 m, 2.57 m,

3.07 m and 4.14 m (type-tested).

Layher SpeedyScaf®: So variable.

0840_01_10_GB 30.03.2005 13:45 Uhr Seite 4

Page 5: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

5

The wedge locking system for the

guard rails sits firmly, helps stiffen the

structure, and enhances the feeling of

safety.

All the connections in the system are

bolt-free – just insert. That's economy

in its purest form.

One of the main advantages of

SpeedyScaf is the simplicity of its

assembly and dismantling. Simplicity

means time savings and hence cost

savings and bigger profits. That's an

effect much appreciated by scaffolding

contractors and by craftsmen alike.

The Layher scaffolding decks are

simply hooked into the channel section

on the frame; that means very fast

assembly with optimum safety – and

there's a free choice of decks made

from steel, aluminium and wood;

for any application.

5

0840_01_10_GB 30.03.2005 13:45 Uhr Seite 5

Page 6: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

6

Perfect and efficient details are the trademark

of Layher SpeedyScaf equipment:

One-piece decks for the 0.73 m wideSpeedyScaf have 3 claws on each side.That ensures secure assembly.

Diagonal braces are fitted in every fifthbay.

For internal access, you can choosebetween decks with separate or integratedladder.

Internal guard rails are quickly fitted usingadditional wedge housings.

Besides standard anchoring using theSpeedyScaf wall ties, additional ties canbe provided to prevent lateral movement.

Rapid levelling thanks to easy-actionadjustable base plate with self-cleaning thread and hand-friendly wing nut, with protection against spindle over-extension.

SpeedyScaf is also available with specialbrick guards, plus protective fans, bracketsand so on, for time-saving extension meas-ures and short-notice special solutions.

SpeedyScaf can be easily widened inwardsor outwards with brackets. Side protectionand if necessary support struts for the bracket area are all standard parts.

For individual solutions, tubes with couplerscan be attached at any time to the assemblyframe.

Steel or aluminium lattice girders are available for bridging gaps in scaffolding.

Layher SpeedyScaf®: So perfect…

0840_01_10_GB 30.03.2005 13:47 Uhr Seite 6

Page 7: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

7

…for safe working.

According to German approval,

an erection height of 24.4 m

(platform height) is possible.

Type tests have been passed for

erection heights up to 80 m.

Greater erection heights are

covered with individual verification

of structural strength.

According to German approval,

an erection height of 24.25 m

(platform height) is possible.

Greater erection heights are

covered with individual verification

of structural strength.

According to German approval,

an erection height of 24.4 m

(platform height) is possible.

Greater erection heights are

covered with type calculation or

with individual verification of

structural strength.

SpeedyScaf, 0.73 m wide,steel, hot-dip-galvanised.up to scaffolding group 3,

as per DIN 4420 / HD 1000.

Building authority approval under

Z-8.1-16.2

SpeedyScaf, 0.73 m wide,aluminium,up to scaffolding group 3,

as per DIN 4420 / HD 1000.

Building authority approval under

Z-8.1-844

SpeedyScaf, 1.09 m wide,steel, hot-dip-galvanised,for scaffolding groups 4 – 6,

as per DIN 4420 / HD 1000.

Building authority approval under

Z-8.1-840

Type testing, test No. Ty 9/96

Type testing by the Inspection Office

for Structural Engineering Statics in

Stuttgart relates to 10 standard

versions of Layher SpeedyScaf 70 in

steel with platform heights of up

to 80 m.

Structural calculations are available

for other special extension versions.

0840_01_10_GB 30.03.2005 13:47 Uhr Seite 7

Page 8: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

8

SpeedyScaf System – individual partsAssembly frames in practical dimensions form, together with user-friendly accessories, the SpeedyScaf system. All parts

come from Layher's own certified production and are subject to continual quality checks in every production phase.

Thanks to the large stocks kept at the plant and at the many delivery warehouses, dependable availability is

assured.

Assembly Frames

Euro Assembly Frame,steel, hot-dip-galvanised2.0 x 0.73 m (standard frame)1.5 x 0.73 m (adjustment frame)1.0 x 0.73 m (adjustment frame)0.66 x 0.73 m (adjustment frame)

Euro Assembly Frame,aluminium2.0 x 0.73 m (standard frame)1.0 x 0.73 m (adjustment frame)0.66 x 0.73 m (adjustment frame)

Euro Assembly Frame,steel, hot-dip-galvanised2.0 x 1.09 m (standard frame)1.5 x 1.09 m (adjustment frame)1.0 x 1.09 m (adjustment frame)0.66 x 1.09 m (adjustment frame)

Euro Assembly Framefor balustrade,steel, hot-dip-galvanised2.0 x 0.73 m

Euro Assembly Frame,steel, hot-dip-galvanised2.0 x 0.36 m

Gantry frame,steel, hot-dip-galvanised2.2 x 1.5 m

Diagonal Braces

Diagonal bracewith wedge half-couplerfor bay lengths of 2.07 m – 3.07 m

or with 2 half-couplersfor bay lengths of 1.57 m, 4.14 m

Detail of wedge half-coupler

Base ledgerwith 2 wedge half-couplersfor bay lengths of 2.07 m – 3.07 m

A complete list of all individual parts and further expansion partscan be found in our catalogues and price lists for SpeedyScaf andaccessories for scaffolding construction.

0840_01_10_GB 30.03.2005 13:47 Uhr Seite 8

Page 9: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

9

Guard Rails, Toe Boards

Single guardrail, steelLength 0.73 m – 3.07 m

Double guardrail, steel or aluminiumLength 1.57 m – 4.14 m

Single end guardrailLength 0.73 m, 1.09 m

Double end guardrailLength 0.73 m, 1.09 m

Toe board, for longitudinal sideLength 0.73 m – 4.14 m

Toe board, for endsLength 0.73 m, 1.09 m

Base Plates

Base plate,Height 0.11 m

Adjustable base 60Height 0.6 m Adjustable base 80Height 0.8 m

Adjustable base 60, swivellingHeight 0.6 m

Adjustable base plate 150Height 1.5 m

Scaffold Decks, Access Decks

Steel deck, 0.32 m wideLength 0.73 m – 4.14 m

Robust deck, 0.61 m wideLength 0.73 m – 3.07 m

Stalu deck, 0.61 m wideLength 1.57 m – 3.07 m

Laminated wood deck, 0.32 m wideLength 1.57 m – 3.07 m

Robust access deck, 0.61 m wideLength 1.57 m – 3.07 m

Access ladder for access deckLength 2.15 m

Steel plank, 0.3 m wideLength 1.0 m – 2.5 m; 45 mm high

Robust access deck, 0.61 m wide,with integrated access ladderLength 2.57 m, 3.07 m

Aluminium access deck, 0.61 m wide,with integrated ladderLength 2.57 m, 3.07 m

0840_01_10_GB 30.03.2005 13:47 Uhr Seite 9

Page 10: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

10

Console Brackets

Console bracketWidth 0.22 m

Console bracketWidth 0.36 m

Console bracketWidth 0.50 m

Console bracketWidth 0.73 m

Console bracket, swivellingWidth 0.73 m

Console bracketWidth 1.09 m

Protection Fans / Pedestrian Protection

SpeedyScaf Roof guardHeight 1.0 m, length 1.57 – 3.07 m

Protection netHeight 2 m, length 10 m

Brick guard support0.36 m / 0.5 m / 0.73 mHeight 2 m, use on assemblyframe 0.73 m and brackets0.36 m, 0.5 m and 0.73 m

Fan supportWrench size 19 or 22 mm

Scaffold Anchoring

SpeedyScaf wall tieLength 0.69 m

Wall tieLength 0.38 m, 0.95 m, 1.45 m

Top Scaffold Level

Top intermediate frameWidth 0.73 msteel or aluminium

Width 1.09 msteel

Top end frameWidth 0.73 msteel or aluminium

Width 1.09 msteel

Guardrail post, single,with guard rail wedge housing,for bracket, 0.36 m wide,steel or aluminium

SpeedyScaf System – individual parts

0840_01_10_GB 30.03.2005 13:47 Uhr Seite 10

Page 11: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

11

Scaffold Accessories

Aluminium Bridging-ledgerLength 2.57 m, 3.07 m

Intermediate transomLength 0.73 m, 1.09 m

Intermediate transomLength 0.73 m

U-transom with spigotsand half-couplerLength 0.73 m

Spigot Height 0.2 m

External Stairway Access

Aluminium platform stairsfor bay lengths 2.57 m and 3.07 m

Starter U-transomLength 0.73 m

Stair guardrailfor bay lengths 2.57 m and 3.07 m

Internal guardrail

Alu Stage 600

Length 3.18 mLength 4.12 mLength 4.75 mLength 5.2 mLength 6.15 m

Length 7.1 mLength 8.0 mLength 9.1 mLength 10.0 m

Length 5.1 mLength 7.3 mLength 9.15 m

Scaffold Couplers

Double couplerSwivel coupler

Squared timber couplerClamp coupler

SpeedyScaf System – general components

A complete list of all individual parts and further expansionparts can be found in our catalogues and price lists forSpeedyScaf and accessories for scaffolding construction.

Unit beams for general use

Steel unit beam, 45 cm highLength 2.0 mLength 3.0 m, with type-testingLength 4.0 m, with type-testingLength 5.0 m, with type-testingLength 6.0 m, with type-testing

Aluminium unit beam, 45 cm highLength 2.0 mLength 3.0 mLength 4.0 mLength 5.0 mLength 6.0 mLength 8.0 m

Alu Stage 600 Alu Stage 600, folding

0840_11_20_GB 30.03.2005 13:40 Uhr Seite 11

Page 12: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

12

General Component List

Tab. 1 SpeedyScaf: General Component List

Art. No. Designation H (L) x W [m] Weig. [kg]3835.073 Robust deck 0.73 x 0.61 7.23835.109 1.09 x 0.61 9.73835.157 1.57 x 0.61 13.13835.207 2.07 x 0.61 16.43835.257 2.57 x 0.61 20.43835.307 3.07 x 0.61 25.03850.157 Stalu deck, unperforated 1.57 x 0.61 12.13850.207 2.07 x 0.61 15.33850.257 2.57 x 0.61 18.53850.307 3.07 x 0.61 21.63818.157 Laminated wood deck 1.57 x 0.32 10.53818.207 2.07 x 0.32 13.53818.257 2.57 x 0.32 19.53818.307 3.07 x 0.32 24.93838.257 Robust access deck,

with integratedd access ladder2.57 x 0.61 25.2

3838.307 3.07 x 0.61 29.03837.157 Robust access deck 1.57 x 0.61 14.23837.207 2.07 x 0.61 17.23837.257 2.57 x 0.61 20.53837.307 3.07 x 0.61 24.63852.257 Aluminium access

with integrated ladder2.57 x 0.61 26.6

3852.307 3.07 x 0.61 30.54005.007 Access ladder 2.15 x 0.35 8.71745.319 Console bracket 0.36 3.51744.519 0.5 5.81744.719 0.73 6.41744.119 1.09 9.41719.073 Top intermediate frame, steel 1.0 x 0.73 7.91769.073 Top intermediate frame, aluminium 1.0 x 0.73 2.71719.109 Top intermediate frame, steel 1.0 x 1.09 8.51722.073 Top end frame, steel 1.0 x 0.73 13.31770.073 Top end frame, aluminium 1.0 x 0.73 4.61722.109 Top end frame, steel 1.0 x 1.09 14.91716.000 Guardrail post, single, steel 1.0 x 0.36 5.51768.000 Guardrail post, single, aluminium 1.0 x 0.36 2.41749.157 SpeedyScaf roof guard 1.0 x 1.57 15.51749.207 1.0 x 2.07 17.71749.257 1.0 x 2.57 21.11749.307 1.0 x 3.07 24.41748.000 Brick guard support 2.0 x 0.73 12.11773.019 Fan support 3.3 18.94923.073 Intermediate transom 0.73 3.14923.109 1.09 4.34924.073 Intermediate transom 0.73 6.51766.719 U-transom with spigot and half-coupler 0.73 5.50700.367 SpeedyScaf bridging ledger 3.07 22.01775.257 Aluminium bridging ledger 2.57 8.51775.000 Spigot 3.07 22.01751.257 Aluminium platform stairs 0.2 1.81751.307 3.07 x 0.64 27.51751.073 Starter U-transom 0.73 3.81752.257 Stair guardrail 2.57 16.11752.307 3.07 17.61752.000 Internal guardrail 14.8

Tab. 1 SpeedyScaf: General Component List

Art. No. Designation H (L) x W [m] Weig. [kg]1700.200 Euro Assembly Frame, steel 2.0 x 0.73 18.81700.150 1.5 x 0.73 15.81700.100 1.0 x 0.73 11.41700.066 0.66 x 0.73 9.31701.200 2.0 x 1.09 24.51704.150 Gantry frame 2.2 x 1.5 34.91718.200 Euro Speedy Frame, balustrade 2.0 22.71724.073 Guardrail 0.73 1.41724.109 1.09 2.01725.157 1.57 3.31725.207 2.07 4.41725.257 2.57 5.61725.307 3.07 6.21728.157 Double guardrail, steel 1.57 7.91728.207 2.07 9.81728.257 2.57 11.71728.307 3.07 14.11728.414 4.14 21.01732.157 Double guardrail, aluminium 1.57 3.51732.207 2.07 4.61732.257 2.57 5.81732.307 3.07 6.71725.073 Single end guardrail 0.73 2.81725.109 1.09 3.51728.719 Double end guardrail 0.73 4.41728.119 1.09 5.61756.073 Toe board, for longitudinal side 0.73 x 0.15 1.61756.109 1.09 x 0.15 2.41756.157 1.57 x 0.15 3.11756.207 2.07 x 0.15 4.71756.257 2.57 x 0.15 6.11756.307 3.07 x 0.15 6.81756.414 4.14 x 0.15 10.31757.073 Toe board, for ends 0.73 x 0.15 2.11757.109 1.09 x 0.15 2.31736.207 Diagonal brace 2.8 7.01736.257 3.2 7.81736.307 3.6 8.81727.207 Base ledger 2.07 8.01727.257 2.57 10.01727.307 3.07 12.01755.069 SpeedyScaf wall tie 0.69 3.01754.038 Wall tie 0.38 1.61754.095 0.95 3.71754.145 1.45 5.74001.000 Base plate 0.11 1.04001.060 Adjustable base 60 0.6 3.64002.080 Adjustable base 80 0.8 4.94003.000 Adjustable base 60, swivelling 0.6 6.14002.130 Adjustable base plate 1.50 1.5 10.03802.073 Steel deck 0.73 x 0.32 6.13802.109 1.09 x 0.32 8.63802.157 1.57 x 0.32 11.93802.207 2.07 x 0.32 15.43802.257 2.57 x 0.32 18.73802.307 3.07 x 0.32 22.23802.414 4.14 x 0.32 32.0

Further accessories can be found in the SpeedyScaf Catalogue and in the Scaffolding Accessories Catalogue.

0840_11_20_GB 30.03.2005 13:40 Uhr Seite 12

Page 13: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

13

Scaffolding Decks

● Approved for this scaffolding group.

– Not approved for this scaffolding group.

Tab. 2a Steel decks

Scaffolding group as per DIN 4420 /

HD 1000

Steel deck, 0.32 m Art. No. 3802

Steel deck, 0.19 m Art. No. 3801

Access steel deck Art. No. 3813

1.57 2.07 2.57 3.07 4.14 1.57 2.07 2.57 3.07 2.07 2.57perm.q1) [kN/m2] 18.0 11.4 7.5 5.0 2.0 30.7 17.4 11.2 7.8

1 • • • • • • • • • • •2 • • • • • • • • • • •3 • • • • • • • • • • •4 • • • • – • • • • • •5 • • • – – • • • – – –6 • • – – – • • – – – –

Roof brick guard andstandard brick guard

• • • • • – – – – • •

Tab. 2b Robust decks

Scaffolding group as per DIN 4420 /

HD 1000

Robust deck, 0.61 m Art. No. 3835

Robust deck, 0.32 m Art. No. 3836

Robust access deck Art. Nos. 3837 + 3838

1.57 2.07 2.57 3.07 1.57 2.07 2.57 3.07 2.07 2.57 3.071 • • • • • • • • • • •2 • • • • • • • • • • •3 • • • • • • • • • • •4 – – – – • • • – – – –5 – – – – • • – – – – –6 – – – – • – – – – – –

Roof brick guard andstandard brick guard

• • • • • • • • • • •

Tab. 2c Aluminium decks, Stalu decks

Scaffolding group as per DIN 4420 /

HD 1000

Aluminium deck, 0.32 m, perforated, Art. No. 3803

Aluminium deck, 0.19 mArt. No. 3824

Stalu deck, 0.61 m, perforated, Art. No. 3849 / unperforated, Art. No. 3850

1.57 2.07 2.57 3.07 4.14 1.57 2.07 2.57 1.57 2.07 2.57 3.071 • • • • • • • • • • • •2 • • • • • • • • • • • •3 • • • • • • • • • • • •4 • • • – – • • • • • • –5 • • – – – • • – • • – –6 • – – – – • – – • – – –

Roof brick guard andstandard brick guard

• • • • • – – – • • • •

Tab. 2d Laminated wood decks

Scaffolding group as per DIN 4420 /

HD 1000

Laminated wood deck, 0.32 m Art. No. 3818

1.57 2.07 2.57 3.071 • • • •2 • • • •3 • • • •4 • – – –5 • – – –6 – – – –

Roof brick guard andstandard brick guard

– – • •

1) Design load qR,d = perm. q x 1,5 (γM= 1.1 is included in the values)

0840_11_20_GB 30.03.2005 13:40 Uhr Seite 13

Page 14: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

14

Assembly

1

2

3

A few basic components, plus useful and well-designed accessories, form the basis for economical scaffolding construction.

Since ergonomic aspects such as handiness and low weight for all components have an effect on the erection time,

the load-bearing capacity and dead weight of the parts have been optimally matched to one another.

Assembly with basic components1 Base out by laying the guardrails alongside the facade;this marks the assembly position of the scaffolding. No measurement work for setting out is necessary. Place the adjustable base plates at the required distancefrom the wall on a load-distributing surface. Hang the U starter transom (only in the ladder access bay) from theadjustable base plates, then insert the deck. Set up thefirst two assembly frames and connect them to the guardrail.

2 Place the deck in these assembly frames. Using a spirit level on the guard rail, align the scaffolding bay longitudinally by appropriate spindle adjustment.Then vertically adjust the assembly frame in its axis. Insert and fix the diagonal brace. Aligning the wedgehalf-coupler with the marker hole (Euro Speedy Frame)achieves a perpendicular alignment transversely to the frame axis. A horizontal strut is needed only in the diagonal bay. Place the next assembly frame on the base plates, connect with the guard rail and insert the deck.

3 Next, assemble the adjacent scaffolding bays, withthe sequence of the work always remaining the same:

� Place assembly frame on the base plates� Attach guard rail� Insert deck

Align the scaffolding bays, beginning at the bay next to the already aligned first bay.Insert and fix the diagonal braces – each further brace provides stiffening for 5 scaffolding bays – as described, either in same direction or in zigzag form.

0840_11_20_GB 30.03.2005 13:40 Uhr Seite 14

Page 15: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

15

Assembly with basic components4 In the next scaffolding level start with the first scaffolding bay. The further working steps are repeated on every scaffolding level:

� Set up assembly frame� Attach guard rail� Insert deck� Insert toe board� Insert and fix diagonal brace

Ladders are arranged in an offset pattern. Constructthe scaffolding level in the same way as the lower level. Install any anchoring necessary straight away.This is the only way to ensure the stability of the scaffolding during actual assembly.

5 On the top level, insert end guard rail supports andthe three-piece side protection (guard rails and toeboard).

6 Depending on local regulations, a guard rail mustbe provided ahead of the rest of the structure duringassembly. This rail is assembled bay by bay from thealready secured scaffolding level.

4

5

6

0840_11_20_GB 30.03.2005 13:40 Uhr Seite 15

Page 16: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

16

Assembly

Standard assemblySimple, safe, fast and very strong – those are the requirements placed on modern scaffolding: SpeedyScaf meets all

these requirements. With its basic components – assembly frame, adjustable base plates, scaffolding decks, guardrails,

diagonal braces and toe boards – scaffolding is assembled for the facade in a logical sequence. Depending on the roof

projection, optimum adjustment is achieved using console brackets.

0840_11_20_GB 30.03.2005 13:41 Uhr Seite 16

Page 17: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

17

Gable scaffoldingAlignment and assembly

Console bracket 0.5 m / 0.73 m

9 By installing 0.5 m (or 0.73 mbrackets with bolted-on spigot),the existing bay width can bereduced by 0.5 m.

7 For gable scaffolding, the middlescaffolding bays (preferably the access bays) are aligned with the ridge.

Further assembly, usually symmetrical,follows on both sides.

The scaffolding is optimally adjustedto the roof angle by appropriateselection of the bay lengths.

Aluminium Bridging-ledger

8 For large roof overhangs, the installation of aluminium bridgingledgers is ideal. Spigots on alu-minium bridging ledgers hold theassembly frames above them andpermit a step-by-step reduction ofthe bay width.

7

8

9a Reduction with 0.5 m bracket.

9b Alternative: Reductionwith 0.73 m bracket andbolted-on spigot for channelsection.

9b9a

9

0840_11_20_GB 30.03.2005 13:41 Uhr Seite 17

Page 18: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

18

Inside corners12 For a gap-free transition at the corner the frames are positioned flush. In the over-lapping bay, side protection isafforded with a telescopic guard rail or tube and couplers,and with a correspondinglylong toe board.

13 0.36 m bracket on the inside:The corner is closed by thefitting of a corner deck, 0,36 m(special part, Art. No. 0707.308),which helps to maintain the per-missible distance from the wall.

13a View of corner area frombelow.

14 Version with 0.73 m bracketon the outside: If the scaffoldingis widened with a 0.73 m bracketin the closing level, a flat andgap-free transition in the cornerarea is possible in conjunctionwith a 1.57 m long bay fitted atthe end.

14a Version as above,seen from below.

Outside corners

The examples show the standard application. Any length

adjustment needed is performed as shown on page 19.

10 For a gap-free transition at the corner the frames are positioned flush.

10a View from above.

11 Widening at the top level is possible with the use of aswivelling and a fixed brackettogether on one upright tube.This avoids any heightmismatch in the scaffoldingdeck levels.

11a Scaffolding widening,view from below.

Assembly

10

10a

11

11a

12

13

13a

14

14a

0840_11_20_GB 30.03.2005 13:41 Uhr Seite 18

Page 19: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

19

18 Length adjustment at the scaffolding corner depending on the bay lengths: The scaffolding section with the fitted bay is assembled with the level offset by the deck thickness. The deck of the fitted bay is suspended on one side from the assembly frame and on the other side rests on the deck of thesecond scaffolding section.

Length adjustment

17

Height adjustment

15

16 If an assembly framestandard has to be extended,this is done by connecting asteel scaffolding tube usingtwo swivel couplers with aspacing of at least 50 cm.For permissible loading as a function of the height h see table.

16

Tab. 3 Permissible loading as a function of height h

Height h [m] 0.5 0.7 0.9 1.1

Perm. standard load [kN] 9.7 8.5 7.5 6.6

h

≥ 50 cm

18

17 Length adjustment in the middle of the scaffoldingdepending on bay lengths: The scaffolding is positioned left and right, with the fitted bay in approximately the centre of the scaffolding. In the adjustment bay, lapped steel planks or scaffolding boards are used for the deck, with telescopicguard rail or with tubes and couplers fitted as side protection.

15 In the case of inclined terrain, assembly starts at the highestpoint. In conjunction with adjustment frames – 0.66 m, 1.0 mand 1.5 m – problem-free adjustment of the scaffolding to the lieof the ground is possible. The installation of the swivellingadjustable base 60 is recommended for even transmission of the loads.

0840_11_20_GB 30.03.2005 13:41 Uhr Seite 19

Page 20: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

20

Anchoring

The anchoring of the scaffolding is in accordance with

building authority approval or with the individual verification

of structural strength or respective to local regulations.

22 SpeedyScaf wall tie and inclined wall tiewith double coupler

20 V-type wall tie with double coupler

21 Wall tie with connector coupler

19 SpeedyScaf wall tie with double coupler

19

21

20

22

In addition to the required number of anchors, particular care

must be taken that the wall inserts used are suitable for the

base material. A pull-out test must be conducted and

recorded in the appropriate form and for the application in

question.

0840_11_20_GB 30.03.2005 13:42 Uhr Seite 20

Page 21: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

21

23

25

26 Physical tie on steel girder or concrete balustradewith scaffolding tube and double couplers

25 Anchoring with short wall tie

24 Clamping coupler on steel support 23 Allround ledger attached to scaffold with doublecouplers (wedge secures tie in ring)

24

26

0840_21_30_GB 30.03.2005 13:31 Uhr Seite 21

Page 22: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

22

Scaffolding access27 Internal ladder access 27 For scaffolding access, internal ladder access

(standard solution), access decks with integrated or

separate ladder, or external platform stairs are available.

28 The external platform stair access is the appropriate

alternative when craftsmen of various trades are working

on the scaffolding. Decks are provided in full for the

working platform.

29 The SpeedyScaf stairway tower is the preferred

access to higher working areas.

The stairs are installed in parallel (Fig. 28) or alternating

(Fig. 29) directions, and permit rapid and safe access to

the working area.

Application technology

28 External platform stair access (stairs in parallel direction) 29 SpeedyScaf stairway tower (stairs in alternating direction)

0840_21_30_GB 30.03.2005 13:32 Uhr Seite 22

Page 23: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

23

31 The deck in the assemblyframe must be secured by alock against lift-off.

32 A fan provides protectionagainst falling objects. The surfaces must be coveredwith system decks.

Brick guards

Brick guards must be used when there is any risk of slipping onthe roof.

Either brick guards or protection nets can be attached to thebrick guard support.

Building offset

30

33

34

0.5 m

Facades with projections can be scaffolded when scaffoldingsections are offset: The last assembly frame of the innerscaffolding section and the first frame of the outer section are 0.5 m apart. In this way the system lengths can be maintained. A bracket of the appropriate width is attached to the last-but-oneassembly frame of the inner scaffolding section. The remaining inner gap between the assembly frame is covered by a lappedsteel plank.

34 Projections, e.g. oriel windows or balconies, are easily provided with scaffolding using brackets of appropriate length. On the projecting sections decks of the required length (max. 4.14 m),cover the space between the brackets.

0840_21_30_GB 30.03.2005 13:32 Uhr Seite 23

Page 24: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

24

Application technology

35 The assembly frames on the brackets must be secured with locking pins.

37 The side walls of dormers are easily scaffolded usingSpeedyScaf aluminium U-double transoms. Assembly framesfrom the last scaffolding level must be secured with locking pins.

36 Connect lattice girders to the assembly frame and then fastenU transoms (with spigot and half-coupler Art. No. 1766.719) to it.Secure the assembly frames of the last and last-but-one levelsusing locking pins.

38 SpeedyScaf and Allround scaffolding can be combinedthanks to standardized dimensions.

Dormers

Dormers can be quickly and safely scaffolded with

standard material; expensive structures using tubes

and couplers can be dispensed with.

35 36

37 38

0840_21_30_GB 30.03.2005 13:33 Uhr Seite 24

Page 25: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

25

Birdcage scaffolding Gantry frame

43 Gantry frames are used to construct pedestrian passagewaysunderneath scaffolding. Complete covering with scaffolding decksprotects passers-by. The remaining construction can be continuedwith 0.73 m or 1.09 m wide scaffolding. Stiffening of the gantryframes and anchoring of the scaffolding should be in accordancewith German approval.

0.73 m 1.09 m

39 The SpeedyScaf frame for balustrades in use for a dormer.

Dormers 40

41

42

39

43

40 2 m Speedy Frames for balustrades are available forwork on dormers and walls.

41 The SpeedyScaf bridging ledger (special part Art. No. 0700.367) of 2.57 m or 3.07 m length permits rapid and system-conforming construction of birdcage scaffolding. They offer a full-surface scaffolding deck and a permissible load-bearing capacity of 2.0 kN/m2 over the entire surface.

42 An even and gap-free scaffolding deck surface can be obtainedby placing 15 cm long butt tubes on the spigots of the top assemblyframe. The lattice girders are attached to the butts and to theassembly frame standard using double couplers.

In any case, structural strength verification is required for thesupporting scaffolding underneath. Support and additional bracingmust be provided in accordance with structural requirements andwith local conditions.

0840_21_30_GB 30.03.2005 13:33 Uhr Seite 25

Page 26: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

26

Dead weights of the scaffolding

Tab. 4 Dead weights of facade scaffolding per scaffolding bay

Dead weights of facade scaffoldingBay height 2.00 m

Bay length

2,07 m 2,57 m 3,07 m

per level and standard per m2

visiblearea*

per level and standard per m2

visiblearea*

per level and standard per m2

visiblearea*

Deck/system Width Inner standard gi

Outer standard ga

Inner standard gi

Outer standard ga

Inner standard gi

Outer standard ga

[kg] [kg] [kg/m2] [kg] [kg] [kg/m2] [kg] [kg] [kg/m2]

SpeedyScaf, steel 0.73 m

Robust deck 0.61 m 21.5 36.9 8.9 23.5 42.6 8.3 25.8 48.5 7.9

Robust deck 0.32 m 24.8 40.2 9.7 28.0 47.1 9.1 29.3 52.0 8.5

Steel deck 0.32 m 28.7 44.1 10.6 32.0 51.1 9.9 35.5 58.2 9.5

Stalu deck 0.61 m 20.9 36.3 8.8 22.5 41.6 8.1 24.1 46.8 7.6

Stalu deck 0.32 m 22.5 37.9 9.1 24.6 43.7 8.5 26.6 49.3 8.0

Solid wood deck 0.32 m 26.8 42.2 10.2 32.8 51.9 10.1 38.2 60.9 9.9

EuroSpeedy, steel 0.73 m

Robust deck 0.61 m 20.2 35.6 8.6 22.2 41.3 8.0 24.5 47.2 7.7

Robust deck 0.32 m 23.5 38.9 9.4 26.7 45.8 8.9 28.0 50.7 8.3

Steel deck 0.32 m 27.4 42.8 10.3 30.7 49.8 9.7 34.2 56.9 9.3

Stalu deck 0.61 m 19.7 35.1 8.5 21.3 40.4 7.8 22.8 45.5 7.4

Stalu deck 0.32 m 21.2 36.6 8.8 23.3 42.4 8.2 25.3 48.0 7.8

Solid wood deck 0.32 m 25.5 40.9 9.9 31.5 50.6 9.8 36.9 59.6 9.7

Euro Speedy, aluminium 0.73 m

Robust deck 0.61 m 15.1 25.3 6.1 17.1 30.3 5.9 19.4 34.7 5.6

Robust deck 0.32 m 18.4 28.6 6.9 21.6 34.8 6.8 22.9 38.2 6.2

Stalu deck 0.61 m 14.6 24.8 6.0 16.2 29.4 5.7 17.7 33.0 5.4

Stalu deck 0.32 m 16.1 26.3 6.3 18.2 31.4 6.1 20.2 35.5 5.8

SpeedyScaf, steel 1.09 m

Steel deck 0.32 m 39.2 56.8 13.7 44.1 65.5 12.7 49.4 74.3 12.1

Deck frame + deck 1.00 m 42.0 59.7 14.4 51.6 73.0 14.2 54.4 79.4 12.9

* for the outer standard row

1) Toe board can beincluded in computation

2) AB = deck surface

Tab. 5 Scaffolding groups as per DIN 4420 / HD 1000

Scaffoldinggroup

Fig. 1 Fig. 2

Scaffolding groupevenly distributed

load p

Conc. loadp1

0.5 x 0.5 m

Conc. loadp2

0.2 x 0.2 m

Partial area load Minimum width ofdeck surface

pc Partial area

[kN/m2] [kN] [kN] [kN/m2] [m2] [m]1 0.75 1.50 1.00 not required 0.501)

2 1.50 1.50 1.00 not required 0.601)

3 2.00 1.50 1.00 not required 0.601)

4 3.00 3.00 1.00 5.00 (0.4 x AB)2) 0.90

5 4.50 3.00 1.00 7.50 (0.4 x AB)2) 0.90

6 6.00 3.00 1.00 10.00 (0.5 x AB)2) 0.90

perm. bend

perm. f {

≥ 0.20

≤ l / 100≤ 2.50 cm

III

pc

b

p

b

f

Fig. 1 Fig. 2

0840_21_30_GB 30.03.2005 13:33 Uhr Seite 26

Page 27: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

27

Erection height on cantilever brackets

Tab. 6a Steel SpeedyScaf 0.73 m with 0.73 m bracket, scaffolding group 3: 2.0 kN/m2

Type of strengthening Diagonal brace with swivel couplers, with section brace

Deck Steel deck Alu deck, perforated

Robust deck Solid woodframe board

Bay width [m] 2.57 3.07 2.57 3.07 2.57 3.07 2.57 3.07

Number of levels 4 3 5 3 5 3 4 2

Type of strengthening Scaffolding tube diag. brace with double couplers + longitudinal tube

Deck Steel deck Alu deck, perforated

Robust deck Solid woodframe board

Bay width [m] 2.57 3.07 2.57 3.07 2.57 3.07 2.57 3.07

Number of levels 11 9 14 11 14 11 11 8

Type of strengthening Scaffolding tube diagonal brace with double coupler+ outer coupler + longitudinal tube

Deck Steel deck Alu deck, perforated

Robust deck Solid woodframe board

Bay width [m] 2.57 3.07 2.57 3.07 2.57 3.07 2.57 3.07

Number of levels 22 19 27 23 28 23 21 17

Tab. 6b Steel SpeedyScaf 1.09 m with 1.09 m bracket, scaffolding group 4: 3.0 kN/m2

Type of strengthening Scaffolding tube diag. brace with double coupler + longitudinal tube

Deck Steel deck Solid wood frameboard

Deck frame withwood deck

Bay width [m] 2.57 3.07 2.57 3.07 2.57 3.07

Number of levels 3 – 2 – 2 –

Type of strengthening Scaffolding tube diagonal brace with double coupler+ outer coupler + longitudinal tube

Deck Steel deck Solid wood frameboard

Deck frame withwood deck

Bay width [m] 2.57 3.07 2.57 3.07 2.57 3.07

Number of levels 9 9 8 4 8 5

For scaffolding group 3, the following applies:

Z = D = Qa x 0.73 / 2 = kN

Qa = Ga + Pa = kN

Pa1) = 2.4 kN for L3) = 2.57m

Pa1) = 2.8 kN for L3) = 3.07m

Ga = ga x n

For scaffolding group 4, the following applies:

Qa = Ga + Pa = kN

Pa2) = 3.6 kN for L3) = 2.57m

Pa2) = 4.2 kN for L3) = 3.07m

Ga = ga x n

ga as per table page 26

n number of levels on thebracket

1) Pa useful load (2.0 kN/m2) from loading on 1.5 levels

2) Pa useful load (3.0 kN/m2) from loading on 1.5 levels

3) L bay widthThe anchoring and the scaffolding underneath the bracket must in any case be structurally verified.

* The calculated anchor forces result solely from the vertical load, withoutthe additional influence of the wind load. Wind loadings alsohave to be considered.

Calculating the anchor forces*(working loads)

– simplified verification

Qi

Z

D

Qa

0840_21_30_GB 30.03.2005 13:33 Uhr Seite 27

Page 28: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

28

Application technology

Bridging with framework structure

Gable bridging with 0.45 m or 0.75 m lattice girder

Tab. 7a Lattice girder 0.45 m / 0.75 m

Steel lattice girder 0.45 mwith type-testing

Heavy-duty lattice girder

0.75 m

Spacing c [m] of lateralcompression chord support

1.2 1.3

Number of levelsas a function of the span llattice girder 1)

l = 8.0 m (3 x 2.57 m)

14 20

l = 10.5 m(4 x 2.57 m)

3 12

Live load 2.0 kN/m2 on 1.5 levels

Lattice girder anchoring every 2.57 m

Scaffolding anchoring according to approval

Cable routing on SpeedyScaf scaffolding system 70 steel

Tab. 7b Framework bridging

Span [m]

12.85 15.42 17.99 20.56

Spacing c [m] of lateralcompression chord support

1.2 m 1.2 m 1.2 m 1.2 m

Number of levels 1) 16 10 6 4

Supporting force of lattice girder [kN] (working load)

28.5 24.9 22.0 21.2

Live load 2.0 kN/m2 on 1.5 levels

Lattice girder anchoring / top chord

every 2.57 m

Scaffolding anchoring according to approval

2 lattice girders must be connected at their top chord with swivel couplers, and at the bottomchord with 1 m tubes and double couplers.

Cable/line weight approx. 15 kg/m. Spread approx. 8 kNof ballast provided by others oneach side of the road. Secureframe joints with locking pins.

Max. 11 m

ca. 4

.70

m

1) Above the bridging.2) The scaffolding underneath the bridging must be design checked.

c c

c c

Detail A

Section I– I

Version with type-tested steel lattice girders 0.45 m.1) Above the bridging.2) The scaffolding underneath the bridging must be design checked.

All connections as per details A and B with double and outer coupler.

A B

Detail B

≈ 1,80 m

I I

44

45

46

0840_21_30_GB 30.03.2005 13:33 Uhr Seite 28

Page 29: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

29

Removal or attachment of scaffolding bays

The Alu Stage 600 with a max. length of 10 m is used for bridging in work* 47 and safety 48 scaffolding structures. With a permissible loading capacity of 2.0 kN/m2 upto 7 m and 1.5 kN/m2 up to 10 m length it meets all the requirements placed on work andsafety scaffolding. Up to 9.15 m length the staging is also available as a folding variant.

* If only the top layer of the work scaffolding is used, the toe boards can be dispensed with in the lower levels;comply to local regulations.

48a Attachment of the brick guard support.

48b Alu stages are secured withsquared-timber couplers againstshifting and tilting.

Alu Stage 60047 48 48a

48b 48a

48b

With SpeedyScaf, it is easy to attach or remove individual scaffolding bays. Thescaffolding frame is, once the deck has been slightly lifted � tilted slightly outwards �and the deck to be removed is, while still suspended on the other side � set down on the existing scaffolding deck �. The deck can now be simply detached (Fig. 49d).Attachment is in the reverse sequence.

49a 49b 49c

49d

0840_21_30_GB 30.03.2005 13:33 Uhr Seite 29

Page 30: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

30

Use of niche bracket, 0.36 m, “hook over”(Art. No. 4005.036)

Tab. 8c Scaffolding groups for arrangements E and F

Bracket baylength LK [m]

Bay length LF [m]

1.09 1.57 2.07 2.57 3.07

0.73 3 3 3 3 3

1.09 – 3 3 3 3

1.57 – – 3 3 3

2.07 – – – 3 3

2.57 – – – – 3

Arrangement D: For all combinations of bay lengths and the bracket bay length LK scaffolding group 3 applies.

D

E

F

LF

LF

LF

LK

LK

LK

a

0.36 m

0.36 m

0.36 m

Niche brackets, hook-over

Tab. 8a Scaffolding groups for arrangement A

Bracket baylength LK [m]

Bay length LF [m]

1.09 1.57 2.07 2.57 3.07

0.73 3 3 3 3 3

1.09 3 3 3 3 3

1.57 3 3 3 3 –

2.07 3 3 3 – –

2.57 3 3 2 – –

3.07 3 3 2 – –

Tab. 8b Scaffolding groups for arrangements B and C

Bracket baylength LK [m]

Bay length LF [m]

1.09 1.57 2.07 2.57 3.07

0.73 3* 3 3 3 3*

1.09 – 3* 3 3 3**

1.57 – – 3* 3 –

2.07 – – – 3* 3*

2.57 – – – – 3** Scaffolding group 3 for arrangement B with a ≤ 30 cm and C.** Scaffolding group 3 only permissible for arrangement C.

a ≤ LK

a = 0

a ≤ LF - LK

A

B

LF

LF

LF

LK

LK

LK

a

a

0.73 m

0.73 m

0.73 m

C

Use (vertically adjustable) of niche bracket, 0.73 m, “hook over” (Art. No. 4005.073)

0840_21_30_GB 30.03.2005 13:33 Uhr Seite 30

Page 31: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

31

LF

LF

LF

LK

LK

LK

a

0.36 m

0.36 m

0.36 m

Tab. 8f Scaffolding groups for arrangements K and L

Bracket baylength LK [m]

Bay length LF [m]

1.09 1.57 2.07 2.57 3.07

0.73 3 3 3 3 3

1.09 – 3 3 3 3

1.57 – – 3 3 3

2.07 – – – 3 3

2.57 – – – – 3

Arrangement J: For all combinations of bay lengths and the bracket bay length LK scaffolding group 3 applies.

J

K

L

Use of niche bracket, 0.36 m, “curved”(Art. No. 4006.036)

Niche brackets, curved

Tab. 8d Scaffolding groups for arrangement G

Bracket baylength LK [m]

Bay length LF [m]

1.09 1.57 2.07 2.57 3.07

0.73 3 3 3 3 3

1.09 3 3 3 3 3

1.57 3 3 3 2 –

2.07 3 3 2 – –

2.57 3 2 1 – –

3.07 2 1 1 – –

Tab. 8e Scaffolding groups for arrangements H and I

Bracket baylength LK [m]

Bay length LF [m]

1.09 1.57 2.07 2.57 3.07

0.73 3 3 3 3 3*

1.09 – 3 3 3 2**

1.57 – – 3 2 –

2.07 – – – 3 –

2.57 – – – – 2* Scaffolding group 3 for arrangement H with a ≤ 40 cm and I.** Scaffolding group 2 only permissible for arrangement I.

a ≤ LK

a = 0

a ≤ LF - LK

LF

LF

LF

LK

LK

LK

a

a

0.73 m

0.73 m

0.73 m

G

H

I

Use of niche bracket, 0.73 m, “curved” (Art. No. 4006.073)

0840_31_40_GB 30.03.2005 13:36 Uhr Seite 31

Page 32: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

H

a

L

L ≥ a

32

50a Tube raker50b Second scaffolding

section as buttress50c Projecting scaffolding bay

as buttress

Freestanding scaffolding

Tab. 9 Basic rules for erection

In the open H–a ≤ 3–1

Hmax. = 12 m

In closed areas H–a ≤ 4–1

Hmax. = 20 m

Freestanding scaffolding is required when it cannot or

may not be anchored to the facade.

Here the basic rules of standard DIN 4420, Section 5.4,

must be complied with.

In the open: up to a maximum platform height of 12 m

the ratio of height to smallest base side length must not

exceed 3:1.

In closed areas: up to a platform height of 20 m the ratio

of height to smallest base side length must not exceed 4:1.

The ratios quoted apply only for scaffolding

with steel assembly frames.

50a

51

50b

50c

50c

Plan view

Section

0840_31_40_GB 30.03.2005 13:36 Uhr Seite 32

Page 33: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

33

x = not permissibleThe relevant safety rules must be complied with.

Rolling towers as per DIN 4420

Rolling towers made of SpeedyScaf parts are assembled

with steel or aluminium assembly frames,

� by connecting together assembly frames using swivel

couplers, or alternatively with tubes and couplers

� by connecting together assembly frames

with lattice girders

� by using mobile beams (Art. No. 1338.320)

The permissible erection heights and any ballast

necessary must be taken into account.

Tab. 10 Required number of ballast weights of 10 kg each

Platform height [m]

6.5 8.5 10.5

In closed areascentral lateral

02

06

010

In the opencentrallateral

010

xx

xx

52c Two scaffolding sectionsconnected by lattice girders, tubes and couplers

52d Scaffolding with mobile beam 3.2 m, adjustable (Art. No. 1338.320) and spigot,adjustable (Art. No. 1337.000).

52b Two scaffolding sectionsconnected by tubes andcouplers.

52a

52b 52c 52d

52a One-sided ortwo-sided wideningwith an assemblyframe and swivelcouplers.

0840_31_40_GB 30.03.2005 13:36 Uhr Seite 33

Page 34: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

The Assembly Frame pin pallet is an optimised and low-costsolution for vertical palletising. It holds up to 20 assembly framesand is dimensioned such that 3 pallets 0.73 m in width can beplaced side by side on the truck loading surface. Fork guides and a central rung ensure absolute safety against tilting during fork-lift transport.

L x W 1.2 x 0.77 m for 0.73 m framesL x W 1.2 x 1.13 m for 1.09 m frames

In the Universal pallet, either 12 assembly frames, 0.73 m, or 10 robust decks, 0.61 m, or 24 wide steel decks, 0.32 m, can be stored flat and transported and stacked by crane or fork-lifter. The pallet posts only have to be changed round when the stackedmaterial changes.

L x W 1.37 x 0.86 m, permissible load capacity 1.5 t

34

Pallets

Layher Pallets help to save labour and costs for storage,

transport, assembly and inventory control. All pallet types

have been developed on the basis of practical experience.

A truck with a loading crane can handle the entire

material transport work, including loading and unloading

in the warehouse and at the sites. The warehouse is

better organised and counting processes are speeded up,

hence saving costs. The material is stored flat or upright,

tidy and ready to hand, for availability at the installation

site in the shortest possible time. The crane or the fork-lift

can be used to move the filled pallets and shorten the

transport distances. Scaffolding parts are removed from

the pallets on site with a scaffolding hoist. The pallets

may only be used close to the ground and must not be

lifted above personnel. All pallets are suitable for fork-lift

or crane transport, full pallets are stackable to save

storage space.

The Logi pallet guarantees optimum transport and storage offrames, decks, guard rails, diagonal braces, toe boards, standards,ledgers, tubes and much else. The loaded pallet is lifted up withthe fork-lift or crane, and the stacked material is taken directlyfrom the pallet by the fork-lift. Up to five pallets can be stacked on top of one another on suitable ground. The tubes are stored inthe lower pallet frame when the empty pallet is transported.

L x W 1.37 x 0.97 m, permissible load capacity 1.5 t

The hot-dip-galvanised Skeleton box in standardised Europeandimensions is stackable with Euro pallets. The upper part hascrane eyelets. A lateral opening allows stacked material to be removed even when several pallets are stacked one above theother.

L x W x H 1.2 x 0.8 x 0.53, permissible load capacity 2 t

0840_31_40_GB 30.03.2005 13:36 Uhr Seite 34

Page 35: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

35

Software

Keeping costs under control means consistently cutting

production and erection times and optimising the

material use. There is further potential for rationalisation

in logistics, in palletising, scaffolding hoists and the use

of scaffolding-specific software.

Here too Layher can offer convincing solutions. From the

very beginning, Layher has sought to apply electronic

data processing to reduce the work involved in scaffolding

planning, organisation and accounting, and has

developed practical programs.

Scaffolding PlannerWith the Layher Scaffolding Planner,you can calculate in seconds how much material is needed for facadescaffolding using Layher SpeedyScafcomponents. With the optional equalizer module, photos taken with a digital camera can be imaged true to scale. The program proposes astructure, on the basis of your specifications, including anchoring,bracing and side protection, and in accordance with the approvals or typetests. The material list is created by the push of a key and can be printedout immediately together with the assembly sketch.

Layher GBMFor economical handling of technical and commercial tasks.Dimensioning, preparation of quotations, writing of invoicesand printing out of accounts are the main areas covered bythis program.Available only in German language.

MAPMAXWith MAPMAX, you create a three-dimensional model of the structure to be scaffolded, including walls, gables and balconies. MAPMAX is fast and simple, and offers new ways of – for example – directly shortening or extending scaffoldingplanes using the mouse. Even complex scaffolding structurescan be created using this ambitious program.

0840_31_40_GB 30.03.2005 13:36 Uhr Seite 35

Page 36: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

3636

Whatever the building which needs

scaffolding looks like, whatever the

angle at which the walls are to one

another, with offset wall planes,

oriel windows or gabled roof

windows; with SpeedyScaf there's

always an economical solution.

Lattice girders are available for

entrances or other building parts

which have to be bridged.

For heights up to 80 m, the 0.73 m

wide scaffolding can be assembled

in accordance with type test Ty 9/96,

while greater heights required

individual verification of structural

strength.

F a s t U s e a t t h e F a c a d e .

SpeedyScaf® in operation

0840_31_40_GB 30.03.2005 13:37 Uhr Seite 36

Page 37: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

3737

Round scaffolding is just as easy to

put up using SpeedyScaf equipment.

The assembly frames are connected

to one another at the inner standard

by swivel couplers. The bay lengths

must be selected such that the per-

missible distances from the walls are

not exceeded.

Even complex tower buildings can

be dependably scaffolded. Depend-

ing on the form and facade design,

the scaffolding is supplemented with

system-linked or system-free lattice

girders.

R o u n d w e g o – S p e e d y S c a f ® w i t h a d i f f e r e n c e .

Round scaffolding and towers

0840_31_40_GB 30.03.2005 13:37 Uhr Seite 37

Page 38: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

38

Scaffolding for industry frequently

involves unusual requirements when

it comes to load capacity and

adaptability. Machines and plants

have to be serviced and repaired,

apparatus and equipment has to be

fitted, and electrical units have to

be replaced.

With its permissible load capacities

of up to 6.0 kN/m2 and a large num-

ber of useful extras and accessories,

SpeedyScaf permits economical use

in this field too.

S a f e w o r k i n g p l a t f o r m s – q u i c k t o b u i l d .

Scaffolding for industry and refurbishment

0840_31_40_GB 30.03.2005 13:37 Uhr Seite 38

Page 39: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

39

SpeedyScaf in conjunction with

Protect and roof systems provide

perfect protection against the

weather and for the environment.

Cassette roofs afford dependable

protection of the site from above and

thus help to shorten building times.

Repairs to roofs or the addition of

new storeys to buildings can,

particularly in conjunction with side

coverings (Keder or Protect System)

be performed regardless of weather

conditions.

The Protect System forms an effective

cover. Fine facades are protected,

and work is possible in contaminated

areas too, for example in asbestos

clearance.

F o r e n v i r o n m e n t a l p r o t e c t i o n , w e a t h e r p r o t e c t i o n a n d n o i s e p r e v e n t i o n .

SpeedyScaf® with Protect and roofs

0840_31_40_GB 30.03.2005 13:37 Uhr Seite 39

Page 40: Layher - Scaffold USA · 2018. 2. 9. · Layher ® More Possibilities. The Scaffolding System. Layher SpeedyScaf® System Technical Brochure The standard system for scaffolding construction

8102.207 Edition: 1-03-03

SpeedyScaf®

Rolling towers

Protectivesystems

Allroundscaffolding®

More possibilities

Acces-sories

Event systems

LaddersFalsework

The Layher Product Range

We’re there for you. Wherever and whenever you need us.

Wilhelm Layher GmbH & Co.KG

Scaffolding Grandstands LaddersPost Box 40D-74361 Güglingen-EibensbachPhone: +49-71 35-7 00Fax: +49-71 35-7 03 72E-mail: [email protected]: www.layher.com

Branch in the U.K.:

Layher Ltd.

Works Road Letchworth Hertfordshire SG61WLPhone: (+44) 01462-475 100Fax: (+44) 01462-475 101 E-mail: [email protected]: www.layher.com

Branch in the USA:

Layher Inc.

8495 Moffet RoadSemmes, Alabama 36575

Postal address:P.O. Box 1335Semmes, Alabama 36575-1335USA

Phone: (+1) 251649 7696Fax: (+1) 251649 7793Web: www.layher.com

Layher in Germany

Branches and delivery warehouses nationwide.

Layher International

Subsidiaries:Argentina, Austria, Belgium, Canada,France, Hungary, Italy, The Netherlands, Poland, Spain, Sweden, Switzerland,United Kingdom, USA.

Representatives:Chile, Croatia, Czech Republic, Denmark, Estonia, Finland, Greece, Hong Kong, Iceland, Japan, Kuwait, Latvija, Lebanon, Lithuania, Luxembourg, Mexico, New Zealand, Norway, Oman, Romania, Russia,Saudi-Arabia, Singapore, Slovakia, Slovenia, Ukraine, United Arab Emirates, Yugoslavia and many other countries.

All dimensions and weights are guideline values. Subject to technical modifications.We shall make delivery exclusively on the basis of our currently valid general terms of business.

0840_31_40_GB 30.03.2005 13:37 Uhr Seite 40